Search NASA⌕ Search

SEARCH · Search NASA

Results for “extended operators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Post-Shuttle EVA Operations on ISS

The expected retirement of the NASA Space Transportation System (also known as the Space Shuttle ) by 2011 will pose a significant challenge to Extra-Vehicular Activities (EVA) on-board the International Space Station (ISS). The EVA hardware currently used to assemble and maintain the ISS was designed assuming that it would be returned to Earth on the Space Shuttle for refurbishment, or if necessary for failure investigation. With the retirement of the Space Shuttle, a new concept of operations was developed to enable EVA hardware (Extra-vehicular Mobility Unit (EMU), Airlock Systems, EVA tools, and associated support hardware and consumables) to perform ISS EVAs until 2015, and possibly beyond to 2020. Shortly after the decision to retire the Space Shuttle was announced, the EVA 2010 Project was jointly initiated by NASA and the One EVA contractor team. The challenges addressed were to extend the operating life and certification of EVA hardware, to secure the capability to launch EVA hardware safely on alternate launch vehicles, to protect for EMU hardware operability on-orbit, and to determine the source of high water purity to support recharge of PLSSs (no longer available via Shuttle). EVA 2010 Project includes the following tasks: the development of a launch fixture that would allow the EMU Portable Life Support System (PLSS) to be launched on-board alternate vehicles; extension of the EMU hardware maintenance interval from 3 years (current certification) to a minimum of 6 years (to extend to 2015); testing of recycled ISS Water Processor Assembly (WPA) water for use in the EMU cooling system in lieu of water resupplied by International Partner (IP) vehicles; development of techniques to remove & replace critical components in the PLSS on-orbit (not routine); extension of on-orbit certification of EVA tools; and development of an EVA hardware logistical plan to support the ISS without the Space Shuttle. Assumptions for the EVA 2010 Project included no more than 8 EVAs per year for ISS EVA operations in the Post-Shuttle environment and limited availability of cargo upmass on IP launch vehicles. From 2010 forward, EVA operations on-board the ISS without the Space Shuttle will be a paradigm shift in safely operating EVA hardware on orbit and the EVA 2010 effort was initiated to accommodate this significant change in EVA evolutionary history. 1

West, William↗

Modeling of thermal and kinetic processes in non-equilibrium plasma ignition applied to a lean combustion engine

In recent years novel ignition systems have been developed to enable stable and efficient engine operations with lean mixtures. Among them, radio-frequency corona ignition systems create discharges that involve a much wider region compared to traditional spark, and produce non equilibrium plasma with high levels of active radicals and excited species. These devices considerably increase the early flame growth speed and extend stable operating limits. With the aim of expanding the knowledge on high efficiency lean-burn SI engines, this paper investigates and compares the combustion development generated by spark and corona ignitions through computational fluid dynamics, within the Reynolds-Averaged Navier-Stokes framework for turbulence modeling. In order to simultaneously take thermal and chemical effects into account, the Perfectly Stirred Reactor combustion model is used. Experimental data are also collected for validation in an optical access engine, for different mixture levels, from stoichiometric to very lean. Furthermore, the faster burn rate generated by the corona system in the initial stage of the combustion is well predicted by the simulations, in all the relative air-fuel ratio conditions. Remarkably, as the mixture becomes lean, simulations are able to capture the non-linear transition from fast to slow kernel growth, before a self-sustainable flame propagation is established. This correlates very well with the measured engine cyclic variability and the corresponding steep change in the duration of the flame kernel formation. Ultimately, this study highlights the important role of the atomic oxygen, as active radical, in promoting and enhancing the combustion initiated by a corona discharge, in addition to the volumetric ignition effect. By contrast, the validated simulations allow to explain that the high-temperature thermal plasma generated in a traditional spark discharge is insensitive to kinetic aspects.

42 ENGINEERING↗

Autonomous Rovers for Mars Exploration

Rovers will play a critical role in the exploration of Mars. Near-term mission plans call for long traverses over unknown terrain, robust navigation and instrument placement, and reliable operations for extended periods of time. Longer-term missions may visit multiple science sites in a single day and perform opportunistic science data collection, as well as complex scouting, construction, and maintenance tasks in preparation for an eventual human presence. The Pathfinder mission demonstrated the potential for robotic Mars exploration but at the same time indicated the need for more rover autonomy. The highly ground-intensive control with infrequent communication and high latency limited the effectiveness of the Sojourner rover. When failures occurred, Sojourner often sat idle for extended periods of time, awaiting further commands from earth. In future missions, the tasks will be more complex and extended; hence there will be even more situations where things do not go exactly as planned. Significant advances in rover autonomy are needed to cope with increasing task complexity and greater execution uncertainty. Towards this end, we have designed an on-board executive architecture that incorporates robust operation, resource utilization, and failure recovery. In addition, we have designed ground tools to produce and refine contingent schedules that take advantage of the on-board architecture's flexible execution characteristics. Together, the on-board executive and the ground tools constitute an integrated rover autonomy architecture. This work draws from our experience with the Deep Space One autonomy experiment, with enhancements to ensure robust operation in the face of the unpredictable, complex environment that the rover will encounter on Mars. The rover autonomy architecture is currently being developed and deployed on the Marsokhod rover platform at NASA Ames Research Center. The capabilities of the rover autonomy architecture to support autonomous operations will be demonstrated concretely in upcoming field tests.

Anderson, Corin↗

Assessment of Delivery Accuracy in an Operational-Like Environment

In order to enable arrival management concepts and solutions in a Next Generation Air Transportation System (NextGen) environment, ground-based sequencing and scheduling functions were developed to support metering operations in the National Airspace System. These sequencing and scheduling tools are designed to assist air traffic controllers in developing an overall arrival strategy, from enroute down to the terminal area boundary. NASA developed a ground system concept and protoype capability called Terminal Sequencing and Spacing (TSAS) to extend metering operations into the terminal area to the runway. To demonstrate the use of these scheduling and spacing tools in an operational-like environment, the FAA, NASA, and MITRE conducted an Operational Integration Assessment (OIA) of a prototype TSAS system at the FAA's William J. Hughes Technical Center (WJHTC). This paper presents an analysis of the arrival management strategies utilized and delivery accuracy achieved during the OIA. The analysis demonstrates how en route preconditioning, in various forms, and schedule disruptions impact delivery accuracy. As the simulation spanned both enroute and terminal airspace, the use of Ground Interval Management - Spacing (GIM-S) enroute speed advisories was investigated. Delivery accuracy was measured as the difference between the Scheduled Time of Arrival (STA) and the Actual Time of Arrival (ATA). The delivery accuracy was computed across all runs conducted during the OIA, which included deviations from nominal operations which are known to commonly occur in real operations, such as schedule changes and missed approaches. Overall, 83% of all flights were delivered into the terminal airspace within +/- 30 seconds of their STA and 94% of flights were delivered within +/- 60 seconds. The meter fix delivery accuracy standard deviation was found to be between 36 and 55 seconds across all arrival procedures. The data also showed when schedule disruptions were excluded, the percentage of aircraft delivered within +/- 30 seconds was between 85 and 90% across the various arrival procedures at the meter fix. This paper illustrates the ability to meet new delivery accuracy requirements in an operational-like environment using operational systems and NATCA controller participants, while also including common events that might cause disruptions to the schedule and overall system.

Air Traffic Scheduling↗

Economic Dispatch Optimization of Multi-Unit SMR Site

With the increase of integration of variable renewable into the grid, grid resilience can be compromised without flexible electricity suppliers. Flexible operation of NPP can expand the scope of integration of new nuclear power plants in regions with high share of renewables. It also provides opportunity to increase profits through participation in ancillary services. In this research, NuScale modules are used as the case study. NuScale is an integrated pressurized water reactor with thermal power of 250 MWth. Having multiple units can provide higher flexibility in changing power levels and supplying the grid with electricity all year long. Additionally, load-following might perturbate the ordered sequence of refueling (every 24 months for NuScale). To maintain the 2 year refueling cycles, the loading patterns will need to be adjusted in a year-to-year basis, resulting in additional unnecessary costs. Another solution is to find the optimal outage schedule. This will also shift the focus of the planned outage to a more optimized predictive outages and maintenance. Results from short-term optimization (i.e., daily participation in energy and ancillary services markets) shows that average commitment to regulation down ancillary service markets during late night and early morning hours can increase revenues. Participating in upward reserves during pre-work commuting hours and early evening hours can also generate additional revenues due to high ramp up of electricity demand. Having multiple units at a single site can also help operate flexibly. Results from long-term optimization show that daily fluctuation in electric power is usually handled by few units while other units operate on base-load profile. It is possible to combine base-load operation with flexible operation to extend component remaining useful life in some units and find optimal outage schedule for the units.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cargo Logistics Airlift Systems Study (CLASS). Volume 4: Future requirements of dedicated freighter aircraft to year 2008

The 1978 fleet operations are extended to the year 1992, thus providing an evaluation of current aircraft types in meeting the ensuing increased market demand. Possible changes in the fleet mix and the resulting economic situation are defined in terms of the number of units of each type aircraft and the resulting growth in operational frequency. Among the economic parameters considered are the associated investment required by the airline, the return on investment to the airline, and the accompanying levels of cash flow and operating income. Against this background the potential for a derivative aircraft to enter fleet operations in 1985 is defined as a function of payload size and as affected by 1980 technology. In a similar manner, the size and potential for a new dedicated 1990 technology, freighter aircraft to become operational in 1995 is established. The resulting aircraft and fleet operational and economic characteristics are evaluated over the period 1994 to 2008. The impacts of restricted growth in operational frequency, reduced market demand, variations in aircraft configurations, and military participation, are assessed.

Burby, R. J.↗

Glueballs at physical pion mass

Glueballs are investigated through gluonic operators on two $ N_f=2+1 $ RBC/UKQCD gauge ensembles at the physical pion mass. The statistical errors of glueball correlation functions are considerably reduced through the cluster decomposition error reduction (CDER) method. The Bethe-Salpeter wave functions are obtained for the scalar, tensor, and pseudoscalar glueballs by using spatially extended glueball operators defined through the gauge potential $ A_\mu(x) $ in the Coulomb gauge. These wave functions exhibit similar features of non-relativistic two-gluon systems and are used to optimize the signals of the related correlation functions at the early time regions, where the ground state masses are extracted. These masses are close to those from the quenched approximation and indicate the possible existence of glueballs at the physical point. The resonance feature of glueballs and the mixing with conventional mesons and multi-hadron systems should be considered in a more systematic lattice study.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Lightweight Boom For Rescue Helicopter

Telescoping boom and associated mechanisms attached to helicopter aid rescue operations by extending lifeline beyond sweep of main rotor. Pilot observes rescuee and control position of helicopter more effectively than if rescuee directly below and hidden from pilot's view. Rescuee outside downdraft of rotor, which is often powerful enough to blow away or submerge someone in water. Used for marine or land operations. Boom thin and lightweight because it need not support weight of rescuee. Lifeline pulls away from boom after secured around rescuee, who is lifted directly into cabin by winch. Potential application for in situ erection of telescopic space structures.

Haslim, Leonard A.↗

Dormancy and Recovery Testing for Biological Wastewater Processors

Bioreactors, such as aerated membrane type bioreactors have been proposed and studied for a number of years as an alternate approach for treating wastewater streams for space exploration. Several challenges remain before these types of bioreactors can be used in space settings, including transporting the bioreactors with their microbial communities to space, whether that be the International Space Station or beyond, or procedures for safing the systems and placing them into dormant state for later start-up. Little information is available on such operations as it is not common practice for terrestrial systems. This study explored several dormancy processes for established bioreactors to determine optimal storage and recovery conditions. Procedures focused on complete isolation of the microbial communities from an operational standpoint and observing the effects of: 1) storage temperature, and 2) storage with or without the reactor bulk fluid. The first consideration was tested from a microbial integrity and power consumption standpoint; both room temperature (25 C) and cold (4 C) storage conditions were studied. The second consideration was explored; again, for microbial integrity as well as plausible real-world scenarios of how terrestrially established bioreactors would be transported to microgravity and stored for periods of time between operations. Biofilms were stored without the reactor bulk fluid to simulate transport of established biofilms into microgravity, while biofilms stored with the reactor bulk fluid simulated the most simplistic storage condition to implement operations for extended periods of nonuse. Dormancy condition did not have an influence on recovery in initial studies with immature biofilms (48 days old), however, a lengthy recovery time was required (20+ days). Bioreactors with fully established biofilms (13 months) were able to recover from a 7-month dormancy period to steady state operation within 4 days (approximately 1 residence cycle). Results indicate a need for future testing on biofilm age and health and further exploration of dormancy length.

Dormancy↗

Dormancy and Recovery Testing for Biological Wastewater Processors

Bioreactors, such as the aerated hollow fiber membrane type, have been proposed and studied for a number of years as an alternate approach for treating wastewater streams for space exploration. Several challenges remain to be resolved before these types of bioreactors can be used in space settings, including transporting the bioreactors with intact and active biofilms, whether that be to the International Space Station or beyond, or procedures for safing the systems and placing them into a dormant state for later start-up. Little information is available on such operations as it is not common practice for terrestrial systems. This study explored several dormancy processes for established bioreactors to determine optimal storage and recovery conditions. Procedures focused on complete isolation of the microbial communities from an operational standpoint and observing the effects of: 1) storage temperature, and 2) storage with or without the reactor bulk fluid. The first consideration was tested from a microbial integrity and power consumption standpoint; both ambient temperature (25 C) and cold (4 C) storage conditions were studied. The second consideration was explored; again, for microbial integrity as well as plausible real-world scenarios of how terrestrially established bioreactors would be transported to microgravity and stored for periods of time between operations. Biofilms were stored without the reactor bulk fluid to simulate transport of established biofilms into microgravity, while biofilms stored with the reactor bulk fluid simulated the most simplistic storage condition to implement operations for extended periods of nonuse. Dormancy condition did not have an influence on recovery in initial studies with immature biofilms (48 days old), however a lengthy recovery time was required (20+ days). Bioreactors with fully established biofilms (13 months) were able to recover from a 7-month dormancy period to steady state operation within 4 days (approx. 1 residence cycle). Results indicate a need for future testing on biofilm age and health and further exploration of dormancy length.

Recovery Testing↗

Electromagnetic Properties of Aluminum-based Bilayers for Kinetic Inductance Detectors

The complex conductivity of a superconducting thin film is related to the quasiparticle density, which depends on the physical temperature and can also be modified by external pair breaking with photons and phonons. This relationship forms the underlying operating principle of Kinetic Inductance Detectors (KIDs), where the detection threshold is governed by the superconducting energy gap. We investigate the electromagnetic properties of thin-film aluminum that is proximitized with either a normal metal layer of copper or a superconducting layer with a lower T-C, such as iridium, in order to extend the operating range of KIDs. Using the Usadel equations along with the Nam expressions for complex conductivity, we calculate the density of states and the complex conductivity of the resulting bilayers to understand the dependence of the pair breaking threshold, surface impedance, and intrinsic quality factor of superconducting bilayers on the relative film thicknesses. The calculations and analyses provide theoretical insights in designing aluminum-based bilayer kinetic inductance detectors for detection of microwave photons and athermal phonons at the frequencies well below the pair breaking threshold of a pure aluminum film.

complex conductivity↗

Post-Shuttle EVA Operations on ISS

The EVA hardware used to assemble and maintain the ISS was designed with the assumption that it would be returned to Earth on the Space Shuttle for ground processing, refurbishment, or failure investigation (if necessary). With the retirement of the Space Shuttle, a new concept of operations was developed to enable EVA hardware (EMU, Airlock Systems, EVA tools, and associated support equipment and consumables) to perform ISS EVAs until 2016 and possibly beyond to 2020. Shortly after the decision to retire the Space Shuttle was announced, NASA and the One EVA contractor team jointly initiated the EVA 2010 Project. Challenges were addressed to extend the operating life and certification of EVA hardware, secure the capability to launch EVA hardware safely on alternate launch vehicles, and protect EMU hardware operability on orbit for long durations.

West, Bill↗

Artemis Deep Space Habitation: Enabling a Sustained Human Presence on the Moon and Beyond

As NASA and its partners’ capabilities for human exploration of deep space continue to mature, so too does its roadmap toward a sustained crewed presence on the surface of the Moon and eventual human missions to Mars. The first launch of the Space Launch System and Orion crew vehicle, the contract award for the first demonstrations of a Human Landing System, and the beginning of construction on the initial elements of the lunar Gateway have marked major milestones toward NASA’s near-term exploration goals: a long-duration outpost in orbit around the Moon and the next footsteps on the lunar surface. At the same time, NASA is in the early phases of planning the capabilities that will be needed for long-term exploration. Among the common elements that will be required by long-duration stays on the lunar surface, transit to Mars, and Martian surface expeditions will be new habitats unlike any flown to date. NASA is currently working on development of both architectures for those habitats and on the technological advancements that will enable them, with an eye toward systems that will not only extend mission operations but also provide for living quarters that will keep the crew happy and healthy throughout their expeditions. Beyond the Gateway habitation needs, these capabilities will need to be defined and advanced to support the initial lunar surface missions and to prepare for human missions to the Mars system. The Surface Habitat is the current concept in consideration to serve as this initial surface habitat that will extend the crew mission durations. It will provide 30-to-60-day habitability for a crew of up to four allowing for the astronauts to explore farther and longer on each visit to the lunar surface. NASA is also currently reviewing opportunities to use current or near-term in-space habitation systems as proving grounds or precursors for keeping astronauts safe and healthy during future transits to Mars. Already, the International Space Station (ISS) is being used for implementation of next-generation life-support systems that will inform those used in exploration habitats, and the operations approach for ISS is providing lessons-learned for future science operations around or on the Moon.1U.S. Government work not protected by U.S. copyright While a suite of habitation concepts is currently under study within NASA, the agency is also working closely with U.S. industry through the Next Space Technologies for Exploration Partnerships (NextSTEP) activity to understand their concepts for commercially provided habitation capabilities as well as close coordination with international partners to understand their desires for in-space and surface habitation. This paper will provide a status of these concepts and partnership activities as well as potential future technology and architecture development paths.

Habitat↗

LANL Activities on Mechanistic Approach to Analyzing and Improving Unconventional Hydrocarbon Production

Hydrocarbon production from shale reservoirs is inherently inefficient and challenging since these are low permeability plays. In addition, there is a limited understanding of the fundamentals and the controlling mechanisms, further complicating how to optimize these plays. Herein, we summarize our experimental and computational efforts fully and partially supported by the fundamental shale portfolio to reveal unconventional shale fundamentals and devise development strategies to enhance extraction efficiency with a minimal environmental footprint. Integrating these fundamentals with machine learning, we outline a pathway to improve the predictive power of our models, which enhances the forecast quality of production, thereby improving the economics of operations in unconventional reservoirs. For instance, we have developed science informed workflows and platforms for optimizing pressure-drawdown at a site, which allow operators to make reservoir-management decisions that optimize recovery in consideration of future production. Recently, our work relies on the hybridization of physics-based prediction and machine learning, whereby accurate synthetic data (combined with available site data) can enable the application of machine learning methods for rapid forecasting and optimization. Consequently, the workflow and platform are readily extendable to operations at other sites, plays, and basins.

04 OIL SHALES AND TAR SANDS↗

Design of an Additively Manufactured Recuperator With 800 °C Inlet Temperature for sCO2 Power Cycle Application

Abstract Recuperators with design temperatures at and above 800 °C can further increase the thermal efficiency of supercritical CO2 power cycles by enabling higher turbine exhaust temperatures. Mar-M247 is a well-suited nickel-based superalloy for high temperature service due to its high creep strength that prevents excessive material thickness being required for pressure containment. Additive manufacturing using a high-speed laser-directed energy deposition (L-DED) process presents a promising solution, with build trials demonstrating the ability to produce nonconventional flow channels for enhanced heat transfer. A design process is presented that includes aerothermal and mechanical evaluation to maximize performance within the constraints of the manufacturing process. A 2-D heat transfer network and pressure drop code allows prediction of flow distribution and its effect on overall thermal performance. Established literature correlations, along with CFD simulation, inform the prediction of heat transfer coefficients and friction factors for the flowpaths and enhancement features in the heat exchanger core. Mechanical evaluation using finite element analysis (FEA) modeling with the intent of the ASME Boiler & Pressure Vessel Code (BPVC) Section VIII, Div. 2 assesses the operational safety of the design. The detailed design features annular finned passages that take advantage of helical flow paths to distribute the flow from separated headers to shared heat transfer surfaces. Performance predictions for the recuperator at a 50 kW scale provide insights into the feasibility of the additively manufactured (AM) process to produce recuperators on a commercial scale that extend existing operating envelopes.

Engineering↗

Solar/Stellar Irradiance Comparison Experiment (SOLSTICE) on the Upper Atmosphere Research Satellite (UARS)

A final report on the operational activities related to the UARS Solar Stellar irradiance Comparison Experiment (SOLSTICE) is presented. Scientific activities of SOLSTICE has also been supported. The UARS SOLSTICE originated at the University of Colorado in 1981. One year after the UARS launch in 1991, the operations and research support activities for SOLSTICE were moved to the High Altitude Observatory (HAO) of the National Center for Atmospheric Research (NCAR). The SOLSTICE program continued at HAO with the National Science Foundation, and after four years, it was moved once again back to the University of Colorado. At the University after 1997 this subject grant was issued to further extend the operations activities from July 2001 through September 2002. Although this is a final report for one particular activity, in fact the SOLSTICE operations activity -first at the University, then at HAO, and now again at the University -has continued in a seamless fashion.

Rottman, Gary J.↗

Dataset from: Improved multispecies Dougherty collisions

The Dougherty model Fokker-Planck operator is extended to describe nonlinear full-f collisions between multiple species in plasmas. Simple relations for cross-species primitive moments are developed which obey conservation laws, and reproduce familiar velocity and temperature relaxation rates. This treatment of multispecies Dougherty collisions, valid for arbitrary mass ratios, avoids unphysical temperatures and satisfies the H-theorem unlike an analogous Bhatnagar-Gross-Krook operator. Formulas for both a Cartesian velocity-space and a gyroaveraged operator are provided for use in Vlasov as well as long-wavelength gyrokinetic models. We present an algorithm for the discontinuous Galerkin discretization of this operator, and provide results from relaxation and Landau damping benchmarks.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Active stabilization to prevent surge in centrifugal compression systems

This report documents an experimental and analytical study of the active stabilization of surge in a centrifugal engine. The aims of the research were to extend the operating range of a compressor as far as possible and to establish the theoretical framework for the active stabilization of surge from both an aerodynamic stability and a control theoretic perspective. In particular, much attention was paid to understanding the physical limitations of active stabilization and how they are influenced by control system design parameters. Previously developed linear models of actively stabilized compressors were extended to include such nonlinear phenomena as bounded actuation, bandwidth limits, and robustness criteria. This model was then used to systematically quantify the influence of sensor-actuator selection on system performance. Five different actuation schemes were considered along with four different sensors. Sensor-actuator choice was shown to have a profound effect on the performance of the stabilized compressor. The optimum choice was not unique, but rather shown to be a strong function of some of the non-dimensional parameters which characterize the compression system dynamics. Specifically, the utility of the concepts were shown to depend on the system compliance to inertia ratio ('B' parameter) and the local slope of the compressor speedline. In general, the most effective arrangements are ones in which the actuator is most closely coupled to the compressor, such as a close-coupled bleed valve inlet jet, rather than elsewhere in the flow train, such as a fuel flow modulator. The analytical model was used to explore the influence of control system bandwidth on control effectiveness. The relevant reference frequency was shown to be the compression system's Helmholtz frequency rather than the surge frequency. The analysis shows that control bandwidths of three to ten times the Helmholtz frequency are required for larger increases in the compressor flow range. This has important implications for implementation in gas turbine engines since the Helmholtz frequencies can be over 100 Hz, making actuator design extremely challenging.

Epstein, Alan H.↗