Search NASA⌕ Search

SEARCH · Search NASA

Results for “geosynchronous orbits”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Intelsat solar array coupon atomic oxygen flight experiment

A Hughes communications satellite (INTELSAT series) belonging to the INTELSAT Organization was marooned in low-Earth orbit (LEO) on March 14, 1990, following failure of the Titan launch vehicle third stage to separate properly. The satellite, INTELSAT 6, was designed for service in geosynchronous orbit and contains several materials that are potentially susceptible to attack by atomic oxygen. Analysis showed that direct exposure of the silver interconnects in the satellite photovoltaic array to atomic oxygen in LEO was the key materials issue. Available data on atomic oxygen degradation of silver are limited and show high variance, so solar array configurations of the INTELSAT 6 type and individual interconnects were tested in ground-based facilities and during STS-41 (Space Shuttle Discovery, October 1990) as part of the ISAC flight experiment. Several materials for which little or no flight data exist were also tested for atomic oxygen reactivity. Dry lubricants, elastomers, and polymeric and inorganic materials were exposed to an oxygen atom fluence of 1.1 x 10(exp 20) atoms cm(exp 2). Many of the samples were selected to support Space Station Freedom design and decision making. This paper provides an overview of the ISAC flight experiment and a brief summary of results. In addition to new data on materials not before flown, ISAC provided data supporting the decision to rescue INTELSAT 6, which was successfully undertaken in May 1992.

TRT-GENERAL REVIEW↗

Overview on In-Space Internet Node Testbed (ISINT)

The Satellite Networks and Architecture Branch has developed the In-Space Internet Node Technology testbed (ISINT) for investigating the use of commercial Internet products for NASA missions. The testbed connects two closed subnets over a tabletop Ka-band transponder by using commercial routers and modems. Since many NASA assets are in low Earth orbits (LEO's), the testbed simulates the varying signal strength, changing propagation delay, and varying connection times that are normally experienced when communicating to the Earth via a geosynchronous orbiting (GEO) communications satellite. Research results from using this testbed will be used to determine which Internet technologies are appropriate for NASA's future communication needs.

Richard, Alan M.↗

On-orbit prelaunch processing and refurbishment

As the capabilities of the operational Space Station increase, emphasis will be placed on use of the Station for final development of missions, including the launch of large, complex, and reusable launch vehicles with destinations to geosynchronous orbit; lunar exploration or lunar development bases; and planetary exploration. This paper identifies and discusses the capabilities that would be needed to support the on-orbit prelaunch processing and refurbishing of a manned Mars vehicle launched from Space Station. The on-orbit launch vehicle prelaunch and refurbishment resource requirements needed to perform processing operations are projected from experience and data developed by the actual preparation of payloads for launch at the National Space Transportation System (NSTS) launch and landing site.

Glaab, A. K.↗

Estimation of monthly rainfall over Japan and surrounding waters from a combination of low-orbit microwave and geosynchronous IR data

A method is described for estimating the mean monthly rainfall data for climate studies by combining the geosynchronous IR and low-orbit microwave data. The microwave technique uses the brightness temperature at 37 and 86 GHz from the Special Sensor Microwave/Imager instrument on board the DMSP satellite to define raining areas over water and land, and the 86-GHz scattering signal to assign rain rate based on cloud model-microwave calculations. The IR estimates are initially computed separately, using hourly data from the Japanese Geostationary Meteorological Satellite. Results show that, in areas where the microwave technique performs well, the combined microwave-IR monthly total estimates have better error statistics than either the microwave of the IR techniques individually.

Adler, Robert F.↗

Affordable In-Space Transportation

Current and proposed launch systems will provide access to low-Earth orbit (LEO), and destinations beyond LEO, but the cost of delivering payloads will preclude the use of these services by many users. To develop and encourage revolutionary commercial utilization of geosynchronous orbit (GEO) and to provide an affordable means to continue NASA space science and exploration missions, the transportation costs to in-space destinations must be reduced. The principal objective of this study was to conceptually define three to four promising approaches to in-space transportation for delivery of satellites and other payloads, 3,000- to 10,000-lb class, to GEO destinations. This study established a methodology for evaluating in-space transportation systems based on life-cycle cost. The reusable concepts seemed to fare better in the evaluation than expendable, since a major driver in the life-cycle cost was the stage production cost.

Curtis, L. A.↗

Complementary Roles of LEO and GEO IR Sounders in NWP Evaluated using an OSSE Framework

The United States is currently preparing for the next-generation weather satellite program. Building off the multi-decadal successes of the Low-Earth Orbit (LEO) infrared (IR) sounder program, NOAA and NASA are planning for the Geostationary eXtended Observations (GeoXO) Sounder (GXS) that will join international counterparts to form a global ring from geosynchronous orbit (GEO). To address questions about the complementarities and roles of these two platform types in the context of numerical weather prediction (NWP) and forecast accuracy, NASA’s Global Modeling and Assimilation Office (GMAO) Observing System Simulation Experiment (OSSE) framework was used to test their impact individually and in concert. Analyses, forecasts, and forecast sensitivity-based observations impact (FSOI) are examined. Overall, each has a role in forecast error reduction with the most beneficial impacts occurring when both LEO and GEO sounders are used together to address the needs of global skill and targeted regional weather phenomena.

Erica Mcgrath-Spangler↗

Navigation tracking with multiple baselines Part 1: high-level theory and system concepts

We describe a system concept that detects and locates dead and non-cooperatively spacecraft in the Geostationary Orbit (GEO). This can be done by making use of an existing GEO satellite with accurately known location as a reference, and/or by placing a dedicated “reference” spacecraft into an eccentric geosynchronous orbit over a region of interest (e.g. above North America).

Lee, Charles↗

IUS capability for earth orbital spacecraft

A basic element of the Space Transportation System (STS) is the Interim Upper Stage (IUS) currently being planned by the USAF. The prime use of the basic two-stage IUS vehicle by both NASA and DoD will be to place satellites in geosynchronous orbit. High energy missions such as planetary will be accomplished by three- and four-stage vehicles. Various other configurations such as tandem vehicles in a single Shuttle and multiple spacecraft are being planned. Also under study is a smaller stage that can be flown with other payloads on a space available basis. The various concepts being studied offer economical transportation alternatives to potential users. This paper describes details of the IUS program status, design requirements, concepts and applications to Earth orbital spacecraft.

Huber, W. G.↗

An accelerated test design for use with synchronous orbit

The Naval Weapons Support Center at Crane, Indiana has conducted a large scale accelerated test of 6.0 Ah Ni-Cd cells. Data from the Crane test have been used to develop an equation for the description of Ni-Cd cell behavior in geosynchronous orbit. This equation relates the anticipated time to failure for a cell in synchronous orbit to temperature and overcharge rate sustained by the cell during the light period. A test design is suggested which uses this equation for setting test parameters for future accelerated testing.

Mcdermott, P. P.↗

Booster and orbiter configurations

In the recent Future Space Transportation System (FSFS) study, a mission model was selected and a baseline vehicle which best met model requirements was shaped. This baseline was then analyzed for flight performance, structural and subsystem weight, and operation. Figures related to a payload of 150,000 lb in a 20-ft-diam by 90-ft-long envelope became the baseline. The existence of both space-based orbital transfer vehicles (OTVs) and a space station was assumed, taking into account a transfer of the payload from the launch vehicle to OTVs at the space station for final delivery to geosynchronous orbit (GEO). A computer-aided engineering system called Aerospace Vehicle Interactive Design (AVID) was employed in connection with baseline vehicle development. It was found that approximately three-fifth of the payload weight would be cryogenic propellants for OTVs. Attention is given to problems regarding the packaging of cryogenic tankage, a payload shroud, and studies of staging for two different booster propulsion units.

Wilhite, A. W.↗

Selected tether applications in space: An analysis of five selected concepts

Ground rules and assumptions; operations; orbit considerations/dynamics; tether system design and dynamics; functional requirements; hardware concepts; and safety factors are examined for five scenarios: tethered effected separation of an Earth bound shuttle from the space station; tether effected orbit boost of a spacecraft (AXAF) into its operational orbit from the shuttle; an operational science/technology platform tether deployed from space station; a tether mediated rendezvous involving an OMV tether deployed from space station to rendezvous with an aerobraked OTV returning to geosynchronous orbit from a payload delivery mission; and an electrodynamic tether used in a dual motor/generator mode to serve as the primary energy storage facility for space station.

Source record↗

Working group written presentation: Meteoroid/orbital debris effects on materials

Low earth orbit (LEO) is the most significant region relative to orbital debris, since the flux of orbital debris peaks in the region from 800 to 1000 kilometers, and the relative velocities of objects in LEO are about 10 kilometers per second. The flux and relative velocities of objects in geosynchronous orbit (GEO) are small, so that debris is not considered to be a problem in GEO. The meteoroid environment is independent of orbit or altitude, so that its effects are the same in LEO and GEO. The effects of orbital debris and meteoroid impacts can be divided into two broad regions: (1) Erosion and pitting; Small particles (less than 100 microns) are very numerous. Impacts from these generally do not lead to penetration of surfaces, but cause pitting and erosion. The Solar Max surfaces were peppered with thousands of tiny impact pits. (2) Catastrophic impacts; Large debris particles are few in number relative to small debris, so that the probability of an impact is low. However, the effects of an impact of a large particle at 10 kilometers per second are devastating. These effects are examined.

Potter, Andrew↗

Provisional specification for satellite time in a geomagnetic environment

Satellites in geosynchronous orbit were experiencing operational anomalies. These anomalies are believed to be due to the environment charging the spacecraft surfaces to a point where discharges occur. In designing future satellites for long term operation at geosynchronous altitude, it is important that designers have a specification that will give the total time per year, the particle flux density and particle energies that their satellites can be expected to encounter in these substorm environmental conditions. The limited data currently available on the environmental conditions are used to generate the provisional specification given in this report.

Stevens, N. J.↗

Second Shuttle Join NASA's STS Fleet: Challenger Launches First New Tracking Satellite

NASA made a major stride in readying a second delivery vehicle for its Space Transportation System (STS) fleet with the perfect landing of Shuttle Orbiter Challenger at Edwards Air Force Base, California, April 9, 1983. Besides being the first flight test of Challenger's performance, the mission marked the orbiting of the first spacecraft in NASA's new Tracking and Data Relay Satellite System (TDRSS). The new family of orbiting space communications platforms is essential to serve future Shuttle missions. Although the Inertial Upper Stage (IUS) second stage engine firing failed to place TDRS in its final 35,888 kilometer (22,300 mile) geosynchronous orbit, its release from the orbiter cargo bay went as planned. Launch officials were confident they can achieve its planned orbit in a matter of weeks.

Source record↗

Regenerative fuel cell systems for mid- to high-orbit satellites

An assessment of the present and projected capabilities of selected hydrogen-oxygen and hydrogen-halogen fuel cell and electrolyzer combinations for energy storage systems (ESS) in configurations useful for spacecraft missions operating in the 10- to 50-kW range for many years in midaltitude to geosynchronous orbits has recently been completed. Results of the study indicate that regenerative fuel cell ESS are feasible for the intended application. A computer model was used to provide tradeoff analyses for optimizing the various ESS fuel cell concepts. When appropriately configured to be compatible with the mission needs of the selected model spacecraft, the specific energy for these ESS are intermediate between that presently available for nickel-hydrogen batteries and that expected for the newly emerging sodium-sulfur technology.

Taenaka, R. K.↗

Provisional specification for satellite time in a geomagnetic substorm environment

Satellites in geosynchronous orbit have been experiencing operational anomalies. These anomalies are believed to be due to the environment charging the spacecraft surfaces to a point where discharges occur. In designing future satellites for long term operation at geosynchronous altitude, it is important that designers have a specification that will give the total time per year, the particle flux density, and particle energies that their satellites can be expected to encounter in these substorm environmental conditions. The limited data currently available on the environmental conditions was used to generate the provisional specification given.

Stevens, N. J.↗

Wide-Field High-Performance Geosynchronous Imaging

The NASA Mission to Planet Earth (MTPE) Program and the National Oceanographic and Atmospheric Administration (NOAA) are sponsoring the Advanced Geosynchronous Studies (AGS) to develop technologies and system concepts for Earth observation from geosynchronous orbit. This series of studies is intended to benefit both MTPE science and the NOAA GOES Program. Within the AGS program, advanced imager trade studies have investigated two candidate concepts for near-term advanced geosynchronous imagers. One concept uses a scan mirror to direct the line of sight from a 3-axis stabilized platform. Another eliminates the need for a scan mirror by using an agile spacecraft bus to scan the entire instrument. The purpose of this paper is to discuss the optical design trades and system issues encountered in evaluating the two scanning approaches.

Wood, H. John↗

The calculation of efficient high precision orbits by optimum matching of the formulation and numerical integrator

The development of improved computer algorithms is considered for calculating earth satellite orbital trajectories by optimum selection of the analytical method that minimizes the number of perturbative acceleration computations for a given accuracy. A variation of parameter algorithm considering the equation of motion for a satellite proved superior for the geosynchronous orbit.

Velez, C. E.↗