Search NASA⌕ Search

SEARCH · Search NASA

Results for “hardware”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Advanced information processing system for advanced launch system: Hardware technology survey and projections

The major goals of this effort are as follows: (1) to examine technology insertion options to optimize Advanced Information Processing System (AIPS) performance in the Advanced Launch System (ALS) environment; (2) to examine the AIPS concepts to ensure that valuable new technologies are not excluded from the AIPS/ALS implementations; (3) to examine advanced microprocessors applicable to AIPS/ALS, (4) to examine radiation hardening technologies applicable to AIPS/ALS; (5) to reach conclusions on AIPS hardware building blocks implementation technologies; and (6) reach conclusions on appropriate architectural improvements. The hardware building blocks are the Fault-Tolerant Processor, the Input/Output Sequencers (IOS), and the Intercomputer Interface Sequencers (ICIS).

Cole, Richard↗

Towards composition of verified hardware devices

Computers are being used where no affordable level of testing is adequate. Safety and life critical systems must find a replacement for exhaustive testing to guarantee their correctness. Through a mathematical proof, hardware verification research has focused on device verification and has largely ignored system composition verification. To address these deficiencies, we examine how the current hardware verification methodology can be extended to verify complete systems.

Schubert, E. Thomas↗

Analysis of systems hardware flown on LDEF. Results of the systems special investigation group

The Long Duration Exposure Facility (LDEF) was retrieved after spending 69 months in low Earth orbit (LEO). LDEF carried a remarkable variety of mechanical, electrical, thermal, and optical systems, subsystems, and components. The Systems Special Investigation Group (Systems SIG) was formed to investigate the effects of the long duration exposure to LEO on systems related hardware and to coordinate and collate all systems analysis of LDEF hardware. Discussed here is the status of the LDEF Systems SIG investigation through the end of 1991.

Dursch, Harry W.↗

Hardware scaleup procedures for P/C life support systems

This paper compares scaleup correlations developed at the Jet Propulsion Laboratory and at the Langley Research Center for various life-support hardware to estimate mass, volume, and power-consumption values as a function of feed or product-mass flow rates. The scaleup correlations are provided for a few selected advanced life-support technologies developed for the Space Station Freedom. In addition, correlation-validity limits and sources of data on various life-support hardware are also discussed.

Naresh, Rohatgi↗

Performance of the Research Animal Holding Facility (RAHF) and General Purpose Work Station (GPWS) and other hardware in the microgravity environment

This paper discusses the performance of the Research Animal Holding Facility (RAHF) and General Purpose Work Station (GPWS) plus other associated hardware during the recent flight of Spacelab Life Sciences 1 (SLS-1). The RAHF was developed to provide proper housing (food, water, temperature control, lighting and waste management) for up to 24 rodents during flights on the Spacelab. The GPWS was designed to contain particulates and toxic chemicals generated during plant and animal handling and dissection/fixation activities during space flights. A history of the hardware development involves as well as the redesign activities prior to the actual flight are discussed.

Hogan, Robert P.↗

An environmental testing facility for Space Station Freedom power management and distribution hardware

The plans for a new test facility, including new environmental test systems, which are presently under construction, and the major environmental Test Support Equipment (TSE) used therein are addressed. This all-new Rocketdyne facility will perform space simulation environmental tests on Power Management and Distribution (PMAD) hardware to Space Station Freedom (SSF) at the Engineering Model, Qualification Model, and Flight Model levels of fidelity. Testing will include Random Vibration in three axes - Thermal Vacuum, Thermal Cycling and Thermal Burn-in - as well as numerous electrical functional tests. The facility is designed to support a relatively high throughput of hardware under test, while maintaining the high standards required for a man-rated space program.

Jackola, Arthur S.↗

Capabilities and constraints of typical space flight hardware

The Space Experiments Division is in the business of performing ground based low gravity testing and designing experiment hardware for space flight on the Space Shuttle and in the future, Space Station Freedom. As witnessed in combustion work, the reduction of gravity brings forward previously negligible processes and parameters. In a similar manner, the design of experiments for microgravity operation aboard the Space Shuttle must consider parameters that are often not factors for laboratory hardware.

Koudelka, John M.↗

Neutral buoyancy test evaluation of hardware and extravehicular activity procedures for on-orbit assembly of a 14 meter precision reflector

A procedure that enables astronauts in extravehicular activity (EVA) to perform efficient on-orbit assembly of large paraboloidal precision reflectors is presented. The procedure and associated hardware are verified in simulated Og (neutral buoyancy) assembly tests of a 14 m diameter precision reflector mockup. The test article represents a precision reflector having a reflective surface which is segmented into 37 individual panels. The panels are supported on a doubly curved tetrahedral truss consisting of 315 struts. The entire truss and seven reflector panels were assembled in three hours and seven minutes by two pressure-suited test subjects. The average time to attach a panel was two minutes and three seconds. These efficient assembly times were achieved because all hardware and assembly procedures were designed to be compatible with EVA assembly capabilities.

Heard, Walter L., Jr.↗

Propellant production and useful materials: Hardware data from components and the systems

Research activities at the University of Arizona/NASA Space Engineering Research Center are described; the primary emphasis is on hardware development and operation. The research activities are all aimed toward introducing significant cost reductions through the utilization of resources locally available at extraterrestrial sites. The four logical aspects include lunar, Martian, support, and common technologies. These are described in turn. The hardware realizations are based upon sound scientific principles which are used to screen a host of interesting and novel concepts. Small scale feasibility studies are used as the screen to allow only the most promising concepts to proceed. Specific examples include: kg/day-class oxygen plant that uses CO2 as the feed stock, spent stream utilization to produce methane and 'higher' compounds (using hydrogen from a water electrolysis plant), separation of CO from the CO2, reduction of any iron bearing silicate (lunar soils), production of structural components, smart sensors and autonomous controls, and quantitative computer simulation of extraterrestrial plants. The most important feature of all this research continues to be the training of high-quality students for our future in space.

Ramohalli, Kumar↗

Extravehicular Activity training and hardware design considerations

Designing hardware that can be successfully operated by EVA astronauts for EVA tasks required to assemble and maintain Space Station Freedom requires a thorough understanding of human factors and of the capabilities and limitations of the space-suited astronaut, as well as of the effect of microgravity environment on the crew member's capabilities and on the overhead associated with EVA. This paper describes various training methods and facilities that are being designed for training EVA astronauts for Space Station assembly and maintenance, taking into account the above discussed factors. Particular attention is given to the user-friendly hardware design for EVA and to recent EVA flight experience.

Thuot, Pierre J.↗

Advanced Cardiac Life Support (ACLS) utilizing Man-Tended Capability (MTC) hardware onboard Space Station Freedom

Because of the time and distance involved in returning a patient from space to a definitive medical care facility, the capability for Advanced Cardiac Life Support (ACLS) exists onboard Space Station Freedom. Methods: In order to evaluate the effectiveness of terrestrial ACLS protocols in microgravity, a medical team conducted simulations during parabolic flights onboard the KC-135 aircraft. The hardware planned for use during the MTC phase of the space station was utilized to increase the fidelity of the scenario and to evaluate the prototype equipment. Based on initial KC-135 testing of CPR and ACLS, changes were made to the ventricular fibrillation algorithm in order to accommodate the space environment. Other constraints to delivery of ACLS onboard the space station include crew size, minimum training, crew deconditioning, and limited supplies and equipment. Results: The delivery of ACLS in microgravity is hindered by the environment, but should be adequate. Factors specific to microgravity were identified for inclusion in the protocol including immediate restraint of the patient and early intubation to insure airway. External cardiac compressions of adequate force and frequency were administered using various methods. The more significant limiting factors appear to be crew training, crew size, and limited supplies. Conclusions: Although ACLS is possible in the microgravity environment, future evaluations are necessary to further refine the protocols. Proper patient and medical officer restraint is crucial prior to advanced procedures. Also emphasis should be placed on early intubation for airway management and drug administration. Preliminary results and further testing will be utilized in the design of medical hardware, determination of crew training, and medical operations for space station and beyond.

Smith, M.↗

Investigation of cleanliness verification techniques for rocket engine hardware

Oxidizer propellant systems for liquid-fueled rocket engines must meet stringent cleanliness requirements for particulate and nonvolatile residue. These requirements were established to limit residual contaminants which could block small orifices or ignite in the oxidizer system during engine operation. Limiting organic residues in high pressure oxygen systems is particularly important. The current method of cleanliness verification used by Rocketdyne requires an organic solvent flush of the critical hardware surfaces. The solvent is filtered and analyzed for particulate matter, followed by gravimetric determination of the nonvolatile residue (NVR) content of the filtered solvent. The organic solvents currently specified for use (1,1,1-trichloroethane and CFC-113) are ozone-depleting chemicals slated for elimination by December 1995. A test program is in progress to evaluate alternative methods for cleanliness verification that do not require the use of ozone-depleting chemicals and that minimize or eliminate the use of solvents regulated as hazardous air pollutants or smog precursors. Initial results from the laboratory test program to evaluate aqueous-based methods and organic solvent flush methods for NVR verification are provided and compared with results obtained using the current method. Evaluation of the alternative methods was conducted using a range of contaminants encountered in the manufacture of rocket engine hardware.

Fritzemeier, Marilyn L.↗

P-MASS and P-GBA: Two new hardware developments for growing plants in space

Plant growth, and especially plant performance experiments in microgravity are limited by the currently available plant growth facilities (low light levels, inadequate nutrient delivery and atmosphere conditioning systems, insufficient science instrumentation, infrequent flight opportunities). In addition, mission durations of 10 to 14 days aboard the NSTS Space Shuttle allow for only brief periods of microgravity exposure with respect to the life cycle of a plant. Based on seed germination experiments, using the Generic BioProcessing Apparatus hardware (GBA), two new payloads have been designed specifically for plant growth. These payloads provide new opportunities for plant gravitational and space biology research and emphasize the investigation of plant performance (photosynthesis, biomass accumulations) in microgravity. The Plant-Module for Autonomous Space Support (P-MASS) was designed to utilize microgravity exposure times in excess of 30 days on the first flight of the recoverable COMET satellite (Commercial Experiment Transporter). The Plant-Generic Bioprocessing Apparatus (P-GBA), is designed for the National Space Transportation System (NSTS) Space Shuttle middeck and the SPACEHAB environment. The P-GBA is an evolution from the GBA hardware and P-MASS (plant chamber and instrumentation). The available light levels of both payloads more than double currently available capabilities.

Hoehn, Alexander↗

Hardware And Software For Development Of Robot Arms

System of modular, reusable hardware and software assembled for use in developing remotely controlled robotic arms. Includes (1) central computer and peripheral equipment at control and monitoring station and (2) remote mechanical platform that supports robotic arm. Central computer controls motor drives of robotic arm, but optically, platform holds on-board computer for autonomous operation. Consists mostly of commercial hardware and software. Simulated results of commands viewed in three dimensions.

Usikov, Daniel↗

Investigation of Cleanliness Verification Techniques for Rocket Engine Hardware

Oxidizer propellant systems for liquid-fueled rocket engines must meet stringent cleanliness requirements for particulate and nonvolatile residue. These requirements were established to limit residual contaminants which could block small orifices or ignite in the oxidizer system during engine operation. Limiting organic residues in high pressure oxygen systems, such as in the Space Shuttle Main Engine (SSME), is particularly important. The current method of cleanliness verification for the SSME uses an organic solvent flush of the critical hardware surfaces. The solvent is filtered and analyzed for particulate matter followed by gravimetric determination of the nonvolatile residue (NVR) content of the filtered solvent. The organic solvents currently specified for use (1, 1, 1-trichloroethane and CFC-113) are ozone-depleting chemicals slated for elimination by December 1995. A test program is in progress to evaluate alternative methods for cleanliness verification that do not require the use of ozone-depleting chemicals and that minimize or eliminate the use of solvents regulated as hazardous air pollutants or smog precursors. Initial results from the laboratory test program to evaluate aqueous-based methods and organic solvent flush methods for NVR verification are provided and compared with results obtained using the current method. Evaluation of the alternative methods was conducted using a range of contaminants encountered in the manufacture of rocket engine hardware.

Fritzemeier, Marilyn L.↗

The Development of Methodologies and Solvent Systems to Replace CFC-113 in the Validation of Large-Scale Spacecraft Hardware

Liquid oxygen is used as the oxidizer for the liquid fueled main engines during the launch of the space shuttle. Any hardware that comes into contact with pure oxygen either during servicing of the shuttle or in the operation of the shuttle must be validated as being free of nonvolatile residue (NVR). This is a safety requirement to prevent spontaneous combustion of carbonaceous NVR if it was to come into contact with pure oxygen. Previous NVR validation testing of space hardware used Freon (CFC-113) as the test solvent. Because CFC-113 no longer can be used, a program was conducted to develop a NVR test procedure that uses a safe environmentally friendly solvent. The solvent that has been used in the new NVR test procedure is water. Work that has been conducted over the past three years has served to demonstrate that when small parts are subjected to ultrasound in a water bath and NVR is present a sufficient quantity is dispersed into the water to analyze for its concentration by the TOC method. The work that is described in this report extends the water wash NVR validation test to large-scale parts; that is, parts too large to be subjected to ultrasound. The method consists of concentrating the NVR in the water wash onto a bed of silica gel. The total adsorbent bed is then analyzed for TOC content by using a solid sample probe. Work that has been completed thus far has demonstrated that hydrocarbon based NVR's can be detected at levels of less than 0.1 mg per square foot of part's surface area by using a simple water wash.

Clausen, Christian A., III↗

Follow-the-Leader Control for the PIPS Prototype Hardware

This report describes the payload inspection and processing system (PIPS), an automated system programmed off-line for inspection of space shuttle payloads after integration and prior to launch. PIPS features a hyper-redundant 18-degree of freedom (DOF) serpentine truss manipulator capable of snake like motions to avoid obstacles. During the summer of 1995, the author worked on the same project, developing a follow-the-leader (FTL) algorithm in graphical simulation which ensures whole arm collision avoidance by forcing ensuing links to follow the same tip trajectory. The summer 1996 work was to control the prototype PIPS hardware in follow-the-leader mode. The project was successful in providing FTL control in hardware. The STS-82 payload mockup was used in the laboratory to demonstrate serpentine motions to avoid obstacles in a realistic environment.

Williams, Robert L. II↗

International Neutral Buoyancy Simulation of Space Station Hardware

The International Standard Payload Rack (ISPR) Neutral Buoyancy Simulation was conducted at the Marshall Space Flight Center (MSFC) Neutral Buoyancy Simulator facility during April and May 1992. The purpose of this simulation was to evaluate hardware design and operations for the ISPR and U.S. Lab system racks under simulated conditions of microgravity. The ISPR NBS was conducted by an international simulation team including representatives from Boeing, NASA, NASDA, and ESA. Hardware for the ISPR NBS was provided by Boeing, Alenia, ESA, and MSFC. NASDA and its contractors MEH and IHI provided experienced in-tank participants and technical observers who were present for the duration of the simulation. The ISPR NBS was the first Space Station simulation involving NASA, NASDA and ESA. In addition to bringing together technical representatives from around the world, the ISPR NBS included test subjects who are some of the most experienced U.S. and European astronauts. Eight general areas of investigation were addressed during the ISPR NBS, including: utility panel interfaces, rack tilt down, standoff access, wall access behind the rack, rack removal and installation, rack translation, multiple rack operations, and restraints and mobility aids. This paper focuses on aspects of simulation planning, conduct, and reporting that pertain to specifically to the international involvement of the activity.

Lisa C King↗