Search NASA⌕ Search

SEARCH · Search NASA

Results for “injectors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

CEBAF 22 GeV FFA energy upgrade

Extending the energy reach of CEBAF by increasing the number of recirculations, while using the existing linacs is explored. This energy upgrade is based on the multi-pass acceleration of electrons in a single non-scaling Fixed Field Alternating Gradient (FFA) beam line, using Halbach-style permanent magnets. Encouraged by the recent successful demonstration of CBETA, a proposal was formulated to nearly double the energy of CEBAF from 12 to 22~GeV by replacing the highest energy arcs with FFA transport. The new FFA arcs would support simultaneous transport of an additional 6 passes spanning roughly a factor of two in energy. One of the challenges of the multi-pass (11) linac optics is to assure uniform focusing over a wide range of energies. Here, we propose a triplet lattice that provides a stable periodic solution covering an energy ratio of 1:33. The current CEBAF injection at 123 MeV, makes optical matching in the first linac impossible due to the extremely high energy ratio (1:175). Replacement of the current injector with a 650 MeV recirculating injector will alleviate this issue. Orbital and optical matching from the FFA arcs to the linacs is implemented as a compact non-adiabatic insert. The design presented here is anticipated to deliver a 22 GeV beam with normalized emittance of 76 mm·mrad and a relative energy spread of 1×10\textsuperscript{-3}. Further recirculation beyond 22 GeV is limited by the large (974 MeV per electron) energy loss due to synchrotron radiation.

Benesch, J.↗

High Power Solid Target for Positron Source at CEBAF

The progress in the development of a polarized positron injector for the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Laboratory is presented. The polarized positron beam is generated by a high current polarized electron beam (>1 mA @ 120 MeV) via bremsstrahlung radiation and e+e- pair production in the tungsten target. The simulations show that using an optimized target and positron beamline, the positron injector can provide a cw positron beam with a current larger than 50 nA and a polarization as large as 60%. Injected into the North Linac of CEBAF at an energy of 123 MeV, the positron beam can reach a maximum energy of 12 GeV to perform a rich experimental program. The results of the thermal and structural FEA analysis of the heat load in the target are presented, as well as the simulation results of radiation damage in the target. The performed and planned target material fatigue and radiation damage tests are discussed. This work is supported by the U.S. DOE, Office of Science, Office of Nuclear Physics, Contract No. DE-AC05-06OR23177 and the European Union?s Horizon 2020 research and innovation program under grant agreement No. 824093.

Ushakov, Andriy↗

Status of CEBAF Upgrades

Extending CEBAF energy reach by increasing the number of recirculations, while using the existing SRF system is being explored. Proposed energy upgrade is based on a new approach to multi-pass acceleration of electrons in a single Fixed Field Alternating Gradient (FFA) beam line, configured with Halbach-style permanent magnets. Encouraged by recent success of CBETA, a proposal was formulated to nearly ?double? CEBAF energy by replacing the highest energy arcs with a pair of FFA arcs. The new non-scaling FFA arcs would support simultaneous transport of additional 6 passes with energies spanning a factor of two. One of the challenges of the multi-pass (11) linac optics is to assure uniform focusing in a vast range of energies, in a fixed field lattice. Here, we propose a triplet lattice that would provide a stable periodic solution covering energy ratio of 1:33. The current CEBAF injection at 123 MeV, makes optical matching in the first linac virtually impossible due to extremely high energy span ratio (1:175). Replacement of the current injector with a 650 MeV recirculating injector will alleviate that problem. Orbital and optical matching from the FFA arcs to the linacs is implemented as a compact non-adiabatic insert. Presented scheme would promise to deliver a 22 GeV beam with normalized emittance of 76 mm·mrad and with a relative energy spread of 1×10-3. Further recirculation beyond 22 GeV is limited by large, 974 MeV per electron, energy loss due to synchrotron radiation

Bogacz, Alex↗

Accelerator challenges in the Fermilab Neutrino Program

In Fermilab's 2022-2023 proton complex run, Fermilab recovered from an unexpected failure in the neutrino focusing horn to achieve a record beam power of 960 kW. For Snowmass and P5, Fermilab recently proposed a new upgrade plan known as Accelerator Complex Evolution (ACE) to occur after PIP-II upgrade in tandem with DUNE/LBNF operation. The first phase of ACE, is the ACE Main Injector Ramp and Targetry upgrade, would raise the LBNF beam power from 1.2 MW to 2 MW by shortening the Main Injector cycle time to around 0.65s. The second phase of ACE, the ACE Booster Replacement, would replace the Booster with a new machine and achieve 2.4 MW for DUNE/LBNF. The core accelerator challenges, present and future, for operating intense neutrino beams at Fermilab will be highlighted.

43 PARTICLE ACCELERATORS↗

Graph Analytics for CEBAF Operations

We report on the progress achieved during a 2-year Laboratory Directed Research and Development (LDRD) project titled “Graph Analytics for CEBAF Operations”. The objective of this project is to leverage deep learning on graph representations of CEBAF’s injector beamline in order to create a tool for improving the efficiency of beam tuning tasks. Specifically, we use graphs to represent the injector beamline at any arbitrary date and time and invoke a graph neural network (GNN) to extract a low-dimensional, informative representation that can be visualized in two-dimensions. By analyzing years of operational data from the CEBAF archiver, good and bad regions of parameter space can be identified. The goal is to exercise this framework as a real-time tool to aid beam tuning, which represents the dominant source of machine downtime.

43 PARTICLE ACCELERATORS↗

Reconstruction of the BNB and NuMI Neutrino Bunch Structure with ICARUS

ICARUS serves as the Far Detector of the Short Baseline Neutrino (SBN) program at Fermilab, sitting on-axis on the Booster Neutrino Beam (BNB) and 6$^\circ$ off-axis from the Neutrinos at the Main Injector (NuMI) beam. Neutrinos from both beams inherit the timing sub-structure of their parent proton spills, which is in turn derived from either the Booster's or the Main Injector's synchrotron acceleration. Since neutrino propagation introduces only a constant offset, their timing structure is preserved as they travel. Identifying this structure in data represents a powerful tool for selecting neutrino events and searching for physics beyond the Standard Model (BSM). This poster presents the preliminary reconstruction of the BNB and NuMI neutrino bunch structure with ICARUS data, exploiting only the precise timing of ICARUS optical readout system to both locate and assign a time to each interaction.

43 PARTICLE ACCELERATORS↗

GRIDDED RF GUN DESIGN FOR SRF LINAC APPLICATIONS

The thermionic gridded gun is described which gener-ates short electron bunches for further acceleration in a Nb3Sn conduction cooled SRF linac. The gun is built into the first cavity of the 250 keV injector [1] for the 20 kW, 10 MeV, 1.3 GHz CW conduction cooled one-cavity linac. The beam current is 2 mA. The RF gun design is presented as well as the results of perveance measure-ments, which are in a good agreement with the design parameters. The design of the RF resonator of the gun is presented also. The beam generated by the gun is matched to the injector to provide lack of current inter-ception in the SRF cavity.

Gonin, I.↗

Demonstration of low-density, high-performance operation of sustained spheromaks and favorable scalability toward compact, low-cost fusion power plants (Final Scientific/Technical Report)

This project worked to advance the technical viability of a novel method for efficiently sustaining stable, high-performance spheromak plasma configurations to serve as the basis of compact, low-cost fusion power plants. In particular, our group worked to improve the method of Steady Inductive Helicity Injection (SIHI) with Imposed-Dynamo Current Drive (IDCD) for spheromak plasma sustainment. Prior to this project demonstrations of this plasma sustainment technology have achieved plasma performance consistent with entry milestone 3 of the BETHE FOA. Research and development (R&D) activities for this project were focused on increasing plasma performance toward a level consistent with exit milestone 4. To do this the PI and his group worked to increase the performance of sustained spheromaks produced in an existing experimental prototype (HIT-SIU) while improving confidence in projections to and design of future, higher performance devices through three primary R&D activities: 1) Improved control over the density of plasma in the device throughout a discharge to provide a pathway for demonstration of spheromaks Ohmically heating to the Mercier beta limit via: a. Fueling the device directly with plasma through the installation of pre-ionized source on the injectors b. Optimization of electrical current waveforms in the driver circuits to enable low-density plasma formation with a lower fueling rate 2) Computational demonstration of a validated, realistic injector circuit coupled to a dynamic plasma model capable of use as a design tool for SIHI drivers and associated circuits for new experimental design points on the pathway to commercial reactors. The improvements in plasma performance achieved during research activity 1), and the computational projections performed in research activity 2) increased the technological readiness level (TRL) of this fusion energy concept toward a level sufficient to attract early-stage private investment and/or other forms of follow-on investment to pursue required R&D activities required for the eventual fusion power plants based on this novel technical approach.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Long Baseline Neutrino Facility (LBNF) Corrector Magnets

The Long Baseline Neutrino Facility (LBNF) includes at the Fermi National Accelerator Laboratory (Fermilab) site a Beamline which will aim neutrinos towards massive detectors at the Sanford Underground Research Facility (SURF) at South Dakota. The neutrinos will be created by a beam of 60-120 GeV protons extracted from Fermilab’s Main Injector interacting with a target located in the end of the LBNF proton beamline. The design of the proton beamline involves 79 conventional magnets; 23 are corrector magnets. These correctors are of a new design which evolved from those built for the Fermilab Main Injector. Following the production of a prototype corrector magnet by the Institute of High Energy Physics (IHEP) and its testing by both IHEP and Fermilab, IHEP will procure the materials for the 24 (including one spare) corrector magnets needed by the LBNF proton beamline; then, will build, test and certify them

43 PARTICLE ACCELERATORS↗

Newberry SHR Demonstration Project – Bipartisan Infrastructure Law Enhanced Geothermal (EGS) Pilot Demonstration (Abstract)

This project will create an Engineered Geothermal System (EGS) comprising two or more wells drilled to a depth of 4.25 km into superhot rock (SHR) with a temperature of 425 °C at Newberry Volcano in Central Oregon. An EGS is a manufactured heat exchanger in which water is injected in a deep injection well, or injector, to extract heat from the hot rock at depth and steam is returned to the surface in a production well, or producer, to generate electricity. In this project, the SHR EGS will be made using new methods and technologies to stimulate and connect hydraulic and natural fractures to enable multiple flow pathways between wells, allowing for optimal heat mining from the reservoir rock. The new technologies are designed to operate at rock temperatures much higher than those encountered in traditional geothermal. Following EGS completion, water will be injected into the injector well and steam extracted from the producer well in a long-term connectivity flow test demonstrating SHR reservoir evolution with time and use. Success will be measured by demonstrating the efficacy of new technologies and by producing economic quantities of steam (>40 MWth).

15 GEOTHERMAL ENERGY↗

An R&D program for milliampere spin-polarized electron beams

The electron injector driving the positron conversion target for Ce+BAF requires a spin-polarized beam with at least 1 mA of average current. While the parameters are not unusual from a beam dynamics point of view, the high average current is challenging due to the finite charge lifetime of the GaAs-based high-polarization photocathodes, even when operated in state-of-the-art load-lock photo-guns. We discuss the dominant limitations and present a systematic experimental program at the Gun Test Stand aiming to overcome them. With a multi-pronged approach involving a redesign of the photo-gun electrodes and an optimized drive laser profile, we hope to demonstrate a charge lifetime in excess of 1 kC from a high-polarization photocathode, mitigating one of the main risks in the injector design.

Bruker, Max [Thomas Jefferson National Accelerator↗

NuMI Beam Monitoring Simulation and Data Analysis Status and Progress

With the Main Injector Neutrino Oscillation Search (MINOS) experiment decommissioned, muon and hadron monitors became an important diagnostic tool for the NuMI O↵- axis vμ Appearance (NOvA) experiment at Fermilab to monitor the Neutrinos at the Main Injector (NuMI) beam. The goal of this study is to maintain the quality of the monitor signals and to establish correlations with the neutrino beam profile. And we carry out a systematic study of the response of the muon monitors to the changes in the parameters of the proton beam and lattice parameters. We report here on the progress of the beam data analysis and comparison with the simulation results.

43 PARTICLE ACCELERATORS↗

Numerical Optimization of Spray-Guided Spark Assistance for Cold Idle Operation in a Heavy-Duty Gasoline Compression Ignition Engine

This article describes the results of a response surface model (RSM)-based numerical optimization campaign for spray-guided spark assistance at cold operations in a heavy-duty gasoline compression ignition (GCI) engine. On the basis of an earlier work on spark-assisted GCI cold combustion, a space-filling design of experiments (DoE) method was first undertaken to investigate a multitude of hardware design variables and engine operating parameters. The main design variables included the number of injector nozzles, fuel split quantities and injection timings, and spark timing. The objective variables were engine combustion efficiency (ŋ c ), maximum pressure rise rate (MPRR), and engine-out nitrogen oxide (NO x ) emissions. A total of 150 design candidates were automatically generated using the Sobol sequence method provided by the commercial software package, CAESES. Then, closed-cycle computational fluid dynamic (CFD) spark-assisted GCI simulations under cold idling operations were performed. The outcomes from the CFD-DoE design campaign were utilized to construct high-fidelity RSMs that allowed for further design optimization of the spark plug- and fuel injector-related design variables, along with fuel injection strategy parameters. A merit function with respect to objective variables was formulated with an appropriate weight assignment on each objective variable. Finally, the best design candidate was identified from the RSM-based optimization process and further validated in the CFD analysis. The best design candidate showed the potential to significantly improve combustion efficiency (ŋ c > 90%) over the baseline at cold idle while satisfying MPRR and NOx emissions constraints (MPRR < 5 bar/CAD and NO x < 4.5 g/kWh).

33 ADVANCED PROPULSION SYSTEMS↗

NuMI Beam Monitoring Simulation and Data Analysis †

Following the decommissioning of the Main Injector Neutrino Oscillation Search (MINOS) experiment, muon and hadron monitors have emerged as vital diagnostic tools for the NuMI Off-axis Appearance (NOvA) experiment at Fermilab. These tools are crucial for overseeing the Neutrinos at the Main Injector (NuMI) beam. This study endeavors to ensure the monitor signal quality and to correlate them with the Neutrino beam profile. Leveraging muon monitor simulations, we systematically explore the monitor responses to variations in proton-beam and lattice parameters. Through the amalgamation of individual pixel data from muon monitors, pattern-recognition algorithms, simulations, and measured data, we devise machine-learning-based models to predict muon monitor responses and Neutrino flux.

43 PARTICLE ACCELERATORS↗

Segmented annular combustion system

An annular combustion system includes a fuel nozzle, a panel fuel injector including a fuel plenum and at least one premixing channel therein, an inner liner having a hot side surface and a cool side surface and an outer liner having a hot side surface and a cool side surface. The inner liner, the outer liner and the panel fuel injector partially define a hot gas path downstream from the fuel nozzle. The inner liner and/or the outer liner define a plurality of micro-channel cooling passages which is disposed between the hot side surface and cool side surface of the inner liner. Each micro-channel cooling passage of the first plurality of micro-channel cooling passages is in fluid communication with an inlet hole defined along the cool side surface of the respective liner and an outlet hole.

Berry, Jonathan Dwight↗

Liquid tamped targets for extreme ultraviolet lithography

An EUV light source including a vacuum chamber, a droplets injector operatively connected to the vacuum chamber for directing the droplets into the vacuum chamber, droplets produced by the droplets injector wherein the droplets have one side and another side opposite the one side, the droplets including a solid higher Z bead in a low Z liquid, and at least one laser beam directed onto the one side of the droplets.

Frank, Yechiel R.↗

Combustor with axially staged fuel injection

A combustor with axially staged fuel injection includes an endcover and a fuel injector that extends axially downstream from the endcover. The fuel injector includes a cylindrical shell formed by an outer wall and an inner wall. A first plurality of outlets is circumferentially spaced across the inner wall. A first plurality of premix channels is defined between the outer wall and the inner wall. Each premix channel of the first plurality of premix channels is in fluid communication with a fuel supply, a compressed air supply and a respective outlet of the first plurality of outlets.

Berry, Jonathan Dwight↗

Experiments On A Conduction Cooled Superconducting Radio Frequency Cavity With Field Emission Cathode

To achieve Ampere-class electron beam accelerators the pulse delivery rate need to be much higher than the typical photo injector repetition rate of the order of a few kilohertz. We propose here an injector which can, in principle, generate electron bunches at the same rate as the operating RF frequency. A conduction-cooled superconducting radio frequency (SRF) cavity operating in the CW mode and housing a field emission element at its region of high axial electric field can be a viable method of generating high-repetition-rate electron bunches. In this paper, we report the development and experiments on a conduction-cooled Nb3Sn cavity with a niobium rod intended as a field emitter support. The initial experiments demonstrate 0.4 MV/m average accelerating gradient, which is equivalent of peak gradient of 3.2 MV/m. The measured RF cavity quality factor is 1.4 x 10$^8$ slightly above our goal. The achieved field gradient is limited by the relatively low input RF power and by the poor coupling between the external power supply and the RF cavity. With ideal coupling the field gradient can be as high as 0.6 MV/m still below our goal of about 1 MV/m.

43 PARTICLE ACCELERATORS↗