Search NASA⌕ Search

SEARCH · Search NASA

Results for “integral operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Flight Test Exploration of Integrated Wildfire Response Operations with Crewed and Uncrewed Air Assets

Since 2016, JAXA and NASA have partnered to investigate the safe and efficient integration of unmanned aircraft systems (UAS) in disaster response operations. Through the collaboration, supporting systems from the respective agencies have been successfully integrated and demonstrated in multiple activities ranging from localized simulations and flight tests to large-scale national disaster drills. This paper describes findings from the most recent flight test by JAXA using a crewed helicopter conducting wildfire response operations in proximity to an area in which simulated small UAS, supported by UTM services, were conducting prescribed burn operations.

disaster response↗

Flight Test Exploration of Integrated Wildfire Response Operations with Crewed and Uncrewed Air Assets

Since 2016, Japan Aerospace Exploration Agency (JAXA) and NASA have partnered to investigate the safe and efficient integration of uncrewed aircraft systems (UAS) in disaster relief operations. Current disaster response operations would benefit from the use of UAS but are limited by the need for safe airspace integration technologies and enabling regulations. The work presented in this paper focuses on the safe integration of UAS and helicopters in active wildfire disaster response operations. The authors propose the use of mission planning and traffic management technologies, including onboard pilot situation awareness support technologies, to coordinate airspace operations between crewed and uncrewed aircraft (e.g., UAS). A representative wildfire scenario including a helicopter and UAS was developed. The helicopter mission included a flight path that mimicked the siphoning of water from a natural water reservoir (lake) and a subsequent water drop over vegetation along the progressing edge of a fire perimeter. Simulated UAS were assumed to conduct aerial ignition flights in the vicinity as part of a controlled burn of the vegetation ahead of the fire front to create a natural barrier between the fire and a nearby populated area. A situation awareness tool was developed and used to support the helicopter pilots’ task to stay clear of the volume of airspace where the UAS was conducting its operation while efficiently conducting the fire suppression mission. A flight test using JAXA’s experimental helicopter was conducted in August 2022 to validate the developed technology. The advantages of the developed technology were demonstrated, and pilot feedback confirmed that real-time awareness of the UAS operation airspace helped the flight planning and execution of a safe mission that minimized the flight time loss due to the potential interference with the UAS. Post-flight interviews with the pilots indicated no sufficient increase in the pilots’ workload and provided ideas for future technology development. Future research will provide recommendations to standards development organizations to support considerations for crewed-uncrewed interactions in disaster-response operations.

disaster response↗

Business Intelligence Modeling in Launch Operations

This technology project is to advance an integrated Planning and Management Simulation Model for evaluation of risks, costs, and reliability of launch systems from Earth to Orbit for Space Exploration. The approach builds on research done in the NASA ARC/KSC developed Virtual Test Bed (VTB) to integrate architectural, operations process, and mission simulations for the purpose of evaluating enterprise level strategies to reduce cost, improve systems operability, and reduce mission risks. The objectives are to understand the interdependency of architecture and process on recurring launch cost of operations, provide management a tool for assessing systems safety and dependability versus cost, and leverage lessons learned and empirical models from Shuttle and International Space Station to validate models applied to Exploration. The systems-of-systems concept is built to balance the conflicting objectives of safety, reliability, and process strategy in order to achieve long term sustainability. A planning and analysis test bed is needed for evaluation of enterprise level options and strategies for transit and launch systems as well as surface and orbital systems. This environment can also support agency simulation .based acquisition process objectives. The technology development approach is based on the collaborative effort set forth in the VTB's integrating operations. process models, systems and environment models, and cost models as a comprehensive disciplined enterprise analysis environment. Significant emphasis is being placed on adapting root cause from existing Shuttle operations to exploration. Technical challenges include cost model validation, integration of parametric models with discrete event process and systems simulations. and large-scale simulation integration. The enterprise architecture is required for coherent integration of systems models. It will also require a plan for evolution over the life of the program. The proposed technology will produce long-term benefits in support of the NASA objectives for simulation based acquisition, will improve the ability to assess architectural options verses safety/risk for future exploration systems, and will facilitate incorporation of operability as a systems design consideration, reducing overall life cycle cost for future systems. The future of business intelligence of space exploration will focus on the intelligent system-of-systems real-time enterprise. In present business intelligence, a number of technologies that are most relevant to space exploration are experiencing the greatest change. Emerging patterns of set of processes rather than organizational units leading to end-to-end automation is becoming a major objective of enterprise information technology. The cost element is a leading factor of future exploration systems.

Bardina, Jorge E.↗

Launch site integration for mixed fleet operations

Launch site impacts and integration planning issues are presented to support launch operations for a mixed vehicle fleet (manned and cargo). Proposed ground systems and launch site configurations are described. Prelaunch processing scenarios and schedules are developed for candidate launch vehicles. Earth-to-orbit (ETO) vehicle architectures are presented to meet future launch requirements, including the Space Exploration Initiative (SEI). Flight vehicle design recommendations to enhance launch processing are discussed. The significance of operational designs for future launch vehicles is shown to be a critical factor in planning for mixed fleet launch site operations.

Scott, L. P.↗

NASA's ATM Technology Demonstration-1: Integrated Concept of Arrival Operations

This paper describes operations and procedures envisioned for NASA s Air Traffic Management (ATM) Technology Demonstration #1 (ATD-1). The ATD-1 Concept of Operations (ConOps) demonstration will integrate three NASA technologies to achieve high throughput, fuel-efficient arrival operations into busy terminal airspace. They are Traffic Management Advisor with Terminal Metering (TMA-TM) for precise time-based schedules to the runway and points within the terminal area, Controller-Managed Spacing (CMS) decision support tools for terminal controllers to better manage aircraft delay using speed control, and Flight deck Interval Management (FIM) avionics and flight crew procedures to conduct airborne spacing operations. The ATD-1 concept provides de-conflicted and efficient operations of multiple arrival streams of aircraft, passing through multiple merge points, from top-of-descent (TOD) to touchdown. It also enables aircraft to conduct Optimized Profile Descents (OPDs) from en route altitude to the runway, using primarily speed control to maintain separation and schedule. The ATD-1 project is currently addressing the challenges of integrating the three technologies, and implantation into an operational environment. Goals of the ATD-1 demonstration include increasing the throughput of high-density airports, reducing controller workload, increasing efficiency of arrival operations and the frequency of trajectory-based operations, and promoting aircraft ADS-B equipage.

Baxley, Brian T.↗

Integrated Demand Management (IDM): Concept of Operations

NASA's Integrated Demand Management research activity developed a concept for a novel use of the FAA's Collaborative Trajectory Options Program (CTOP) decision support software to support airspace capacity-limited arrival operations involving Time Based Flow Management (TBFM). This document provides a detailed, graphical description of the concept.

IDM↗

Integrated Airport Surface Operations

The current air traffic environment in airport terminal areas experiences substantial delays when weather conditions deteriorate to Instrument Meteorological Conditions (IMC). Research activity at NASA has culminated in the development, flight test and demonstration of a prototype Low Visibility Landing and Surface Operations (LVLASO) system. A NASA led industry team and the FAA developed the system which integrated airport surface surveillance systems, aeronautical data links, DGPS navigation, automation systems, and controller and flight deck displays. The LVLASO system was demonstrated at the Hartsfield-Atlanta International Airport using a Boeing 757-200 aircraft during August, 1997. This report documents the contractors role in this testing particularly in the area of data link and DGPS navigation.

Koczo, S.↗

Real Time Metrics and Analysis of Integrated Arrival, Departure, and Surface Operations

To address the Integrated Arrival, Departure, and Surface (IADS) challenge, NASA is developing and demonstrating trajectory-based departure automation under a collaborative effort with the FAA and industry known Airspace Technology Demonstration 2 (ATD-2). ATD-2 builds upon and integrates previous NASA research capabilities that include the Spot and Runway Departure Advisor (SARDA), the Precision Departure Release Capability (PDRC), and the Terminal Sequencing and Spacing (TSAS) capability. As trajectory-based departure scheduling and collaborative decision making tools are introduced in order to reduce delays and uncertainties in taxi and climb operations across the National Airspace System, users of the tools across a number of roles benefit from a real time system that enables common situational awareness. A real time dashboard was developed to inform and present users notifications and integrated information regarding airport surface operations. The dashboard is a supplement to capabilities and tools that incorporate arrival, departure, and surface air-traffic operations concepts in a NextGen environment. In addition to shared situational awareness, the dashboard offers the ability to compute real time metrics and analysis to inform users about capacity, predictability, and efficiency of the system as a whole. This paper describes the architecture of the real time dashboard as well as an initial proposed set of metrics. The potential impact of the real time dashboard is studied at the site identified for initial deployment and demonstration in 2017: Charlotte-Douglas International Airport (CLT). The architecture of implementing such a tool as well as potential uses are presented for operations at CLT. Metrics computed in real time illustrate the opportunity to provide common situational awareness and inform users of system delay, throughput, taxi time, and airport capacity. In addition, common awareness of delays and the impact of takeoff and departure restrictions stemming from traffic flow management initiatives are explored. The potential of the real time tool to inform users of the predictability and efficiency of using a trajectory-based departure scheduling system is also discussed.

integrated arrival departure surface operations↗

Probabilistic risk assessment of the Space Shuttle. Phase 3: A study of the potential of losing the vehicle during nominal operation. Volume 2: Integrated loss of vehicle model

The application of the probabilistic risk assessment methodology to a Space Shuttle environment, particularly to the potential of losing the Shuttle during nominal operation is addressed. The different related concerns are identified and combined to determine overall program risks. A fault tree model is used to allocate system probabilities to the subsystem level. The loss of the vehicle due to failure to contain energetic gas and debris, to maintain proper propulsion and configuration is analyzed, along with the loss due to Orbiter, external tank failure, and landing failure or error.

Fragola, Joseph R.↗

Space Station - An integrated approach to operational logistics support

Development of an efficient and cost effective operational logistics system for the Space Station will require logistics planning early in the program's design and development phase. This paper will focus on Integrated Logistics Support (ILS) Program techniques and their application to the Space Station program design, production and deployment phases to assure the development of an effective and cost efficient operational logistics system. The paper will provide the methodology and time-phased programmatic steps required to establish a Space Station ILS Program that will provide an operational logistics system based on planned Space Station program logistics support.

Hosmer, G. J.↗

Electrical power integration for lunar operations

Electrical power for future lunar operations is expected to range from a few kilowatts for an early human outpost to many megawatts for industrial operations in the 21st century. All electrical power must be imported as chemical, solar, nuclear, or directed energy. The slow rotation of the Moon and consequent long lunar night impose severe mass penalties on solar systems needing night delivery from storage. The cost of power depends on the cost of the power systems the cost of its transportation to the Moon, operating cost, and, of course, the life of the power system. The economic feasibility of some proposed lunar ventures depends in part on the cost of power. This paper explores power integration issues, costs, and affordability in the context of the following representative lunar ventures: (1) early human outpost (10 kWe); (2) early permanent lunar base, including experimental ISMU activities (100 kWe); (3) lunar oxygen production serving an evolved lunar base (500 kWe); (4) lunar base production of specialized high-value products for use on Earth (5 kWe); and (5) lunar mining and production of helium-3 (500 kWe). The schema of the paper is to project likely costs of power alternatives (including integration factors) in these power ranges, to select the most economic, to determine power cost contribution to the product or activities, to estimate whether the power cost is economically acceptable, and, finally, to offer suggestions for reaching acceptability where cost problems exist.

Woodcock, Gordon↗

UTM and D-NET: NASA and JAXA's Collaborative Research on Integrating Small UAS with Disaster Response Efforts

Natural disasters, such as flooding, wildfire, hurricane, tornadoes, earthquakes and tsunamis, pose challenges in preserving human life and minimizing the damages to a region. During catastrophic events, timely response of disaster relief personnel, an efficient deployment of resources in the recovery effort, and coordinated information sharing amongst different relief agencies can make a substantial difference in responding to those impacted by the disaster. Many relief activities currently utilize both ground personnel and manned airborne assets during different phases of the disaster response. Typically, multiple organizations support relief activities and this often creates logistics coordination challenges between agencies which can result in wasted time or resources. The Japan Aerospace Exploration Agency (JAXA) has been developing an "Integrated aircraft operation system for disaster relief (D-NET)", which assists collection and sharing of disaster information through the integrated operation of aircraft such as helicopters, aircraft, and satellites, for efficient and safe rescue operations by disaster relief aircraft. Due to the advancement in unmanned aircraft systems (UAS) technologies, public safety organizations have started incorporating small UAS (sUAS) as an asset in their disasters response activities. To address the airspace integration challenges of the influx of sUAS in the United States the National Aeronautics and Space Administration (NASA), under the UAS Traffic Management (UTM) project, has been engaged in research to enable large-scale commercial applications of sUAS operating in low altitude airspace. This paper presents the integration of D-NET, which incorporate sUAS in the planning, information sharing, and operation support of disasters response activities, and UTM, which provides airspace management to enable large scale high density operations. The integration of the DNET and UTM systems enables coordination, data sharing, and airspace management to improve the timeliness of the disaster response, enable relief organization to reduce cost and overhead by using UAS assets and still maintain airspace safety during the relief activities.

UTM↗

Preparation of Flight Operations and IWS Integration of the CELIAS Experiment on the SOHO Spacecraft

During this reporting time period, the following activities took place: (1) generation of several versions of the CELIAS (STOF/SEM/CTOF/MTOF/DPU) commissioning timeline for the first 180 days after launch; (2) identification of several problems with the CELIAS portion of the Project Data Base (PDB); (3) attendance of the Science Operations Working Group (SOWG) Meetings (November 1994, February 1995, May 1995) and Flight Operations Review Meeting (July 1995); (4) participation in Flight Operation Simulations SIM 1 (November 14-18, 1994), SIM 2 (May 1-4, 1995) and SIM3 (August 7-11, 1995); and (5) participation in the Ground System Compatibility Test Rehearsal (April 24-28) 1995), GSCT #2 (May 30-June 14, 1995), GSCT #3 (September 12-22 1995), and GSCT #4b (October 30-November 5, 1995).

Ipavich, Fred↗

Insights Gained from the Ongoing Integrated Arrival/Departure/Surface (IADS) Traffic Flow Operational Prototype

The Insights Gained from the Ongoing Integrated Arrival/Departure/Surface (IADS) Traffic Flow Operational Prototype presentation will include a definition of the learning objectives for the audience, an overview/explanation of the ATD-2 project, an overview of the ATC/Operator data exchange and integration that is foundational for advanced surface capability, and a description of the ATC/Operator data exchange and integration research questions and insights. It will also give an overview of the overhead stream around CLT and a preview of the operational integration benefits, research questions, and insights related to the overhead stream. It will continue with a surface metering process flow overview, a description of local surface demand/capacity imbalance, the benefits of collaborative surface metering, the associated research questions and insights, and wrap up with the next steps planned for ATD-2.

collaborative operational environment↗

Preparation of Flight Operations and IWS Integration of the CELIAS Experiment on the SOHO Spacecraft

During this annual progress report time period, the following activities took place: (1) Generation of several versions of the CELIAS (STOF/SEM/CTOF/MTOF/DPU) commissioning timeline for the first 180 days after launch. These were written and submitted by A. Galvin after consultation (phone, fax, e-mail, meetings) with the CELIAS Instrument Manager and Lead-Co-I's. (2) Identification of several problems with the CELIAS portion of the Project Data Base (PDB). (3) Meetings with the Flight Operations Team regarding PDB, critical commands, etc. (4) Attend Science Operations Working Group (SOWG) Meetings (November 1994, February 1995, May 1995) and Flight Operations Review Meeting (July 1995). (5) Participate in Flight Operation Simulations SIM 1 (November 14-18, 1994), SIM 2 (May 1-4, 1995) and SIM3 (August 7-11, 1995). (6) Participate in the Ground System Compatibility Test Rehearsal (April 24- 28, 1995), GSCT #2 (May 30-June 14, 1995), GSCT #3 (September 12-22, 1995), and GSCT #4b (October 30-November 5, 1995). A small portion of the documentation for the above cited activities is appended.

Ipavich, Fred↗

Newly Enacted Intent Changes to ADS-B MASPS: Emphasis on Operations, Compatibility, and Integrity

Significant changes to the intent reporting structure in the Minimum Aviation System Performance Standards (MASPS) for Automatic Dependent Surveillance Broadcast (ADS-B) have recently been approved by RTCA Special Committee 186. The re-structured intent formats incorporate two major changes to the current MASPS (DO-242): addition of a Target State (TS) report that provides information on the horizontal and vertical targets for the current flight segment and replacement of the current Trajectory Change Point (TCP) and TCP+1 reports with Trajectory Change (TC) reports. TC reports include expanded information about TCPs and their connecting flight segments, in addition to making provisions for trajectory conformance elements. New intent elements are designed to accommodate a greater range of intent information, better reflect operational use and capabilities of existing and future aircraft avionics, and aid trajectory synthesis and conformance monitoring systems. These elements are expected to benefit near-term and future Air Traffic Management (ATM) applications, including separation assurance, local traffic flow management, and conformance monitoring. The current MASPS revision (DO-242A) implements those intent elements that are supported by current avionics standards and data buses. Additional elements are provisioned for inclusion in future MASPS revisions (beyond DO-242A) as avionics systems are evolved.

Barhydt, Richard↗

Coordinating space telescope operations in an integrated planning and scheduling architecture

The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.

Muscettola, Nicola↗