Search NASA⌕ Search

SEARCH · Search NASA

Results for “integrated system testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Initial SVS Integrated Technology Evaluation Flight Test Requirements and Hardware Architecture

This document presents the flight test requirements for the Initial Synthetic Vision Systems Integrated Technology Evaluation flight Test to be flown aboard NASA Langley's ARIES aircraft and the final hardware architecture implemented to meet these requirements. Part I of this document contains the hardware, software, simulator, and flight operations requirements for this light test as they were defined in August 2002. The contents of this section are the actual requirements document that was signed for this flight test. Part II of this document contains information pertaining to the hardware architecture that was realized to meet these requirements as presented to and approved by a Critical Design Review Panel prior to installation on the B-757 Airborne Research Integrated Experiments Systems (ARIES) airplane. This information includes a description of the equipment, block diagrams of the architecture, layouts of the workstations, and pictures of the actual installations.

Harrison, Stella V.↗

Desert Research and Technology Studies 2005 Report

During the first two weeks of September 2005, the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) Advanced Extravehicular Activity (AEVA) team led the field test portion of the 2005 Research and Technology Studies (RATS). The Desert RATS field test activity is the culmination of the various individual science and advanced engineering discipline areas year-long technology and operations development efforts into a coordinated field test demonstration under representative (analog) planetary surface terrain conditions. The purpose of the RATS is to drive out preliminary exploration concept of operations EVA system requirements by providing hands-on experience with simulated planetary surface exploration extravehicular activity (EVA) hardware and procedures. The RATS activities also are of significant importance in helping to develop the necessary levels of technical skills and experience for the next generation of engineers, scientists, technicians, and astronauts who will be responsible for realizing the goals of the Constellation Program. The 2005 Desert RATS was the eighth RATS field test and was the most systems-oriented, integrated field test to date with participants from NASA field centers, the United States Geologic Survey (USGS), industry partners, and research institutes. Each week of the test, the 2005 RATS addressed specific sets of objectives. The first week focused on the performance of surface science astro-biological sampling operations, including planetary protection considerations and procedures. The second week supported evaluation of the Science, Crew, Operations, and Utility Testbed (SCOUT) proto-type rover and its sub-systems. Throughout the duration of the field test, the Communications, Avionics, and Infomatics pack (CAI-pack) was tested. This year the CAI-pack served to provide information on surface navigation, science sample collection procedures, and EVA timeline awareness. Additionally, 2005 was the first year since the Apollo program that two pressurized suited test subjects have worked together simultaneously. Another first was the demonstration of recharge of cryogenic life support systems while in-use by the suited test subjects. The recharge capability allowed the simulated EVA test duration to be doubled, facilitating SCOUT proto-type rover testing. This paper summarizes Desert RATS 2005 test hardware, detailed test objectives, test operations and test results.

Ross, Amy J.↗

Planned flight test of a mercury ion auxiliary propulsion system. Part 2: Integration with host spacecraft

The objectives of the flight test and a description on how those objectives are in support of an overall program goal of attaining user application were described. The approach to accomplishment was presented as it applies to integrating the propulsion system with the host spacecraft. A number of known interface design considerations which affect the propulsion system and the spacecraft were discussed. Analogies were drawn comparing the relationship of the organizations involved with this flight test with those anticipated for future operational missions. The paper also expanded upon objectives, system description, mission operations, and measurement of plume effects.

Knight, R. M.↗

Evaluation of Cable Harness Post-Installation Testing

The Cable Harness Post-Installation Testing Report was written in response to an action issued by the Ares Project Control Board (PCB). The action for the Ares I Avionics & Software Chief Engineer and the Avionics Integration and Vehicle Systems Test Work Breakdown Structure (WBS) Manager in the Vehicle Integration Office was to develop a set of guidelines for electrical cable harnesses. Research showed that post-installation tests have been done since the Apollo era. For Ares I-X, the requirement for post-installation testing was removed to make it consistent with the avionics processes used on the Atlas V expendable launch vehicle. Further research for the report involved surveying government and private sector launch vehicle developers, military and commercial aircraft, spacecraft developers, and harness vendors. Responses indicated crewed launch vehicles and military aircraft perform post-installation tests. Key findings in the report were as follows: Test requirements identify damage, human-rated vehicles should be tested despite the identification of statistically few failures, data does not support the claim that post-installation testing damages the harness insulation system, and proper planning can reduce overhead associated with testing. The primary recommendation of the report is for the Ares projects to retain the practice of post-fabrication and post-installation cable harness testing.

King, M. S.↗

Acoustic and Thermal Testing of an Integrated Multilayer Insulation and Broad Area Cooling Shield System

A Multilayer Insulation (MLI) and Broad Area Cooling (BAC) shield thermal control system shows promise for long-duration storage of cryogenic propellant. The NASA Cryogenic Propellant Storage and Transfer (CPST) project is investigating the thermal and structural performance of this tank-applied integrated system. The MLI/BAC Shield Acoustic and Thermal Test was performed to evaluate the MLI/BAC shield's structural performance by subjecting it to worst-case launch acoustic loads. Identical thermal tests using Liquid Nitrogen (LN2) were performed before and after the acoustic test. The data from these tests was compared to determine if any degradation occurred in the thermal performance of the system as a result of exposure to the acoustic loads. The thermal test series consisted of two primary components: a passive boil-off test to evaluate the MLI performance and an active cooling test to evaluate the integrated MLI/BAC shield system with chilled vapor circulating through the BAC shield tubes. The acoustic test used loads closely matching the worst-case envelope of all launch vehicles currently under consideration for CPST. Acoustic test results yielded reasonable responses for the given load. The thermal test matrix was completed prior to the acoustic test and successfully repeated after the acoustic test. Data was compared and yielded near identical results, indicating that the MLI/BAC shield configuration tested in this series is an option for structurally implementing this thermal control system concept.

Wood, J. J.↗

Acoustic and Thermal Testing of an Integrated Multilayer Insulation and Broad Area Cooling Shield System

A Multilayer Insulation (MLI) and Broad Area Cooling (BAC) shield thermal control system shows promise for long-duration storage of cryogenic propellant. The NASA Cryogenic Propellant Storage and Transfer (CPST) project is investigating the thermal and structural performance of this tank-applied integrated system. The MLI/BAC Shield Acoustic and Thermal Test was performed to evaluate the MLI/BAC shield's structural performance by subjecting it to worst-case launch acoustic loads. Identical thermal tests using Liquid Nitrogen (LN2) were performed before and after the acoustic test. The data from these tests was compared to determine if any degradation occurred in the thermal performance of the system as a result of exposure to the acoustic loads. The thermal test series consisted of two primary components: a passive boil-off test to evaluate the MLI performance and an active cooling test to evaluate the integrated MLI/BAC shield system with chilled vapor circulating through the BAC shield tubes. The acoustic test used loads closely matching the worst-case envelope of all launch vehicles currently under consideration for CPST. Acoustic test results yielded reasonable responses for the given load. The thermal test matrix was completed prior to the acoustic test and successfully repeated after the acoustic test. Data was compared and yielded near identical results, indicating that the MLI/BAC shield configuration tested in this series is an option for structurally implementing this thermal control system concept.

Wood, Jessica J.↗

A 96% Alumina based Packaging System for 500°C Test of SiC Integrated Circuits

With the development of silicon carbide (SiC) sensors and electronic devices for operation at 500°C, compatible packaging technologies are needed for long term high temperature test and deployment of these sensors and electronic devices. 96% Al2O3ceramic is an excellent electrically insulating material with acceptable dielectric constant and low dielectric loss over wide temperature and frequency ranges. This paper presents a packaging system for low power integrated circuits including a prototype 8-I/O chip-level package and printed circuit board (PCB) based on 96% Al2O3ceramic substrates and Au thick-film metallization for 500°C applications. The details related to designs of packages and PCBs, packaging materials, and specific packaging step recipes including wire -bonding and die-attach, are presented. Some test results of this prototype packaging approach applied to SiC integrated circuits at 500°C are reviewed.

High Temperature, Packaging, Alumina, Thick Film↗

A 96% Alumina based Packaging System for 500°C Test of SiC Integrated Circuits

With the development of silicon carbide (SiC) sensors and electronic devices for operation at 500°C, compatible packaging technologies are needed for long term high temperature test and deployment of these sensors and electronic devices. 96% Al2O3 ceramic is an excellent electrically insulating material with acceptable dielectric constant and low dielectric loss over wide temperature and frequency ranges. This paper presents a packaging system for low power integrated circuits including a prototype 8-I/O chip-level package and printed circuit board (PCB) based on 96% Al2O3 ceramic substrates and Au thick-film metallization for 500°C applications. The details related to designs of packages and PCBs, packaging materials, and specific packaging step recipes including wire - bonding and die-attach, are presented. Some test results of this prototype packaging approach applied to SiC integrated circuits at 500oC are reviewed.

high temperature↗

Development and Testing of a Lab-Scale Electrochemical Refrigerator

Eta Space and NASA have been developing a lab-scale electrochemical hydrogen refrigerator (ECHR) capable of providing isothermal heat exchange for applications in the 20-Kelvin range. The cryocooler utilizes an electrochemical compressor paired with Joule-Thomson expansion to cool the hydrogen working fluid down to its saturation point within a purpose-built cold box. The use of electrochemical compression allows the cycle to operate with no moving parts presenting several key advantages for a variety of applications. Testing of the integrated system occurred in Eta Space’s cryogenic test facility where the system was able to achieve and maintain saturated temperatures at low pressure. Results of this test campaign demonstrate the feasibility of the ECHR concept in practice.

D J Hollibaugh↗

Thermal Integration of a Liquid Acquisition Device into a Cryogenic Feed System

Primary objectives of this effort were to define the following: (1) Approaches for quantification of the accumulation of thermal energy within a capillary screen liquid acquisition device (LAD) for a lunar lander upper stage during periods of up to 210 days on the lunar surface, (2) techniques for mitigating heat entrapment, and (3) perform initial testing, data evaluation. The technical effort was divided into the following categories: (1) Detailed thermal modeling of the LAD/feed system interactions using both COMSOL computational fluid device and standard codes, (2) FLOW-3D modeling of bulk liquid to provide interfacing conditions for the LAD thermal modeling, (3) condensation conditioning of capillary screens to stabilize surface tension retention capability, and (4) subscale testing of an integrated LAD/feed system. Substantial progress was achieved in the following technical areas: (1) Thermal modeling and experimental approaches for evaluating integrated cryogen LAD/feed systems, at both the system and component levels, (2) reduced gravity pressure control analyses, (3) analytical modeling and testing for capillary screen conditioning using condensation and wicking, and (4) development of rapid turnaround testing techniques for evaluating LAD/feed system thermal and fluid integration. A comprehensive effort, participants included a diverse cross section of representatives from academia, contractors, and multiple Marshall Space Flight Center organizations.

Hastings, L. J.↗

James Webb Space Telescope (JWST) Integrated Science Instruments Module (ISIM) Cryo-Vacuum (CV) Test Campaign Summary

JWST Integrated Science Instruments Module (ISIM) completed its system-level space simulation testing program at the NASA Goddard Space Flight Center (GSFC). In March 2016, ISIM was successfully delivered to the next level of integration with the Optical Telescope Element (OTE), to form OTIS (OTE + ISIM), after concluding a series of three cryo-vacuum (CV) tests. During these tests, the complexity of the mission has generated challenging requirements that demand highly reliable system performance and capabilities from the Space Environment Simulator (SES) vacuum chamber. The first test served as a risk reduction test; the second test provided the initial verification of the fully-integrated flight instruments; and the third test verified the system in its final flight configuration following mechanical environmental tests (vibration and acoustics). From one test to the next, shortcomings of the facility were uncovered and associated improvements in operational capabilities and reliability of the facility were required to enable the project to verify system-level requirements. This paper: (1) provides an overview of the integrated mechanical and thermal facility systems required to achieve the objectives of JWST ISIM testing, (2) compares the overall facility performance and instrumentation results from the three ISIM CV tests, and (3) summarizes lessons learned from the ISIM testing campaign.

Yew, Calinda↗

System-Integrated Finite Element Analysis of a Full-Scale Helicopter Crash Test with Deployable Energy Absorbers

A full-scale crash test of an MD-500 helicopter was conducted in December 2009 at NASA Langley's Landing and Impact Research facility (LandIR). The MD-500 helicopter was fitted with a composite honeycomb Deployable Energy Absorber (DEA) and tested under vertical and horizontal impact velocities of 26-ft/sec and 40-ft/sec, respectively. The objectives of the test were to evaluate the performance of the DEA concept under realistic crash conditions and to generate test data for validation of a system integrated finite element model. In preparation for the full-scale crash test, a series of sub-scale and MD-500 mass simulator tests was conducted to evaluate the impact performances of various components, including a new crush tube and the DEA blocks. Parameters defined within the system integrated finite element model were determined from these tests. The objective of this paper is to summarize the finite element models developed and analyses performed, beginning with pre-test predictions and continuing through post-test validation.

Annett, Martin S.↗

Increasing software testability with standard access and control interfaces

Testing is the most common method of determining whether a software system satisfies its requirements. Traditionally, testing starts with the detailed examination of individual functions or methods, progresses through the integration of functions or methods into subsystems, and ends with testing the functionality and behavior of the completely integrated system. At each stage of testing, the amount of functionality and behavior of the artifact being tested is increasingly limited. One reason for this is that it becomes impossible to test all paths through the system within a reasonable amount of time. However, another reason for this progressive decrease of test coverage has to do with increasingly limited control of and visibility into the state of the artifact being tested. During unit test, it is rather simple to control the inputs of individual functions or methods or view their internal state - modem development environments provide adequate facilities for doing so. However, these facilities do not scale up to the testing of partially or completely integrated systems. Control of and visibility into the system's state is then limited to the input and output facilities provided by the software itself as well as the hardware on which the software is hosted during the test. These facilities are usually insufficient to precisely control the state of individual components or sets of components of the system; they are also inadequate to the task of displaying on demand the state of specific components. We describe an approach to improving the testability of complex software systems with software constructs modeled after the hardware JTAG bus, used to provide visibility and controllability in testing digital circuits.

Tamir, Yuval↗

Integrated Human Test Facilities at NASA and the Role of Human Engineering

Integrated human test facilities are a key component of NASA's Advanced Life Support Program (ALSP). Over the past several years, the ALSP has been developing such facilities to serve as a large-scale advanced life support and habitability test bed capable of supporting long-duration evaluations of integrated bioregenerative life support systems with human test crews. These facilities-targeted for evaluation of hypogravity compatible life support and habitability systems to be developed for use on planetary surfaces-are currently in the development stage at the Johnson Space Center. These major test facilities are comprised of a set of interconnected chambers with a sealed internal environment, which will be outfitted with systems capable of supporting test crews of four individuals for periods exceeding one year. The advanced technology systems to be tested will consist of both biological and physicochemical components and will perform all required crew life support and habitability functions. This presentation provides a description of the proposed test "missions" to be supported by these integrated human test facilities, the overall system architecture of the facilities, the current development status of the facilities, and the role that human design has played in the development of the facilities.

Tri, Terry O.↗

Stirling Convertor Controller Development at NASA Glenn Research Center

For nearly two decades, NASA Glenn Research Center has been supporting the development of radioisotope power systems (RPS). NASA desires higher conversion efficiency RPS options that are reliable and robust with long-life design. Dynamic conversion, such as Stirling and Brayton, offer the potential for higher conversion efficiencies than current RPS but have yet to be demonstrated in a flight application. The RPS program sent out a solicitation to investigate options for dynamic conversion technologies. As a result of this solicitation, four dynamic power convertor (DPC) technologies were selected for design and three are proceeding to the fabrication phase of prototype dynamic convertors. One lesson learned from the Advanced Stirling Radioisotope Generator (ASRG) project is that controller development should be coordinated with the development of a dynamic convertor. As a result of this, Glenn has been utilizing hardware from past Stirling convertor projects, including that of the ASRG, to support controller development for the DPCs. Glenn has developed a strong knowledge base on both analog and digital Stirling DPC controllers and will continue to expand and apply that knowledge to the DPCs. Over the past 15 years, controllers were developed at Glenn, at Lockheed Martin (LM), and by the Johns Hopkins University Applied Physics Laboratory (APL). Various generations of the controllers have been developed as lessons were learned through various component- and system-level tests. Some of the tests performed were fault tolerance, flight acceptance vibration, electromagnetic interference (EMI), spacecraft integration, and extended operation. The fault tolerance test characterized the controller’s ability to handle various fault conditions, including high or low bus power consumption, total open load or short circuit, and replacing a failed controller card while the backup maintains control of the Stirling convertor. The vibration test confirms the controller’s ability to control an Advanced Stirling Convertor (ASC) during launch. The EMI test characterized the alternating-current (AC) and direct-current (DC) magnetic and electric fields emitted by the single ASC and if the controller has an impact on the radiated EMI. Spacecraft integration testing in the Radioisotope Power Systems (RPS), System Integration Laboratory (RSIL) provided insight into the electrical interactions between the representative RPS, its associated control schemes, and realistic electric system loads. The extended operation test allows data to be collected over a period of thousands of hours to obtain long-term performance data of the system. This paper describes the history of controller development at Glenn, tests performed on these controllers, and lessons learned.

Dugala, Gina M.↗

The Viking surface sampler

A surface sampler subsystem for the Viking Lander has been designed, fabricated, cleaned, and successfully tested. Testing has included component level tests to qualification environment and subsystem level tests. This development hardware has also been integrated into a System Test Bed (STB) for the lander system. In addition to the normal dynamic and thermal environments the surface sampler hardware has been tested in an aircraft to simulate the effects of the reduced Martian gravity. Although problems have been encountered with the first-build and integration, the basic design appears to be sound and hardware qualification is scheduled for late 1973.

Seger, R. B.↗

Low-cost, Risk-Reduction Testing of Class D Spacecraft Photovoltaic Systems

The end-to-end verification of a spacecraft photovoltaic power generation system requires light! A low-cost, portable, and end-to-end photovoltaic-system test appropriate for NASAs new generation of Class D missions is presented. High risk, low-cost, and quick-turn satellites rarely have the resources to execute the traditional approaches from higher-class (A-C) missions. The Class D approach, as demonstrated on the Lunar Atmospheric and Dust Environment Explorer (LADEE), utilizes a portable, metal-halide, theatre lamp for an end-to-end photovoltaic system test. While not as precise and comprehensive as the traditional Large Area Pulsed Solar Simulator (LAPSS) test, the LADEE method leverages minimal resources into an ongoing assessment program that can be applied through numerous stages of the mission. The project takes a true Class D approach in assessing the technical value of a costly, high-fidelity performance test versus a simpler approach with less programmatic risk. The resources required are a fraction of that for a LAPSS test, and is easy to repeat due to its portability. Further, the test equipment can be handed down to future projects without building an on-site facility.At the vanguard of Class D missions, the LADEE team frequently wrestled with and challenged the status quo. The philosophy of risk avoidance at all cost, typical to Class A-C missions, simply could not be executed. This innovative and simple testing solution is contextualized to NASA Class D programs and a specific risk encountered during development of the LADEE Electrical Power System (EPS). Selection of the appropriate lamp and safety concerns are discussed, with examples of test results. Combined with the vendors panel-level data and periodic inspection, the method ensures system integrity from Integration and Test (IT) through launch. Following launch, mission operations tools are utilized to assess system performance based on a scant amount of available data.

photovoltaic↗

Low-Cost, Class D Testing of Spacecraft Photovoltaic Systems Can Reduce Risk

The end-to-end verification of a spacecraft photovoltaic power generation system requires light! A lowcost, portable, and end-to-end photovoltaic-system test appropriate for NASA's new generation of Class D missions is presented. High risk, low-cost, and quick-turn satellites rarely have the resources to execute the traditional approaches from higher-class (A-C) missions. The Class D approach, as demonstrated on the Lunar Atmospheric and Dust Environment Explorer (LADEE), utilizes a portable, metalhalide, theatre lamp for an end-to-end photovoltaic system test. While not as precise and comprehensive as the traditional Large Area Pulsed Solar Simulator (LAPSS) test, the LADEE method leverages minimal resources into an ongoing assessment program that can be applied through numerous stages of the mission. The project takes a true Class D approach in assessing the technical value of a costly, highfidelity performance test versus a simpler approach with less programmatic risk. The resources required are a fraction of that for a LAPSS test, and is easy to repeat due to its portability. Further, the test equipment can be handed down to future projects without building an on-site facility. At the vanguard of Class D missions, the LADEE team frequently wrestled with and challenged the status quo. The philosophy of risk avoidance at all cost, typical to Class A-C missions, simply could not be executed. This innovative and simple testing solution is contextualized to NASA Class D programs and a specific risk encountered during development of the LADEE Electrical Power System (EPS). Selection of the appropriate lamp and safety concerns are discussed, with examples of test results. Combined with the vendor's panellevel data and periodic inspection, the method ensures system integrity from Integration and Test (I&T) through launch. Following launch, mission operations tools are utilized to assess system performance based on a scant amount of available data.

power systems↗