Search NASA⌕ Search

SEARCH · Search NASA

Results for “lessons”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

G-399 and G178: Lessons learned

This paper outlines the lessons learned implementing Get Away Specials (GAS) payloads G-399 and G-178 with regard to power systems, computer/data logger, structure and working with undergraduates.

Dobeck, Michael↗

Space Mechanisms Lessons Learned Study. Volume 2: Literature Review

Hundreds of satellites have been launched to date. Some have operated extremely well and others have not. In order to learn from past operating experiences, a study was conducted to determine the conditions under which space mechanisms (mechanically moving components) have previously worked or failed. The study consisted of an extensive literature review that included both government contractor reports and technical journals, communication and visits (when necessary) to the various NASA and DOD centers and their designated contractors (this included contact with project managers of current and prior NASA satellite programs as well as their industry counterparts), requests for unpublished information to NASA and industry, and a mail survey designed to acquire specific mechanism experience. The information obtained has been organized into two volumes. Volume 1 provides a summary of the lesson learned, the results of a needs analysis, responses to the mail survey, a listing of experts, a description of some available facilities, and a compilation of references. Volume 2 contains a compilation of the literature review synopsis.

Shapiro, Wilbur↗

Workshop on Discovery Lessons-Learned

As part of the Discovery Program's continuous improvement effort, a Discovery Program Lessons-Learned workshop was designed to review how well the Discovery Program is moving toward its goal of providing low-cost research opportunities to the planetary science community while ensuring continued U.S. leadership in solar system exploration. The principal focus of the workshop was on the recently completed Announcement of Opportunity (AO) cycle, but the program direction and program management were also open to comment. The objective of the workshop was to identify both the strengths and weaknesses of the process up to this point, with the goal of improving the process for the next AO cycle. The process for initializing the workshop was to solicit comments from the communities involved in the program and to use the feedback as the basis for establishing the workshop agenda. The following four sessions were developed after reviewing and synthesizing both the formal feedback received and informal feedback obtained during discussions with various participants: (1) Science and Return on Investment; (2) Technology vs. Risk; Mission Success and Other Factors; (3) Cost; and (4) AO.AO Process Changes and Program Management.

Saunders, M.↗

A History of Aerospace Problems, Their Solutions, Their Lessons

The positive aspect of problem occurrences is the opportunity for learning and a challenge for innovation. The learning aspect is not restricted to the solution period of the problem occurrence, but can become the beacon for problem prevention on future programs. Problems/failures serve as a point of departure for scaling to new designs. To ensure that problems/failures and their solutions guide the future programs, a concerted effort has been expended to study these problems, their solutions, their derived lessons learned, and projections for future programs. This includes identification of technology thrusts, process changes, codes development, etc. However, they must not become an excuse for adding layers upon layers of standards, criteria, and requirements, but must serve as guidelines that assist instead of stifling engineers. This report is an extension of prior efforts to accomplish this task. Although these efforts only scratch the surface, it is a beginning that others must complete.

Ryan, R. S.↗

Evidence for Ancient Life in Mars Meteorites: Lessons Learned

The lines of evidence we first proposed as supporting a hypothesis of early life on Mars are discussed by Treiman, who presents pros and cons of our hypothesis in the light of subsequent research by many groups. Our assessment of the current status of the many controversies over our hypothesis is given in reports by Gibson et al. Rather than repeat or elaborate on that information, I prefer to take an overview and present what I think are some of the "lessons learned" by our team in particular, and by the science community in general.

McKay, D. S.↗

Lesson Plan Prototype for International Space Station's Interactive Video Education Events

The outreach and education components of the International Space Station Program are creating a number of materials, programs, and activities that educate and inform various groups as to the implementation and purposes of the International Space Station. One of the strategies for disseminating this information to K-12 students involves an electronic class room using state of the art video conferencing technology. K-12 classrooms are able to visit the JSC, via an electronic field trip. Students interact with outreach personnel as they are taken on a tour of ISS mockups. Currently these events can be generally characterized as: Being limited to a one shot events, providing only one opportunity for students to view the ISS mockups; Using a "one to many" mode of communications; Using a transmissive, lecture based method of presenting information; Having student interactions limited to Q&A during the live event; Making limited use of media; and Lacking any formal, performance based, demonstration of learning on the part of students. My project involved developing interactive lessons for K-12 students (specifically 7th grade) that will reflect a 2nd generation design for electronic field trips. The goal of this design will be to create electronic field trips that will: Conform to national education standards; More fully utilize existing information resources; Integrate media into field trip presentations; Make support media accessible to both presenters and students; Challenge students to actively participate in field trip related activities; and Provide students with opportunities to demonstrate learning

Zigon, Thomas↗

Designing Specification Languages for Process Control Systems: Lessons Learned and Steps to the Future

Previously, we defined a blackbox formal system modeling language called RSML (Requirements State Machine Language). The language was developed over several years while specifying the system requirements for a collision avoidance system for commercial passenger aircraft. During the language development, we received continual feedback and evaluation by FAA employees and industry representatives, which helped us to produce a specification language that is easily learned and used by application experts. Since the completion of the PSML project, we have continued our research on specification languages. This research is part of a larger effort to investigate the more general problem of providing tools to assist in developing embedded systems. Our latest experimental toolset is called SpecTRM (Specification Tools and Requirements Methodology), and the formal specification language is SpecTRM-RL (SpecTRM Requirements Language). This paper describes what we have learned from our use of RSML and how those lessons were applied to the design of SpecTRM-RL. We discuss our goals for SpecTRM-RL and the design features that support each of these goals.

Leveson, Nancy G.↗

Lessons Learned on Operating and Preparing Operations for a Technology Mission from the Perspective of the Earth Observing-1 Mission

The New Millennium Program's first Earth-observing mission (EO-1) is a technology validation mission. It is managed by the NASA Goddard Space Flight Center in Greenbelt, Maryland and is scheduled for launch in the summer of 2000. The purpose of this mission is to flight-validate revolutionary technologies that will contribute to the reduction of cost and increase of capabilities for future land imaging missions. In the EO-1 mission, there are five instrument, five spacecraft, and three supporting technologies to flight-validate during a year of operations. EO-1 operations and the accompanying ground system were intended to be simple in order to maintain low operational costs. For purposes of formulating operations, it was initially modeled as a small science mission. However, it quickly evolved into a more complex mission due to the difficulties in effectively integrating all of the validation plans of the individual technologies. As a consequence, more operational support was required to confidently complete the on-orbit validation of the new technologies. This paper will outline the issues and lessons learned applicable to future technology validation missions. Examples of some of these include the following: (1) operational complexity encountered in integrating all of the validation plans into a coherent operational plan, (2) initial desire to run single shift operations subsequently growing to 6 "around-the-clock" operations, (3) managing changes in the technologies that ultimately affected operations, (4) necessity for better team communications within the project to offset the effects of change on the Ground System Developers, Operations Engineers, Integration and Test Engineers, S/C Subsystem Engineers, and Scientists, and (5) the need for a more experienced Flight Operations Team to achieve the necessary operational flexibility. The discussion will conclude by providing several cost comparisons for developing operations from previous missions to EO-1 and discuss some details that might be done differently for future technology validation missions.

Mandl, Dan↗

Lessons Learned During Implementation and Early Operations of the DS1 Beacon Monitor Experiment

A new approach to mission operations will be flight validated on NASA's New Millennium Program Deep Space One (DS1) mission which launched in October 1998. The Beacon Monitor Operations Technology is aimed at decreasing the total volume of downlinked engineering telemetry by reducing the frequency of downlink and the volume of data received per pass. Cost savings are achieved by reducing the amount of routine telemetry processing and analysis performed by ground staff. The technology is required for upcoming NASA missions to Pluto, Europa, and possibly some other missions. With beacon monitoring, the spacecraft will assess its own health and will transmit one of four beacon messages each representing a unique frequency tone to inform the ground how urgent it is to track the spacecraft for telemetry. If all conditions are nominal, the tone provides periodic assurance to ground personnel that the mission is proceeding as planned without having to receive and analyze downlinked telemetry. If there is a problem, the tone will indicate that tracking is required and the resulting telemetry will contain a concise summary of what has occurred since the last telemetry pass. The primary components of the technology are a tone monitoring technology, AI-based software for onboard engineering data summarization, and a ground response system. In addition, there is a ground visualization system for telemetry summaries. This paper includes a description of the Beacon monitor concept, the trade-offs with adapting that concept as a technology experiment, the current state of the resulting implementation on DS1, and our lessons learned during the initial checkout phase of the mission. Applicability to future missions is also included.

Sherwood, Rob↗

ACTS Ka-Band Earth Stations: Technology, Performance, and Lessons Learned

The Advanced Communications Technology Satellite (ACTS) Project invested heavily in prototype Ka-band satellite ground terminals to conduct an experiments program with ACTS. The ACTS experiments program proposed to validate Ka-band satellite and ground-station technology, demonstrate future telecommunication services, demonstrate commercial viability and market acceptability of these new services, evaluate system networking and processing technology, and characterize Ka-band propagation effects, including development of techniques to mitigate signal fading. This paper will present a summary of the fixed ground terminals developed by the NASA Glenn Research Center and its industry partners, emphasizing the technology and performance of the terminals and the lessons learned throughout their 6-year operation, including the inclined orbit phase-of-operations. The fixed ground stations used for experiments by government, academic, and commercial entities used reflector-based offset-fed antenna systems with antennas ranging in size from 0.35 to 3.4 in. in diameter. Gateway earth stations included two systems referred to as the NASA Ground Station (NGS) and the Link Evaluation Terminal (LET).

Reinhart, Richard C.↗

The Advanced Communications Technology Satellite - Performance, Reliability and Lessons Learned

The Advanced Communications Satellite (ACTS) was conceived and developed in the mid- 1980s as an experimental satellite to demonstrate unproven Ka-band technology, and potential new commercial applications and services. Since launch into geostationary orbit in September 1993. ACTS has accumulated almost seven years of essentially trouble-free operation and met all program objectives. The unique technology, service experiments. and system level demonstrations accomplished by ACTS have been reported in many forums over the past several years. As ACTS completes its final experiments activity, this paper will relate the top-level program goals that have been achieved in the design, operation, and performance of the particular satellite subsystems. Pre-launch decisions to ensure satellite reliability and the subsequent operational experiences contribute to lessons learned that may be applicable to other comsat programs.

Krawczyk, Richard J.↗

Using Model-Based Reasoning for Autonomous Instrument Operation - Lessons Learned From IMAGE/LENA

Model-based reasoning has been applied as an autonomous control strategy on the Low Energy Neutral Atom (LENA) instrument currently flying on board the Imager for Magnetosphere-to-Aurora Global Exploration (IMAGE) spacecraft. Explicit models of instrument subsystem responses have been constructed and are used to dynamically adapt the instrument to the spacecraft's environment. These functions are cast as part of a Virtual Principal Investigator (VPI) that autonomously monitors and controls the instrument. In the VPI's current implementation, LENA's command uplink volume has been decreased significantly from its previous volume; typically, no uplinks are required for operations. This work demonstrates that a model-based approach can be used to enhance science instrument effectiveness. The components of LENA are common in space science instrumentation, and lessons learned by modeling this system may be applied to other instruments. Future work involves the extension of these methods to cover more aspects of LENA operation and the generalization to other space science instrumentation.

Johnson, Michael A.↗

A Balanced Model for Exploration of the Terrestrial Planets: Lessons from the Lunar Experience

The Moon is the only extraterrestrial rocky body for which we have a combination of surface-selected samples, high-resolution orbital photography (Lunar Orbiter), manned and robotic surface exploration (Surveyor, Apollo, Luna), and global compositional, mineralogical, and geophysical data (Galileo, Clementine, Lunar Prospector). Beginning in 1998, CAPTEM organized a series of workshops and conference sessions aimed at integrating these diverse data sets. The insights gained by bringing together scientists from the remote-sensing and sample-analysis communities have been singularly rewarding. Not least of these has been the recognition by both groups that having both kinds of data maximizes the scientific return and permits reconciling information from diverse scales and perspectives. The 20-20 hindsight of the Lunar experience thus provides important lessons; learning from mistakes as well as successes, we can derive a sensible scientific program for Mars exploration. In this abstract, we describe examples of key information from (a) in-situ geologic investigation, (b) laboratory analysis of returned samples whose geologic context and location are known, and (c) global remote sensing of mineralogy, composition, and geophysical parameters. We then show the value of integrating these diverse data sets.

Jolliff, B. L.↗

Lessons Learned from the Construction of Upgrades to the NASA Glenn Icing Research Tunnel and Re-activation Testing

Major upgrades were made in 1999 to the 6- by 9-Foot (1.8- by 2.7-m) Icing Research Tunnel (IRT) at the NASA Glenn Research Center. These included replacement of the electronic controls for the variable-speed drive motor, replacement of the heat exchanger, complete replacement and enlargement of the leg of the tunnel containing the new heat-exchanger, the addition of flow-expanding and flow-contracting turning vanes upstream and downstream of the heat exchanger, respectively, and the addition of fan outlet guide vanes (OGV's). This paper presents an overview of the construction and reactivation testing phases of the project. Important lessons learned during the technical and contract management work are documented.

Sheldon, David W.↗

The Biological Relevance of Artificial Life: Lessons from Artificial Intelligence

There is no fundamental reason why A-life couldn't simply be a branch of computer science that deals with algorithms that are inspired by, or emulate biological phenomena. However, if these are the limits we place on this field, we miss the opportunity to help advance Theoretical Biology and to contribute to a deeper understanding of the nature of life. The history of Artificial Intelligence provides a good example, in that early interest in the nature of cognition quickly was lost to the process of building tools, such as "expert systems" that, were certainly useful, but provided little insight in the nature of cognition. Based on this lesson, I will discuss criteria for increasing the biological relevance of A-life and the probability that this field may provide a theoretical foundation for Biology.

Colombano, Silvano↗

Launch Vehicle Design Process: Characterization, Technical Integration, and Lessons Learned

Engineering design is a challenging activity for any product. Since launch vehicles are highly complex and interconnected and have extreme energy densities, their design represents a challenge of the highest order. The purpose of this document is to delineate and clarify the design process associated with the launch vehicle for space flight transportation. The goal is to define and characterize a baseline for the space transportation design process. This baseline can be used as a basis for improving effectiveness and efficiency of the design process. The baseline characterization is achieved via compartmentalization and technical integration of subsystems, design functions, and discipline functions. First, a global design process overview is provided in order to show responsibility, interactions, and connectivity of overall aspects of the design process. Then design essentials are delineated in order to emphasize necessary features of the design process that are sometimes overlooked. Finally the design process characterization is presented. This is accomplished by considering project technical framework, technical integration, process description (technical integration model, subsystem tree, design/discipline planes, decision gates, and tasks), and the design sequence. Also included in the document are a snapshot relating to process improvements, illustrations of the process, a survey of recommendations from experienced practitioners in aerospace, lessons learned, references, and a bibliography.

Blair, J. C.↗

Compton Gamma Ray Observatory: Lessons Learned in Propulsion

The Compton Gamma Ray Observatory was the second of NASA's Great Observatories. At 17 1/2 tons. it was the heaviest astrophysical payload ever flown at the time of its launch on April 5, 1991 aboard the Space Shuttle. During initial, on-orbit priming of the spacecraft's monopropellant hydrazine propulsion system, a severe waterhammer transient was experienced. At that time, anomalous telemetry readings were received from on-board propulsion system instrumentation. This led to ground analyses and laboratory investigations as to the root cause of the waterhammer, potential damage to system integrity and functionality, and risks for switching from the primary (A-side) propulsion system to the redundant (B-side) system. The switchover to B-side was ultimately performed successfully and the spacecraft completed its basic and extended missions in this configuration. Nine years later, following a critical control gyroscope failure, Compton was safely deorbited and re-entered the Earth's atmosphere on June 4, 2000. Additional risk assessments concerning viability of A- and B-sides were necessary to provide confidence in attitude and delta-V authority and reliability to manage the precisely controlled reentry. This paper summarizes the design and operation of the propulsion system used on the spacecraft and provides "lessons learned" from the system engineering investigations into the propellant loading procedures, the initial priming anomaly, mission operations, and the commanded re-entry following the gyro failure.

Dressler, G. A.↗

Lessons from Adaptive Level One Accelerator (ALOA) System Implementation

The Adaptive Level One Accelerator (ALOA) system was developed as part of the Earth Science Data and Information System (ESDIS) project. The reconfigurable computing technologies were investigated for Level 1 satellite telemetry data processing to achieve computing acceleration and cost reduction for the next-generation Level 1 data processing systems. The MODIS instrument calibration algorithm was implemented using reconfigurable a computer. The system development process and the lessons learned throughout the design cycle are summarized in this paper.

Patel, Umesh D.↗