Search NASA⌕ Search

SEARCH · Search NASA

Results for “office building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

345 records · Page 20

Investigation of Hardware and Instrumentation to Measure Hand Grasp Activity with the Spacesuit Gloves

Introduction: During the 2022 suited injury summit, it was hypothesized that there will be concerns for hand and glove injuries for future exploration space missions, especially given the fact that the “total number of Extravehicular activity (EVA) hours and frequency” for lunar surface missions is expected to vastly increase [1]. It has been reported that the hands experienced the greatest “absolute numbers” of reported injuries and far exceeds other injuries during EVA [1, 2]. It was reported that the most fatiguing part of the surface EVA was the repetitive gripping tasks [3]. It was recommended that a “glove sub-team” be created to look at possible injury mechanism and mitigation strategies. Some of the recommendations that were suggested [1] are as follows: examine hand fatigue, utilize motion capture, examine the duration and frequency of hand movements, and identify frequent hand motions. We started assessing hardware and instrumentation to measure hand grasp activity in the pressurized glove environment. The purpose of this test was to perform a hardware evaluation for motion capture (MoCap) gloves obtained from StretchSense (Auckland, New Zealand). The specific gloves used were the Pro Fidelity and SuperSplay to determine the repeatability, reliability, feasibility, and useability inside of a pressurized gloved environment. Methods: The MoCap gloves were customized (e.g., battery/Bluetooth pack relocated to upper arm) to better suit the pressurized testing environment and protect the subject from unintentional injury (Fig. 1). Fourteen total subjects from different demographics (i.e., gender and pressurized glove experience level) participated in this test series. Testing included one session each of a baseline data collection (NASA Johnson Space Center (JSC) building 21) and a spacesuit glove box (Fig. 2 at JSC building 7 room 2027) data collection (under vacuum down to 4.3 psid), where each session lasted 3-5 hours. Controlled and reproducible tasks to systematically evaluate the repeatability and reliability of the hardware were performed during baseline data collection. Additionally, subjects performed simulated EVA-like tasks in a pressurized gloved environment. For all sessions, MoCap gloves were placed on each of the subjects’ hands and the signal from it, or the raw capacitance (Fig. 3), was analysed. The raw capacitance was used to estimate the open and closed hand states between the testing conditions and allow us to provide an offset caused by the pressurized environment. Results & Discussion: Initial observation with the bare hands (baseline) condition showed that the MoCap gloves appeared to track grasping and releasing of the fingers (opening and closing fist) with both high- and low-speed conditions, while adduction and abduction of the fingers were not relatively tracked. A hardware evaluation was done outside of the glove box to assess the reliability and repeatability of the MoCap glove. In one task, a point force was applied to various locations on the back of the hand. When the point force was applied to the space between the 1st digit and the pointer finger, there was a noticeable distortion to the MoCap data. Another task examining an increasing force from a 10 lb. sandbag applied to the back of the hand while lying flat on a table, showed a constant flat line with only a distortion when the weight was increased or added to the back of the hand. Fig. 3 shows an object relocation task where you can see when each individual finger “opened” and “closed” (changed position) when picking up and setting down the dumbbell. When the fingers were stationary, the signal remained relatively flat compared to the peaks and valleys that can be observed in Fig. 3. This study showed promising results and imperative input into an attempt to discriminate between hand states across various functional tasks and should be evaluated with context to the repeatability and reliability outcomes. Depending on the task done inside of the pressurized glove box environment and outside, the results appear to be affected by many different factors (i.e., drift, pressure, hand size, etc.). Significance: If this hardware proves to be reliable and repeatable in determining the open and closed hand states then this may provide critical insight into assisting in the characterization of the pressurized gloved environment and the effect on crew member exertion level. Ultimately, this tool will provide useful data for quantifying the repetitive nature of EVA training and tasks. Acknowledgments: The authors would like to acknowledge the NASA Mars Campaign Office for providing funding for this research. Lastly, thanks to all the engineers and technicians at NASA JSC who helped with this data collection. References: [1] Reiber, et al. (2022), NASA/TM-20220007605; [2] Scheuring, et al. (2009), Av., Sp., and Envir. Med. 80(2). [3] Scheuring, et al. (2007), NASA/TM–2007–214755.

Rachel L Thompson↗

Imagery Integration Team

The Human Exploration Science Office (KX) provides leadership for NASA's Imagery Integration (Integration 2) Team, an affiliation of experts in the use of engineering-class imagery intended to monitor the performance of launch vehicles and crewed spacecraft in flight. Typical engineering imagery assessments include studying and characterizing the liftoff and ascent debris environments; launch vehicle and propulsion element performance; in-flight activities; and entry, landing, and recovery operations. Integration 2 support has been provided not only for U.S. Government spaceflight (e.g., Space Shuttle, Ares I-X) but also for commercial launch providers, such as Space Exploration Technologies Corporation (SpaceX) and Orbital Sciences Corporation, servicing the International Space Station. The NASA Integration 2 Team is composed of imagery integration specialists from JSC, the Marshall Space Flight Center (MSFC), and the Kennedy Space Center (KSC), who have access to a vast pool of experience and capabilities related to program integration, deployment and management of imagery assets, imagery data management, and photogrammetric analysis. The Integration 2 team is currently providing integration services to commercial demonstration flights, Exploration Flight Test-1 (EFT-1), and the Space Launch System (SLS)-based Exploration Missions (EM)-1 and EM-2. EM-2 will be the first attempt to fly a piloted mission with the Orion spacecraft. The Integration 2 Team provides the customer (both commercial and Government) with access to a wide array of imagery options - ground-based, airborne, seaborne, or vehicle-based - that are available through the Government and commercial vendors. The team guides the customer in assembling the appropriate complement of imagery acquisition assets at the customer's facilities, minimizing costs associated with market research and the risk of purchasing inadequate assets. The NASA Integration 2 capability simplifies the process of securing one-of-a-kind imagery assets and skill sets, such as ground-based fixed and tracking cameras, crew-in the-loop imaging applications, and the integration of custom or commercial-off-the-shelf sensors onboard spacecraft. For spaceflight applications, the Integration 2 Team leverages modeling, analytical, and scientific resources along with decades of experience and lessons learned to assist the customer in optimizing engineering imagery acquisition and management schemes for any phase of flight - launch, ascent, on-orbit, descent, and landing. The Integration 2 Team guides the customer in using NASA's world-class imagery analysis teams, which specialize in overcoming inherent challenges associated with spaceflight imagery sets. Precision motion tracking, two-dimensional (2D) and three-dimensional (3D) photogrammetry, image stabilization, 3D modeling of imagery data, lighting assessment, and vehicle fiducial marking assessments are available. During a mission or test, the Integration 2 Team provides oversight of imagery operations to verify fulfillment of imagery requirements. The team oversees the collection, screening, and analysis of imagery to build a set of imagery findings. It integrates and corroborates the imagery findings with other mission data sets, generating executive summaries to support time-critical mission decisions.

Calhoun, Tracy↗

Ares I and Ares V First Stage - Powering Exploration

The National Aeronautics and Space Administration (NASA) Ares Projects Office (APO) is continuing to make progress toward the final design of the first stage propulsion system for the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Ares I and Ares V will provide the space launch capabilities needed to fulfill NASA' s exploration strategy of sending human beings to the Moon, Mars, and beyond. As primary propulsion for the Ares launch vehicles, the Space Shuttle-derived Reusable Solid Rocket Motor (RSRM) is one of the first and most important components to be tested. The first flight of Ares I, called Ares I-X, will occur in April 2009, with booster integration to begin at Kennedy Space Center (KSC) by autumn 2008. The Ares I-X flight will use a combination of flight and simulation hardware to obtain data on controlling the long and narrow crew launch vehicle configuration. The test will use a four-segment RSRM from the Shuttle inventory and a fifth spacer segment to simulate the size and weight of the operational five-segment motor to be used on later flights. The upper stage, Orion crew exploration vehicle, and launch abort system will all be replaced with simulator hardware. Manufacturing work has begun on the spacer segment, as well as the new forward hardware for the booster. Atlas V avionics will be adapted to control Ares I-X' s first stage. That hardware is undergoing hardware-in-the-loop testing in a contractor-provided systems integration laboratory (SIL); a critical design review (CDR) was completed in December 2007. Drogue and main parachute drop tests have also been conducted successfully at Yuma Proving Grounds, allowing the First Stage team to begin fabricating parachutes for Ares I-X. The Ares I-X flight test will be the first flight test for the parachutes. A series of preliminary design technical interchange meetings is being conducted prior to the Ares I-X CDR in January 2007 to ensure readiness for the flight. Much of the First Stage activity in 2007 has focused on a series of preliminary design (PDR) activities associated with each booster subsystem. These events will culminate in a formal preliminary design review in 2008, where subsystems and component specifications will be developed and associated analyses and drawings will be evaluated for technical adequacy. The first stage also has been undergoing a series of trade studies to determine means for upgrading booster performance and reducing operational costs. Performance improvement studies have included changing from polybutadiene acrylonitrile (PBAN) propellant to hydroxyl-terminated polybutadiene (HTPB); replacing aluminum with composite motor casings; and optimizing or upgrading the propellant grain and nozzle structures. Some or all of these changes could result in a block upgrade to the Ares I first stage, after becoming the standard configuration for the Ares V. The cost reduction studies included a change from reusable or recoverable boosters to completely expendable boosters; changing from hydrazine-powered to more environmentally friendly electrohydrostatic actuators (EHAs) on the thrust vector control (TVC) system; and changing the location of the separation plane to reduce the likelihood of recontact upon booster separation. The expendability trade study resulted in a decision to keep the recoverable boosters, as the new hardware costs significantly outweighed the potential operational cost savings due to reduced ground operations. Likewise, due to cost considerations, the team continued using existing hydrazine-powered actuators for the TVC system. The separation plane location for Ares I is still being studied, with results to be announced in 2008. In short, the Ares launch vehicles' first stage is building upon NASA's close familiarity with this Shuttle-derived system, while continuing to seek out improvements for long-term exploration.

Priskos, Alex S.↗