ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

Business Case Analysis for Replacing the Mazak 30Y Mill-Turn Machine in SM-39. Summary

Business case studies are being looked at to support procurement of new machines and capital equipment in the SM-39 and TA-03-0102 machine shops. The first effort conducted economic analysis of replacing the Mazak 30Y Mill-Turn Machine located in SM-39. To determine the value of switching machinery, a baseline scenario was compared with a future scenario where new machinery was purchased and installed. The conditions under the two scenarios were defined via interviews with subject matter experts in terms of one-time and periodic costs. The results of the analysis were compiled in a life-cycle cost/benefit table. The costs of procuring, installing, and maintaining a new machine were balanced against the costs avoided by replacing older machinery. Productivity savings were included as a measure to show the costs avoided by being able to produce parts at a quicker and more efficient pace.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

HPC - Platforms Penta Chart

Strategy, Planning, Acquiring- very large scale computing platforms come and go and planning for immensely scalable machines often precedes actual procurement by 3 years. Procurement can be another year or more. Integration- After Acquisition, machines must be integrated into the computing environments at LANL. Connection to scalable storage via large scale storage networking, assuring correct and secure operations. Management and Utilization – Ongoing operations, maintenance, and trouble shooting of the hardware and systems software at massive scale is required.

Computer Hardware↗

High Tonnage Forest Biomass Production Systems from Southern Pine Energy Plantations

In this study, a high-tonnage harvesting system designed specifically to operate efficiently in the expected stand types of a bioenergy scenario was built, deployed, and evaluated in a production setting. Stands on which the system was evaluated exhibited the heavy stocking levels (> 600 stems per acre) and tree size distributions with significant volume in small stems (down to 2” DBH) that were expected in the modified energy plantation silvicultural approach. The harvest system also was designed to be functional in the traditional plantation stands dominating the commercial forestry landscape in the region. The Tigercat 845D feller buncher, which was a prototype machine designed for the high tonnage harvest system, used a boom-mounted prototype DT1802 shear felling head and incorporated a number of options intended to maximize its small-stem productivity, including: a high-speed shear severing system that was cheaper to operate than a saw; a large-pocket felling head that allowed larger accumulations of small stems to be built before expending the time to drop them for the skidder; efficient, low ground pressure, tracked carrier system to decrease the amount of maneuvering, saving time and minimizing soil disturbance; and various energy-saving devices to lower fuel costs and minimize air quality impacts. Overall, the feller buncher represented a quantum advance in small-stem harvesting technology. Extensive testing showed the machine’s production rate to be relatively insensitive to piece size, much less so than comparable traditional equipment. In plantation stands, the feller buncher was able to produce approximately 100 green tons of biomass per productive machine hour (PMH), and in natural stands, it produced nearly 120 green tons per PMH. The ability of the high tonnage feller buncher to maintain high productivity in stands with smaller diameter stems is something that has not been achieved in previous feller buncher designs. The Tigercat 845D feller buncher is now a production machine for Tigercat and is being sold in their current product line. The high-speed felling system was paired with a Tigercat 630D skidder and high-capacity grapple; one that could match the felling productivity when pulling small stems. The harvesting system minimized hourly costs using a single, high-capacity skidder (with a single operator), rather than two smaller ones, which is the traditional practice. The skidder itself can be considered a mid-range size and had an engine no larger than other machines in its class, but it incorporated a very large capacity 25 ft2 grapple. The large grapple is well suited to grabbing and hauling a large bunch of small-diameter trees, as produced by the high tonnage feller buncher. The grapple worked effectively in larger stems as well, but its ability to carry large numbers of small stems meant the average payload did not drop as stand DBH decreased. Tests with the machine indicated its travel speeds were nearly the same as, or perhaps slightly better than, conventionally equipped skidders, but grapple capacity was 75% larger. Productivity and cost per ton of the new skidder were better than conventional skidders for average skid distances of any length greater than 100 feet. Measured skidder productivity was as high as 143 gt/PMH. Its productivity exceeded that of the high-capacity feller buncher for skid distances out to nearly 700 feet, so system productivity could be expected to remain high for stands of a size typical in the southern U.S. The Tigercat 630D skidder is a production machine for Tigercat and the large grapple can now be ordered by customers using it for small diameter trees. When the feller buncher and skidder are analyzed as a two-machine system, overall productivity is fixed at the level of the least productive machine. Results from a set of side-by-side tests in the same density stand with conventional feller bunchers and skidders showed that the high tonnage system produced 97 gt/PMH versus 68 gt/PMH for a comparable conventional system. Machine rate costs for felling and skidding were $2.31/gt and $3.72/gt for the high tonnage, and conventional systems, respectively. However, the most significant result of the project is that the high tonnage system was shown to be relatively insensitive to tree size. This ability to maintain felling and skidding productivity and cost as tree size decreases is a breakthrough in harvesting systems for southern pine plantations. The concept of transpirational drying of woody biomass was tested at an industrial scale at multiple locations during this project. Felled trees were allowed to dry in two scenarios: 1) in bunches where they were felled, and 2) in roadside piles. Although the wood piled in large piles at roadside did experience drying, the wood left in bunches experienced a greater moisture reduction. Drying times of 72 days in the late summer resulted in mean wood moisture content of 26% for skidder bunches and 39% for the large pile at roadside as compared to moisture contents of 55% to 58% for freshly cut trees. An existing whole-tree chipper, Precision 2675, was modified to allow production of chips smaller than the traditional pulp size chip (i.e. “microchips”). Feed rates and knife placements were retained in the new design, while additional pockets were incorporated in the chipper disk to allow the attachment of either four knives for pulp chips or eight knives for microchips. This design facilitated switching between the energy and pulp chip product options at relatively low expense (about ½ day downtime). Chipping of whole-trees into pulp chips and microchips with the Precision 2675 disk chipper resulted in average productivities of 79.5 gt/PMH and 70.7 gt/PMH, respectively. Production rates of the chipper were lower when producing microchips by about 10% relative to producing pulp chips, but rates were similar to those achievable when making clean pulp chips. Particle size analysis for clean pine microchips revealed 26.6% retention on a 13 mm (slightly less than 3/8-inch) round hole screen and 25.9% retention for whole-tree pine microchips. For comparison, clean pine pulp chips had 52.2% retained. Ash content (% dry basis) was 0.54% for clean pine microchips and 0.62% for whole-tree pine microchips. Ash content for clean pine pulp chips was 0.39%. For transpirationally-dried material there was 38.1% retention for whole-tree microchips on a 13mm screen compared to 70.1% for dried clean pulp chips. Ash content was 0.78% and 0.44% respectively for these two chip types. Clean pine microchips stored at roadside had 25.2% retention on a 13 mm screen and 0.50% ash content. For mixed species (pine and hardwood), whole-tree microchips had 25.1% retention on a 13 mm screen compared to 50.6% for whole-tree pulp chips. Ash content was 2.12% and 2.74% respectively for these two chip types. Clean hardwood microchips stored at roadside had 35.0% retention on a 13 mm screen and an ash content of 1.24%. There are two significant advantages to using transpirational drying: reduced transportation costs, and reduced drying costs (capital and operating costs) for the biorefinery. This project evaluated the potential to reduce transportation costs through transpirational drying, and it included a component that tested higher capacity chip trailers (23% larger volume) to be able to transport dry wood with a lower bulk density. For transpirationally-dried chips at 35% MC, the high-capacity trailers achieved loads with a mean payload of 24 tons with maximum payloads of 29 tons. The typical legal payload on this trailer is 28.5 tons. Therefore, the project demonstrated that it is possible to achieve maximum legal payloads on chip trailers with transpirationally dried wood. Assuming that the truck is loaded to the legal payload limit, the transportation costs of chips can be reduced from $15.91/dry ton (dt) for 56% MC wood to $10.77/dt for transpirationally dried wood at 35% MC (for an example 50-mile haul distance at $0.14 per one-way ton-mile). For longer haul distances, these savings in trucking costs become even more significant. These results have demonstrated how significant savings in transportation costs can be achieved through transpirational drying. Also, these results show that it may be possible to increase the procurement radius for a biorefinery by using transpirational drying. Further cost reductions can be realized by the biorefinery when drying costs are reduced. The goal of this study was development of a timber harvesting system as productive in stands optimized for biomass production as it was in stands grown for roundwood markets. If that goal is achieved, a logger can invest in a single suite of equipment and operate efficiently in any future silvicultural regime that might include energy feedstocks as an output. It was the premise of the study that a future biomass market would shift the age distribution and stem size in stands grown for energy downward, and the key strategy in developing a harvest system for that scenario would be creating one with logging costs relatively insensitive to tree size. Our vision for such a system included a felling machine with a large capacity head to minimize time spent building bunches, plus a skidder capable of moving large volumes of small trees. The study proposed building the system and testing it against existing equipment in stands similar to those envisioned as resulting from biomass-optimized silviculture. As stated previously, the new feller buncher and skidder evaluated on their own merits showed their designs were clearly a step in the right direction - their productivity was indeed high and less sensitive to reductions in stem size. Cost projections based on extensive time and production studies of the high tonnage and benchmark operations showed modest advantages in FOB costs of the new system in both ‘average’ and simulated ‘energy’ stands (7.7% and 9.5%, respectively). But it was clear, when coupled into a traditional logging system, the in-woods productivity advantage of the modified equipment was easily overwhelmed by inefficiencies in chipping or trucking. Some additional savings can be achieved by spreading the cost of the feller buncher over multiple chipping operations (another 7.5%), but generally, in stands with average DBH above 6 inches, the in-woods equipment was not limiting productivity, and costs were driven by chipping and transport. Our results were a positive step in lowering delivered cost of trees grown for energy purposes, but they also argue strongly for a more comprehensive approach in solving this issue. The procurement system in its entirety has to be optimized to take full advantage of the productivity gains achieved with the machines and transpirational drying techniques developed in this project. We have to understand the true costs of all logistical options, particularly those of the choice in chipping strategy and in truck allocation, both of which seemed, in this study, to be the greatest source of variability in cost, and often the most expensive operations as well.

09 BIOMASS FUELS↗

Foundational Report Series: Advanced Distribution Management Systems for Grid Modernization, Implementation Strategy for a Distribution Management System

Electric distribution utilities encounter many challenges to successful deployment of Distribution Management Systems (DMSs). The key challenges are documented in this report, along with suggestions for overcoming them. This report offers a recommended list of activities for implementing a DMS. It takes a strategic approach to implementing DMS from a project management perspective. The project management strategy covers DMS planning, procurement, design, building, testing, Installation, commissioning, and system integration issues and solutions. It identifies the risks that are associated with implementation and suggests strategies for utilities to use to mitigate them or avoid them altogether. Attention is given to common barriers to successful DMS implementation. This report begins with an overview of the implementation strategy for a DMS and proceeds to put forward a basic approach for procuring hardware and software for a DMS; designing the interfaces with external corporate computing systems such as EMS, GIS, OMS, and AMI; and implementing a complete solution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Report on the Installation and Preparedness of a Protochips Fusion in-situ Heating Holder for TEM

This brief report documents the procurement and installation of a Protochips Fusion (formerly Aduro) high-temperature, high stability transmission electron microscopy (TEM) specimen holder that allows for the high spatial resolution characterization of material specimens at high temperature in situ of an electron microscope. This specimen holder was specifically procured for use with The FEI Talos F200X Scanning/Transmission Electron Microscope (STEM) in Oak Ridge National Laboratory’s (ORNL’s) Low Activation Materials Development and Analysis (LAMDA) Laboratory. The Protochips Fusion holder will enable high-resolution structural and chemical analysis of irradiated materials at high temperature, becoming a unique capability worldwide, and would encourage high-quality in situ experiments to be conducted on irradiated materials.

47 OTHER INSTRUMENTATION↗

Policies for Enabling Corporate Sourcing of Renewable Energy Internationally: A 21st Century Power Partnership Report

This paper explores the policy and regulatory enabling environment for corporate sourcing of renewables. The paper has been developed in support of the Corporate Sourcing of Renewables Campaign, which was launched at the Clean Energy Ministerial (CEM) meeting in June 2016. Through the campaign, a subset of CEM member governments is collaborating with corporate and nongovernmental organization partners to facilitate increased corporate procurement of renewables and pursue supportive policies for corporate procurement. This paper finds that policy certainty is essential to creating vibrant markets for renewable energy. While policymakers may need to adjust policy mechanisms over time as markets go through different stages of maturity, they must also consider the economic decisions that end-users make in evaluating projects. Policy interaction is also important to consider because buyers seek assurances that their investments in renewables have impact and wish to make clear claims about their renewable energy purchases.

21st Century Power Partnership↗

U.S. Renewables Portfolio Standards: 2017 Annual Status Report

Berkeley Lab’s annual status report on U.S. renewables portfolio standards (RPS) provides an overview of key trends associated with U.S. state RPS policies. The report, published in slide-deck form, describes recent legislative revisions, key policy design features, compliance with interim targets, past and projected impacts on renewables development, and compliance costs. The 2017 edition of the report presents historical data through year-end 2016 and projections through 2030. Key trends from this edition of the report include the following: -Evolution of state RPS programs: Significant RPS-related policy revisions since the start of 2016 include increased RPS targets in DC, MD, MI, NY, RI, and OR; requirements for new wind and solar projects and other major reforms to the RPS procurement process in IL; and a new offshore wind carve-out and solar procurement program in MA. -Historical impacts on renewables development: Roughly half of all growth in U.S. renewable electricity (RE) generation and capacity since 2000 is associated with state RPS requirements. Nationally, the role of RPS policies has diminished over time, representing 44% of all U.S. RE capacity additions in 2016. However, within particular regions, RPS policies continue to play a central role in supporting RE growth, constituting 70-90% of 2016 RE capacity additions in the West, Mid-Atlantic, and Northeast. -Future RPS demand and incremental needs: Meeting RPS demand growth will require roughly a 50% increase in U.S. RE generation by 2030, equating to 55 GW of new RE capacity. To meet future RPS demand, total U.S. RE generation will need to reach 13% of electricity sales by 2030 (compared to 10% today), though other drivers will also continue to influence RE growth. -RPS target achievement to-date: States have generally met their interim RPS targets in recent years, with only a few exceptions reflecting unique state-specific policy designs. -REC pricing trends: Prices for renewable energy certificates (RECs) used to meet general RPS obligations fell in most markets in 2016, as surplus RPS supplies emerged in many regions. Price trends for solar RECs were more varied, with a particularly pronounced drop in MD. -RPS compliance costs and cost caps: RPS compliance costs totaled $3.0 billion in 2015 (the most-recent year for which relatively complete data are available), which equates to 1.6% of average retail electricity bills in RPS states. Though total U.S. RPS compliance costs rose from 2014, future cost growth in most RPS states will be capped by cost containment mechanisms.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessment of commercially available energy-efficient room air conditioners including models with low global warming potential (GWP) refrigerants

Improving the energy efficiency of room air conditioners (RACs) while transitioning to low global-warming-potential (GWP) refrigerants will be a critical step toward reducing the energy, peak load, and emissions impacts of RACs while keeping costs low. Previous research quantified the benefits of leapfrogging to high efficiency in tandem with the transition to low-GWP refrigerants for RACs (Shah et al., 2015) and identified opportunities for initial action to coordinate energy efficiency with refrigerant transition in economies constituting about 65% of the global RAC market (Shah et al., 2017). This report describes further research performed to identify the best-performing (i.e., most efficient and low-GWP-refrigerant using) RACs on the market, to support an understanding of the best available technology (BAT). Understanding BAT can help support market-transformation programs for high-efficiency and low-GWP equipment such as minimum energy performance standards (MEPS), labeling, procurement, and incentive programs. We studied RACs available in six economies—China, Europe, India, Japan, South Korea, and the United States—that together account for about 70% of global RAC demand, as well as other emerging economies. The following are our key findings: • Highly efficient RACs using low-GWP refrigerants, e.g., HFC-32 (R-32) and HC-290 (R-290), are commercially available today at prices comparable to similar RACs using high-GWP HCFC-22 (R-22) or HFC-410A (R-410A). • High efficiency is typically a feature of high-end products. However, highly efficient, cost-competitive (less than 1,000 or 1,500 U.S. dollars in retail price, depending on size) RACs are available. • Where R-22 is being phased out, high GWP R-410A still dominates RAC sales in most mature markets except Japan, where R-32 dominates. • In all of the economies studied except Japan, only a few models are energy efficient and use low-GWP refrigerants. For example, in Europe, India, and Indonesia, the highest-efficiency RAC models employ the low-GWP refrigerants R-32 or R-290. • RACs are available in most regions and worldwide that surpass the highest efficiency levels recognized by labeling programs. • Fixed-speed RACs using high-GWP and ozone-depleting R-22 refrigerant still dominate the market in many emerging economies. There is significant scope to improve RAC efficiency and transition to low-GWP refrigerants using commercially available technology and to design market-transformation programs for high-efficiency, low-GWP equipment including standards, labeling, procurement, and incentive programs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FY 2017-Progress Report on the Design and Construction of the Sodium Loop SMT-3

This report provides an update on the design of a forced-convection sodium loop to be used for the evaluation of sodium compatibility of advanced Alloy 709 with emphasis on long term exposures of tensile, creep, fatigue, creep fatigue, and fracture toughness ASTM-size specimens in support of ASME Code qualification and NRC licensing. The report is a deliverable (Level 4) in FY17 (M4AT-17AN1602094), under the Work Package AT-17AN160209, “Sodium Compatibility” performed by Argonne National Laboratory (ANL), as part of the Advanced Materials Program for the Advanced Reactor Technology. This work package enables the development of advanced structural materials by providing corrosion, microstructure, and mechanical property data from the standpoint of sodium compatibility of advanced structural alloys. The first sodium loop (SMT-1) with a single tank was constructed in 2011 at ANL and has been in operation for exposure of subsize sheet specimens of advanced alloys at a single temperature. The second sodium loop with dual tanks (SMT-2) was constructed in 2013 and has been in operation for the exposure of subsize sheet specimens of advanced alloys at two different temperatures. The current loop (SMT-3) has been designed to incorporate sufficient chamber capacity to expose a large number of ASTM-size specimens to evaluate the sodium effects on tensile, creep, fatigue, creep-fatigue, and fracture toughness properties, in support of ASME Code Qualification and USNRC Licensing. The design of individual components for the third sodium loop SMT-3 is almost complete. The design also has been sent to an outside vendor for piping analysis to be in compliance with ASME Code. A purchase order has been placed with an outside vendor for the fabrication of major components such as the specimen exposure tanks. However, we have contracted with another vendor to establish the piping design in compliance with ASME design codes. The piping design was completed in FY2017 and the information is being transmitted to the tank fabricator. The SMT-3 loop will be located in Building 206 adjacent to the currently operating SMT-2 loop. In addition, we have demolished the aged power supply system in Building 206 and installed a new transformer, wiring, and power panels for the new loop. Procurement of some of the long lead items such as valves, EM pumps, EM flowmeters, etc. is in progress and will continue in FY 2018. The construction of components such as cold trap, economizers, piping arrangement etc. will be performed in the central shops at ANL. About 150 liters of sodium for the loop will be procured in early FY2018. The loop system is designed to circulate sodium through the sample tanks and the associated loop without an operator for an extended period of time. With the three sodium loops (with single-tank, dual-tank and four–tanks), materials can be tested at different sodium temperatures, and large tensile, creep, fatigue, creep-fatigue, and fracture toughness specimens can be exposed to sodium for extended periods of time and generate data on mechanical properties in support of ASME Code Qualification and USNRC Licensing of advanced Alloy 709 for use as a structural material in SFRs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

City and County Solar PV Training Program, Module 1: Goal Setting and Clarification

This module will help attendees understand nuances between different types of renewable energy goals, the importance of terminology when setting and announcing goals, the value of formally clarifying priorities, and how priorities may impact procurement options. It is the first training in a series intended to help municipal staff procure solar PV for their land and buildings.

100% renewable↗

Robot deployable air sampling development suite

Many areas exist within the DOE EM complex where it is desired to obtain a better understanding of the environment through the use of sensors. Many of these areas are hazardous and/or inaccessible to humans requiring the development of capabilities and technologies to remotely access these areas for monitoring. Often it is desired to understand the air quality and basic environmental parameters of these inaccessible areas. The focus this LDRD was to identify and procure air and environmental sampling sensors of common interest to DOE facilities such as pH, Nitric Acid Concentration (NOx), humidity, temperature, and air velocity. Additionally, it was desired to procure a robotic platform as a basis developing a remotely deployable air sampling suite.

54 ENVIRONMENTAL SCIENCES↗

An On-Axis Tomography Holder for Correlative Electron and Atom Probe Microscopy

This document briefly outlines the procurement and commissioning of a Fishione Model 2050 on-axis rotational tomography specimen holder for the FEI F200X Talos Scanning Transmission Electron Microscope in Oak Ridge National Laboratory’s Low Activation Materials Development and Analysis (LAMDA) Laboratory. The Model 2050 specimen rod was successfully procured and commissioned and is now available to users.

47 OTHER INSTRUMENTATION↗

Weekly Update -- Scintillators and Mobile Imaging System

The Neutron Imaging (NI) project is developing innovative tools that will allow multimodal imaging and high-quality CT imaging of dense objects. To realize these goals a Flat Panel Detector (FPD) has been procured and novel scintillating materials are being investigated. A compact, mobile neutron imaging system is being designed and components procured

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design Installation and Operation of the Vortex ART Platform

ATS platforms are some of the largest, most complex, and most expensive computer systems installed in the United States at just a few major national laboratories. This milestone describes our recent efforts to procure, install, and test a machine called Vortex at Sandia National Laboratories that is compatible with the larger ATS platform Sierra at LLNL. In this milestone, we have 1) configured and procured a machine with similar hardware characteristics as Sierra ATS, 2) installed the machine, verified its physical hardware, and measured its baseline performance, and 3) demonstrated the machine's compatibility with Sierra ATS, and capacity for useful development and testing of Sandia computer codes (such as SPARC), including uses such as nightly regression testing workloads.

97 MATHEMATICS AND COMPUTING↗

Site Preparation Integration and Operation of Mini-Sierra ART System

ATS platforms are some of the largest, most complex, and most expensive computer systems installed in the United States at just a few major national laboratories. This milestone describes our recent efforts to procure, install, and test a machine called Vortex at Sandia National Laboratories that is compatible with the larger ATS platform Sierra at LLNL. In this milestone, we have 1) configured and procured a machine with similar hardware characteristics as Sierra ATS, 2) installed the machine, verified its physical hardware, and measured its baseline performance, and 3) demonstrated the machine’s compatibility with Sierra ATS, and capacity for useful development and testing of Sandia computer codes (such as SPARC), including uses such as nightly regression testing workloads.

97 MATHEMATICS AND COMPUTING↗

Thermally Conductive Backsheets (TCB) for Reduced Operating Temperatures

The performance of photovoltaic (PV) modules is primarily influenced by the plane of array (POA) irradiance and their operating temperature. The lower the module operating temperature, the higher is its performance. Increasing a module’s operating temperature reduces its power output due to an increase in the semiconductor’s intrinsic carrier density, leading to a reduction in the open-circuit voltage and, subsequently, reducing the maximum power point voltage. Reducing the operating temperature lowers the levelized cost of energy (LCOE) via increased energy production (i.e., more kilowatt hour over the life of the asset) and increased service lifetime (years in the field). The module operating temperature is dictated by the weather parameters and the thermal properties of module construction materials. The primary weather parameters influencing the PV module temperature are: the ambient temperature (directly related), irradiance (directly related), and wind speed (inversely related). The primary thermal properties of module construction materials influencing the PV module temperature are: the optical transmissivity and thermal conductivity of superstrate, the thermal conductivity of substrate, the thermal conductivity of encapsulant and the efficiency of the encapsulated solar cells. The primary goal of this study is to reduce the operating temperature of PV modules using thermally conductive backsheet (TCB) substrates developed by the industry. The temperature of PV modules installed in a large multi-MW plant can also be influenced by their physical locations in the plants due to the influence of wind direction. A thermal mapping of PV plants has also been investigated and presented in this study. The most commonly used PV backsheet material has been polyvinyl fluoride (DuPont trade name “Tedlar”)-based backsheet, which typically has three layers: Tedlar–polyethylene terephthalate (PET)–Tedlar (TPT). The primary goal of this project is to reduce the module operating temperature below the benchmark TPT backsheet temperature using newly developed TCBs by the industry. The overall approach of this project involves six focus areas: i) select and procure one TPT and thirteen promising TCBs available in the industry; ii) construct a large number of 1-cell and 9-cell modules using benchmark TPT and selected TCBs [all other construction materials are fixed and they are: glass superstrate, EVA encapsulant, mono-Si cell and junction box]; iii) to identify best performing TCBs, monitor the long-term field operating temperatures of the constructed modules which are installed in three climatic conditions (hot-low wind [Mesa, AZ], hot-high wind [Maricopa County, AZ] and temperate [Cumberland County, NC]; iv) to identify the most durable TCB, perform extended accelerated reliability testing of modules constructed with best three TCBs and benchmark TPT; v) to predict module temperature, develop physical and empirical thermal models with and without thermal properties of all construction materials in the modules, respectively; and vi) to determine the influence of wind speed and direction on the module operating temperature in a plant, and perform thermal mapping of PV modules in two large PV plants [Maricopa County, AZ and Cumberland County, NC]. The key achievements of this project are listed below: Backsheet selection: 14 backsheets were procured after an extensive literature and industry search. Finally, based on the thermal and other selection criteria, 1 TPT and 4 thermally conductive backsheets were selected for this project. Fabrication of mini modules: 50 one-cell modules were fabricated in year 1 for thermal performance evaluation. The module design was changed to nine-cell module at start of year 2 to mimic commercial design. 20 nine-cell modules were fabricated in year 2 for thermal performance evaluation. 28 four-cell modules were fabricated in year 3 for accelerated stress-testing. Thermal conductivity of backsheets: Year 1 TCBs showed at least 8% higher thermal conductivities than TPT. Year 2 and 3 TCBs showed at least 20% higher thermal conductivities than TPT. Installation of mini PV modules at three sites: 6 one-cell modules and 8 nine-cell modules were installed at AZ-1 site [Mesa, AZ]. 12 one-cell modules and 6 nine-cell modules were installed at each of two powerplants (AZ-2 [Maricopa County, AZ] and NC sites). Nominal operating cell temperatures (NOCT) of mini PV modules: NOCT of TCBs were observed to be lower than TPT with differences as high as 2°C. Comparison of thermal performance: The median operating temperature of one-cell modules was found to be reduced by 2°C by using TCB_A modules compared to TPT modules on several days in a month for few months in a year. The median temperature improvement of 4oC was achieved at several instances on a few days, but not all days, in a year using multiple TCBs compared to TPT. The final project milestone of achieving median temperature improvement of 5oC was achieved at several instances on a few days, but not all days, in a year using TCB_A compared to TPT. Empirical thermal model (without the need of construction material properties): Empirical thermal model for one-cell module was developed based on the input data of irradiance, wind speed and ambient temperatures. The primary input data differentiator for temperature differences between TPT and TCBs appears to be the irradiance level (solar gain). Accelerated durability testing: 20 four-cell modules using 4 backsheets (1 TPT and 3 TCBs) were exposed to Damp Heat 1000 hours (8 modules), UV/Thermal cycling (50 cycles)/Humidity freeze (10 cycles) test sequence (8 modules) and UV Weathering for qualification (8 modules). All the modules with four selected backsheets passed the stress tests per the retest guidelines of IEC 61215 standard for the backsheet change. Simplified comparative LCOE analysis: Using backsheet-specific power degradation levels in the accelerated tests (for TCB_A and TPT only), efficiency, service lifetime and assuming same cost for all backsheets, the LCOE of modules using TCB_A is determined to be lower than TPT. Due to lower operating temperature of TCB_A-based modules compared to TPT-based modules, the operating efficiency and service life of TCB_A-based modules are calculated to be higher than TPT-based modules. Temperature mapping of PV power plants: A distinct temperature difference (as high as 4°C) has been observed between the modules located in various parts of a single PV plant.

14 SOLAR ENERGY↗

Hot Topic Brief: Emerging Policies for Mobilizing Private Sector Investment into Clean Energy in the Philippines

The Philippines has one of the highest electricity prices for commercial and residential consumers in the Association of Southeast Asian Nations (ASEAN) region with prices between $0.12 (commercial) and $0.20 (residential) per kilowatt-hour (kWh) (ERIA 2018). Significant reliance on imported coal and diesel is the primary cause of this cost to ratepayers. This 'hot topic brief' details new policies in the Philippines designed to diversify the country's fuel-mix and the opportunities for investments in renewable energy to reduce prices for consumers and industry. This brief focuses on two recent policies: 1. Renewable Portfolio Standard (RPS): The RPS establishes mandatory targets for each electric distribution utility--both publicly and privately owned--to procure renewable energy through 2030. 2. Green Energy Option Program (GEOP): The GEOP enables companies to independently procure renewable energy from third-party power producers, which can be used to help meet private sector renewable energy goals, unlock lower electricity costs, and increase energy security.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗