Search NASA⌕ Search

SEARCH · Search NASA

Results for “reliability engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Integrated Design of a Robust System for Inertial Fusion Energy

For inertial fusion energy (IFE) to be successful, designs need to work robustly including both target physics and engineering considerations. For a power plant to be reliable and have a high operating capacity factor, the integrated design of the target, driver, target fabrication, target injection system, and chamber all need to work together in way that is robust and repeatable to expected variations. One of the lesson’s learned from our experience at NIF is that designs that are sensitive have not performed as expected – even in single shot mode. The lesson’s learned from NIF should be folded into creating integrated designs for IFE and for evaluating the tradeoffs between the different parts of the IFE system. To do so, we propose using the NIF 1.3 MJ yield shot/design (N210808) as a starting point of a study of the feasibility of indirect drive designs for IFE. If the hohlraum inefficiency precludes indirect drive, the study would include direct drive or fast ignition versions of this design.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Dynamic Event Tree Analysis Through RAVEN

Conventional Event-Tree (ET) based methodologies are extensively used as tools to perform reliability and safety assessment of complex and critical engineering systems. One of the disadvantages of these methods is that timing/sequencing of events and system dynamics is not explicitly accounted for in the analysis. In order to overcome these limitations several techniques, also know as Dynamic Probabilistic Risk Assessment (D-PRA), have been developed. Monte-Carlo (MC) and Dynamic Event Tree (DET) are two of the most widely used D-PRA methodologies to perform safety assessment of Nuclear Power Plants (NPP). In the past two years, the Idaho National Laboratory (INL) has developed its own tool to perform Dynamic PRA: RAVEN (Reactor Analysis and Virtual control ENvironment). RAVEN has been designed in a high modular and pluggable way in order to enable easy integration of different programming languages (i.e., C++, Python) and coupling with other application including the ones based on the MOOSE framework, developed by INL as well. RAVEN performs two main tasks: 1) control logic driver for the new Thermo-Hydraulic code RELAP-7 and 2) post-processing tool. In the first task, RAVEN acts as a deterministic controller in which the set of control logic laws (user defined) monitors the RELAP-7 simulation and controls the activation of specific systems. Moreover, RAVEN also models stochastic events, such as components failures, and performs uncertainty quantification. Such stochastic modeling is employed by using both MC and DET algorithms. In the second task, RAVEN processes the large amount of data generated by RELAP-7 using data-mining based algorithms. This paper focuses on the first task and shows how it is possible to perform the analysis of dynamic stochastic systems using the newly developed RAVEN DET capability. As an example, the Dynamic PRA analysis, using Dynamic Event Tree, of a simplified pressurized water reactor for a Station Black-Out scenario is presented.

42 ENGINEERING↗

Evaluating the Durability of Balance of Systems Components Using Combined-Accelerated Stress Testing

The degradation of photovoltaic (PV) balance of systems (BoS) components is not well-studied, but the consequences include offline modules, strings, and inverters; system shutdown; arc faults; and fires. A utility provider experienced a ~30% failure rate in their power transfer chain, originally attributed to branch connectors. Field-failed specimen assemblies were therefore examined, consisting of cable connector, branch connector, and discrete fuse components. Previous papers and presentations have focused on the development of the test method using a benchtop prototype. This presentation covers the early results of C-AST aging of static and dynamic specimens.

balance of systems↗

Trends in Field and Laboratory Performance of Photovoltaic Modules and Materials

This DuraMAT project intends to identify bill of materials (BOM) and/or process control measures for photovoltaic modules with representative failure modes as informed by accelerated and field tests to guide next steps in module and material design. We have begun work to identify correlation between module field performance and accelerated testing results by cross-comparing a module database of accelerated test results with a module database of fielded systems. We have identified fielded systems with degraded performance, and intend to compare this to the results observed in certification and qualification testing. We also intend to apply lessons and observations from accelerated tests to the field, where it may be possible to mitigate or avoid degradation in the field.

DuraMAT↗

Rapid Response Risk Assessment Turnaround System (R3ATS)

The Rapid Response Risk Assessment Turnaround System (R3ATS) is a decision support system that can be used for cost and schedule risk assessment as prescribed by the US Department of Energy (DOE) Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. Unlike complex and training-intensive project control and accounting risk systems - or naive and statistically incorrect risk assessment approaches - employed throughout the DOE complex R3ATS is a powerful and yet simple decision support system for conducting project risk assessments. Output from R3ATS include: (1) establishing a project risk register which can be periodically updated to regularly monitor and assess a dynamic risk picture, (2) producing statistically derived and justifiable cost and schedule contingency probability density functions, and (3) inclusion, via Bayesian updating, of significant trigger events that result in project cost, schedule or technical risk events. During FY2007, R3ATS was used by the Oak Ridge Transuranic (TRU) Waste Processing Center (TWPC) project to examine the FY 2008 through FY 2009 budget ({approx}$70 million) and the life cycle budget (over $500 million). In less than eight weeks, Oak Ridge DOE personnel and TWPC project management were trained on - and subsequently incorporated - the R3ATS approach thus demonstrating its significance as a viable and rapid turn-around decision support tool for cost and schedule risk assessment. In conclusion: The R3ATS was developed to meet the mission need for a defensible risk-oriented decision support system. We have demonstrated how R3ATS meets DOE ORO budget planning efforts associated with the TWPC life cycle from FY 2008 through FY 2018. We have further identified the critical shortcomings in the entire approach that DOE takes perform risk management. When we realized that DOE guidance for risk management is naive and can easily produce results are not reliable or repeatable, we applied a defensible systems engineering approach to develop R3ATS. The TWPC approach to risk management offers a risk-balancing approach for performance management and ensures that future investment in training enables all users to use risk management as a tool for successful TWPC mission accomplishment. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Aging Infrastructure: Application of System Health Monitoring at the Defense Waste Processing Facility - 16069

The disposition of high level waste (HLW) into borosilicate glass canistered waste forms began at SRS in 1996. Since that time, the Defense Waste Processing Facility (DWPF) has produced nearly four thousand HLW canisters. The DWPF is now approaching 20 years of radioactive service and 25 years of operation since the commencement of nonradioactive testing in 1990. Many facility systems are challenged by equipment or component obsolescence, which places a premium on proper work planning, engineering, and maintenance resource allocation to ensure facility reliability. To this end, Savannah River Remediation (SRR) implements programs and procedures for performance monitoring of structures, systems, and components (SSCs) within all of its processing facilities. As these programs have matured, they have helped to identify vulnerabilities within facility systems and provided a framework for ranking system assets to ensure correct priority is established and maintained. This paper provides an overview of how SRR structures and implements system performance monitoring with specific focus on the recent replacement of the DWPF Safety Grade Purge Flowmeters. This case study will discuss: 1) How the performance monitoring process identified an availability risk due to the minimal vendor support for the in-use flow transmitters, 2) The design changes developed as part of the project to transition to a different measurement technology, which includes operational lessons learned from the original installation, 3) The execution of the replacement effort, which was complicated by the fact that the purge system is a Vital Safety System (VSS) and not easily taken out of service for extended maintenance, and 4) The need to consider future maintainability, particularly given that continued acceleration in technical innovation will likely increase the frequency of equipment obsolescence. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experimental Considerations for Estimating Degradation in PV Modules

Carefully controlled laboratory experiments and measurements can enable the determination of acceleration factors suitable for extrapolation to durability and performance of a fielded PV module. Ideally, a single mechanism can be identified with appropriate acceleration factors for extrapolation to the field. However, even with a single mechanism, the inherent uncertainty in these factors leads to uncertainty in the extrapolation which is greater the higher the acceleration factor. This course will explain how because of the wide range of acceleration factors for a given degradation mode, utilizing acceleration factors greater than about 10x will typically lead to unacceptable uncertainty in the results. Therefore, if even just a rank ordering of materials is desired, acceleration factors must be minimized which requires a good general understanding of the scale of the different acceleration factors for the degradation mode of interest. In this tutorial we will discuss what the different purposes are for many of the accelerated stress tests used today. E.g., what is a qualification test, a highly accelerated stress test, a rank ordering test, or a service life prediction test. We will discuss how one can understand the relationship between test results and expected field performance. A single accelerated stress test condition cannot duplicate outdoor exposure for all possible degradation pathways; therefore, one must use targeted evaluation of material properties at different stress levels to determine the relevant acceleration factors and fit it to a model. We will also discuss how to interpret the results of experiments understanding what is relevant/not relevant, or not e valuated in a test. There are many common error people make in their test interpretations because they push the stress levels to be too harsh. This creates biases and can mask the relevant failure modes and mechanisms or will erroneously lead one to over design materials against things that aren't relevant. Several case studies will be presented to illustrate appropriate interpretation of accelerated stress testing results.

degradation↗

Evaluation of the Reconstruction Accuracy of the Ultrasound Model–Based Image Reconstruction (U-MBIR) Method for Concrete to Optimize Damage Detection

Reinforced concrete is a critical structural material used to construct nuclear power plants (NPPs). As such, its safety and performance must be thoroughly examined throughout the life cycle of the NPP infrastructure system. Ultrasonic measurements have been an industry standard for both surface and subsurface inspections. To support the development of these techniques, Oak Ridge National Laboratory (ORNL) has researched and developed advanced image reconstruction algorithms to capture internal damage. The results and discussion presented herein summarize the current state of the ultrasonic model–based iterative reconstruction (U-MBIR) algorithm developed at ORNL. In the work documented in this report, the U-MBIR methodology was applied to four sets of ultrasonic data collected from concrete specimens. The results demonstrate that the U-MBIR algorithm can successfully detect defects within the four concrete samples. The reconstruction images help identify the specimen thickness, regions of delamination, and location of rebar embedded within the concrete. The reconstruction images allow engineers and technicians to characterize the internal defects within concrete specimens and structural members. Ultimately, this knowledge can guide engineers in making informed decisions regarding the performance, safety, and reliability of structural materials (i.e., reinforced concrete) throughout the life cycle of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Atomically engineering activation sites onto metallic 1T-MoS 2 catalysts for enhanced electrochemical hydrogen evolution

Engineering catalytic sites at the atomic level provides an opportunity to understand the catalyst’s active sites, which is vital to the development of improved catalysts. Here we show a reliable and tunable polyoxometalate template-based synthetic strategy to atomically engineer metal doping sites onto metallic 1T-MoS 2 , using Anderson-type polyoxometalates as precursors. Benefiting from engineering nickel and oxygen atoms, the optimized electrocatalyst shows great enhancement in the hydrogen evolution reaction with a positive onset potential of ~ 0 V and a low overpotential of –46 mV in alkaline electrolyte, comparable to platinum-based catalysts. First-principles calculations reveal co-doping nickel and oxygen into 1T-MoS 2 assists the process of water dissociation and hydrogen generation from their intermediate states. This research will expand on the ability to improve the activities of various catalysts by precisely engineering atomic activation sites to achieve significant electronic modulations and improve atomic utilization efficiencies.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Prioritization of Stockpile Maintenance with Layered Pareto Fronts

Difficult choices are required for a decision-making process where resources and budgets are increasingly constrained. This study demonstrates a structured decision-making approach using layered Pareto fronts to identify priorities about how to allocate funds between munitions stockpiles based on their estimated reliability, the urgency of needing available units, and the consequences if adequate numbers of units are not available. This case study, while specific to the characteristics of a group of munitions stockpiles, illustrates the general process of structured decision-making based on first identifying appropriate metrics that summarize the important dimensions of the decision, and then objectively eliminating non-contenders from further consideration. Finally, the final subjective stage incorporates user priorities to select the four stockpiles to receive additional maintenance and surveillance funds based on understanding the trade-offs and robustness to various user priorities.

42 ENGINEERING↗

Determining the Tolerances in Fitting for Joints with Interference

A formula for the theoretical tolerance in fitting is derived by analysis of the components in the model of parametric failure for joints with interference. The formula takes account of the life of the joint and the specified probability of fault-free operation. It is found that selection of the fit without a margin of precision does not ensure the necessary reliability of the joint, while correct selection of the margin of precision extends the fault-free operation of the joint.

42 ENGINEERING↗

Reliability Improvement by Fault-Tolerant Operation of NPC Inverter for Motor Driving

The high-reliability operation of three-level inverters is crucial to prevent equipment damage, process downtime, and economic losses. This article investigates a three-level neutral-point-clamped inverter under all possible combinations of open-circuit and short-circuit faults and proposes a new postfault operation method without adding extra hardware. This method provides comprehensive solution for operations after single and multiple-device failures, increasing the inverter reliability by 24%. This article classified postfault modulations and uncovered previously unknown fault scenarios that can be addressed using the proposed control method. A new postfault modulation based on space vector modulation with virtual vectors is proposed. The feasibility of the proposed control method is verified by simulation and an experiment for one fault scenario in a three-level neutral-point-clamped inverter with a 3.73 kW motor load. Furthermore, this article contributes to improving the reliability of three-level inverters.

42 ENGINEERING↗

Drivetrain Reliability from Inherent to Operational

Despite reliability improvements made to wind turbine drivetrains over the years, premature component failures are still challenging the wind industry. There are, however, opportunities to understand drivetrain reliability challenges and investigate potential mitigation solutions. This presentation discusses a few research and development (R&D) activities on drivetrain reliability carried out by the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) over the last ten years. It covers two angles of reliability, inherent and operational, and goes into detail on specific R&D activities. Some inherent reliability challenges covered include gearbox planetary stage loads investigation, high speed shaft and main bearing operational condition understanding, dynamic modeling approaches, and recommended practices. The R&D activities on operational reliability improvements covered include benchmarking, performance and condition monitoring, and predictions on the remaining useful life of components. The presentation concludes with a list of necessary drivetrain reliability improvements that could close the loop between operational and inherent reliability efforts. The team hopes that some of these lessons learned can contribute to relevant international standards or recommended practices.

17 WIND ENERGY↗

Increasing the Reliability, Service Life, and Ecological Safety of the Stuffing Boxes of Wellhead Equipment of Wells that Operate by Means of Deep-Well Sucker-Rod Pumping Units

A novel design of an axial (self-centering) blowout prevention well-head seal that eliminates a number of the drawbacks in the wellhead equipment which is used today and whicuh possesses high services qualities, reliability indicators, and service life is proposed. The design is protected by Russian Patent No. 2573887.

42 ENGINEERING↗

Exploring Geologic Hydrogen: A New Frontier for Affordable, Reliable Energy Security

Recent successes in the exploration, drilling, and discovery of geologic hydrogen have generated notable excitement. This new energy resource has the potential to make an important contribution to our nation’s energy supply, resiliency, and security. Contemporary studies of geologic hydrogen have a common theme of suggesting places where it might be found or even more specifically, what rocks in what geologic formations may contribute to its formation — either naturally or via artificially induced means. This vital ongoing body of work sets the stage for imagining what may be possible with vast available quantities of naturally occurring hydrogen in the subsurface. While acknowledging current approaches to characterizing geologic hydrogen, this report advances the discussion by suggesting next steps, including the critical science and engineering necessary to make geologic hydrogen an affordable and reliable part of the U.S. energy portfolio.

08 HYDROGEN↗