Search NASA⌕ Search

SEARCH · Search NASA

Results for “resource planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

The Development of a Long-Term, Continually Updated Global Solar Resource at 10 km Resolution: Preliminary Results From Test Processing and Continuing Plans

Background: Considering the likelihood of global climatic weather pattern changes and the global competition for energy resources, there is an increasing need to provide improved and continuously updated global Earth surface solar resource information. Toward this end, a project was funded under the NASA Applied Science program involving the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC), National Renewable Energy Laboratory (NREL), the State University of New York/Albany (SUNY) and the NOAA National Climatic Data Center (NCDC) to provide NREL with a global long-term advanced global solar mapping production system for improved depiction of historical solar resources and variability and to provide a mechanism for continual updates of solar resource information. This new production system is made possible by the efforts of NOAA and NASA to completely reprocess the International Satellite Cloud Climatology Project (ISCCP) data set that provides satellite visible and infrared radiances together with retrieved cloud and surface properties on a 3-hourly basis beginning from July 1983. The old version of the ISCCP data provided this information for all the world TMs available geosynchronous satellite systems and NOAA TMs AVHRR data sets at a 30 km effective resolution. This new version aims to provide a new and improved satellite calibration at an effective 10 km resolution. Thus, working with SUNY, NASA will develop and test an improved production system that will enable NREL to continually update the Earth TM solar resource. Objective and Methods: In this presentation, we provide a general overview of this project together with samples of the new solar irradiance mapped data products and comparisons to surface measurements at various locations across the world. An assessment of the solar resource values relative to calibration uncertainty and assumptions are presented. Errors resulting assumptions in snow cover and background aerosol amount are described. These uncertainties and the statistics of the agreement between the measurements and new satellite estimates are also reviewed and compared to other solar data sets. Findings and Conclusions: Preliminary results show that insolation values show an overall small bias (less than 1%) with a RMS of 25% relative to surface measurements. Exceptions at certain locations were found and will be discussed relative to the uncertainties identified above. Lastly, we will identify the next steps in the development and improvement of this production system including some accuracy goals in preparation for ultimate delivery to NREL.

Stackhouse, P.↗

Application of ERTS-1 imagery to state wide land information system in Minnesota

The author has identified the following significant results. To update and refine existing state-wide land resource information systems, the Minnesota State Planning Agency is assessing the feasibility of extracting resource information from ERTS-1 imagery. Work has centered on a comparative analysis of Minnesota Land Management Information System (MLMIS) and ERTS-1 land use classes. The associated problems of determining appropriate data cell size and optimal seasonal timing have also been addressed. Using ERTS-1 images, dominant land use is classified as follows: urban, forest, agriculture, extractive, transportation, water, and wetlands. Preliminary analysis suggests that with appropriate changes in operational definitions these general classes can be further refined for the benefit of MLMIS users. Additional detail appears most feasible extractive classes.

Sizer, J. E.↗

Teaching with Space: K-6 Aviation, Space and Technology Resource Guide

Teaching with Space permits easy and quick identification of resources you will find most beneficial. This guide captures the essence of resources with applicability across the elementary curriculum. Specific product reviews and suggested uses in the classroom are provided to enable informed decision-making. Materials from NASA and the Federal Aviation Administration may be obtained in limited quantities at no cost from public domain sources when available. Pricing in this guide is based on duplication, warehousing, and overhead costs associated with distributing these items. Although this resource guide is a prototype guide distributed on a limited basis, we trust you will find it useful in locating quality instructional resources. Your suggestions and comments are most welcome, and will receive the fullest consideration as we work to expand and validate this guide for national distribution. Based on teacher criteria for quality, educational soundness, compatibility with the curriculum, ease of use, and affordability, the guide will be updated as new resources become available, and in response to teacher feedback. You may provide us with additional items for consideration at any time. We also are planning to develop a resource guide for middle and high school teachers, and your input is welcome for that effort too. This guide is just one way that space can help you in the classroom.

Source record↗

Automated Derivation of Complex System Constraints from User Requirements

The Payload Operations Integration Center (POIC) located at the Marshall Space Flight Center has the responsibility of integrating US payload science requirements for the International Space Station (ISS). All payload operations must request ISS system resources so that the resource usage will be included in the ISS on-board execution timelines. The scheduling of resources and building of the timeline is performed using the Consolidated Planning System (CPS). The ISS resources are quite complex due to the large number of components that must be accounted for. The planners at the POIC simplify the process for Payload Developers (PD) by providing the PDs with a application that has the basic functionality PDs need as well as list of simplified resources in the User Requirements Collection (URC) application. The planners maintained a mapping of the URC resources to the CPS resources. The process of manually converting PD's science requirements from a simplified representation to a more complex CPS representation is a time-consuming and tedious process. The goal is to provide a software solution to allow the planners to build a mapping of the complex CPS constraints to the basic URC constraints and automatically convert the PD's requirements into systems requirements during export to CPS.

Foshee, Mark↗

Alaskan resources, current development. Traditional cultural values, and the role of LANDSAT data in current and future land use management planning

Past, present, and proposed applications of LANDSAT data for renewable resource assessments in Alaska are described. Specific projects briefly discussed include: a feasibility investigation applying LANDSAT data to caribou habitat mapping in northeast Alaska, analysis of a native corporate region in southwest Alaska, analysis of a game management unit in interior Alaska, and two proposed analyses in northwest Alaska. These analyses principally address range evaluations concerning caribou, moose, and Dall sheep, but results have application to other renewable resource themes. Application of resource assessment results to a statewide land use management plan is discussed.

Laperriere, A. J.↗

Application of remote sensing to selected problems within the state of California

Specific case studies undertaken to demonstrate the usefulness of remote sensing technology to resource managers in California are highlighted. Applications discussed include the mapping and quantization of wildland fire fuels in Mendocino and Shasta Counties as well as in the Central Valley; the development of a digital spectral/terrain data set for Colusa County; the Forsythe Planning Experiment to maximize the usefulness of inputs from LANDSAT and geographic information systems to county planning in Mendocino County; the development of a digital data bank for Big Basin State Park in Santa Cruz County; the detection of salinity related cotton canopy reflectance differences in the Central Valley; and the surveying of avocado acreage and that of other fruits and nut crops in Southern California. Special studies include the interpretability of high altitude, large format photography of forested areas for coordinated resource planning using U-2 photographs of the NASA Bucks Lake Forestry test site in the Plumas National Forest in the Sierra Nevada Mountains.

Colwell, R. N.↗

The application of automated operations at the Institutional Processing Center

The JPL Institutional and Mission Computing Division, Communications, Computing and Network Services Section, with its mission contractor, OAO Corporation, have for some time been applying automation to the operation of JPL's Information Processing Center (IPC). Automation does not come in one easy to use package. Automation for a data processing center is made up of many different software and hardware products supported by trained personnel. The IPC automation effort formally began with console automation, and has since spiraled out to include production scheduling, data entry, report distribution, online reporting, failure reporting and resolution, documentation, library storage, and operator and user education, while requiring the interaction of multi-vendor and locally developed software. To begin the process, automation goals are determined. Then a team including operations personnel is formed to research and evaluate available options. By acquiring knowledge of current products and those in development, taking an active role in industry organizations, and learning of other data center's experiences, a forecast can be developed as to what direction technology is moving. With IPC management's approval, an implementation plan is developed and resources identified to test or implement new systems. As an example, IPC's new automated data entry system was researched by Data Entry, Production Control, and Advance Planning personnel. A proposal was then submitted to management for review. A determination to implement the new system was made and elements/personnel involved with the initial planning performed the implementation. The final steps of the implementation were educating data entry personnel in the areas effected and procedural changes necessary to the successful operation of the new system.

Barr, Thomas H.↗

Weather support for the Earth Resources Technology Satellite

The operational plans for ERTS include cloud-cover forecasting as a means of preventing the limited lifetime of the spacecraft's tape recorder to be used up on useless imagery. Each day, a forecast of the cloud cover is prepared for all land areas beneath the satellite's track and some adjacent ocean areas for each of the next day's 14 passes. The forecasts are transmitted by facsimile to the ERTS Operations Control Center at 4:00 p.m. each day, where they are used to plan the next day's operations. The forecasting techniques employed are described.

Moore, W. P.↗

ACTS propagation concerns, issues, and plans

ACTS counters fading by resource sharing between the users. It provides a large margin only for those terminals which are at risk by unfavorable atmospheric conditions. ACTS, as an experimental satellite, provides a 5 dB clear weather margin and 10 dB additional margin via rate reduction and encoding. For the uplink, this margin may be increased by exercising uplink power control. Some of the challenges faced by the radiowave propagation community are listed. The issue of needs for the satellite are listed, both general and specific.

Davarian, Faramaz↗

Using Iterative Repair to Increase the Responsiveness of Planning and Scheduling for Autonomous Spacecraft

An autonomous spacecraft must balance long-term and short-term considerations. It must perform purposeful activities that ensure long-term science and engineering goals are achieved and ensure that it maintains positive resource margins. This requires planning in advance to avoid a series of shortsighted decisions that can lead to failure, However, it must also respond in a timely fashion to a somewhat dynamic and unpredictable environment. Thus, spacecraft plans must often be modified due to fortuitous events such as early completion of observations and setbacks such as failure to acquire a guidestar for a science observation. This paper describes the use of iterative repair to support continuous modification and updating of a current working plan in light of changing operating context.

Chien, Steve↗

Constraint-based Attribute and Interval Planning

In this paper we describe Constraint-based Attribute and Interval Planning (CAIP), a paradigm for representing and reasoning about plans. The paradigm enables the description of planning domains with time, resources, concurrent activities, mutual exclusions among sets of activities, disjunctive preconditions and conditional effects. We provide a theoretical foundation for the paradigm, based on temporal intervals and attributes. We then show how the plans are naturally expressed by networks of constraints, and show that the process of planning maps directly to dynamic constraint reasoning. In addition, we de ne compatibilities, a compact mechanism for describing planning domains. We describe how this framework can incorporate the use of constraint reasoning technology to improve planning. Finally, we describe EUROPA, an implementation of the CAIP framework.

Jonsson, Ari↗

A Constraint-based Attribute and Interval Planning

In this paper we introduce Constraint-based Attribute and Interval Planning (CAIP), a new paradigm for representing and reasoning about plans. The paradigm enables the description of planning domains with time, resources, concurrent activities, mutual exclusions among sets of activities, disjunctive preconditions and conditional effects. We provide a theoretical foundation for the paradigm using a mapping to first order logic. We also show that CAIP plans are naturally expressed by networks of constraints, and that planning maps directly to dynamic constraint reasoning. In addition, we show how constraint templates are used to provide a compact mechanism for describing planning domains.

Frank, Jeremy↗

Galileo mission planning for Low Gain Antenna based operations

The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.

Gershman, R.↗

Application of Earth Resources Technology Satellite data to urban development and regional planning: Test site, County of Los Angeles

The author has identified the following significant results. Signigicant results have been obtained from the analyses of ERTS-1 imagery from five cycles over Test Site SR 124 by classical photointerpretation and by an interactive hybrid multispectral information extraction system (GEMS). Photointerpretation has produced over 25 overlays at 1:1,000,000 scale depicting regional relations and urban structure in terms of several hundred linear and areal features. A possible new fault lineament has been discovered on the northern slope of the Santa Monica mountains. GEMS analysis of the ERTS-1 products has provided new or improved information in the following planning data categories: urban vegetation; land cover segregation; manmade and natural impact monitoring; urban design; land suitability. ERTS-1 data analysis has allowed planners to establish trends that directly impact planning policies. For example, detectable grading and new construction sites quantitatively indicated the extent, direction, and rate of urban expansion which enable planners to forecast demand and growth patterns on a regional scale. This new source of information will not only assist current methods to be more efficient, but permits entirely new planning methodologies to be employed.

Raje, S.↗

Deep space network resource scheduling approach and application

Deep Space Network (DSN) resource scheduling is the process of distributing ground-based facilities to track multiple spacecraft. The Jet Propulsion Laboratory has carried out extensive research to find ways of automating this process in an effort to reduce time and manpower costs. This paper presents a resource-scheduling system entitled PLAN-IT with a description of its design philosophy. The PLAN-IT's current on-line usage and limitations in scheduling the resources of the DSN are discussed, along with potential enhancements for DSN application.

Eggemeyer, William C.↗

Remote sensing: The application of space technology to the survey of the earth and its environment

Research in the earth sciences and management of both natural and man-made resources has been hindered by the difficulty of obtaining accurate and timely information on regional and global scale. Space surveys with remote sensing instruments are simply another means of attempting to attain the total knowledge of the resources needed for sound planning, development, and conservation. The use of earth orbiting satellites will greatly expand the ability to collect this information. The collection and use of these data and imagery, however, are now an end in itself, but only the means to an end, that of achieving total resource knowledge. Satellite systems will provide a valuable supplement to existing aerial and ground based observation techniques.

Schertler, R. J.↗

The Office of Space Science and Applications strategic plan, 1990: A strategy for leadership in space through excellence in space science and applications

A strategic plan for the U.S. space science and applications program during the next 5 to 10 years was developed and published in 1988. Based on the strategies developed by the advisory committees of both the National Academy of Science and NASA, the plan balances major, moderate, and small mission initiatives, the utilization of the Space Station Freedom, and the requirements for a vital research base. The Office of Space Science and Applications (OSSA) strategic plan is constructed around five actions: establish a set of programmatic themes; establish a set of decision rules; establish a set of priorities for missions and programs within each theme; demonstrate that the strategy will yield a viable program; and check the strategy for consistency within resource constraints. The OSSA plan is revised annually. This OSSA 1990 Strategic Plan refines the 1989 Plan and represents OSSA's initial plan for fulfilling its responsibilities in two major national initiatives. The Plan is now built on interrelated, complementary strategies for the core space science and applications program, for the U.S. Global Change Research Program, and for the Space Exploration Initiative. The challenge is to make sure that the current level of activity is sustained through the end of this century and into the next. The 1990 Plan presents OSSA's strategy to do this.

Source record↗