Search NASA⌕ Search

SEARCH · Search NASA

Results for “simultaneous operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Science Requirements and Conceptual Design for a Polarized Medium Energy Electron-Ion Collider at Jlab

Researchers have envisioned an electron-ion collider with ion species up to heavy ions, high polarization of electrons and light ions, and a well-matched center-of-mass energy range as an ideal gluon microscope to explore new frontiers of nuclear science. In its most recent Long Range Plan, the Nuclear Science Advisory Committee (NSAC) of the US Department of Energy and the National Science Foundation endorsed such a collider in the form of a 'half-recommendation.' As a response to this science need, Jefferson Lab and its user community have been engaged in feasibility studies of a medium energy polarized electron-ion collider (MEIC), cost-effectively utilizing Jefferson Lab's already existing Continuous Electron Beam Accelerator Facility (CEBAF). In close collaboration, this community of nuclear physicists and accelerator scientists has rigorously explored the science case and design concept for this envisioned grand instrument of science. An electron-ion collider embodies the vision of reaching the next frontier in Quantum Chromodynamics - understanding the behavior of hadrons as complex bound states of quarks and gluons. Whereas the 12 GeV Upgrade of CEBAF will map the valence-quark components of the nucleon and nuclear wave functions in detail, an electron-ion collider will determine the largely unknown role sea quarks play and for the first time study the glue that binds all atomic nuclei. The MEIC will allow nuclear scientists to map the spin and spatial structure of quarks and gluons in nucleons, to discover the collective effects of gluons in nuclei, and to understand the emergence of hadrons from quarks and gluons. The proposed electron-ion collider at Jefferson Lab will collide a highly polarized electron beam originating from the CEBAF recirculating superconducting radiofrequency (SRF) linear accelerator (linac) with highly polarized light-ion beams or unpolarized light- to heavy-ion beams from a new ion accelerator and storage complex. Since the very beginning, the design studies at Jefferson Lab have focused on achieving high collider performance, particularly ultrahigh luminosities up to 10{sup 34} cm{sup -2}s{sup -1} per detector with large acceptance, while maintaining high polarization for both the electron and light-ion beams. These are the two key performance requirements of a future electron-ion collider facility as articulated by the NSAC Long Range Plan. In MEIC, a new ion complex is designed specifically to deliver ion beams that match the high bunch repetition and highly polarized electron beam from CEBAF. During the last two years, both development of the science case and optimization of the machine design point toward a medium-energy electron-ion collider as the topmost goal for Jefferson Lab. The MEIC, with relatively compact collider rings, can deliver a luminosity above 10{sup 34} cm{sup -2}s{sup -1} at a center-of-mass energy up to 65 GeV. It offers an electron energy up to 11 GeV, a proton energy up to 100 GeV, and corresponding energies per nucleon for heavy ions with the same magnetic rigidity. This design choice balances the scope of the science program, collider capabilities, accelerator technology innovation, and total project cost. An energy upgrade could be implemented in the future by adding two large collider rings housed in another large tunnel to push the center-of-mass energy up to or exceeding 140 GeV. After careful consideration of an alternative electron energy recovery linac on ion storage ring approach, a ring-ring collider scenario at high bunch repetition frequency was found to offer fully competitive performance while eliminating the uncertainties of challenging R&D on ampere-class polarized electron sources and many-pass energy-recovery linacs (ERLs). The essential new elements of an MEIC facility at Jefferson Lab are an electron storage ring and an entirely new, modern ion acceleration and storage complex. For the high-current electron collider ring, the upgraded 12 GeV CEBAF SRF linac will serve as a full-energy injector, and, if needed, provide top-off refilling. The CEBAF fixed-target nuclear physics program can be simultaneously operated since the filling time of the electron ring is very short. The ion complex for MEIC consists of sources for polarized light ions and unpolarized light to heavy ions, an SRF ion linac with proton energy up to 280 MeV, a 3 GeV prebooster synchrotron, a large booster synchrotron for proton energy up to 20 GeV, and a medium-energy collider ring with energy up to 100 GeV. The ion complex can accelerate other species of ions with corresponding energies at each accelerating stage. There are three collision points planned for MEIC. Two of them are for collisions with medium-energy ions; the third is for low energy ion beams stored in a dedicated low-energy compact storage ring, as a possible follow-on project.

43 PARTICLE ACCELERATORS↗

Lidar Comparison for GoAmazon 2014/15 Field Campaign Report

The Observations and Modeling of the Green Ocean Amazon 2014/15 (GoAmazon 2014/15) experiment uses the city of Manaus, Amazonas (AM), Brazil, in the setting of the surrounding green ocean as a natural laboratory for understanding the effects of present and future anthropogenic pollution on the aerosol and cloud life cycle in the tropics. The U.S. Department of Energy (DOE) supported this experiment through the deployment of the Atmospheric Radiation Measurement (ARM) Climate Research Facility’s first Mobile Facility (AMF-1) in the city of Manacapuru, which is 100 km downwind of Manaus, from January 1 2014 to December 31 2015. During the second Intensive Operational Period (IOP) from August 15 to October 15 2014, three lidar systems were operated simultaneously at different experimental sites, and an instrument comparison campaign was carried out during the period October 4 to 10, during which the mobile lidar system from Instituto de Pesquisas Energéticas e Nucleares-Universidade de São Paulo was brought from the T2 site (Iranduba) to the other sites (T3 [Manacapuru] and then T0e-Embrapa). In this report we present the data collected by the mobile lidar system at the DOE-ARM site and compare its measurements with those from the micro-pulse lidar system running at that site.

Amazon, cloud life cycle in the tropics, aerosols,↗

Modeling the CEBAF Injector at 200 kV: Investigating K-Long Beam Conditions with and without Wien Filter

The upcoming K-Long experiment [1] ain Hall D at Jefferson Lab presents unique beam requirements, featuring a significantly low bunch repetition rate and an unusually high bunch charge. This experiment, which utilizes the CEBAF accelerator in conjunction with the GlueX experimental setup, aims to study strange hadron spectroscopy by measuring the differential cross section and polarizations of produced hyperons such as Λ, Σ, Ξ, and Ω. By directing an intense K-Long beam towards the LD2/LH2 target, new and valuable data can be obtained. To optimize the CEBAF injector specifically for this experiment, we employed Multi-Objective Genetic Optimization (MGO) using General Particle Tracer (GPT) simulations. Through this approach, we determined the optimal magnetic elements and radiofrequency (RF) settings required to achieve a K-Long bunch charge of 0.64 pC at an energy of 200 kV. We conducted simulations with both the Wien Filter turned on and off to examine its impact on the beam. Furthermore, we investigated the transmission efficiency and beam characteristics of electron beams with varying charge per bunch through the injector, considering the simultaneous operation of all four CEBAF Halls. The results of our study offer valuable insights and guidance for optimizing the CEBAF injector not only for the Jefferson Lab K-Long experiment but also for other experiments that entail similar beam conditions.

Pokharel, Sunil↗

Seven Channel Multi-collector Isotope Ratio Mass Spectrometer

A new magnetic sector mass spectrometer that utilizes seven full-sized discrete dynode electron multipliers operating simultaneously has been designed, constructed and is in preliminary testing. The instrument utilizes a newly developed ion dispersion lens that enables the mass dispersed individual isotope beams to be separated sufficiently (35 mm) to allow a full-sized discrete dynode pulse counting multiplier to be used for each beam. The ion dispersion lens is a two element electrostatic 90 degree sector device that causes the beam-to-beam dispersion to increase faster than the intra-beam dispersion. Each multiplier is contained in an isolated case with a deflector/condenser lens at the entrance. A 9-sample filament cartridge is mounted on a micro-manipulator two-axis stage that enables adjustment of the filament position with 10 micron resolution within the ion lens. Results of initial testing with actinides will be presented.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Redox Dynamics of Mixed Metal (Mn, Cr, and Fe) Ultrafine Particles

The impact of particle composition on metal oxidation state, and on changes in oxidation state with simulated atmospheric aging, are investigated experimentally in flame-generated nanoparticles containing Mn, Cr, and Fe. The results demonstrate that the initial fraction of Cr(VI) within the particles decreases with increasing total metal concentration in the flame. In contrast, the initial Mn oxidation state was only partly controlled by metal loading, suggesting the importance of other factors. Two reaction pathways, one reductive and one oxidative, were found to be operating simultaneously during simulated atmospheric aging. The oxidative pathway depended upon the presence of simulated sunlight and O{sub 3}, whereas the reductive pathway occurred in the presence of simulated sunlight alone. The reductive pathway appears to be rapid but transient, allowing the oxidative pathway to dominate with longer aging times, i.e. greater than {approx}8 hours. The presence of Mn within the particles enhanced the importance of the oxidative pathway, leading to more net Cr oxidation during aging implying that Mn can mediate oxidation by removal of electrons from other particulate metals.

54 ENVIRONMENTAL SCIENCES↗

Methodology for Exploring Water and Hydropower Operating Criteria That Simultaneously Improve Economic and Environmental Considerations

Despite the reliability and flexibility of hydropower, the operation of hydroelectric power plants may have significant impacts on the downstream river system, including its water stage, sediment transport, and water temperature, ultimately affecting the ecology. To address these challenges, there is a need to identify water scheduling patterns that improve both hydropower economics and the environment relative to current operations. This paper presents a new methodology to explore promising operational criteria/rules that can achieve such improvements. Typical environmental impact statements and relicensing processes generally perform detailed site-specific analyses of a few alternatives that focus on reservoir water release operating rules and their associated environmental impacts. In contrast, the methodology presented in this article uses a widely applicable approach that explores a much larger solution space. This large set of potential alternatives can be represented in a multidimensional space for which one axis represents the economic value and the other axis quantify individual environmental impacts (e.g., sediment transport and fish growth), and they are explored via two approaches: a Monte Carlo simulation that identifies “win–win” alternatives and a multi-objective optimization problem that identifies Pareto-optimal alternatives.

13 HYDRO ENERGY↗

Operational results of simultaneous four-beam delivery at Jefferson Lab

A concept for simultaneous beam delivery to all four CEBAF experimental halls from a single injector and a single main accelerator for the 12 GeV era was proposed in 2012. The original 12 GeV beam delivery plan was for a maximum of three experimental halls at a time as in the 6 GeV era. Therefore, the new concept increases the potential beam time for the experiments up to 33%. This change required minimal modifications to the existing machine. The modifications were mainly timing and pattern changes to the beams in the injector, adding a fourth laser to the photo-cathode gun, and the addition of new RF separators to the highest pass of CEBAF. These changes are now all in place and, for the first time, the full system is operating, producing four simultaneous beams through the accelerator to four different destina-tions. In this paper, in addition to presenting the results of the full system commissioning, we will discuss im-portant details about the new configuration plus some of our operational challenges.

Kazimi, Reza↗

NASA Engineering and Safety Center Technical Bulletin No. 10-02: Potential Failure of Dual Simultaneously Initiated Pyrotechnic Operated Valves

The NASA Engineering and Safety Center (NESC) Technical Bulletin No. 09-01 reported an independent investigation of four pyrovalve failures that occurred while using aluminum (Al) pyrovalve primer chamber assemblies (PCAs) during ground testing. The investigation revealed that simultaneous firing (within a few microseconds) of the NASA Standard Initiators (NSIs) was the primary reason why the booster charge failed to ignite and the pyrovalves subsequently failed to operate. A second investigation of a new stainless steel (SS) PCA design with separate flame channels was completed in 2010. The new SS configuration was found to be improved in most respects; however, no improvement was noted in the temperature delivered to ignite the booster during dual simultaneous NSI firings. Simultaneous firings should be avoided when using either the Al or the SS PCA design.

Potential Failure↗

Simultaneous Design and Operation of a Coal-Fired Hybrid Energy System with Integrated Thermal Energy Storage

This final report describes novel capabilities developed as part of DISPATCHES, Design Integration and Synthesis Platform to Advance Tightly Coupled Hybrid Energy Systems, for designing hybrid energy systems (HES) a.k.a. integrated energy systems (IES) in the context of a larger electricity market. Capabilities are demonstrated on a case study with fossil-based power coupled to a molten salt thermal energy storage system.

20 FOSSIL-FUELED POWER PLANTS↗

Simultaneous Four-Hall Operation for 12 GeV CEBAF

The CEBAF accelerator at Jefferson lab will have a new experimental hall, Hall D, added to its existing three halls as a part of the ongoing 12 GeV upgrade. Under the present CEBAF design, there is no option for sending beam to all four halls simultaneously. At least one hall has to stay down during the machine operation. A new pattern for interleaving the beam bunches is introduced that allows simultaneous operation of all four halls and provide opportunity for additional future experimental beams. The new configuration presents only a minimal change to the existing CEBAF extraction system. In fact all the lower pass extractions will stay as they are and only the frequency of 5th?pass horizontal RF separator will change. In order to make room for the new Hall D beam among the existing three beams, the beam repetition rate is reduced only for the halls taking beam at the highest pass. This and other details of the new configuration and beam pattern will be presented and discussed. A separate paper in this conference will cover the implementation choices including changes to the beam source and extraction region.*

43 PARTICLE ACCELERATORS↗

Applied Virtual Reality in Reusable Launch Vehicle Design, Operations Development, and Training

Application of Virtual Reality (VR) technology offers much promise to enhance and accelerate the development of Reusable Launch Vehicle (RLV) infrastructure and operations while simultaneously reducing developmental and operational costs. One of the primary cost areas in the RLV concept that is receiving special attention is maintenance and refurbishment operations. To produce and operate a cost effective RLV, turnaround cost must be minimized. Designing for maintainability is a necessary requirement in developing RLVs. VR can provide cost effective methods to design and evaluate components and systems for maintenance and refurbishment operations. The National Aeronautics and Space Administration (NASA)/Marshall Space Flight Center (MSFC) is beginning to utilize VR for design, operations development, and design analysis for RLVs. A VR applications program has been under development at NASA/MSFC since 1989. The objectives of the MSFC VR Applications Program are to develop, assess, validate, and utilize VR in hardware development, operations development and support, mission operations training and science training. The NASA/MSFC VR capability has also been utilized in several applications. These include: 1) the assessment of the design of the late Space Station Freedom Payload Control Area (PCA), the control room from which onboard payload operations are managed; 2) a viewing analysis of the Tethered Satellite System's (TSS) "end-of-reel" tether marking options; 3) development of a virtual mockup of the International Space Welding Experiment for science viewing analyses from the Shuttle Remote Manipulator System elbow camera and as a trainer for ground controllers; and 4) teleoperations using VR. This presentation will give a general overview of the MSFC VR Applications Program and describe the use of VR in design analyses, operations development, and training for RLVs.

Hale, Joseph P.↗

Technique to select the optimum modulation indices for suppression of undesired signals for simultaneous range and data operations

An algorithm to search for the optimum set of modulation indices that will optimize a given simultaneous range/command/telemetry communications link is presented. This technique provides a way to suppress the ranging signal in order to limit performance degradation in the data channel due to interference from the ranging channel to a desired level, given a specified ranging accuracy. The link (when optimized) will (1) provide maximum available power to both the data and ranging channels for a specified degradation in the data channel so that it will transmit at the required data rate, (2) achieve a specified ranging accuracy over a maximum distance, under a certain set of conditions, and (3) provide adequate power for carrier tracking without degrading the data-channel thresholds. In addition, both data and ranging channels will fall below the threshold at the same point.

Nguyen, Tien Manh↗

Potential Operating Orbits for Fission Electric Propulsion Systems Driven by the SAFE-400

Safety must be ensured during all phases of space fission system design, development, fabrication, launch, operation, and shutdown. One potential space fission system application is fission electric propulsion (FEP), in which fission energy is converted into electricity and used to power high efficiency (Isp greater than 3000s) electric thrusters. For these types of systems it is important to determine which operational scenarios ensure safety while allowing maximum mission performance and flexibility. Space fission systems are essentially nonradioactive at launch, prior to extended operation at high power. Once high power operation begins, system radiological inventory steadily increases as fission products build up. For a given fission product isotope, the maximum radiological inventory is typically achieved once the system has operated for a length of time equivalent to several half-lives. After that time, the isotope decays at the same rate it is produced, and no further inventory builds in. For an FEP mission beginning in Earth orbit, altitude and orbital lifetime increase as the propulsion system operates. Two simultaneous effects of fission propulsion system operation are thus (1) increasing fission product inventory and (2) increasing orbital lifetime. Phrased differently, as fission products build up, more time is required for the fission products to naturally convert back into non-radioactive isotopes. Simultaneously, as fission products build up, orbital lifetime increases, providing more time for the fission products to naturally convert back into non-radioactive isotopes. Operational constraints required to ensure safety can thus be quantified.

Houts, Mike↗

Potential Operating Orbits for the SAFE-400

Safety must be ensured during all phases of space fission system design, development, fabrication, launch, operation, and shutdown. One potential space fission system application is fission electric propulsion (FEP), in which fission energy is converted into electricity and used to power high efficiency (Isp is greater than 3000s) electric thrusters. For these types of systems it is important to determine which operational scenarios ensure safety while allowing maximum mission performance and flexibility. Space fission systems are essentially non-radioactive at launch, prior to extended operation at high power. Once high power operation begins, system radiological inventory steadily increases as fission products build up. For a given fission product isotope, the maximum radiological inventory is typically achieved once the system has operated for a length of time equivalent to several half-lives. After that time, the isotope decays at the same rate it is produced, and no further inventory builds in. For an FEP mission beginning in Earth orbit, altitude and orbital lifetime increase as the propulsion system operates. Two simultaneous effects of fission propulsion system operation are thus (1) increasing fission product inventory and (2) increasing orbital lifetime. Phrased differently, as fission products build up, more time is required for the fission products to naturally convert back into non-radioactive isotopes. Simultaneously, as fission products build up, orbital lifetime increases, providing more time for the fission products to naturally convert back into non-radioactive isotopes. Operational constraints required to ensure safety can thus be quantified.

Houts, Mike↗

Experimental study on team coordination of NPP plant operators based on the simultaneous NIRS measurements - 266

One of the key features when dealing with severe situations far beyond the previous experiences and expectations is the coordination capability among operators with different roles. In this study, the feasibility of estimating coordination capability of nuclear plant operators has been examined based on the correlation analysis of brain activities among operators. The cognitive experiments have been performed in the full scope NPP simulator at BWR Operator Training Center Cooperation. Four experienced instructors participated in the experiments. They played different roles such as shift supervisor, turbine operator, reactor operator and auxiliary operator and were instructed to go through four training scenarios shown below with NIRS devices attached. The brain activity of each operator has been measured along with the progress of anomaly events and the correlation of brain activities for every pair of operators have been calculated. The correlations of brain activities have also analyzed focusing on the specific events along with the progress in the anomaly scenarios. It has been shown in the results that the higher correlation among all operators were observed when the global events occurred and the higher correlation among specific pair of operators related to the specific event were partially observed. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Four Beam Generation for Simultaneous Four-Hall Operation at CEBAF

As part of the CEBAF 12 GeV upgrade at Jefferson Lab, a new experimental hall was added to the existing three halls. To deliver beam to all four halls simultaneous-ly, a new timing pattern for electron bunches is needed at the injector. This pattern change has consequences for the frequency of the lasers at the photogun, beam behavior in the chopping system, beam optics due to space charge, and setup procedures. We have successfully demonstrated this new pattern using the three existing drive lasers. The implementation of the full system will occur when the fourth laser is added and upgrades to the Low Level RF (LLRF) are complete. In this paper we explain the new bunch pattern, the challenges for setting and measuring the pattern such as 180° RF phase ambiguity, addition of the fourth laser to the laser table and LLRF upgrade.

Kazimi, Reza↗