Search NASA⌕ Search

SEARCH · Search NASA

Results for “surface operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Dust Removal on Mars Using Laser-Induced Breakdown Spectroscopy

Dust coatings on the surface of Mars complicate and, if sufficiently thick, mask the spectral characteristics and compositional determination of underlying material from in situ and remote sensing instrumentation. The Laser-Induced Breakdown Spectroscopy (LIBS) portion of the Chemistry & Camera (ChemCam) instrument, aboard the Mars Science Laboratory (MSL) rover, will be the first active remote sensing technique deployed on Mars able to remove dust. ChemCam utilizes a 5 ns pulsed 1067 nm high-powered laser focused to less than 400 m diameter on targets at distances up to 7 m [1,2]. With multiple laser pulses, dust and weathering coatings can be remotely analyzed and potentially removed using this technique [2,3]. A typical LIBS measurement during MSL surface operations is planned to consist of 50 laser pulses at ~14 mJ, with the first 5 to 10 pulses used to analyze as well as remove any surface coating. Additionally, ChemCam's Remote Micro-Imager (RMI) is capable of resolving 200 m details at a distance of 2 m, or 1 mm at 10 m [1,4]. In this study, we report on initial laboratory experiments conducted to characterize the removal of dust coatings using similar LIBS parameters as ChemCam under Mars-like conditions. These experiments serve to better understand the removal of surface dust using LIBS and to facilitate the analysis of ChemCam LIBS spectral data and RMI images.

Graff, T. G.↗

Integrated Ground Operations Demonstration for Responsive Space Access

Integrated Ground Operations Demonstration Units (IGODU) project developed to mature, integrate and demonstrate advancements in cryogenics, system health management and command and control technologies. Two Distinct Testing Environments: a) GODU Integrated Refrigeration and Storage - GODU LH2; b) GODU Autonomous Control - GODU LO2. Scope: I. GODU LH2: a) Investigate alternative storage and distribution architecture for future cryogenic propellant operations. b) Demonstrate advanced cryogenic propellant handling operations (liquefaction, storage and distribution) of normal boiling point and sub-cooled cryogenic propellants. II. GODU L02: a) Develop and demonstrate advanced control and health management technologies and techniques to autonomously control cryogenic propellant servicing operations. b) Investigate modern COTS hardware and control systems in an effort to reduce the "standing army" of engineers associated with maintaining and operating ground systems through the use of health management and autonomous control technologies. Goals: a) Raise Technology Readiness Levels (TRL) and Integration Readiness Levels (IRL) of several key technology development areas. b) Reduce operations lifecycle costs of future test programs and launch complexes. c) Demonstrate technologies for future exploration beyond low earth orbit. d) Serve as test environments for extraterrestrial surface operations.

Johnson, Robert G.↗

Building Airport Surface HITL Simulation Capability

FutureFlight Central is a high fidelity, real-time simulator designed to study surface operations and automation. As an air traffic control tower simulator, FFC allows stakeholders such as the FAA, controllers, pilots, airports, and airlines to develop and test advanced surface and terminal area concepts and automation including NextGen and beyond automation concepts and tools. These technologies will improve the safety, capacity and environmental issues facing the National Airspace system. FFC also has extensive video streaming capabilities, which combined with the 3-D database capability makes the facility ideal for any research needing an immersive virtual and or video environment. FutureFlight Central allows human in the loop testing which accommodates human interactions and errors giving a more complete picture than fast time simulations. This presentation describes FFCs capabilities and the components necessary to build an airport surface human in the loop simulation capability.

facility capabilities↗

Payload Utilization in NASA's Space Launch System

With Space Policy Directive 1, the United States administration has directed the National Aeronautics and Space Administration’s (NASA’s) Human Exploration & Operations Mission Directorate (HEOMD) to return to the Moon with missions and infrastructure designed to support a sustained presence in cislunar space, with robotic and human lunar surface operations. NASA’s new deep space exploration system — the super heavy-lift Space Launch System (SLS), the Orion crew spacecraft and revamped launch facilities at Kennedy Space Center (KSC) — will enable NASA and its commercial and international partners to meet this goal for human exploration of deep space. SLS is the most capable launch vehicle for these efforts, as well as for sending robotic missions deep into the solar system, or even to interstellar space. The vehicle will be available in crew and cargo configurations in progressively more powerful block variants. The initial Block 1 lift capability of at least 26 metric tons (t) to trans-lunar injection (TLI) will be followed by a more powerful Block 1B with the power to loft more than 37 t to TLI. The ultimate Block 2 variant will lift more than 45 t to TLI. For payload accommodation, the Block 1 vehicle can utilize a 5 meter (m) fairing in its cargo configuration with the crew version also able to provide berths for 6U and 12U CubeSats as secondary payloads. The Block 1B crew vehicle will provide as much volume as the space shuttle payload bay in a Universal Stage Adapter (USA) for co-manifested payloads (CPLs). Block 1B cargo vehicles will offer 8.4 m-diameter fairings in 19.1 m and possibly longer lengths, with enough volume to accommodate lunar-orbiting habitat modules and other elements of NASA’s Gateway science outpost. For Mars-class payloads, larger fairings for the Block 2 cargo launcher are under consideration. For missions beyond the Earth-Moon system, SLS offers greater characteristic energy (C3) than any other launch vehicle, enabling shorter transit times or heavier payloads with more robust science packages for missions to the outer solar system. Indeed, the unmatched combination of thrust, payload volume and departure energy that SLS provides opens new opportunities for human and robotic exploration of deep space. This paper will provide an overview of the various vehicle block configurations, their capabilities and payload accommodations for sending primary, co-manifested and secondary payloads to deep space

Creech, Stephen D.↗

Artificial Gravity Research Project

Protecting the health, safety, and performance of exploration-class mission crews against the physiological deconditioning resulting from long-term weightlessness during transit and long-term hypogravity during surface operations will require effective, multi-system countermeasures. Artificial gravity (AG), which would replace terrestrial gravity with inertial forces generated by rotating the transit vehicle or by a human centrifuge device within the transit vehicle or surface habitat, has long been considered a potential solution. However, despite its attractiveness as an efficient, multi-system countermeasure and its potential for improving the environment and simplifying operational activities (e.g., WCS, galley, etc.), much still needs to be learned regarding the human response to rotating environments before AG can be successfully implemented. This paper will describe our approach for developing and implementing a rigorous AG Research Project to address the key biomedical research questions that must be answered before developing effective AG countermeasure implementation strategies for exploration-class missions. The AG Research Project will be performed at JSC, ARC, extramural academic and government research venues, and international partner facilities maintained by DLR and IMBP. The Project includes three major ground-based human research subprojects that will lead to flight testing of intermittent short-radius AG in ISS crewmembers after 201 0, continuous long-radius AG in CEV crews transiting to and from the Moon, and intermittent short-radius AG plus exercise in lunar habitats. These human ground-based subprojects include: 1) a directed, managed international short-radius project to investigate the multi-system effectiveness of intermittent AG in human subjects deconditioned by bed rest, 2) a directed, managed long-radius project to investigate the capacity of humans to live and work for extended periods in rotating environments, and 3) a focused, investigator-initiated project to investigate system-specific adaptation to and from rotating environments. The AG Research Project also includes two major animal research subprojects: 1) a directed, managed ground-based subproject using rodents and, possibly, sub-human primates, to address mechanistic issues that cannot be studied in humans, to rapidly develop higher sample numbers than can be achieved in the human subprojects, and to establish feasible parameter operating bands to reduce the breadth of the human subprojects, and 2) a flight subproject using rodents to estimate the physiological effects of long term exposure to hypogravity and to investigate the effects of contamination by terrestrial gravity in estimating AG effectiveness. The animal flight subproject would be performed aboard ISS using the CAM module in approximately the 2008-201 1 timeframe. The paper will first present an overview of the key biomedical research questions to be answered. It will then describe the overall approaches to be utilized in developing and implementing the AG Research Project, including definition of the intended scientific research, management and development approaches, identification of roles and responsibilities, risk management, and definition of project deliverables. The primary focus of the paper will be on the first of the three ground-based human research subprojects, since it is the only one currently in development and is scheduled to start active subject investigations in April of 2005.

Kamman, Michelle R.↗

Operational implications for path constrained rendezvous

After noting that many large orbiting space structures will be of such magnitude as to require proximity rendezvous guidance targeting in order to accomplish path-constrained approaches in the vicinity of their exterior surfaces, attention is given to the difficulties that inhere in the accomplishment of such rendezvous transfers due to physical constraints imposed by the structures' surfaces. Operationally feasible transfer techniques which circumvent the path constraints inherent in these maneuvers are discussed under the assumption of a number of restrictions. The techniques presented may be important in asteroid exploration and exploitation.

Stern, S. A.↗

Roll-Out and Turn-Off Display Software for Integrated Display System

This report describes the software products, system architectures and operational procedures developed by Lockheed-Martin in support of the Roll-Out and Turn-Off (ROTO) sub-element of the Low Visibility Landing and Surface Operations (LVLASO) program at the NASA Langley Research Center. The ROTO portion of this program focuses on developing technologies that aid pilots in the task of managing the deceleration of an aircraft to a pre-selected exit taxiway. This report focuses on software that produces a system of redundant deceleration cues for a pilot during the landing roll-out, and presents these cues on a head up display (HUD). The software also produces symbology for aircraft operational phases involving cruise flight, approach, takeoff, and go-around. The algorithms and data sources used to compute the deceleration guidance and generate the displays are discussed. Examples of the display formats and symbology options are presented. Logic diagrams describing the design of the ROTO software module are also given.

Johnson, Edward J., Jr.↗

Novel Ways to use the International Spacer Station as an Exploration Analog: International Progress in Planning "ISS4Mars"

In October 2020, International Space Station (ISS) Partner Agencies held a set of international workshops to solicit and develop creative and forward-looking ideas for using the ISS as an analog for preparation for Mars missions during its 3rd decade of operations. The workshops brought together participants from nine international space agencies or organizations, with stakeholders consisting of research managers, discipline experts, technology developers, flight physicians, flight operators, and astronauts. Breakout meetings and brainstorming sessions were conducted focusing on the following topics: Critical hazards and countermeasures for the transit to Mars; gravity transitions and early surface operations; environmental control and life support systems; food systems; human microbiome, microbial monitoring, and planetary protection; medical operations for Mars missions; isolation and confinement; autonomous systems and crew-centered autonomy; and communications delay effects on operations. In many cases the scenarios and approaches identified were compelling but challenging to implement under the current utilization structure used to manage the ISS for experiments. Following the series of workshops, a team of utilization leaders across the ISS partnership worked to compile the workshop recommendations and extract a set of use-cases with their prerequisites and constraints. The work considered the following aspects: what can be effectively done on ISS; which new technologies, approaches and scenarios are feasible; what alternatives could be considered; and what steps should be taken to enable integrated testing and future use of ISS as an analog for Mars missions. The final report will be published so that the use cases can be considered in each agency’s strategic planning processes. This paper will cover the process of international assessment in detail and how this process has influenced and broadened the vision of ISS utilization beyond single experiments to integrated studies and testing for future Mars missions. This approach to international collaboration informs both the next decade of international exploration research on the ISS and advancement of its utilization as an analog for deep space missions. For many of the participating partners, it also helps to frame the strategy for human research in Artemis as we begin planning for human missions to the moon. We conclude with a summary of the progress on the actions in the report and the additional implementation discussions that have occurred across the partnership.

Julie A Robinson↗

ATD-2 Digital Services / DIP

The path to NAS-wide implementation for ATD-2 multi-airport IADS is as a digital service for flight operators that builds on and supplements FAA TBO investments. This session will focus on a suite of Machine Learning (ML) services the ATD-2 team developed to model airport surface operations. The approach used to leverage SWIM data sets will be described and a preliminary analysis of ML model accuracy will be presented. NASA’s plans to build on this work under the ATM-X Digital Information Platform (DIP) sub-project will be discussed.

ATD TIM, ATD-2 Digital Services, DIP↗

Preparing for Human Missions to Mars: The role of ISS and Artemis as Analogs for Research and Technology Testing

The hazards of spaceflight to the human system are present in in varying degrees on different spaceflight platforms: altered gravity, isolation and confinement, distance from Earth, radiation, and hostile closed environments. A strategic view of the fidelity of hazards experienced on different platforms can shape the testing plans for human research and technology demonstration related to crew health and performance. Working across the international partnership, the International Space Station (ISS) is planning periods of modified operations to improve the fidelity of Mars simulations. To understand transit durations as an independent variable, a series of 1-year, 6-month and 30-45 day missions are being planned on ISS. Standard measurements across ISS missions of different durations, lunar missions and ground analogs offers the opportunity to distinguish different hazards and their effects in the context of the relevance to future mission concepts. The ISS partnership is planning for additional test cases that are aligned with Mars mission plans. (1) Evaluating crew performance capabilities when transitioning to gravity after long durations in microgravity representative of a Mars transit. (2) Simulating crew medical care under Mars-like autonomous operations. (3) Identification and testing of operations under communications delay and autonomy expected for Mars missions and the linked effects on behavioral health and performance of the crew. Artemis missions serve as a valuable analogs for Mars surface operations, with partial gravity and deep space radiation hazards, but with crewmembers that are probably more physically capable than their counterparts would be after a Mars transit. Getting unobtrusive data from early Artemis missions, and knowledge gained from operational experience as Artemis operations develop can improve engineering design, medical requirements and countermeasures, and ultimately ensure mission success on Mars. Linking Mars architectures with the plans and capabilities for ISS and Artemis allows us to plan to most operationally relevant tests of crew health and performance on current spaceflight missions to inform planning for future missions to Mars. By using human spaceflight platforms as well as ground simulation in an integrated way, the international community can improve exploration readiness, develop countermeasures and reduce risks of future human space missions.

International Space Station↗

Mars 2020 Perseverance Rover SHERLOC Instrument Isolation System

The NASA Jet Propulsion Laboratory (JPL) successfully landed the Mars 2020 Perseverance Rover at Jezero Crater on the Martian surface. Perseverance’s main mission objective is to cache Martian rock and regolith samples in hermetically sealed tubes to be brought back to Earth by future missions. To achieve this goal the rover is equipped with a 2-meter-long Robotic Arm (RA) which manipulates the Turret to interact with the surface. The Turret is comprised of science instruments and tools that enable surface sampling and science. The backbone of the Turret hardware is the Rotary Percussive Coring Drill. The science instruments, which are directly mounted to the structural housing of this drill, must be able to withstand not only the launch and entry, descent and landing (EDL) loads of the vehicle but also the dynamic percussive environment, induced by the drill throughout surface operations. This paper discusses the technical hardware design, development and testing of a vibration isolation system to protect the Scanning Habitable Environments with Raman and Luminescence for Organics and Chemicals (SHERLOC) Instrument from these dynamic environments. The hardware design aspect of this problem was limited by both size and mass constraints. The Turret is tightly configured and the physical space in which hardware can reside is restricted due to multiple axes of surface interaction points. Another driving requirement is the extreme range of thermal non-operational environment from -135C to +90C. This, in addition to SHERLOC being a heavier instrument than previously integrated on a turret, made the use of isolation systems employed on previous rover missions problematic. The final design incorporates custom wire mesh springs preloaded within titanium hexapod struts equipped with flexure ends. Custom versions of commercially available wire mesh springs were designed and tested. These custom springs differed in dimension, density and stiffness from the off the shelf options. The newly designed springs went through various stages of flight acceptance testing. Detailed physics-based modeling to understand what loads the isolation system would experience was used to define the test conditions for the springs and entire isolation subsystem. The testing program developed around this was extensive to fully characterize the isolation performance over cleanliness levels, temperature and life. Another major aspect of this work was developing a method of replicating the drill’s percussive environment for performance and life testing of Turret mounted hardware. Attaching the instrument to an operating drill for testing was not a viable option. A method of using a Highly Accelerated Life Test (HALT) table was developed and applied across the project as the most representative and tunable option to physically simulate this new environment. This method, along with launch environment random vibration testing, was used to build an entire dynamic qualification and flight hardware test program. The results of the design, modeling, testing and analysis of the SHERLOC Isolation System is described throughout the following paper.

Krafchak, Todd↗

Transmission line design for the lunar environment

How the mass, operating temperature, and efficiency of a transmission line operating on the moon are affected by its operating parameters, the lunar environment, and the choice of materials is examined. The key transmission line parameters which have an effect on mass, operating temperature, and efficiency are voltage, power loss, and waveform. The choice of waveform for transmission will be influenced by the waveform of the source and load, and therefore an analysis of both DC and AC transmission is necessary for a complete understanding of lunar power transmission. The data presented are for the DC case only; however, the discussion of the environmental effects and of material selection is pertinent to both AC and DC transmission. The operating voltage is shown to be a key parameter in transmission line design. The role efficiency plays in transmission line design is also examined. The analyses include above- and below-the-surface operation for both a vacuum-insulated, two-wire, transmission line, and a solid-dielectric-insulated, coaxial, transmission line.

Gaustad, Krista L.↗

Impact of Utilizing Photos and Deimos as Waypoints for Mars Human Surface Missions

Phobos and Deimos, the moons of Mars, are interesting exploration destinations that offer extensibility of the Asteroid Redirect Mission (ARM) technologies. Solar Electric Propulsion (SEP), asteroid rendezvous and docking, and surface operations can be used to land on and explore the moons of Mars. The close Mars vicinity of Phobos and Deimos warrant examining them as waypoints, or intermediate staging orbits, for Mars surface missions. This paper outlines the analysis performed to determine the mass impact of using the moons of Mars both as an intermediate staging point for exploration as well as for in-situ recourse utilization, namely propellant, to determine if the moons are viable options to include in the broader Mars surface exploration architecture.

Cianciolo, Alicia D.↗

Mars Pathfinder mission operations concepts

The Mars Pathfinder Project plans a December 1996 launch of a single spacecraft. After jettisoning a cruise stage, an entry body containing a lander and microrover will directly enter the Mars atmosphere and parachute to a hard landing near the sub-solar latitude of 15 degrees North in July 1997. Primary surface operations last for 30 days. Cost estimates for Pathfinder ground systems development and operations are not only lower in absolute dollars, but also are a lower percentage of total project costs than in past planetary missions. Operations teams will be smaller and fewer than typical flight projects. Operations scenarios have been developed early in the project and are being used to guide operations implementation and flight system design. Recovery of key engineering data from entry, descent, and landing is a top mission priority. These data will be recorded for playback after landing. Real-time tracking of a modified carrier signal through this phase can provide important insight into the spacecraft performance during entry, descent, and landing in the event recorded data is never recovered. Surface scenarios are dominated by microrover activity and lander imaging during 7 hours of the Mars day from 0700 to 1400 local solar time. Efficient uplink and downlink processes have been designed to command the lander and microrover each Mars day.

Sturms, Francis M., Jr.↗

Long Duration Venus Probes and Landers

Planetary probes have long been a tool used by scientists to gain early clues on environments and systems of new planetary targets. This not only fueled the scientific process but also helped prepare for future missions, such as landers, and helped ensure their success. Venus, Earth's sister planet, has been the target of more probes and landers than any other body in our solar system except for Earth and yet many fundamental questions are unanswered. Challenge for Venus Surface Science: This lack of knowledge is a result of the challenging Venus environments. Remote sensing of the surface and portions of the atmosphere is difficult at best due to the thick layers of sulfuric acid clouds and the high pressure supercritical CO2 atmosphere below those clouds. This has hampered the ability of orbiting missions to provide us insight into surface features and processes and thus hides potential clues on interior process from our view. Surface probes and landers face an even more daunting challenge, which is the extreme temperature, pressure and unfriendly chemical composition of the near surface atmosphere. Over 10 assets have landed on the surface yet the longest surviving asset Venera-13 lasted only 127 minutes before succumbing to the extreme temperature. While this and other landers provided valuable new data, the short life impacted ability to understand any temporal processes, for example meteorology, seismic active, and therefore very little is known about the interior and surface atmosphere interactions. New Capability Offering Potential Solutions: Re-cent developments by NASA are offering hope of overcoming the technical challenges of surface operations and life with the use of high temperature electronics and systems. Wide band gap, SiC based electronics have been demonstrated to function successfully for extended periods of time both at 500C, Venus surface temperatures as well as when temperature is combined with the reactive chemistry of the surface atmosphere and the high pressures (over 90 bar pressure at the surface). In addition to electronics a number of other subsystems are in development including power in the form of high temperature batteries and power management devices, communications including antennas, transmitters and other components, materials, and structures and mechanisms. These are all activities under NASA's Long Lived In situ Solar System Exploration (LLISSE) project. Other activities are also funded under NASA's HOTTech program.

Kremic, T.↗

Fast-Time Simulation for Evaluating the Impact of Estimated Flight Ready Time Uncertainty on Surface Metering

NASA has been developing and demonstrating new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the IADS capabilities in the ATD-2 project is surface metering enabled by a tactical surface scheduler to provide controllers with the pushback advisories for departures at gates. The tactical surface scheduler uses the estimated flight ready times provided by airlines, called Earliest Off-Block Times (EOBTs), as input to calculate the target off-block times for pushback advisories. However, the EOBTs are often inaccurate and deviate from the actual flight ready times, which may reduce the benefits of surface metering. In this paper, a linear regression model is developed to model the EOBT uncertainty distribution over time based on actual EOBT data collected at Charlotte airport. This EOBT model is integrated with a tactical surface scheduler and a fast-time simulation tool. To evaluate the impact of the EOBT accuracy on airport surface operations, fast-time simulations are implemented for selected traffic scenarios under different levels of modelled EOBT accuracy. The simulation results show that the EOBT uncertainty affects several performance metrics related to the surface metering, such as gate hold, taxi time reduction, and target takeoff time predictability, which in turn influences ATD-2's scheduler performance.

tactical surface scheduler↗

Fast-Time Simulation for Evaluating the Impact of Estimated Flight Ready Time Uncertainty on Surface Metering

NASA has been developing and demonstrating new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the IADS capabilities in the ATD-2 project is surface metering enabled by a tactical surface scheduler to provide controllers with the pushback advisories for departures at gates. The tactical surface scheduler uses the estimated flight ready times provided by airlines, called Earliest Off-Block Times (EOBTs), as input to calculate the target off-block times for pushback advisories. However, the EOBTs are often inaccurate and deviate from the actual flight ready times, which may reduce the benefits of surface metering. In this paper, a linear regression model is developed to model the EOBT uncertainty distribution over time based on actual EOBT data collected at Charlotte airport. This EOBT model is integrated with a tactical surface scheduler and a fast-time simulation tool. To evaluate the impact of the EOBT accuracy on airport surface operations, fast-time simulations are implemented for selected traffic scenarios under different levels of modelled EOBT accuracy. The simulation results show that the EOBT uncertainty affects several performance metrics related to the surface metering, such as gate hold, taxi time reduction, and target takeoff time predictability, which in turn influences ATD-2's scheduler performance.

tactical surface scheduler↗

Spacecraft Status Report: 2001 Mars Odyssey

Fourth extension of Odyssey mission continues, with orbital science investigations and relay services for landed assets. Mitigation of aging IMU and UHF transceiver. ODY has responded to Program Office/board recommendations. All Stellar mode has been certified for flight operations and is now standard for nadir point operations on the A-side. Investigating options to mitigate aging Battery. Gradual transfer to a later LMST orbit node to shorten eclipse durations. Reduce spacecraft loads during the longer eclipses. Optimize battery performance. ODY is preparing for E5 Proposal and Planetary Science Division FY12 Senior Review activities. ODY is on track to support MSL EDL and surface operations. ODY is managing consumables in order to remain in operations until 2020.

inter-annual variations↗