Search NASA⌕ Search

SEARCH · Search NASA

Results for “synchronization operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Status of SERT 2 thrusters and spacecraft 1976

The historical record of the SERT II ion thrusters and spacecraft performance for 6 1/2 years since the February 1970 launch is reviewed. The most recent ion thruster operation test shows no changes since 1974. Thruster 2 is fully operational with no performance degradation. Thruster 1 has a high voltage grid short, but continues to demonstrate cathode and discharge relight capability. Spacecraft orbit and dynamic analysis indicates a stable, sun-synchronous spacecraft orientation by 1979. An attitude adjustment maneuver was performed in August 1976 to achieve this orientation and provide sufficient continuous solar power for thruster operation in 1979.

Kerslake, W. R.↗

Status of SERT II thrusters and spacecraft - 1976

The historical record of the SERT II ion thrustors and spacecraft performance for 6-1/2 years since the February 1970 launch is reviewed. The most recent ion thrustor operation test shows no changes since 1974. Thrustor 2 is fully operational with no performance degradation. Thrustor 1 has a high voltage grid short, but continues to demonstrate cathode and discharge relight capability. Spacecraft orbit and dynamic analysis indicates a stable, sun-synchronous spacecraft orientation by 1979. An attitude adjustment maneuver was performed in August 1976 to achieve this orientation and provide sufficient continuous solar power for thrustor operation in 1979.

Kerslake, W. R.↗

Time Warp Operating System, Version 2.5.1

Time Warp Operating System, TWOS, is special purpose computer program designed to support parallel simulation of discrete events. Complete implementation of Time Warp software mechanism, which implements distributed protocol for virtual synchronization based on rollback of processes and annihilation of messages. Supports simulations and other computations in which both virtual time and dynamic load balancing used. Program utilizes underlying resources of operating system. Written in C programming language.

Bellenot, Steven F.↗

Synchronous Meteorological Satellite spin testing

The end-to-end spin tests conducted on the Synchronous Meteorological Satellite are described in detail. It is noted that the objective of these tests was to demonstrate that the satellite performed its intended functions under spinning conditions and that all satellite functions were tested except for solar-panel illumination, pyrotechnic-device operation, VISSR infrared operation, and auxiliary propulsion-system operation. Tests discussed include antenna pointing, S-band and UHF equivalent isotropic radiated power, output-power ripple, bit error rate, synchronous electromagnetic interference, earth width measurement, and satellite magnetic-field measurement. The purpose, technique, salient results, and problems of each test are outlined.

Mcbrady, D. J.↗

The advanced OPLE for search and rescue

Recent technological advances have made it possible to develop an advanced OMEGA position location experiment for a global search and rescue application. This application generated some new problem areas such as the OMEGA lane ambiguity, random access, location accuracy, real time processing, and size and weight of the Search and Rescue Communication (SARCOM). This experiment will demonstrate the feasibility of instantaneous alarm and position location by using a relatively inexpensive, battery operated, three-pound package. This package can transmit the alarm and position through a synchronous satellite to a search and rescue station in less than three minutes.

Morakis, J. C.↗

Some in-field experiences of non-synchronous vibrations in large rotating machinery

Some problems associated with non-synchronous vibrations are analyzed by describing three cases experienced with fairly large rotating machines in operating conditions. In each case, a brief description is first given of the machine and of the instrumentation used. The experimental results are then presented, with reference to time or frequency domain recordings. The lines followed in diagnosis are then discussed and, lastly, the corrective action undertaken is presented.

Colnago, Giuseppe↗

The two-way time synchronization system via a satellite voice channel

A newly developed two-way time synchronization system is described in this paper. The system uses one voice channel at a SCPC satellite digital communication earth station, whose bandwidth is only 45 kHz, thus saving satellite resources greatly. The system is composed of one master station and one or several, up to sixty-two, secondary stations. The master and secondary stations are equipped with the same equipment, including a set of timing equipment, a synthetic data terminal for time synchronizing, and a interface unit between the data terminal and the satellite earth station. The synthetic data terminal for time synchronization also has an IRIG-B code generator and a translator. The data terminal of master station is the key part of whole system. The system synchronization process is full automatic, which is controlled by the master station. Employing an autoscanning technique and conversational mode, the system accomplishes the following tasks: linking up liaison with each secondary station in turn, establishing a coarse time synchronization, calibrating date (years, months, days) and time of day (hours, minutes, seconds), precisely measuring the time difference between local station and the opposite station, exchanging measurement data, statistically processing the data, rejecting error terms, printing the data, calculating the clock difference and correcting the phase, thus realizing real-time synchronization from one point to multiple points. We also designed an adaptive phase circuit to eliminate the phase ambiguity of the PSK demodulator. The experiments have shown that the time synchronization accuracy is better than 2 mu S. The system has been put into regular operation.

Heng-Qiu, Zheng↗

The Gravity Field of Mars From MGS, Mars Odyssey, and MRO Radio Science

The Mars Global Surveyor (MGS), Mars Odyssey (ODY), and Mars Reconnaissance Orbiter (MRO) missions have enabled NASA to conduct reconnaissance and exploration of Mars from orbit for sixteen consecutive years. These radio systems on these spacecraft enabled radio science in orbit around Mars to improve the knowledge of the static structure of the Martian gravitational field. The continuity of the radio tracking data, which cover more than a solar cycle, also provides useful information to characterize the temporal variability of the gravity field, relevant to the planet's internal dynamics and the structure and dynamics of the atmosphere [1]. MGS operated for more than 7 years, between 1999 and 2006, in a frozen sun-synchronous, near-circular, polar orbit with the periapsis at approximately 370 km altitude. ODY and MRO have been orbiting Mars in two separate sun-synchronous orbits at different local times and altitudes. ODY began its mapping phase in 2002 with the periapis at approximately 390 km altitude and 4-5pm Local Solar Time (LST), whereas the MRO science mission started in November 2006 with the periapis at approximately 255 km altitude and 3pm LST. The 16 years of radio tracking data provide useful information on the atmospheric density in the Martian upper atmosphere. We used ODY and MRO radio data to recover the long-term periodicity of the major atmospheric constituents -- CO2, O, and He -- at the orbit altitudes of these two spacecraft [2]. The improved atmospheric model provides a better prediction of the annual and semi-annual variability of the dominant species. Therefore, the inclusion of the recovered model leads to improved orbit determination and an improved gravity field model of Mars with MGS, ODY, and MRO radio tracking data.

Mars↗

Artemis I Flight Instrumentation Data Quality Assessment and Processing

This paper is in support of the SciTech 2024 Space Launch System Aerosciences Special Sessions being organized by Brent Pomeroy and Jeremy Pinier. On November 16th, 2022, NASA launched the inaugural test flight of the Space Launch System (SLS) carrying the Orion capsule into a high orbit far beyond the Moon. The launch vehicle was instrumented with over three thousand flight instrumentation sensors, which monitored aerodynamic, acoustic, structural, and thermal environments. These data are intended to validate experimental and numerical tools used to predict the design environments which the vehicle experiences during launch and ascent. Prior to launch, tests were performed at the SLS Systems Integration Laboratory (SIL) using flight-like avionics and on the integrated flight hardware of Artemis I at the Vehicle Assembly Building (VAB). The purpose of these tests was to characterize the data acquisition units (DAUs) used to record and telemeter flight data to ground stations in order to assure that flight test objectives can be achieved and to quantify the expected quality of the flight data. In addition, pre-flight assessment and development of tools and methods used to process and disseminate flight data at the Huntsville Operations Support Center (HOSC) were conducted and adjustments made with respect to DAU time-synchronization prior to and after the flight. This paper summarizes these tests and some aspects of the post processing of data are discussed.

Developmental Flight Instrumentation↗

GPM Mission Overview and U.S. Science Status

The Global Precipitation Measurement (GPM) Mission is an international satellite mission to unify and advance precipitation measurements from a constellation of research and operational sensors to provide "next-generation" precipitation products [1-2]. Water is fundamental to life on Earth. Knowing where and how much rain and snow falls globally is vital to understanding how weather and climate impact both our environment and Earth's water and energy cycles, including effects on agriculture, fresh water availability, and responses to natural disasters. Since rainfall and snowfall vary greatly from place to place and over time, satellites can provide more uniform observations of rain and snow around the globe than ground instruments, especially in areas where surface measurements are difficult. Relative to current global rainfall products, GPM data products will be characterized by: (l) more accurate instantaneous precipitation measurements (especially for light rain and cold-season solid precipitation), (2) more frequent sampling by an expanded constellation of domestic and international microwave radiometers including operational humidity sounders, (3) intercalibrated microwave brightness temperatures from constellation radiometers within a unified framework, and (4) physical-based precipitation retrievals from constellation radiometers using a common a priori cloud/hydrometeor database derived from GPM Core sensor measurements. The cornerstone of the GPM mission is the deployment of a Core Observatory in a unique 65 non-Sun-synchronous orbit to serve as a physics observatory and a reference standard to unify precipitation measurements by a constellation of dedicated and operational passive microwave sensors. The design of the GPM Core Observatory is an advancement of the Tropical Rainfall Measuring Mission (TRMM)'s highly successful rain-sensing package. The Core Observatory will carry a Ku/Ka-band Dual-frequency Precipitation Radar (DPR) and a multichannel (l0-183 GHz) GPM Microwave Radiometer (GMI). Since light rain and falling snow account for a significant fraction of precipitation occurrence in middle and high latitudes, the GPM instruments extend the capabilities of the TRMM sensors to detect falling snow, measure light rain, and provide, for the first time, quantitative estimates of microphysical properties of precipitation particles. The combined use of DPR and GMI measurements will place greater constraints on possible solutions to radiometer retrievals to improve the accuracy and consistency of precipitation retrievals from all constellation radiometers. The GMI uses 13 different microwave channels to observe energy from the different types of precipitation through clouds for estimating everything from heavy to light rain and for detecting falling snow. As the satellite passes over Earth, the GMI constantly scans a region 885 kilometers across. The Ball Aerospace and Technology Corporation built the GMI under contract with NASA Goddard Space Flight Center. The DPR provides three-dimensional information about precipitation particles derived from reflected energy by these particles at different heights within the cloud system. The two frequencies of the DPR also allow the radar to infer the sizes of precipitation particles and offer insights into a storm's physical characteristics. The Ka-band frequen~y scans across a region of 125 kilometers and is nested within the wider scan of the Ku-band frequency of 245 kilometers. The Japan Aerospace and Exploration Agency (JAXA) and Japan's National Institute of Information and Communications Technology (NICT) built the DPR. The Core Observatory satellite will fly at an altitude of 253 miles (407 kilometers) in a non-Sun-synchronous orbit that covers the Earth from 65 S to 65 N - from about the Antarctic Circle to the Arctic Circle. The GPM Core Observatory is being developed and tested at NASA Goddard Space Flight Center. Once complete, a Japanese H-lIA rocket will carry thPM Core Observatory into orbit from Tanegashima Island, Japan in 2014. The GPM constellation is envisioned to comprise 8 or more microwave sensors provided by partners, including both conical imagers and cross-track sounders. GPM is currently a partnership between NASA and the Japan Aerospace Exploration Agency (JAXA). Additional partnerships are under development to include microwave radiometers on the French-Indian Megha-Tropiques satellite and U.S. Defense Meteorological Satellite Program (DMSP) satellites, as well as humidity sounders or precipitation sensors on operational satellites such as the National Polar-orbiting Operational Environmental Satellite System (NPOESS) Preparatory Project (NPP), NOAA-NASA Joint Polar Satellite System (JPSS) satellites, European MetOp satellites, and DMSP follow-on sensors. In addition, data from Chinese and Russian microwave radiometers may be available through international cooperation under the auspices of the Committee on Earth Observation Satellites (CEOS) and Group on Earth Observations (GEO). GPM's next-generation global precipitation data will lead to scientific advances and societal benefits in the following areas: (1) Improved knowledge of the Earth's water cycle and its link to climate change (2) New insights into precipitation microphysics, storm structures and large-scale atmospheric processes (3) Better understanding of climate sensitivity and feedback processes (4) Extended capabilities in monitoring and predicting hurricanes and other extreme weather events (5) Improved forecasting capabilities for natural hazards, including floods, droughts and landslides. (6) Enhanced numerical prediction skills for weather and climate (7) Better agricultural crop forecasting and monitoring of freshwater resources. An overview of the GPM mission concept and science activities in the United States, together with an update on international collaborations in radiometer intercalibration and ground validation, will be presented.

Hou, Arthur Y.↗

An all digital phase locked loop for synchronization of a sinusoidal signal embedded in white Gaussian noise

An all digital phase locked loop which tracks the phase of the incoming sinusoidal signal once per carrier cycle is proposed. The different elements and their functions and the phase lock operation are explained in detail. The nonlinear difference equations which govern the operation of the digital loop when the incoming signal is embedded in white Gaussian noise are derived, and a suitable model is specified. The performance of the digital loop is considered for the synchronization of a sinusoidal signal. For this, the noise term is suitably modelled which allows specification of the output probabilities for the two level quantizer in the loop at any given phase error. The loop filter considered increases the probability of proper phase correction. The phase error states in modulo two-pi forms a finite state Markov chain which enables the calculation of steady state probabilities, RMS phase error, transient response and mean time for cycle skipping.

Reddy, C. P.↗

Analysis of the dynamics and frequency spectrum synthesis of an optical-mechanical scanning device

A two-coordinate optical-mechanical scanning device (OMSD), the operating unit of which is a scanning disk, with directional and focusing optics and a board, on which the data carrier is placed, is examined. The disk and board are kinematically connected by a transmission mechanism, consisting of a worm and complex gear drive and a tightening screw-nut with correcting device, and it is run by a synchronous type motor. The dynamic errors in the system depend, first, on irregularities in rotation of the disk, fluctuations in its axis and vibrations of the table in the plane parallel to the plane of the disk. The basic sources of the fluctuations referred to above are residual disbalance of the rotor and other rotating masses, the periodic component of the driving torque of the synchronous motor, variability in the resistance, kinematic errors in the drive and other things. The fluctuations can be transmitted to the operating units through the kinematic link as a flexural-torsional system, as well as through vibrations of the housing of the device.

Andryushkevichyus, A. I.↗

Data Synchronization Discrepancies in a Formation Flight Control System

Aircraft hardware-in-the-loop simulation is an invaluable tool to flight test engineers; it reveals design and implementation flaws while operating in a controlled environment. Engineers, however, must always be skeptical of the results and analyze them within their proper context. Engineers must carefully ascertain whether an anomaly that occurs in the simulation will also occur in flight. This report presents a chronology illustrating how misleading simulation timing problems led to the implementation of an overly complex position data synchronization guidance algorithm in place of a simpler one. The report illustrates problems caused by the complex algorithm and how the simpler algorithm was chosen in the end. Brief descriptions of the project objectives, approach, and simulation are presented. The misleading simulation results and the conclusions then drawn are presented. The complex and simple guidance algorithms are presented with flight data illustrating their relative success.

Ryan, Jack↗

Flexible Data and Frame Synchronization Structure for the LunaNet PNT Signal

A LunaNet Lunar Augmented Navigation Service (LANS) is being developed to enable a position, navigation, and timing service for future Lunar operations. The signal includes two components. An in-phase data channel signal is spread by a 1.023 MCPS ranging code that provides a high-rate data message at 250 bps and is encoded by a strong Low Density Parity Check (LDPC) code. A pilot channel with a 5.115 MCPS spreading code is also provided. The pilot code is configured with a secondary (overlay) code that does not currently provide absolute time or frame Synchronization as is the case for L1C. This work shows the advantage of implementing an overlay structure that provides absolute time for the LunaNet LANS signal structure known as the Augmented Forward Signal (AFS). The LunaNet AFS structure was developed to service two classes of user receivers. The first class is a low-complexity user receiver that only receives the 1.023 MCPS signal and does not use the 5.115 MCPS pilot channel. For this class of user, a data frame Sync word is needed. The second class of receiver is a high-end receiver that can processes both data and pilot channels to take advantage of the higher chip rate pilot channel for enhanced robustness and improved accuracy. In the current draft LunaNet LANS AFS design, these users must employ the frame Sync word in the data channel and obtain absolute time after decoding the AFS navigation message. The signal structure would greatly benefit from the addition of a pilot overlay structure that provides absolute time and robust frame Sync for high-end users as done for L1C. To provide a more robust and interoperable AFS structure, this work summarizes a study and recommends alternatives for a new overlay code on the pilot channel that provides absolute time and a Sync word approach on the data channel. The overlay code and Sync word are designed to allow for flexible and robust data synchronization for both low- complexity and high-end user receivers. The new overlay code structure permits frame synchronization performance that is as good as or better than the L1 C signal, while enabling a determination of absolute time upon frame Sync to aid high-end assisted LANS AFS user receivers at low signal to noise levels. We also present the design of rate-matched 5G new radio (5GNR) LDPC codes that fit within the current 6000-symbol frame size along with a time of interval (TOI) word, frame ID (FID) word, and the remaining LunaNet AFS data message blocks. The paper describes and demonstrates robust frame Synchronization performance of the overlay code and Synch word approaches. The results are described in terms of probability of missed detection and probability of false alarm for a correct frame Synchronization at low Eb/No levels expected for decoding the TOI word and LDPC encoded data. Advantages of the proposed data Synchronization structure will be described along with use cases for low-end and high-end receivers. Practical implementation considerations will also be described.

LunaNet↗

Flexible Data and Frame Synchronization Structure for the LunaNet PNT Signal

A LunaNet Lunar Augmented Navigation Service (LANS) is being developed to enable a position, navigation, and timing service for future Lunar operations [1]. The signal includes two components. An in-phase data channel signal is spread by a 1.023 MCPS ranging code that provides a high-rate data message at 250 bps and is encoded by a strong Low Density Parity Check (LDPC) code. A pilot channel with a 5.115 MCPS spreading code is also provided. The pilot code is configured with a secondary (overlay) code that does not currently provide absolute time or frame Synchronization as is the case for L1C [2] [3]. This work shows the advantage of implementing an overlay structure that provides absolute time for the LunaNet LANS signal structure known as the Augmented Forward Signal (AFS). The LunaNet AFS structure was developed to service two classes of user receivers. The first class is a low-complexity user receiver that only receives the 1.023 MCPS signal and does not use the 5.115 MCPS pilot channel. For this class of user, a data frame Sync word is needed. The second class of receiver is a high-end receiver that can processes both data and pilot channels to take advantage of the higher chip rate pilot channel for enhanced robustness and improved accuracy. In the current draft LunaNet LANS AFS design, these users must employ the frame Sync word in the data channel and obtain absolute time after decoding the AFS navigation message [2]. The signal structure would greatly benefit from the addition of a pilot overlay structure that provides absolute time and robust frame Sync for high-end users as done for L1C [3]. To provide a more robust and interoperable AFS structure, this work summarizes a study and recommends alternatives for a new overlay code on the pilot channel that provides absolute time and a Sync word approach on the data channel. The overlay code and Sync word are designed to allow for flexible and robust data synchronization for both low- complexity and high-end user receivers. The new overlay code structure permits frame synchronization performance that is as good as or better than the L1 C signal, while enabling a determination of absolute time upon frame Sync to aid high-end assisted LANS AFS user receivers at low signal to noise levels. We also present the design of rate-matched 5G new radio (5GNR) LDPC codes that fit within the current 6000-symbol frame size along with a time of interval (TOI) word, frame ID (FID) word, and the remaining LunaNet AFS data message blocks. The paper describes and demonstrates robust frame Synchronization performance of the overlay code and Synch word approaches. The results are described in terms of probability of missed detection and probability of false alarm for a correct frame Synchronization at low Eb/No levels expected for decoding the TOI word and LDPC encoded data. Advantages of the proposed data Synchronization structure will be described along with use cases for low-end and high-end receivers. Practical implementation considerations will also be described.

Philip Dafesh↗

The New Millennium Program Space Technology 5 (ST-5) Mission

The Space Technology 5 (ST-5) Project is part of NASA's New Millennium Program. ST-5 will consist of a constellation of three 25kg microsatellites. The mission goals are to demonstrate the research-quality science capability of the ST-5 spacecraft; to operate the three spacecraft as a constellation; and to design, develop and flight-validate three capable microsatellites with new technologies. ST-5 will be launched by a Pegasus XL into an elliptical polar (sun-synchronous) orbit. The three-month flight demonstration phase, beginning in March 2006, will validate the ability to perform science measurements, as well as the technologies and constellation operations. ST-5's technologies and concepts will enable future microsatellite science missions.

Webb, Evan H.↗

A high-speed lossless data compression system for space applications

This paper reports on the integration of a lossless data compression/decompression chipset into a space data system architecture. For its compression engine, the data system incorporates the Universal Source Encoder (USE) designed for the NASA/Goddard Space Flight Center. Currently, the data compression testbed generates video frames consisting of 512 lines of 512 pixels having 8-bit resolution. Each image is passed through the USE where the lines are internally partitioned into 16-word blocks. These blocks are adaptively encoded across widely varying entropy levels using a Rice 12-option set coding algorithm. The current system operates at an Input/Output rate of 10 Msamples/s or 80 Mbits/s for each buffered input line. Frame and line synchronization for each image are maintained through the use of uniquely decodable command words. Length information of each variable length compressed image line is also included in the output stream. The data and command information are passed to the next stage of the system architecture through a serial fiber-optic transmitter. The initial segment of this stage consists of packetizer hardware which adds an appropriate CCSDS header to the received source data. An uncompressed mode is optionally available to pass image lines directly to the packetizer hardware. A data decompression testbed has also been developed to confirm the data compression operation.

Miko, Joe↗