Search NASA⌕ Search

SEARCH · Search NASA

Results for “work planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Center Planning and Development Student Engineer

This fall I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning Development (CPD) Directorate. CPD works with commercial companies who are interested using KSCs unique capabilities in spaceflight, spacecraft processing, ground systems and Research Development (RD) projects that fall in line with NASAs mission and goals. CPD is divided into four (4) groups: (1) AD-A, which works on the Master Planning for center, (2) AD-B (where I am), which works on project management and integration, (3) AD-C, which works on partnership development, and (4) AD-T, which works on the RD aspects of partnerships. CPDs main goal is to one day make KSC the worlds largest spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group with employees having a wide knowledge of not only the Space Shuttle, but also that of the Apollo era. Our director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree at ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering drawings from the Apollo and Shuttle eras, to supporting NASA rocket launches (MAVEN), and working on actual agreementsproposals that will be used in the partnership process with multiple partners. Most of the work I have done is sensitive information and cannot be disclosed.

engineering↗

Center Planning and Development Student Engineer at KSC

This summer I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning & Development (CPD) Directorate. CPD works with commercial companies who are interested in using KSC's unique capabilities for spaceflight, spacecraft processing, ground systems and Research & Development (R&D) projects that fall in line with NASA's Mission and Vision. CPD is divided into three (3) groups: (1) AD-A, which works on the Master Planning for the center, (2) AD-B (where I am), which works on project control, management and integration, and (3) AD-C, which works on partnership development. CPD's main goal is to make KSC the world's preeminent multi-user spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group of employees having a wide knowledge of not only the Space Shuttle, but also Expendable Launch Vehicles (ELV). The director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree from ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering documents, weekly notes for CPD and senior management, engineering familiarizations with facilities at KSC, leading a tour for the Embry-Riddle Aeronautical University Career Services office, and working on actual agreements/proposals that will be used in the partnership process with multiple partners, along with other projects. Most of the work I have done is sensitive information and cannot be disclosed.

Engineer↗

13RC and and 3DRT Working Group of IRC: Status and Plans

We summarize recent activities of the International Intercomparison of 3D Radiation Codes (DRC), including development of an open source code, approximation methods for use in cloud dynamical models, and cloud reconstructions from multiple satellite platforms such as MODIS, MISR and ICESat. We also discuss the charter of the newly formed 3DRT Working Group of the International Radiation Commission, which hopes to coordinate and integrate efforts in various 3D application areas, including clouds, sea ice, and vegetation. Finally we describe plans for a special 3D session at the next International Radiation Symposium in Busan Korea, during 23-30 August 2004.

Cahalan, Robert↗

Adjustable Autonomy and Human-Agent Teamwork in Practice: An Interim Report on Space Applications

We give a preliminary perspective on the basic principles and pitfalls of adjustable autonomy and human-centered teamwork. We then summarize the interim results of our study on the problem of work practice modeling and human-agent collaboration in space applications, the development of a broad model of human-agent teamwork grounded in practice, and the integration of the Brahms, KAoS, and NOMADS agent frameworks. We hope our work will benefit those who plan and participate in work activities in a wide variety of space applications, as well as those who are interested in design and execution tools for teams of robots that can function as effective assistants to humans.

Bradshaw, Jeffrey M.↗

Automated Planning for a Deep Space Communications Station

This paper describes the application of Artificial Intelligence planning techniques to the problem of antenna track plan generation for a NASA Deep Space Communications Station. Me described system enables an antenna communications station to automatically respond to a set of tracking goals by correctly configuring the appropriate hardware and software to provide the requested communication services. To perform this task, the Automated Scheduling and Planning Environment (ASPEN) has been applied to automatically produce antenna trucking plans that are tailored to support a set of input goals. In this paper, we describe the antenna automation problem, the ASPEN planning and scheduling system, how ASPEN is used to generate antenna track plans, the results of several technology demonstrations, and future work utilizing dynamic planning technology.

Estlin, Tara↗

Planning and Execution for Front Delineation and Tracking with Multiple Underwater Vehicles

This work describes a planning architecture for a heterogeneous fleet of marine assets as well as a method for detecting and tracking ocean fronts using multiple autonomous underwater vehicles. Multiple vehicles — equally-spaced along the expected frontal boundary — complete near parallel transects orthogonal to the front. Lateral gradients are used to determine the location of the front crossing from each individual vehicle transect by detecting a change in the observed water property. Adaptive control of the vehicles ensure they remain perpendicular to the estimated frontal boundary as it evolves over time. This method was demonstrated in several experiment periods totaling weeks, in and around Monterey Bay, California in May and June of 2017. We discuss the challenges associated with the implementation of the planning system. We show the capability of this method for repeated sampling across a dynamic two-dimensional ocean front using a fleet of three types of platforms: short-range Iver AUVs, Tethys-Class Long-Range AUVs, and Seagliders. This method extends to tracking gradients of different properties using a variety of vehicles.

Chavez, Francisco P.↗

Advanced Signal Processing Methods Applied to Digital Mammography

The work reported here is on the extension of the earlier proposal of the same title, August 1994-June 1996. The report for that work is also being submitted. The work reported there forms the foundation for this work from January 1997 to September 1997. After the earlier work was completed there were a few items that needed to be completed prior to submission of a new and more comprehensive proposal for further research. Those tasks have been completed and two new proposals have been submitted, one to NASA, and one to Health & Human Services WS). The main purpose of this extension was to refine some of the techniques that lead to automatic large scale evaluation of full mammograms. Progress on each of the proposed tasks follows. Task 1: A multiresolution segmentation of background from breast has been developed and tested. The method is based on the different noise characteristics of the two different fields. The breast field has more power in the lower octaves and the off-breast field behaves similar to a wideband process, where more power is in the high frequency octaves. After the two fields are separated by lowpass filtering, a region labeling routine is used to find the largest contiguous region, the breast. Task 2: A wavelet expansion that can decompose the image without zero padding has been developed. The method preserves all properties of the power-of-two wavelet transform and does not add appreciably to computation time or storage. This work is essential for analysis of the full mammogram, as opposed to selecting sections from the full mammogram. Task 3: A clustering method has been developed based on a simple counting mechanism. No ROC analysis has been performed (and was not proposed), so we cannot finally evaluate this work without further support. Task 4: Further testing of the filter reveals that different wavelet bases do yield slightly different qualitative results. We cannot provide quantitative conclusions about this for all possible bases without further support. Task 5: Better modeling does indeed make an improvement in the detection output. After the proposal ended, we came up with some new theoretical explanations that helps in understanding when the D4 filter should be better. This work is currently in the review process. Task 6: N/A. This no longer applies in view of Tasks 4-5. Task 7: Comprehensive plans for further work have been completed. These plans are the subject of two proposals, one to NASA and one to HHS. These proposals represent plans for a complete evaluation of the methods for identifying normal mammograms, augmented with significant further theoretical work.

Stauduhar, Richard P.↗

Fiscal Year 2024 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued in 2024. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The SUMMAR manual was completed this fiscal year and work was started on creating manuals for SE2ANL, SE2RCT, and DASSH. Software verification work was carried out for DIF3D and REBUS in a previous program and the current fiscal year saw the completion of software verification reports for GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The goal for the next fiscal year is to complete the PERSENT software verification work and begin planning the software verification work for DASSH, SE2ANL, and SE2RCT. The code coverage reports for DIF3D and MC2-3 were completed in the previous fiscal year and the goal is to generate code coverage reports for REBUS, GAMSOR, PERSENT, and DASSH in the coming fiscal year. A considerable amount of effort was spent in the current fiscal year working on the continuous integration capability for automated regression testing in GitLab. The first version of the testing was created in the previous fiscal year and applied to DIF3D and its utility programs. That testing was extended this year to cover GAMSOR, REBUS, and PERSENT. To accomplish this, the first version of the new testing methodology had to be updated to make a single output checking methodology viable for all of the ARC software. This will result in a single document to detail the automated regression testing methodology and minor documents to detail the tolerance settings that have been applied to the output for each ARC code. The previous methodology put into place with SVN would have required a separate document for each ARC code to detail the output checking methodology and the tolerance settings for the output from each code. Because some of our industry partners are providing funds to add new capabilities to the ARC software to meet their needs, all of which must be reviewed and approved by the SQA program funded by this project, a summary of that development work is detailed in this report. Overall progress on resolving the QA gaps has been good this year with the most impactful improvement for our industry partners in capability being the creation of a threaded version of DIF3D-VARIANT that allows the DIF3D, REBUS, and GAMSOR run times to be reduced by a factor of 4-6. The most impactful QA gap that was resolved was the software verification of GAMSRC and VARPOW.

97 MATHEMATICS AND COMPUTING↗

Design Considerations for Spacecraft Operations During Uncrewed Dormant Phases of Human Exploration Missions

NASA is transforming human spaceflight. The Agency is shifting from an exploration-based program with human activities in low Earth orbit (LEO) and targeted robotic missions in deep space to a more sustainable and integrated pioneering approach. However, pioneering space involves daunting technical challenges of transportation, maintaining health, and enabling crew productivity for long durations in remote, hostile, and alien environments. Subject matter experts from NASA's Human Exploration and Operations Mission Directorate (HEOMD) are currently studying a human exploration campaign that involves deployment of assets for planetary exploration. This study, called the Evolvable Mars Campaign (EMC) study, explores options with solar electric propulsion as a central component of the transportation architecture. This particular in-space transportation option often results in long duration transit to destinations. The EMC study is also investigating deployed human rated systems like landers, habitats, rovers, power systems and ISRU system to the surface of Mars, which also will involve long dormant periods when these systems are staged on the surface. In order to enable the EMC architecture, campaign and element design leads along with system and capability development experts from HEOMD's System Maturation Team (SMT) have identified additional capabilities, systems and operation modes that will sustain these systems especially during these dormant phases of the mission. Dormancy is defined by the absence of crew and relative inactivity of the systems. For EMC missions, dormant periods could range from several months to several years. Two aspects of uncrewed dormant operations are considered herein: (1) the vehicle systems that are placed in a dormant state and (2) the autonomous vehicle systems and robotic capabilities that monitor, maintain, and repair the vehicle and systems. This paper describes the mission stages of dormancy operations, phases of dormant operations, and critical system capabilities that are needed for dormant operations. This paper will compare dormancy operations of past robotic missions to identify lessons that can be applied to planned human exploration missions. Finally, this paper will also identify future work and analysis planned to assess system performance metrics and integrated system operations.

Williams-Byrd, Julie↗

Manned remote work station development article. Volume 3: Development test plan. Appendix A: Manufacturing requirements/schedule

The tests and procedures for the manned remote work station (MRWS) open cherry picker (OCP) development test article (DTA) are described to validate systems requirements and performance specifications. A development test program is outlined to evaluate key design issues and man/machine interfaces when the MRWS OCP is used in a shuttle support role of satellite servicing and in orbit construction of large structures.

Source record↗

Work Package 5: Contingency Management. Mission Planning Requirements Document: Preliminary Version. Revision A

The purpose of this document is to identify the general flight/mission planning requirements for same-day file-and-fly access to the NAS for both civil and military High-Altitude Long Endurance (HALE) Unmanned Aircraft System (UAS). Currently the scope of this document is limited to Step 1, operations above flight level 43,000 feet (FL430). This document describes the current applicable mission planning requirements and procedures for both manned and unmanned aircraft and addresses HALE UAS flight planning considerations in the future National Airspace System (NAS). It also discusses the unique performance and operational capabilities of HALE UAS associated with the Access 5 Project, presents some of the projected performance characteristics and conceptual missions for future systems, and provides detailed analysis of the recommended mission planning elements for operating HALE UAS in the NAS.

Source record↗

Working Group 11F Opening Comments NASA Planning for NASA's Future Ground Systems

These are simple charts for the introductory comments to be made at the start of a panel session at the Ground System Architecture Workshop (GSAW2016). It is not meant as a formal paper, but rather contains information to prompt further discussion of the panel members and audience. The panel topic is: Embracing Change via the Use of Service-Based Frameworks and Products in an Enterprise.

Commonality↗

Beyond Coordination: Joint Planning and Program Execution. The IHPRPT Materials Working Group

"Partnership is more than just coordination," stated then-Commander of the Air Force Research Laboratory (AFRL), Major General Dick Paul (USAF-Ret), at this year's National Space and Missile Materials Symposium. His comment referred to the example of the joint planning and program execution provided by the Integrated High Payoff Rocket Propulsion Technology (IHPRPT) Materials Working Group (IMWG). Most people agree that fiscal pressures imposed by shrinking budgets have made it extremely difficult to build upon our existing technical capabilities. In times of sufficient budgets, building advanced systems poses no major difficulties. However, with today's budgets, realizing enhanced capabilities and developing advanced systems often comes at an unaffordable cost. Overcoming this problem represents both a challenge and an opportunity to develop new business practices that allow us to develop advanced technologies within the restrictions imposed by current funding levels. Coordination of technology developments between different government agencies and organizations is a valuable tool for technology transfer. However, rarely do the newly developed technologies have direct applicability to other ongoing programs. Technology requirements are typically determined up-front during the program planning stage so that schedule risk can be minimized. The problem with this process is that the costs associated with the technology development are often borne by a single program. Additionally, the potential exists for duplication of technical effort. Changing this paradigm is a difficult process but one that can be extremely worthwhile should the right opportunity arise. The IMWG is one such example where NASA, the DoD, and industry have developed joint requirements that are intended to satisfy multiple program needs. More than mere coordination, the organizations comprising the group come together as partners, sharing information and resources, proceeding from a joint roadmap.

Stropki, Michael A.↗

The 1981 Argentina ground data collection

Over 600 fields in the corn, soybean and wheat growing regions of the Argentine pampa were categorized by crop or cover type and ancillary data including crop calendars, historical crop production statistics and certain cropping practices were also gathered. A summary of the field work undertaken is included along with a country overview, a chronology of field trip planning and field work events, and the field work inventory of selected sample segments. LANDSAT images were annotated and used as the field work base and several hundred ground and aerial photographs were taken. These items along with segment descriptions are presented. Meetings were held with officials of the State Secretariat of Agriculture (SEAG) and the National Commission on Space Investigations (CNIE), and their support to the program are described.

Horvath, R.↗

Algorithmic Classification of Raman Spectra Biosignatures: Improving Life Detection Confidence

“Agnostic” biosignatures – indicators of life (or the absence of life), independent of a particular biochemistry – are increasingly considered a high standard for life detection. The Ladder of Life Detection (2018) called for investigating how combinations of independent and different potential biosignatures affect confidence. To address this gap, statistical classification of elemental abundances, isotopic fractionation, and reflectance spectroscopy (VNIR) has been implemented. Raman spectroscopy, highly desirable due to its wide availability, has the potential to improve this predictive power. This work implemented biosignature classification algorithms on Raman data alone, in preparation for combination with the other data types. Raman spectroscopy data was collected from published databases and papers as part of a manually curated dataset of “indicative” and “non-indicative of life” samples. These currently include 61 non-indicative samples (meteorites, magnetite); 3 indicative living samples (bacteria); 20 indicative non-living samples (chalk, bone); and 12 indicative mixed (with non-indicative material) samples (soil, microbial mats). Laboratory work is ongoing to characterize additional samples, particularly a greater breadth of mixed systems. Spectra were interpolated, filtered with the Savitzsky-Golay filter, and de-noised. For a preliminary examination, agnostic features were manually extracted including mean intensity, number of peaks, and mean peak width. Different peak prominences and filtering polynomials were used to refine features. Classification algorithms were implemented: k-nearest neighbors (KNN), logistic regression (LR), linear support vector machines (SVM), random forest (RF), Gaussian naïve bayes (GNB). Lastly, Monte Carlo simulations on 1,000 50%-train-test-splits were used to validate classification performance and feature significance. The preliminary feature set achieved its highest AUC of 0.52 with LR, with no strongly discriminatory features. Work to improve feature extraction, such as through deep learning with back propagation, is planned. In future work, the Raman data will be combined with the other data types, and potentially new data types such as enantiomeric excess. This project was partially supported through the NASA Ames Project EXcellence (APEX) incubator program.

Astrobiology↗

Streamlining Collaborative Planning in Spacecraft Mission Architectures

During the past two decades, the planning and scheduling community has substantially increased the capability and efficiency of individual planning and scheduling systems. Relatively recently, research work to streamline collaboration between planning systems is gaining attention. Spacecraft missions stand to benefit substantially from this work as they require the coordination of multiple planning organizations and planning systems. Up to the present time this coordination has demanded a great deal of human intervention and/or extensive custom software development efforts. This problem will become acute with increased requirements for cross-mission plan coordination and multi -spacecraft mission planning. The Advanced Architectures and Automation Branch of NASA's Goddard Space Flight Center is taking innovative steps to define collaborative planning architectures, and to identify coordinated planning tools for Cross-Mission Campaigns. Prototypes are being developed to validate these architectures and assess the usefulness of the coordination tools by the planning community. This presentation will focus on one such planning coordination too], named Visual Observation Layout Tool (VOLT), which is currently being developed to streamline the coordination between astronomical missions

Misra, Dhariti↗

Flight Planning Branch NASA Co-op Tour

This semester I worked with the Flight Planning Branch at the NASA Johnson Space Center. I learned about the different aspects of flight planning for the International Space Station as well as the software that is used internally and ISSLive! which is used to help educate the public on the space program. I had the opportunity to do on the job training in the Mission Control Center with the planning team. I transferred old timeline records from the planning team's old software to the new software in order to preserve the data for the future when the software is retired. I learned about the operations of the International Space Station, the importance of good communication between the different parts of the planning team, and enrolled in professional development classes as well as technical classes to learn about the space station.

Marr, Aja M.↗