Search NASA⌕ Search

SEARCH · Search NASA

Results for “workforce development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

A Collaborative Vision for Deep Space Human Exploration

Artemis will be the first cooperative campaign among nations for crewed planetary exploration. This paradigm shift reflects a collaborative vision for deep space human exploration that embraces the concept that, “If you want to go fast, go alone; If you want to go far, go together.” This paper elaborates on the way the National Aeronautics and Space Administration(NASA)is striving to make its Moon to Mars effort a collaborative endeavor for long-term human exploration of deep space and for the international space community. The agency is making great strides in unifying its workforce, mission directorates, technical authorities, and centers behind shared goals and processes. Enhanced communication and a reinvigoration of systems engineering ideals have been a hallmark of that effort, guided by the Moon to Mars Architecture, which defines what NASA aims to accomplish and how it will execute those goals. This interdisciplinary approach ensures the Artemis campaign supports NASA’s engineering, science, and technology development goals. As of September 2024, over 43 nations have signed the Artemis Accords, which establish a common set of principles for peaceful cooperation in civil space exploration. Building off these efforts, NASA has been engaging in separate and distinct discussions about partner contributions to Artemis. International partnerships for the Artemis campaign include long-standing partners as well as agencies with which NASA has only more recently begun collaborating. The Gateway Program is an early example of both –benefitting from partnerships with Canada, Japan, and Europe forged though decades of cooperation on the International Space Station, as well as a new partnership with the United Arab Emirates. The agency’s Moon to Mars Objectives and Architecture unify the NASA workforce with common goals and shared systems-engineering processes. The architecture offers pathways for broader participation from industry, academia, and international partners. The agency evolves this collaborative approach through its annual Architecture Concept Review cycle, seeking input from the NASA workforce, and through workshops, from industry, academia, and the international space community to refine NASA’s roadmap for exploration. Exploring together, NASA and its partners are setting humanity on the path to long-term presence at the Moon and our eventual journey to Mars

Objective↗

A Guide for Public Utility Commissions: Building Internal Technical Capacity and Recruiting Talent for Grid Resilience

This guide offers insight into how PUCs can strategically expand their technical workforce to meet evolving gird resilience demands. It outlines critical skill sets needed to support informed regulatory decision-making around resilience, such as modeling and weather forecasting, electric power systems analysis, and advanced data interpretation. In addition, it provides strategies for developing technical talent both internally and through additional recruitment efforts. Two appendices provide a list of grid resilience training resources and a compendium of sample job descriptions that reflect grid resilience technical expertise for PUC consideration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Reconstruction and Failure Analysis of the Space Shuttle Columbia

Several days following the Columbia accident a team formed and began planning for the reconstruction of Columbia. A hangar at the Kennedy Space Center was selected for this effort due to it's size, available technical workforce and materials science laboratories and access to the vehicle ground processing infrastructure. The Reconstruction team established processes for receiving, handling, decontamination, tracking, identifying, cleaning and assessment of the debris. Initially, a 2-dimensional reconstruction of the Orbiter outer mold line was developed. As the investigation progressed fixtures which allowed a 3-dimensional reconstruction of the forward portions of the left wing's leading edge was developed. To support the reconstructions and forensic analyses a Materials and Processes (M&P) 'team was formed. This M&P team established processes for recording factual observations, debris cleaning, and engineering analysis. Fracture surfaces and thermal effects of selected airframe debris were assessed, and process flows for both nondestructive and destructive sampling and evaluation of debris were developed. The Team also assessed left hand airframe components that were believed to be associated with a structural breach of Columbia. A major portion of this analysis was evaluation of metallic deposits were prevalent on left wing leading edge components. Extensive evaluation of the visual, metallurgical and chemical nature of the deposits provided conclusions that were consistent with the visual assessments and interpretations of the NASA lead teams and the findings of the Columbia Accident Investigation Board. Analytical data collected by the M&P Team showed that a significant thermal event occurred at the left wing leading edge in the proximity of LH RCC Panels 8-9, and a correlation was formed between the deposits and overheating in these areas to the wing leading edge components. The analysis of deposits also showed exposure to temperatures in excess of 1649 C (3200 F), which would severely degrade support structure, tiles, and RCC panel materials. The integrated failure analysis of wing leading edge debris and deposits strongly supported the hypothesis that a breach occurred at LH RCC Panel 8.

Russell, Richard↗

JUSTIFI: Software for Improving Performance Objectives via Energy Efficiency

With growing energy supply concerns and rising costs, energy efficiency is a critical component of industrial energy resilience and competitiveness by directly reducing energy operating costs. Energy efficiency projects in manufacturing also yield valuable benefits to other key metrics, such as improved quality, reduced maintenance costs, improved safety, decreased pollution, and enhanced productivity. However, it is difficult to receive approval for energy efficiency projects, so implementation rates are low, even when meeting capital project payback period criteria. The inclusion and quantification of non-energy benefits (NEBs) in the decision-making process for energy efficiency projects can improve the overall financial payback period while demonstrating a positive impact on the firm's key performance metrics and business strategy. Despite their significant financial and strategic value, NEBs are rarely factored into decision-making due to lack of tools to effectively identify and quantify them. Therefore, a comprehensive and integrative approach is needed for the rapidly evolving energy landscape. To address these challenges, through funding from U.S. Department of Energy, our new assessment methodology integrates common continuous improvement six sigma concepts, such as the DMAIC process, and a protocol of guiding questions, into energy efficiency assessments to identify NEBs. We have also developed open-source software, JUSTIFI, to guide users through this process, data collection, and quantification. It is designed to be used concurrently with DOE energy system analysis software suite, MEASUR. Our methodology and tools inform energy assessors, firm engineering, decision makers, and workforce seeking to increase energy resilience and to maximize benefits aligned with performance metrics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

JUSTIFI: Software for Improving Performance Objectives via Energy Efficiency

With growing energy supply concerns and rising costs, energy efficiency is a critical component of industrial energy resilience and competitiveness by directly reducing energy operating costs. Energy efficiency projects in manufacturing also yield valuable benefits to other key metrics, such as improved quality, reduced maintenance costs, improved safety, decreased pollution, and enhanced productivity. However, it is difficult to receive approval for energy efficiency projects, so implementation rates are low, even when meeting capital project payback period criteria. The inclusion and quantification of non-energy benefits (NEBs) in the decision-making process for energy efficiency projects can improve the overall financial payback period while demonstrating a positive impact on the firm's key performance metrics and business strategy. Despite their significant financial and strategic value, NEBs are rarely factored into decision-making due to lack of tools to effectively identify and quantify them. Therefore, a comprehensive and integrative approach is needed for the rapidly evolving energy landscape. To address these challenges, through funding from U.S. Department of Energy, our new assessment methodology integrates common continuous improvement six sigma concepts, such as the DMAIC process, and a protocol of guiding questions, into energy efficiency assessments to identify NEBs. We have also developed open-source software, JUSTIFI, to guide users through this process, data collection, and quantification. It is designed to be used concurrently with DOE energy system analysis software suite, MEASUR. Our methodology and tools inform energy assessors, firm engineering, decision makers, and workforce seeking to increase energy resilience and to maximize benefits aligned with performance metrics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NASA Crew and Cargo Launch Vehicle Development Approach Builds on Lessons from Past and Present Missions

The United States (US) Vision for Space Exploration, announced in January 2004, outlines the National Aeronautics and Space Administration's (NASA) strategic goals and objectives, including retiring the Space Shuttle and replacing it with new space transportation systems for missions to the Moon, Mars, and beyond. The Crew Exploration Vehicle (CEV) that the new human-rated Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the International Space Station (ISS) Toward the end of the next decade, a heavy-lift Cargo Launch Vehicle (CaLV) will deliver the Earth Departure Stage (EDS) carrying the Lunar Surface Access Module (LSAM) to low-Earth orbit (LEO), where it will rendezvous with the CEV launched on the CLV and return astronauts to the Moon for the first time in over 30 years. This paper outlines how NASA is building these new space transportation systems on a foundation of legacy technical and management knowledge, using extensive experience gained from past and ongoing launch vehicle programs to maximize its design and development approach, with the objective of reducing total life cycle costs through operational efficiencies such as hardware commonality. For example, the CLV in-line configuration is composed of a 5-segment Reusable Solid Rocket Booster (RSRB), which is an upgrade of the current Space Shuttle 4- segment RSRB, and a new upper stage powered by the liquid oxygen/liquid hydrogen (LOX/LH2) J-2X engine, which is an evolution of the J-2 engine that powered the Apollo Program s Saturn V second and third stages in the 1960s and 1970s. The CaLV configuration consists of a propulsion system composed of two 5-segment RSRBs and a 33- foot core stage that will provide the LOX/LED needed for five commercially available RS-68 main engines. The J-2X also will power the EDS. The Exploration Launch Projects, managed by the Exploration Launch Office located at NASA's Marshall Space Flight Center, is leading the design, development, testing, and operations planning for these new space transportation systems. Utilizing a foundation of heritage hardware and management lessons learned mitigates both technical and programmatic risk. Project engineers and managers work closely with the Space Shuttle Program to transition hardware, infrastructure, and workforce assets to the new launch systems, leveraging a wealth of knowledge from Shuffle operations. In addition, NASA and its industry partners have tapped into valuable Apollo databases and are applying corporate wisdom conveyed firsthand by Apollo-era veterans of America s original Moon missions. Learning from its successes and failures, NASA employs rigorous systems engineering and systems management processes and principles in a disciplined, integrated fashion to further improve the probability of mission success.

Dumbacher, Daniel L.↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Interdisciplinary Undergraduate Space Physics Course: Understanding the Process of Science Through One Field's Colorful History

Science education in this country is in its greatest period of ferment since the post-Sputnik frenzy a generation ago. In that earlier time, however, educators' emphasis was on producing more scientists and engineers. Today we recognize that all Americans need a good science background. The ability to observe, measure, think quantitatively, and reach logical conclusions based on available evidence is a set of skills that everyone entering the workforce needs to acquire if our country is to be competitive in a global economy. Moreover, as public policy increasingly crystallizes around scientific issues, it is critical that citizens be educated in science so that they may provide informed debate and on these issues. In order to develop this idea more fully, I proposed to teach a historically based course about space physics as an honors course at the University of Maryland-College Park (UMCP). The honors program at UMCP was established to foster broad-based undergraduate courses that utilize innovative teaching techniques to provide exemplary education to a select group of students. I designed an introductory course that would have four basic goals: to acquaint students with geomagnetic and auroral phenomena and their relationship to the space environment; to examine issues related to the history of science using the evolution of the field as an example; to develop familiarity with basic skills such as describing and interpreting observations, analyzing scientific papers, and communicating the results of their own research; and to provide some understanding of basic physics, especially those aspect that play a role in the near-earth space environment.

Lopez, Ramon E.↗

A Decade of NASA Strategic Astrophysics Technology Investments: Technology Maturation, Infusion, and Other Benefits

NASA’s Astrophysics Division (APD) funds development of cutting-edge technology to enable its missions to achieve ambitious and groundbreaking science goals. These technology development efforts are managed by the Physics of the Cosmos (PCOS), Cosmic Origins (COR), and Exoplanet Exploration (ExE) Programs. The NASA Strategic Astrophysics Technology (SAT) Program was established in 2009 as a new technology maturation program to fill the gap in the Technology Readiness Level (TRL) range from 3 to 6. Since program inception, 100 SAT grants have been openly competed and awarded, along with dozens of direct-funded projects, leading to a host of technologies advancing their TRLs and/or being infused into space and suborbital missions and ground-based projects. We present the portfolio distribution in terms of specific technology areas addressed, including optics, detectors, coatings, coronagraphs, starshades, lasers, electronics, cooling systems, and micro-thruster subsystems. We show an analysis of the rate of TRL advances, infusion success stories, and other benefits such as training the future astrophysics workforce, including students and postdoctoral fellows hired by projects. Finally, we present APD’s current strategic technology maturation priorities for investment, enabling a range of future strategic astrophysics missions

NASA, astrophysics, technology development, optics↗

[Redesign of the Spacesuit Long Life Battery and the Personal Life Support System Battery]

This fall I was working on two different projects that culminated into a redesign of the spacesuit LLB (long life battery). I also did some work on the PLSS (personal life support system) battery with EC. My first project was redlining the work instruction for completing DPAs (destructive physical analysis) on battery cells in the department. The purpose of this document is to create a standard process and ensure that the data in the same way no matter who carries out the analysis. I observed three DPAs, conducted one with help, and conducted two on my own all while taking notes on the procedure. These notes were used to write the final work instruction that will become is the department standard. My second project continued the work of the summer co-op before me. I was testing aluminum heat sinks for their ability to provide good thermal conduction and structural support during a thermal runaway event. The heat sinks were designed by the summer intern but there was not much time for testing before he left. We ran tests with a heater on the bottom of a trigger cell to try to drive thermal runaway and ensure that it will not propagate to adjacent cells. We also ran heat-to-vent tests in an oven to see if the assembly provided structural support and prevented sidewall rupture during thermal runaway. These tests were carried out at ESTA (energy systems test area) and are providing very promising results that safe, high performing (greater than 180 Wh/kg) designs are possible. My main project was a redesign of the LLB battery. Another summer intern did some testing and concluded that there was no simple fix to mitigate thermal runaway propagation hazards in the current design. The only option was a clean sheet redesign of the battery. I was given a volume and ideal energy density and the rest of the design was up to me. First, I created new heat sink banks in Creo using the information gathered in the metal heat sink tests from the summer intern. After this, I made capture plates to hold the cells in place and I worked on nickel bussings for the electrical connections between the cells. Finally, I designed the test box enclosure that included sections for flame arresting materials. The battery brick design, which is the heart of the battery, promises to become the first for a manned spacecraft application to achieve greater than 180 Wh/kg. My work in redlining the DPA work instructions will also be used in selecting the cells for the battery. We had a few options of cells that would provide the necessary power output and needed to make a choice. We repeatedly charged and discharged cells for around a month until they went through 100 lifecycles. The plan is to compare the DPA results on fresh and cycled cells from each manufacturer to see if cycling introduces any differences. After the complete LLB design was approved, the parts were ordered and testing should begin the first week of December. Some of my side projects included working on the CAD data for the PLSS with EC and attending the NASA Aerospace Battery Workshop in Huntsville. I was also a member of the Tours and Lectures Committee for the USRA and Pathways interns. I coordinated Apollo Evening and was on the committee for touring KSC and seeing an Atlas 5 launch. I really enjoyed my time at JSC and I would like to continue working for NASA or another aerospace company in the future. I have worked other internships prior to this, but I think the heavy research and development focus is the best fit for me. I originally thought I would need to go to grad school to work in an environment like this, but I now see it is possible with a bachelor’s degree and hard work. I would like to go into the workforce and maybe continue my education with night classes.

Scharf, Stephanie↗

AmpSuite

Seismic amplitudes offer vital information about explosion source characteristics, including discrimination and yield estimation. To take advantage of this, we developed an interactive Python package to measure, control data quality, generate broad area propagation models and perform discrimination and estimate yield. Propagation models are essential in support of transportable yield and broad area discrimination. The key benefit of this package will be its ability to continuously integrate data and new techniques. The AmpSuite framework will provide standardized, repeatable, and accurate model generation and characterization routines. The capability is crucial for monitoring agencies tasked with rapid and high-quality seismic event characterization. The AmpSuite software includes a series of independent modules to perform: • Direct Phase Amplitude Measurement and Storage • Coda Envelope Measurement and Storage • Data Quality Control • New Propagation Model Developments • Seismic Discrimination and Analysis • Yield Estimation and supporting utility software. The AmpSuite software provides comprehensive solutions for monitoring agencies seeking to optimize model generation and event analysis within a contemporary Python framework. Stakeholders (AFTAC) have begun to move towards the Python language for scientific analysis as a new workforce emerges.

Alfaro, Richard↗

Information Technology Research Services: Powerful Tools to Keep Up with a Rapidly Moving Field

Marty firms offer Information Technology Research reports, analyst calls, conferences, seminars, tools, leadership development, etc. These entities include Gartner, Forrester Research, IDC, The Burton Group, Society for Information Management, 1nfoTech Research, The Corporate Executive Board, and so on. This talk will cover how a number of such services are being used at the Goddard Space Flight Center to improve our IT management practices, workforce skills, approach to innovation, and service delivery. These tools and services are used across the workforce, from the executive leadership to the IT worker. The presentation will cover the types of services each vendor provides and their primary engagement model. The use of these services at other NASA Centers and Headquarters will be included. In addition, I will explain how two of these services are available now to the entire NASA IT workforce through enterprise-wide subscriptions.

Hunter, Paul↗

Using Degradation Modeling to Identify Fragile Operational Conditions in Human- and Component-driven Resilience Assessment

Studying failure events shows that many high-impact events result from the complex interactions between precipitating failure events and degraded operational conditions. Often, when a system is put in operations, unforeseen practical realities (e.g., maintenance and/or workforce availability) lead the system to be operated in configurations outside its envisioned nominal range. However, design-time failure models often assume that the failure events are initiated in an idealized, nominal state of system operation, resulting in an incomplete assessment of future risk. To solve this, this paper develops a framework to consider degraded operational performance in scenario-based resilience models which uses a corresponding model of performance degradation to determine the values of deteriorated model parameters in the resilience model. This framework is demonstrated on a remotely-piloted rover to determine the (individual and combined) effect of drive-train wear and operator fatigue on the resilience of the rover to drive-train faults. This demonstration showed the substantial impact that degradation has on resilience, highlighting the need to account for degradation in resilience models–specifically, unconsidered degradation can lead to overestimates of resilience (and thus underestimates of safety margin) and because resilience can degrade prior to visible unreliability, which can lead to an operational environment with a high propensity for high-impact unforeseen failure events.

resilience↗

Using Degradation Modeling to Identify Fragile Operational Conditions in Human- and Component-driven Resilience Assessment

Studying failure events shows that many high-impact events result from the complex interactions between precipitating failure events and degraded operational conditions. Often, when a system is put in operations, unforeseen practical realities (e.g., maintenance and/or workforce availability) lead the system to be operated in configurations outside its envisioned nominal range. However, design-time failure models often assume that the failure events are initiated in an idealized, nominal state of system operation, resulting in an incomplete assessment of future risk. To solve this, this paper develops a framework to consider degraded operational performance in scenario-based resilience models which uses a corresponding model of performance degradation to determine the values of deteriorated model parameters in the resilience model. This framework is demonstrated on a remotely-piloted rover to determine the (individual and combined) effect of drive-train wear and operator fatigue on the resilience of the rover to drive-train faults. This demonstration showed the substantial impact that degradation has on resilience, highlighting the need to account for degradation in resilience models--specifically, unconsidered degradation can lead to overestimates of resilience (and thus underestimates of safety margin) and because resilience can degrade prior to visible unreliability, which can lead to an operational environment with a high propensity for high-impact unforeseen failure events.

Daniel Hulse↗

Leading University Students to the Edge of Space

For over 16 years, the Louisiana Space Grant Consortium (LaSPACE), the NASA Balloon Program Office (BPO), and the NASA Columbia Scientific Balloon Facility (CSBF) have collaborated in a series of high altitude balloon-based programs involving hands-on authentic learning experiences that expose university students and other participants to technical skills, teamwork dynamics, and effective communication methods. Such programs go beyond what is possible to achieve in a normal classroom and help prepare future engineers and scientists for a successful aerospace workforce career. In our collaborative effort, LaSPACE has focused on the program content and student mentoring while NASA BPO and CSBF provide balloon flight support and operations. The entry-level Louisiana Aerospace Catalyst Experiences for Students (LaACES) builds students’ skills in basic electronics, sensor interfacing, real-time programming, mechanical development, and project management. These skills are then applied to the design, development, fabrication, and flight of a small (∼500 gram) balloon payload. Finally, the payloads are flight-tested to an altitude of ∼30 km using a 2 kg latex sounding balloon. The LaACES program includes a set of lectures, activities, and Arduino Mega based electronic kits that are used for skill building and as a core control system for the student payload. The more advanced High Altitude Student Platform (HASP) is designed to carry ∼twelve 3 to 20 kg student payloads to an altitude of about 36 kilometers with flight durations of 10 to 20 hours using a ∼311,500 cubic meter, zero pressure balloon. HASP provides all student payloads with power, downlink telemetry, uplink commanding, and real-time HD video for instrument control and assessment during the flight. While originally developed for university students, these programs have been adapted to projects focused on high school teachers as well as affecting minorities underrepresented in aerospace related science and engineering fields. We are now in the process of adapting the LaACES materials to a pre-engineering curriculum for high school students as well as for widespread access over the internet. During this presentation, we will provide details of both the LaACES and HASP programs, how these programs have engaged participants from all demographic groups, and our current plans for continuing and expanding upon our success.

University↗

Carbon Capture from ArcelorMittal Hot Briquetted Iron Plant Using Air Liquide Cryocap™ FG Technology – FEED Study

The process of steel production is energy and carbon intensive with global average energy consumption of 5.5 MWh/tonne of steel and CO2 emission intensity of 1.83 tonne CO2/tonne of steel. The steel making process has inherent CO2 emissions from mineral conversion and is considered major contributors to the global carbon emissions. The steel industry is responsible for 8% of global carbon emissions. The main objective of this research project is to execute and complete a front-end engineering and design (FEED) study for a commercial-scale, carbon capture project that separates 95% of the total CO2 emissions at the ArcelorMittal’s Hot Briquetted Iron (HBI) plant in Portland, TX (Figure 1). The HBI is an ore-based metallic that is used as high-grade feedstock for high-quality steel via an Electric Arc Furnace (EAF) route. The HBI plant produces 2.0 million metric tonnes of high-quality HBI and emits approximately 1 million tonnes CO2/yr. The capture system is a Pressure Swing Adsorption (PSA) system assisted Cryocap™ FG technology (Figure 2). The captured CO2 will be pipeline grade and will be geologically stored in a facility within 10 miles of the CO2 source. The Host Site location in Corpus Christi, TX, is near hydrocarbon processing facilities and near Environmental Justice (EJ) and Qualified Opportunity Zone (QOZ) communities. Due to the location of the Host Site, the retrofit project offers the ability to demonstrate how a workforce focused on the fossil energy sector can be redirected to the clean- energy sector. The Air Liquide Cryocap™ capture technology is a proven technology and has been extensively examined for large industrial applications. It has been shown to be applicable to a variety of industrial applications including the steel industry. Cryocap™ FG (specific setup for Flue Gas application) consists of a Pressure Swing Adsorption (PSA) unit coupled with a Cryogenic System. The PSA pre-concentrates the CO2 from the flue gas, while the cryogenic unit enables the CO2 purity to be increased to the desired level. The scope of this study incorporates completing FEED study of the CO2 capture system which includes point-source CO2 capture and balance-of-plant; Business Case Analysis (BCA) outlining the current and projected volumes of the steel plant’s point sources of CO2 and the potential utilization of tax credits, including its projected revenue and duration; Life Cycle Analysis (LCA); Environmental Justice Analysis; Economic Revitalization and Job Creation Outcomes Analysis; and Workforce Readiness Plan. The plant design work was divided into two components: Inside Battery Limits (ISBL) and Outside Battery Limits (OSBL). The ISBL focuses on the capture system, while the OSBL focuses on the utility feeds and ducting from the plant to the capture system. Various design and engineering deliverables will be developed to define commodity quantities, equipment specifications, and labour effort required to execute the project. These FEED study deliverables will be prepared with the intent to develop an overall project capital cost estimate consistent with an AACE Class 3 estimate. The modular approach for the Cryocap™ FG that is being designed for this study integrates compression, PSA, and cryogenic “bricks” to achieve the desired CO2 capture rates. This carbon capture system integrates easily with the existing plant, thus reducing project costs and risks. It is also capable of managing impurities such as nitrogen oxides (NOx), sulfur oxides (SOx), mercury, hydrocarbons, and particulate matter. The capture system has a smaller footprint than amine-based systems. The two-step process uses PSA to preconcentrate the CO2 in the feedstream and then uses the cryogenic portion to purify and compress the resulting high purity CO2 product. This combination of purification and compression (i.e., process intensification) significantly reduces the CAPEX associated with use of a separate compressor commonly utilized for amine solvent-based systems. Successful completion of the FEED study will provide DOE with a detailed understanding of the costs for scaling up this proven capture technology for commercial applications at industrial facilities.

42 ENGINEERING↗

Exploiting Expertise and Knowledge Sharing Online for the Benefit of NASA's GN&C Community of Practice

In 2004, NASA faced major knowledge sharing challenges due to geographically isolated field centers that inhibited engineers from sharing their experiences, expertise, ideas, and lessons learned. The necessity to collaborate on complex development projects and the reality of constrained project resources together drove the need for ensuring that personnel at all NASA centers had comparable skill sets and that engineers could find resources in a timely fashion. Mission failures and new directions for the Agency also demanded better collaborative tools for NASA's engineering workforce. In response to these needs, the online NASA Engineering Network (NEN) was formed by the NASA Office of the Chief Engineer to provide a multi-faceted system for overcoming geographic and cultural barriers. NEN integrates communities of practice with a cross-repository search and the Lessons Learned Information System. This paper describes the features of the GN&C engineering discipline CoP site which went live on NEN in May of 2008 as an online means of gathering input and guidance from practitioners. It allows GN&C discipline expertise captured at one field center to be shared in a collaborative way with the larger discipline CoP spread across the entire Agency. The site enables GN&C engineers to find the information they need quickly, to find solutions to questions from experienced engineers, and to connect with other practitioners regardless of geographic location, thus increasing the probability of project success.

control↗

Gateway Program Safety and Mission Assurance Integration - the Future of Safe Deep Space Human Exploration

As a foundational element of the National Aeronautics and Space Administration (NASA) Artemis Campaign, the Gateway is an incrementally built cislunar spacecraft that will serve as a platform for deep space human exploration, science, and technology demonstration. The Gateway will be a unifying catalyst for international partners around the world to establish sustained deep space scientific investigations, lunar surface access, and missions to Mars. As human exploration moves farther away from Earth, spacecraft designs must prioritize and optimize mass and volume allocations, while minimizing human and spacecraft risk. To accomplish this objective, the Gateway Program Safety and Mission Assurance functions develop, implement, and ensure compliance with requirements, in concert with the accurate characterization and transparent communication of residual hazard risks, for integrated safety, reliability and maintainability and quality assurance. Safety and Mission Assurance was a key contributor during Gateway program pre-formulation and formulation activities where safety and reliability analysis was embedded in the Gateway Systems Engineering and Integration team. During these early program stages, a preliminary Gateway Integrated Hazard Analysis and Preliminary Gateway Probabilistic Risk Assessment assisted in Gateway architectural and operational definition as part of a risk-informed design process. As the deep space architecture has matured, the integrated Safety and Mission Assurance analyses have matured, new safety review processes have been developed, and requirements have been refined to ensure compliance with integrated safety and mission assurance objectives. The Gateway Program is currently concluding the preliminary design review informed milestone, where the primary objectives included: - Ensured completeness and consistency of the preliminary design, including the meeting of all requirements within appropriate margins and acceptable risk posture. - Identification of any major issues moving forward to the Critical Design phase. At this milestone, Safety and Mission Assurance provided numerous products, including Gateway Top Risks and Risk Mitigation Plans, updated integrated hazard analyses, updated probabilistic risk assessment, Crew Survival Analysis Report, and updated Safety and Mission Assurance Requirements and Plans. These products provide a many-faceted perspective on the inherent risk and available mitigations involved in flying the current proposed vehicle design and anticipated stack configurations. In addition, Safety and Mission Assurance identified top technical, process and workforce concerns to be addressed as the program progresses toward the critical design phase. This paper will detail the evolution of the Gateway Program Safety and Mission Assurance integration functions, provide its current status and lessons learned for future human spaceflight programs. Throughout this paper the key tenets of the Gateway Program Safety and Mission Assurance will be discussed: - Application of a risk-informed approach to identify and mitigate areas of highest risk. - Leverage of valuable processes and lessons learned from earlier spaceflight programs. - Development of Safety and Mission Assurance products to inform design risk trades. - Utilization of common Safety and Mission Assurance practices to identify safety risks for multiple perspectives: top-down, bottom-up, and across lines of integration. - Approval of safety hazards at the appropriate level of authority, keeping most deliberation closest to design expertise and elevating risks of greatest concern for program-level consideration. - Championing of Safety and Mission Assurance processes and forums to foster a pervasive safety culture that is transparent, inclusive, and collaborative between all partners. These tenets have allowed the Gateway Safety and Mission Assurance function to play a key role in optimized vehicle design evolution, and early identification and mitigation of Gateway program and Artemis mission risk.

Helen Vaccaro↗