USDA Application Test System (ATS) session: Technology transfer; concepts, user requirements, and their practical application
There are no author-identified significant results in this report.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
There are no author-identified significant results in this report.
There are no author-identified significant results in this report.
There are no author-identified significant results in this report.
There are no author-identified significant results in this report.
There are no author-identified significant results in this report.
The scientific and technological results obtained by an energetic particle spectrometer are summarized. Data on energetic electrons trapped in the Earth's radiation belt near synchronous altitude and on solar particles penetrating to this altitude are discussed.
The overall mission and spacecraft systems, testing, and operations are summarized. The mechanical subsystems are reviewed, encompassing mechanical design requirements; separation and deployment mechanisms; design and performance evaluation; and the television camera reflector monitor. Thermal control and contamination are discussed in terms of thermal control subsystems, design validation, subsystems performance, the advanced flight experiment, and the quartz-crystal microbalance contamination monitor.
Attitude control is reviewed, encompassing the attitude control subsystem, spacecraft attitude precision pointing and slewing adaptive control experiment, and RF interferometer experiment. The spacecraft propulsion system (SPS) is discussed, including subsystem, SPS design description and validation, orbital operations and performance, in-orbit anomalies and contingency operations, and the cesium bombardment ion engine experiment. Thruster failure due to plugging of the propellant feed passages, a major cause for mission termination, are considered among the critical generic failures on the satellite.
Functional design requirements and in-orbit operations, performance, and anomalies are discussed for (1) the communications subsystem, (2) the electrical power system, and (3) the telemetry and command subsystem. The latter includes a review of ground support. Tracking and data relay experiments and the Apollo-Soyuz test program are reviewed.
Experiments sponsored by the US Department of Health Education and Welfare are discussed, including telecommunications, Alaskan health service, Appalachian education satellite project, and the University of the West Indies. The Satellite Instructional Television Experiment in India is reviewed. Independent television experiments are addressed, including AIDSAT and Project Look Up.
Evaluations include a very high resolution radiometer, a radio beacon experiment, environmental measurement experiments (EME), EME support hardware, EME anomalies and failures, EME results, and US/USSR magnetometer experiments.
Electron emission experiments on Applied Technology Satellite 5 using a thermal electron emitter are reported and analyzed. Operations in eclipse charging environments showed that electron emission could partially discharge a negatively charged satellite. Typical operations resulted in kilovolt potentials being reduced to hundreds of volts for a few tens of seconds, followed by a gradual recharging over a period of minutes. Equilibrium currents were modeled with a one-dimensional current balance model. Currents on the order of 1 microampere were found, significantly below emitter capabilities. Application of a three-dimensional, time-dependent computer model showed that differential charging on the solar arrays was limiting the emitted current, preventing the complete discharge of the satellite, and allowing it to recharge in spite of the electron emitter.
A technique is described which uses relative changes in Faraday rotation and modulation phase of satellite radio signals to determine the median height of the enhancement (or depletion) in the electron density of the ionosphere. During the post sunrise formation of the F layer the incremental layers have a median height of around 210 km (+ or - 40) and in the afternoon the decremental median is above the peak at 340 km (+ or - 40) on a winter day. A winter nighttime enhancement just after midnight appears as a thick layer extending upwards from the peak, with a median height at about 730 km. The method applies to large scale irregularities but not to small, dense, scintillation-causing irregularities for which Faraday and modulation phases do not represent the total electron content.
This viewgraph presentation gives an overview of the Access to Space website, including information on the 'tool boxes' available on the website for access opportunities, performance, interfaces, volume, environments, 'wish list' entry, and educational outreach.
This PowerPoint presentation will discuss efforts to increase rideshare initiatives: current technical challenges and initiatives underway.
NOTE: The manuscript associated with this data package is currently in review. The data may be revised based on reviewer feedback. Upon manuscript acceptance, this data package will be updated with the final dataset and additional metadata. This data package is associated with the manuscript "Hydroclimatic Memory and Watershed Template Shape Stream Intermittency: Multi-scale Attribution Using Process-based Simulation and Explainable ML" by Niroula et al. (2026), submitted to Water Resources Research (WRR). The study investigates the dominant controls on stream intermittency across local, reach, and watershed scales using a coupled process-based simulation and explainable machine-learning framework. Long-term daily simulations from the Advanced Terrestrial Simulator (ATS) were used to generate wetness states and ponded-depth responses over river-corridor cells. These ATS outputs were then aggregated across scales and used to train XGBoost (eXtreme Gradient Boosting) models. SHAP (SHapley Additive exPlanations) was applied to quantify the relative importance of hydroclimatic forcings, watershed template attributes, and antecedent-memory effects in shaping intermittency behavior. The analysis is carried out for three contrasting Pacific Northwest watersheds: Oak Creek (OCW), American River Watershed (ARW), and H.J. Andrews (HJA). Across these testbeds, the package contains ATS-ready watershed inputs, ATS run configuration and selected output files, model-evaluation data products, intermittency-analysis datasets, machine-learning target-feature tables, SHAP outputs, and notebooks used to organize, analyze, and visualize results. At a high level, the package documents a workflow in which ATS provides the physically based simulation backbone and explainable machine learning is used as a post-processing attribution tool. The contents are intended to support interpretation of the manuscript figures and results, provide context for how intermittency metrics were generated at multiple scales, and preserve the key artifacts needed to understand and reuse the analysis workflow. The package contains a high-level directory summary file (`summary.txt`) and four main content folders (1) `evaluation_plots` contains evaluation figures and supporting evaluation datasets; (2) `intermittency_plots` contains intermittency-focused analysis notebook and prepared datasets; (3) `ml-training-and-shap_values_plots` contains ML training inputs, SHAP outputs, and figure-generation notebooks; and (4) `watershed_mesh_and_ats_input` contains ATS model setup materials, forcing inputs, geometry, and selected run files. More specifically, the `evaluation_plots` folder contains the notebook used for ATS evaluation plotting and site-specific evaluation datasets. These include evapotranspiration and water-balance products for three watersheds, as well as an Oak Creek field-measurement discharge file. The `intermittency_plots` folder contains the notebook used for intermittency analysis and the prepared datasets used to analyze intermittent and non-intermittent wetness behavior across the study watersheds. The `ml-training-and-shap_values_plots` folder contains notebooks and outputs for the machine-learning and explainability workflow. This includes the main XGBoost and SHAP notebook(s), a beeswarm plotting notebook, target-feature tables for machine-learning training, SHAP summary tables, and per-sample SHAP value archives. The `watershed_mesh_and_ats_input` folder contains ATS-related watershed inputs and supporting materials. This includes mesh and shape products, ATS-readable LAI and meteorological forcing inputs, selected ATS spinup and transient-run files, and a watershed workflow example notebook. Subdirectories are organized by watershed where applicable.All files are .cpg (codepage files), .csv (comma-separated values), .dbf (database files), .exo (Exodus mesh format), .h5 (HDF5 format), .ipynb (Jupyter notebooks), .pkl (Python pickle), .prj (projection files), .sh (shell scripts), .shp (shapefile geometry), .shx (shapefile index), .txt (text files), or .xml (markup data).
Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.
Data on the geosynchronous plasma environment between approximately 30 eV and 80 keV are analyzed statistically. Nearly 50 days of 10 minute averages of the first four moments of the distribution function from low-energy plasma detectors on the ATS-5 and ATS-6 geosynchronous satellites were used. The data were studied in terms of occurrence frequency, local time variations, and response to geomagnetic activity. These techniques revealed marked differences in the ATS-5 and ATS-6 data bases. When translated into a 2-Maxwellian representation, it was found that (1) the ATS-6 data covered an energy range not covered by ATS-5 (between 1 and 50 eV) and (2) there was a definite change in the ion plasma between the ATS-5 and ATS-6 measurements. Simple expressions are derived to simulate the relationship between the four moments, and a model is presented, which takes into account the ATS-5 and ATS-6 plasma variations. Despite the differences in the ion data, the accuracy of the four-moment representation was found valid for characterizing the geosynchronous electron population.