Search NASA⌕ Search

SEARCH · Search NASA

Results for “Allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

US domestic and international regulatory issues

The U.S. domestic and international regulatory and policy milestones since 1982, when NASA filed its petition with the Federal Communications Commission (FCC) to establish the U.S. domestic Mobile Satellite Service (MSS), are described. In 1985, the FCC proposed to establish MSS services and allocate spectrum for such service. In 1986, the FCC allocated L-band spectrum for MSS. In 1987, at the Mobile World Administrative Radio Conference (MOB WARC-87), despite U.S., Canadian, and Mexican efforts, the WARC did not adopt a multi-service, generic MSS allocation. In 1989, the FCC licensed the first MSS system. After two decisions by the U.S. Court of Appeals, the FCC's licensing actions remain intact. The FCC also has permitted Comsat to provide international aeronautical and land MSS via the Inmarsat system. Inmarsat, however, may not serve the domestic U.S. market. In 1991, the FCC accepted applications for MSS systems, most of which were non-geostationary proposals, for operation in the Radiodetermination Satellite Service (RDSS) bands, and the VHF and UHF bands. In 1992, the FCC proposed rules for non-geostationary MSS systems and applied a negotiated rulemaking procedure to each. Also in 1992, the U.S. position for flexibility in existing MSS bands and for additional worldwide MSS allocations was adopted in large part at the 1992 World Administrative Radio Conference (WARC-92).

Levin, Lon C.↗

An Optimization Framework for Dynamic, Distributed Real-Time Systems

Abstract. This paper presents a model that is useful for developing resource allocation algorithms for distributed real-time systems .that operate in dynamic environments. Interesting aspects of the model include dynamic environments, utility and service levels, which provide a means for graceful degradation in resource-constrained situations and support optimization of the allocation of resources. The paper also provides an allocation algorithm that illustrates how to use the model for producing feasible, optimal resource allocations.

Eckert, Klaus↗

The 100th Anniversary of the Fall of Nakhla: The Subdivision of BM1913,25

This year marks the 100th anniversary of the fall of Nakhla, a cumulate clinopyroxenite of martian origin that fell near Alexandria, Egypt in 1911. Multiple fragments of the meteorite were seen to fall over an area of 4.5 km in diameter. Approximately 40 stones were recovered with a combined weight of about 10 kg. Most of the larger specimens found their way to museums and meteorite collections in Cairo, Paris, Berlin, and the Smithsonian, to name a few. In 1998, the British Museum sent a 641g (BM1913,25), fully fusion crusted stone of Nakhla to the Johnson Space Center (JSC) for processing in the Antarctic Meteorite Lab in order to allocate samples to the scientific community. The stone was split in half in a dry nitrogen glove box. One half of the stone was sent back to the museum and the other half (346g) was used for sample allocations. From 1998-2001, 37 scientists requested 65 separate samples of Nakhla, including 2 thin sections This set of allocations was especially important in that all of the sample splits are from the same piece of Nakhla and it had a known history since it was acquired by the museum in 1913. With the multiple fragments of Nakhla, it is not known from what pieces the main bulk of research has been done, what variation may exist between all the pieces and to what contaminants the fragments may have been exposed, (i.e. water, solvents or cutting fluids, etc.). All of the allocations prepared at JSC were processed in a nitrogen cabinet using only stainless steel, aluminum, and Teflon tools and containers to reduce the chance of introducing any new contaminants. The focused effort to subdivide and distribute samples of Nakhla to the meteorite community resulted in enhanced under-standing of Nakhla and nakhlites in general: organic geochemistry, weathering, sulfur isotopes, radiometric age, and magmatic history. There are 13 Nakhlites that have been recovered to date: Nakhla, Layfayette, Governador Valdares, three from NW Africa, three from Yamato and four from Miller Range regions in Antarctica. The Yamato Nakhlites are paired as are the Miller Range samples.

McBridge, Kathleen M.↗

Control and Non-Payload Communications Generation 1 Prototype Radio Flight Test Report

Unmanned aircraft (UA) represent a new capability that will provide a variety of services in the Government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized because of the lack of a common understanding of what is required to safely operate Unmanned Aircraft Systems in the National Airspace System (UAS in the NAS). The desire and ability to fly UA is of increasing urgency. The application of UA to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UA to the NAS. Existing Federal Aviation Regulations, procedures, and technologies do not allow routine UA access to the NAS. Access to the NAS is hampered by challenges such as the lack of an onboard pilot to see and avoid other aircraft; the ability of a single pilot or operator to control multiple UA; the reliance on command and control (C2) links; the altitudes, speeds, and duration at which the aircraft fly; and the wide variation in UA size and performance. NASA is working with other Government agencies to provide solutions that reduce technical barriers and make access to the NAS routine. This goal will be accomplished through system-level integration of key concepts, technologies, or procedures and through demonstrations of these integrated capabilities in an operationally relevant environment. This project provides an opportunity to transition the acquired empirical data and knowledge to the Federal Aviation Administration and other stakeholders to help them define the requirements for routine UA access to the NAS.Radio communications channels for UA are currently managed through exceptions and use either Department of Defense frequencies for line-of-sight (LOS) and satellite-based communications links, low-power LOS links in amateur bands, or unlicensed Industrial/Scientific/Medical (ISM) frequencies. None of these frequency bands are designated for safety and regularity of flight. Only recently has radiofrequency (RF) spectrum been allocated by the International Telecommunications Union specifically for commercial UA C2, LOS communication (L-Band: 960 to 1164 MHz, and C-Band: 5030 to 5091 MHz). The safe and efficient integration of UA into the NAS requires the use of protected RF spectrum allocations and a new data communications system that is both secure and scalable to accommodate the potential growth of these new aircraft. Data communications for UA-referred to as control and non-payload communications (CNPC)-will be used to exchange information between a UA and a ground station (GS) to ensure safe, reliable, and effective UA flight operation. The focus of this effort is on validating and allocating new RF spectrum and data link communications to enable civil UA integration into the NAS. Through a cost-sharing cooperative agreement with Rockwell Collins, Inc., the NASA Glenn Research Center is exploring and performing the necessary development steps to realize a prototype UA CNPC system. These activities include investigating signal waveforms and access techniques, developing representative CNPC radio hardware, and executing relevant testing and validation activities. There is no intent to manufacture the CNPC end product, rather the goals are to study, demonstrate, and validate a typical CNPC system that will allow safe and efficient communications within the L-Band and C-Band spectrum allocations. The system is addressing initial "seed" requirements from RTCA, Inc., Special Committee 203 (SC-203) and is on a path to Federal Aviation Administration certification. This report provides results from the flight testing campaign of the Rockwell Collins Generation 1 prototype radio, referred hereafter as the "radio." The radio sets operate within the 960- to 977-MHz frequency band with both air and ground radios using identical hardware. Flight tests involved one aircraft and one GS. Results include discussion of aircraft flight paths and associated radio performance.

Shalkhauser, Kurt A.↗

Dividing the Concentrator Target From the Genesis Mission

The Genesis spacecraft, launched in 2001, traveled to a Lagrangian point between the Earth and Sun to collect particles from the solar wind and return them to Earth. However, during the return of the spacecraft in 2004, the parachute failed to open during descent, and the Genesis spacecraft crashed into the Utah desert. Many of the solar wind collectors were broken into smaller pieces, and the field team rapidly collected the capsule and collector pieces for later assessment. On each of the next few days, the team discovered that various collectors had survived intact, including three of four concentrator targets. Within a month, the team had imaged more than 10,000 fragments and packed them for transport to the Astromaterials Acquisition and Curation Office within the ARES Directorate at JSC. Currently, the Genesis samples are curated along with the other extraterrestrial sample collections within ARES. Although they were broken and dirty, the Genesis solar wind collectors still offered the science community the opportunity to better understand our Sun and the solar system as a whole. One of the more highly prized concentrator collectors survived the crash almost completely intact. The Genesis Concentrator was designed to concentrate the solar wind by a factor of at least 20 so that solar oxygen and nitrogen isotopes could be measured. One of these materials was the Diamond-on-Silicon (DoS) concentrator target. Unfortunately, the DoS concentrator broke on impact. Nevertheless, the scientific value of the DoS concentrator target was high. The Genesis Allocation Committee received a request for approximately 1 cm(sup 2) of the DoS specimen taken near the focal point of the concentrator for the analysis of solar wind nitrogen isotopes. The largest fragment, Genesis sample 60000, was designated for this allocation and needed to be precisely cut. The requirement was to subdivide the designated sample in a manner that prevented contamination of the sample and minimized the risk of losing or breaking the precious requested sample fragment. The Genesis curator determined that the use of laser scribing techniques to "cut" a precise line and subsequently cleave the sample (in a controlled break of the sample along that line) was the best method for accomplishing the sample subdivision. However, there were risks, including excess heating of the sample, that could cause some of the implanted solar wind to be lost via thermal diffusion. Accidentally breaking the sample during the handling and cleaving process was an additional risk. Early in fiscal year 2013, to address this delicate, complicated task, the ARES Directorate assembled its top scientists to develop a cutting plan that would ensure success when applied to the actual concentrator target wafer; i.e., to produce an approximately 1 cm(sup 2) piece from the requested area of the wafer. The team, subsequently referred to as the JSC Genesis Tiger Team, spent months researching and testing parameters and techniques related to scribing, cleaving, transporting, handling, and holding (i.e., mounting) the specimen. The investigation required considerable "thinking outside the box," and many, many trials using nonflight wafer analogs. After all preliminary testing, the following method was adopted as the final cutting plan. It was used in two final end-to-end practice runs before being used on the actual flight target wafer. The wafer was oriented on the laser cutting stage with the 100 and 010 directions of the wafer parallel to the corresponding X and Y directions of the cutting stage. The laser was programed to scribe 31 lines of the appropriate length along the Y stage direction. The programed scribe lines were separated by 5 micron in the X direction. The laser parameters were set as follows: (1) The laser power was 0.5 watts; (2) each line consisted of 50 passes, with the Z position being advanced 5 micron per pass; and (3) 30 s would elapse before the next line was scribed to allow for wafer cool down from any possible heating via the laser. The ablated material that "stuck" in the "scribe-cut" was removed from the "cut" using an ultrasonic micro-tool. After all the ablated silicon was removed from the wafer, the wafer was repositioned in exactly the same orientation on the laser stage. The laser was focused using the bottom of the wafer channel, and the 31-line scribing pattern described above was reprogrammed using the Z position of the groove bottom as the starting Z value instead of the top wafer surface, which was used previously. Upon completion of the second set of scribes, the ultrasonic micro-tool was again used to clean out the cut. The wafer was remounted on the stage in exactly the same orientation as before. The laser was again focused on the bottom of the groove. This time, however, the laser was.programed to scribe only one line down the exact center of the channel. The final scribe line consisted of 100 passes with a Z advance of 5 micron per pass and with the laser power set at 0.5 watts. As mentioned above, the final cutting plan was practiced in two end-to-end trials using non-flight, triangular-shaped silicon wafers similar in size and orientation to the actual DOS 60000 target sample. The actual scribing of the triangular-shaped wafers required scribing two lines and cleaving (i.e. scribe-cleave, then scribe-cleave) to obtain the piece requested for allocation. Early in December 2012, after many months of experiments and practicing and perfecting the techniques and procedures, the team successfully subdivided the Genesis DoS 60000 target sample, one of the most scientifically important samples from the Genesis mission (figure 2). On December 17, 2012, the allocated piece of concentrator target sample was delivered to the requesting principal investigator.The cutting plan developed for the subdivision of this sample will be used as the model for subdividing future requested Genesis flight wafers (appropriately modified for different wafer types).

Lauer, H. V., Jr.↗

Management by Trajectory Trade Study of Roles and Responsibilities Between Participants and Automation Report

This report describes a trade study of roles and responsibilities associated with the Management by Trajectory (MBT) concept. The MBT concept describes roles, responsibilities, and information and automation requirements for providing air traffic controllers and managers the ability to quickly generate, evaluate and implement changes to an aircraft's trajectory. In addition, the MBT concept describes mechanisms for imposing constraints on flight operator preferred trajectories only to the extent necessary to maintain safe and efficient traffic flows, and the concept provides a method for the exchange of trajectory information between ground automation systems and the aircraft that allows for trajectory synchronization and trajectory negotiation. The participant roles considered in this trade study include: airline dispatcher, flight crew, radar controller, traffic manager, and Air Traffic Control System Command Center (ATCSCC) traffic management specialists. The proposed allocation of roles and responsibilities was based on analysis of several use cases that were developed for this purpose as well as for walking through concept elements. The resulting allocation of roles and responsibilities reflects both increased automation capability to support many aviation functions, as well as increased flexibility to assign responsibilities to different participants - in many cases afforded by the increased automation capabilities. Note that the selection of participants to consider for allocation of each function is necessarily rooted in the current environment, in that MBT is envisioned as an evolution of the National Airspace System (NAS), and not a revolution. A key feature of the MBT allocations is a vision for the traffic management specialist to take on a greater role. This is facilitated by the vision that separation management functions, in addition to traffic management functions, will be carried out as trajectory management functions. This creates an opportunity for flexibility, allowing the traffic management specialist to carry out tasks that today can only be carried out by the controller currently in contact with the aircraft. This additional tasking for the traffic management specialist comes with requirements for workload management. An increased role for the Data-side (D-side) controller relative to the Radar-side (R-side) controller is a potential approach to mitigating workload for the traffic management specialist, as the D-side controller would have similar ability to perform separation management functions in what today might be considered the "trajectory management" timeframe. This analysis did not distinguish between the D-side and R-side controllers since in many cases the R-side controller works unassisted.

Fernandes, Alicia D.↗

NASA's Space Launch System: Deep-Space Delivery for Smallsats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. While primarily focused on launching the large systems needed for crewed spaceflight beyond Earth orbit, SLS also offers a game-changing capability for the deployment of small satellites to deep-space destinations, beginning with its first flight. Currently, SLS is making rapid progress toward readiness for its first launch in two years, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight test of the Orion spacecraft around the moon, accompanying Orion on SLS will be small-satellite secondary payloads, which will deploy in cislunar space. The deployment berths are sized for "6U" CubeSats, and on EM-1 the spacecraft will be deployed into cislunar space following Orion separate from the SLS Interim Cryogenic Propulsion Stage. Payloads in 6U class will be limited to 14 kg maximum mass. Secondary payloads on EM-1 will be launched in the Orion Stage Adapter (OSA). Payload dispensers will be mounted on specially designed brackets, each attached to the interior wall of the OSA. For the EM-1 mission, a total of fourteen brackets will be installed, allowing for thirteen payload locations. The final location will be used for mounting an avionics unit, which will include a battery and sequencer for executing the mission deployment sequence. Following the launch of EM-1, deployments of the secondary payloads will commence after sufficient separation of the Orion spacecraft to the upper stage vehicle to minimize any possible contact of the deployed CubeSats to Orion. Currently this is estimated to require approximately 4 hours. The allowed deployment window for the CubeSats will be from the time the upper stage disposal maneuvers are complete to up to 10 days after launch. The upper stage will fly past the moon at a perigee of approximately 100km, and this closest approach will occur about 5 days after launch. The limiting factor for the latest deployment time is the available power in the sequencer system. Several NASA Mission Directorates were involved in the development of programs for the competition, selection, and development of EM-1 payloads that support directorate priorities. CubeSat payloads on EM-1 will include both NASA research experiments and spacecraft developed by industry, international and potentially academia partners. The Human Exploration and Operations Mission Directorate (HEOMD) Advanced Exploration Systems (AES) Division was allocated five payload opportunities on the EM-1 mission. Near Earth Asteroid (NEA) Scout is designed to rendezvous with and characterize a candidate NEA. A solar sail, an innovation the spacecraft will demonstrated for the CubeSat class, will provide propulsion. Lunar Flashlight will use a green propellant system and will search for potential ice deposits in the moon's permanently shadowed craters. BioSentinel is a yeast radiation biosensor, planned to measure the effects of space radiation on deoxyribonucleic acid (DNA). Lunar Icecube, a collaboration with Morehead State University, will prospect for water in ice, liquid, and vapor forms as well as other lunar volatiles from a low-perigee, highly inclined lunar orbit using a compact Infrared spectrometer. Skyfire, a partnership with Lockheed Martin, is a technology demonstration mission that will perform a lunar flyby, collecting spectroscopy, and thermography data to address questions related to surface characterization, remote sensing, and site selection. NASA's Space Technology Mission Directorate (STMD) was allocated three payload opportunities on the EM-1 mission. These slots will be filled via the Centennial Challenges Program, NASA's flagship program for technology prize competitions, which directly engages the public, academia, and industry in open prize competitions to stimulate innovation. The NASA Science Mission Directorate (SMD) was allocated two payload opportunities on the EM-1 mission. The CubeSat Mission to Study Solar Particles (CuSP) payload will study the sources and acceleration mechanisms of solar and interplanetary particles in near-Earth orbit, support space weather research by determining proton radiation levels during Solar Energetic Particle (SEP) events and identifying suprathermal properties that could help predict geomagnetic storms. The LunaH-Map payload will help scientists understand the quantity of H-bearing materials in lunar cold traps (~10 km), determine the concentration of H-bearing materials with 1m depth, and constrain the vertical distribution of H-bearing materials. The final three payload opportunities for the EM-1 mission were allocated for NASA's international space agency counterparts. The flight opportunities are intended to benefit the international space agency and NASA as well as further the collective space exploration goals. ArgoMoon is sponsored by ESA/ASI and will fly along with the ICPS on its disposal trajectory to perform proximity operations with the ICPS post-disposal, take external imagery of engineering and historical significance, and perform an optical communications demonstration. EQUULEUS, sponsored by JAXA, will fly to a libration orbit around the Earth-Moon L2 point and demonstrate trajectory control techniques within the Sun-Earth- Moon region for the first time by a nano spacecraft. The mission will also contribute to the future human exploration scenario by understanding the radiation environment in geospace and deep space, characterizing the flux of impacting meteors on the far side of the moon, and demonstrating the future deep space exploration scenario using the "deep space port" at Lagrange points. OMOTENASHI, also sponsored by JAXA, will land the smallest lunar lander to date on the lunar surface to demonstrate the feasibility of the hardware for distributed cooperative exploration system. Small landers will enable multi-point exploration, which is complimentary with large-scale human exploration. Once on the lunar surface, the OMOTENASHI spacecraft will observe the radiation and soil environments of the lunar surface by active radiation measurements and soil shear measurements. Following EM-1, Space Launch System will evolve to the more-powerful Block 1B configuration, which uses a new Exploration Upper Stage to increase the vehicle's LEO payload capability from 70 t to 105 t. With that transition, the Orion Stage Adapter, which will carry the secondary payloads on EM-1, will be phased out, and a new Universal Stage Adapter will be introduced, creating opportunities for flying larger secondary payloads. This paper will provide a brief status of SLS progress toward first launch; an overview of smallsat accommodations, integration, and operations on EM-1; information about the specific payloads flying on that launch; and a discussion of future accommodations and opportunities for secondary payloads on SLS for Exploration Mission-2 and beyond.

Robinson, Kimberly F.↗

NASA's Space Launch System: Deep-Space Opportunities for SmallSats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. While primarily focused on launching the large systems needed for crewed spaceflight beyond Earth orbit, SLS also offers a game-changing capability for the deployment of small satellites to deep-space destinations, beginning with its first flight. Currently, SLS is making rapid progress toward readiness for its first launch in two years, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight test of the Orion spacecraft around the moon, accompanying Orion on SLS will be small-satellite secondary payloads, which will deploy in cislunar space. The deployment berths are sized for "6U" CubeSats, and on EM-1 the spacecraft will be deployed into cislunar space following Orion separate from the SLS Interim Cryogenic Propulsion Stage. Payloads in 6U class will be limited to 14 kg maximum mass. Secondary payloads on EM-1 will be launched in the Orion Stage Adapter (OSA). Payload dispensers will be mounted on specially designed brackets, each attached to the interior wall of the OSA. For the EM-1 mission, a total of fourteen brackets will be installed, allowing for thirteen payload locations. The final location will be used for mounting an avionics unit, which will include a battery and sequencer for executing the mission deployment sequence. Following the launch of EM-1, deployments of the secondary payloads will commence after sufficient separation of the Orion spacecraft to the upper stage vehicle to minimize any possible contact of the deployed cubesats to Orion. Currently this is estimated to require approximately 4 hours. The allowed deployment window for the cubesats will be from the time the upper stage disposal maneuvers are complete to up to 10 days after launch. The upper stage will fly past the moon at a perigee of approximately 100km, and this closest approach will occur about 5 days after launch. The limiting factor for the latest deployment time is the available power in the sequencer system. Several NASA Mission Directorates were involved in the development of programs for the competition, selection, and development of EM-1 payloads that support directorate priorities. CubeSat payloads on EM-1 will include both NASA research experiments and spacecraft developed by industry, international and potentially academia partners. The Human Exploration and Operations Mission Directorate (HEOMD) Advanced Exploration Systems (AES) Division was allocated five payload opportunities on the EM-1 mission. Near Earth Asteroid (NEA) Scout is designed to rendezvous with and characterize a candidate NEA. A solar sail, an innovation the spacecraft will demonstrated for the CubeSat class, will provide propulsion. Lunar Flashlight will use a green propellant system and will search for potential ice deposits in the moon's permanently shadowed craters. BioSentinel is a yeast radiation biosensor, planned to measure the effects of space radiation on deoxyribonucleic acid (DNA). Lunar Icecube, a collaboration with Morehead State University, will prospect for water in ice, liquid, and vapor forms as well as other lunar volatiles from a low-perigee, highly inclined lunar orbit using a compact Infrared spectrometer. Skyfire, a partnership with Lockheed Martin, is a technology demonstration mission that will perform a lunar flyby, collecting spectroscopy, and thermography data to address questions related to surface characterization, remote sensing, and site selection. NASA's Space Technology Mission Directorate (STMD) was allocated three payload opportunities on the EM-1 mission. These slots will be filled via the 2 Centennial Challenges Program, NASA's flagship program for technology prize competitions, which directly engages the public, academia, and industry in open prize competitions to stimulate innovation. The NASA Science Mission Directorate (SMD) was allocated two payload opportunities on the EM-1 mission. The CubeSat Mission to Study Solar Particles (CuSP) payload will study the sources and acceleration mechanisms of solar and interplanetary particles in near-Earth orbit, support space weather research by determining proton radiation levels during Solar Energetic Particle (SEP) events and identifying suprathermal properties that could help predict geomagnetic storms. The LunaH-Map payload will help scientists understand the quantity of H-bearing materials in lunar cold traps (~10 km), determine the concentration of H-bearing materials with 1m depth, and constrain the vertical distribution of H-bearing materials. The final three payload opportunities for the EM-1 mission were allocated for NASA's international space agency counterparts. The flight opportunities are intended to benefit the international space agency and NASA as well as further the collective space exploration goals. ArgoMoon is sponsored by ESA/ASI and will fly along with the ICPS on its disposal trajectory to perform proximity operations with the ICPS post-disposal, take external imagery of engineering and historical significance, and perform an optical communications demonstration. EQUULEUS, sponsored by JAXA, will fly to a libration orbit around the Earth-Moon L2 point and demonstrate trajectory control techniques within the Sun-Earth-Moon region for the first time by a nano spacecraft. The mission will also contribute to the future human exploration scenario by understanding the radiation environment in geospace and deep space, characterizing the flux of impacting meteors on the far side of the moon, and demonstrating the future deep space exploration scenario using the "deep space port" at Lagrange points. OMOTENASHI, also sponsored by JAXA, will land the smallest lunar lander to date on the lunar surface to demonstrate the feasibility of the hardware for distributed cooperative exploration system. Small landers will enable multi-point exploration, which is complimentary with large-scale human exploration. Once on the lunar surface, the OMOTENASHI spacecraft will observe the radiation and soil environments of the lunar surface by active radiation measurements and soil shear measurements. Following EM-1, Space Launch System will evolve to the more-powerful Block 1B configuration, which uses a new Exploration Upper Stage to increase the vehicle's LEO payload capability from 70 t to 105 t. With that transition, the Orion Stage Adapter, which will carry the secondary payloads on EM-1, will be phased out, and a new Universal Stage Adapter will be introduced, creating opportunities for flying larger secondary payloads. This paper will provide a brief status of SLS progress toward first launch; an overview of smallsat accommodations, integration, and operations on EM-1; information about the specific payloads flying on that launch; and a discussion of future accommodations and opportunities for secondary payloads on SLS for Exploration Mission-2 and beyond.

Robinson, Kimberly F.↗

From Apollo to the Future, the NASA Curation Model for Engaging the Sample Science Community Maximizes Science on Extraterrestrial Samples

The Astromaterials Acquisition and Curation Office at Johnson Space Center (JSC) has enjoyed a long-term partnership (50 years!) with a broad community of planetary sample scientists. This partnership has enabled the curators of planetary samples to plan for and enact evolving requirements for preservation of sample scientific integrity and for handling and long-term storage. The basis for this relationship is a standing peer review advisory committee composed of leading scientists who are recognized for achievements in sample analysis. The committee and its descendants have brought familiarity with the most relevant scientific investigations and the associated analytical and contamination challenges. Beginning with Apollo, the review committee was charged with oversight of curatorial operations and with ensuring fair access to samples. As additional samples from other planetary bodies were acquired, the committee evolved, taking on new responsibilities, reflected in committee name changes. However, oversight of curatorial operations and fair allocation of samples remain basic responsibilities. Committee recommendations are sent to the NASA Headquarters Discipline Scientist for approval. To minimize conflict of interest and maximize fair access, the rules governing the make-up of the committee is structured. Systematic rotation of leadership and staggered terms of membership allow the committee to retain expertise while bringing in fresh ideas. The first peer review committee was called the Lunar Sample Analysis and Planning Team (LSAPT) and was formalized in early 1968 with about 15 members. Their function was to review a) the equipment and procedures used in the new Lunar Receiving Laboratory (LRL); b) the proficiency and capability of the LRL staff; c) the sequence of sample analysis and allocation after quarantine release; and d) the findings of the Preliminary Examination Team (PET). According to LSAPT member Gerald Wasserburg, one of the first issues they faced was deciding whether to have most of the sample analyses performed in house at the LRL or to distribute samples to members of the scientific community. LSAPT concluded that the major scientific investigations should be carried out externally to the LRL by scientists chosen for their expertise in specific disciplines. Further they recommended that the PET's basic characterization of samples be circulated to the broad scientific community. LSAPT set its own agenda, paid attention to facility details, closely monitored the move of samples from the LRL to the interim curatorial facility in 1973, and was active in inspecting curation facilities. Between 1975 and 1979, a Facility Subcommittee of LSAPT oversaw the design and construction of a permanent facility for preservation of lunar samples. The result was an outstanding facility still in use today. In 1977, a separate peer review committee, the Meteorite Working Group (MWG), was formed to evaluate requests for new meteorites then being collected in Antarctica under what would in 1980 become a 3-agency agreement (National Science Foundation, NASA, Smithsonian Institution). By 1979, after lunar samples were moved into the new permanent facility, the vacated gloveboxes and laboratory were prepared for meteorite curation. Recognizing that LSAPT had been helpful in setting up the JSC curatorial facility for Antarctic meteorites, JSC recommended the review committee be given expanded duties, including advice on curation and analysis of materials from other planetary bodies and the name be changed to Lunar and Planetary Sample Team (LAPST). In 1993, LAPST was renamed the Curation and Analysis Planning Team for Extraterrestrial Materials (CAPTEM) to reflect additional functions. CAPTEM is chartered to be (1) a community-based, interdisciplinary forum for discussion and analysis of matters concerning the collection and curation of extraterrestrial samples, including planning future sample return missions and (2) a standing review panel, charged with evaluating proposals requesting allocation of all extraterrestrial samples contained in NASA collections. Efficiency and flexibility are gained through use of subcommittees, both ad hoc and standing. Transition of the MWG to a subcommittee of CAPTEM was completed in 2017. Today subcommittees review allocation requests for lunar samples, Antarctic meteorites, cosmic dust, Stardust cometary samples, Genesis solar wind samples, and samples returned from asteroids. Other subcommittees address facilities, informatics, and micro-cratered substrates. Planetary samples have been sent to research teams in over 30 countries world-wide. The expertise in the care and fair distribution of astromaterials by NASA using this model spans generations of planetary sample scientists and is a valuable resource to be tapped for future sample returns - OSIRIS-REx, Hayabusa 2, and Mars 2020.

Allton, Judith↗

Assessing Relay Communications for Mars Sample Return Surface Mission Concepts

The Mars Sample Return (MSR) Campaign would be a 3-mission campaign concept supported by NASA and ESA to return samples from the Mars surface. MSR would, for the first time ever, present a need to communicate with multiple surface assets that are co-located on Mars in a coordinated effort to accomplish the unified objective of fetching, transporting, and returning samples from Mars. Currently, Mars surface assets relay data to and from Earth using a number of orbiters in what’s known as the Mars Relay Network (MRN). This network is characterized by a small number of surface assets distributed across the Martian globe and a larger number of orbiters to provide relay services. As of June 2020, there are two surface assets for which five orbiters are providing relay. During the MSR Campaign, there would be two rovers and a lander that all would require relay communication from a small number of Mars orbiters to meet the aggressive MSR timeline. The inversion of the current MRN paradigm, a system of many surface assets requiring relay and few orbiters to provide relay, necessitates the unique challenge of optimally allocating relay passes to maximize the operational capability of all assets. The allocation must consider a large number of trade variables including Mars asset operational requirements and Earth ground system constraints, including staffing schedules, operations planning across time zones, and more. To address these telecommunication challenges, the Mars Asset Relay Mission Link Allocation Design Environment (MARMLADE) tool was developed. It is a MATLAB-based tool to assign orbiter passes or Direct-From-Earth (DFE) links to each of the three surface assets and quantify the operational efficiency of each surface asset.MARMLADE uses a data set of simulated Mars relay orbiter geometry and telecommunication capabilities provided by JPL’s Telecom Orbit Analysis and Simulation Tool (TOAST) software to compute which asset should get each pass based on a series of heuristics and predictions of all assets’ states. Within MARMLADE, the user can provide inputs including the option for time-based pass splitting, fixed FWD data rate capabilities, DFE communication capabilities, and link parameters allowing for the assessment of complex operations and hardware trades using surface mission operational efficiency as a primary figure of merit. As the MSR mission concepts continue to mature, MARMLADE is being used to assess ability of all MSR elements to meet the surface mission timeline requirements and to provide relay link allocations to each of the MSR surface assets.This paper will describe the motivation and design of the MARMLADE tool and how it is being used to perform campaign and mission level trades, generate requirements, and support development of the MSR surface mission scenarios.

Lee, Charles↗

A Framework for Evaluating Distributed Electric Propulsion on the SUSAN Electrofan Aircraft

This work presents a framework for evaluating models and algorithms for Distributed Electric Propulsion (DEP) on the SUSAN Electrofan Aircraft. Throughout the development of the SUSAN aircraft, the performance of various configurations of the aircraft will need to be analyzed. However, the static behavior alone is not sufficient to describe the performance of these configurations. Therefore, simulation with fully integrated subsystem models is required. The proposed framework considers the vehicle aerodynamic, propulsion, and control subsystems. The presented framework automatically generates control laws for any vehicle configuration in response to changes in these subsystems. To compare these different vehicle configurations, various time and frequency domain performance metrics are compared. Three different system modifications are used as cases to evaluate this framework. The first modification integrates the propulsion control system with the flight controller to enable differential thrust without stalling the main engine. This evaluation case is used to validate the framework for aircraft configurations with coupled subsystems. The second modification compares the effect of the vertical tail size on open and closed loop performance. This evaluation case is used to validate the framework for controlling different configurations and tuning towards comparable closed loop performance despite changes to the aircraft's aerodynamic model. The third modification implements two different control allocation schemes. This evaluation case demonstrates the framework's ability to evaluate allocation modifications needed to take advantage of DEP. The first evaluation case is used to show that controller integration enables differential thrust, improving realized wingfan bandwidth by up to 40\% in simulation. The second evaluation case demonstrates that the framework can stabilize the reduced tail size aircraft with closed loop control. The third evaluation case demonstrates that a pseudoinverse control allocation scheme improves lateral velocity settling time by approximately 17~seconds over a symmetric-thrust allocation. These cases show that the framework is useful for evaluating the performance of integrated system designs, enabling analyses of new models and algorithms for the SUSAN distributed electric propulsion vehicle.

Nicholas C Ogden↗

Transitioning Resolution Responsibility between the Controller and Automation Team in Simulated NextGen Separation Assurance

As part of an ongoing research effort on separation assurance and functional allocation in NextGen, a controller- in-the-loop study with ground-based automation was conducted at NASA Ames' Airspace Operations Laboratory in August 2012 to investigate the potential impact of introducing self-separating aircraft in progressively advanced NextGen timeframes. From this larger study, the current exploratory analysis of controller-automation interaction styles focuses on the last and most far-term time frame. Measurements were recorded that firstly verified the continued operational validity of this iteration of the ground-based functional allocation automation concept in forecast traffic densities up to 2x that of current day high altitude en-route sectors. Additionally, with greater levels of fully automated conflict detection and resolution as well as the introduction of intervention functionality, objective and subjective analyses showed a range of passive to active controller- automation interaction styles between the participants. Not only did the controllers work with the automation to meet their safety and capacity goals in the simulated future NextGen timeframe, they did so in different ways and with different attitudes of trust/use of the automation. Taken as a whole, the results showed that the prototyped controller-automation functional allocation framework was very flexible and successful overall.

NextGen↗

Optimal operation of multi-plant steam district heating systems for enhanced efficiency and sustainability

Despite their crucial role in supplying heat and power to universities, industries, and healthcare facilities, many steam-based district heating systems rely on outdated control methods. Among these, multi-central plant districts are particularly challenging due to the complexities of coordinating multiple plants, optimizing load distributions, and managing system downtime. In response, new operational strategies are developed to enhance the efficiency and sustainability of steam districts while utilizing existing resources. These strategies include reducing plant operational pressure without compromising the reliable supply to buildings and optimizing load allocation across multiple plants. The load allocation considers boiler part-load efficiency, runtime, network losses, and building pressure set points, and is compared with traditional multi-boiler controls. To support this exploration, new dynamic Modelica models are developed. In addition, methods to reduce modeling complexities are incorporated, enhancing their suitability for practical applications. A holistic district-wide analysis using a real university case study demonstrates a 4.7% fuel savings by lowering boiler operational pressure from 900 kPa to 600 kPa, along with a 13.3% reduction in condensation losses across the distribution network. Furthermore, the load allocation approach results in a 13.1% reduction in fuel consumption during peak winter periods and 15.3% during shoulder periods, with corresponding decreases in carbon emissions and fuel costs. This approach can also save maintenance costs by reducing the boiler runtime by 49.6%. In conclusion, this research underscores the benefits of retrofitting aging steam district heating systems, offering immediate operational improvements by enhancing efficiency, meeting regulatory compliance, and extending infrastructure lifespans while delaying costly overhauls.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operational optimization for multi-functional charging station with electric and hydrogen-powered vehicles

The rapid adoption of electric vehicles (EVs) and hydrogen fuel cell vehicles (HFCVs), combined with global efforts to reduce carbon emissions, has accelerated the development of EV charging and hydrogen refueling stations. In response to this demand, this paper introduces the concept of Multi-Functional Charging Station (MFCS) that integrates power generation, EV charging, battery swapping, and hydrogen refueling. A comprehensive operational model is developed for the MFCS that couples electricity and hydrogen conversion and storage technologies to enhance infrastructure utilization and improve overall system efficiency. The model also considers multiple revenue streams, including participation in energy and ancillary markets. To validate the effectiveness of the proposed model and evaluate its performance, a series of numerical experiments are conducted with different charger numbers, different electricity purchase limits, and different charger allocations. Numerical results demonstrate that shared charger configurations can lead to 8.11 % improvement in operational profit by improving resource utilization and reducing the number of depleted batteries at the end of operations compared to allocated charger setups. By varying the number of chargers, sensitivity analysis identifies diminishing marginal returns beyond about 45 chargers, suggesting it as an optimal sizing point under current settings. The integration of electricity and hydrogen conversion is also explored under scenarios with limited external electricity purchases. In conclusion, these findings indicate that optimizing charger allocation and energy management can significantly enhance station productivity and profitability, ultimately supporting the broader adoption of electrified and hydrogen-based transportation solutions.

Charging station↗

Computer vision models enable mixed linear modeling to predict arbuscular mycorrhizal fungal colonization using fungal morphology

Abstract The presence of Arbuscular Mycorrhizal Fungi (AMF) in vascular land plant roots is one of the most ancient of symbioses supporting nitrogen and phosphorus exchange for photosynthetically derived carbon. Here we provide a multi-scale modeling approach to predict AMF colonization of a worldwide crop from a Recombinant Inbred Line (RIL) population derived from Sorghum bicolor and S. propinquum . The high-throughput phenotyping methods of fungal structures here rely on a Mask Region-based Convolutional Neural Network (Mask R-CNN) in computer vision for pixel-wise fungal structure segmentations and mixed linear models to explore the relations of AMF colonization, root niche, and fungal structure allocation. Models proposed capture over 95% of the variation in AMF colonization as a function of root niche and relative abundance of fungal structures in each plant. Arbuscule allocation is a significant predictor of AMF colonization among sibling plants. Arbuscules and extraradical hyphae implicated in nutrient exchange predict highest AMF colonization in the top root section. Our work demonstrates that deep learning can be used by the community for the high-throughput phenotyping of AMF in plant roots. Mixed linear modeling provides a framework for testing hypotheses about AMF colonization phenotypes as a function of root niche and fungal structure allocations.

59 BASIC BIOLOGICAL SCIENCES↗

The Carbon Budget of Land Conversion: Sugarcane Expansion and Implications for a Sustainable Bioenergy Landscape in Southeastern United States

The expansion of sugarcane onto land currently occupied by improved (IMP) and semi-native (SN) pastures will reshape the U.S. bioenergy landscape. We combined biometric, ground-based and eddy covariance methods to investigate the impact of sugarcane expansion across subtropical Florida on the carbon (C) budget over a 3-year rotation. With 2.3- and 5.1-fold increase in productivity over IMP and SN pastures, sugarcane displayed a C use efficiency (CUE; i.e., fraction of gross C uptake allocated to plant growth) of 0.59, well above that of pastures (0.31–0.23). Sugarcane also had greater C allocation to aboveground productivity and hence, harvestable biomass relative to IMP and SN. Cane heterotrophic respiration over the 3-year rotation (903 ± 335 gC m −2 year −1 ) was 1% and 14% higher than IMP and SN pastures, respectively. These soil C losses responded largely to disturbance over the first year after conversion (1510 ± 227 gC m −2 year −1 ) but declined in subsequent years to an average 599 ± 90 gC m −2 year −1 —well below those of IMP (933 ± 140 gC m −2 year −1 ) and SN (759 ± 114 gC m −2 year −1 ) pastures—despite a significant 40%–61% increase in soil C inputs. Soil C inputs, however, shifted from root-dominated in pastures to litter-dominated in sugarcane, with only 5% C allocation to roots. Reduced decomposition rates in sugarcane were likely driven by changes in the recalcitrance and distribution rather than the size of the newly incorporated soil C pool. As a result, we observed a rapid shift in the net ecosystem C balance (NECB) of sugarcane from a large source immediately following conversion to approaching the net C losses of IMP pastures only 2 years after conversion. The environmental cost of converting pasture to sugarcane underscores the importance of implementing management practices to harness the soil C storage potential of sugarcane in advancing a sustainable bioeconomy in Southeastern United States.

09 BIOMASS FUELS↗

Evolutionary constraints and climate variability jointly shape starch–sugar balance in woody plants

Nonstructural carbohydrates (NSC) buffer plants against carbon imbalances, yet their partitioning between storage and soluble pools remains elusive at global scales. Here, we compiled a dataset of starch to soluble sugar ratio (St : Su) for 308 woody species across 220 sites world-wide and introduce a dimensionless index that integrates storage and demand while minimizing methodological artifacts. St : Su was strongly associated with growth, identifying it as a key axis of carbon allocation. Foliage consistently exhibited lower St : Su than lignified organs, reflecting a division between transient and conservative pools. Conifers accumulated more starch in foliage but less in stems relative to angiosperms, while leaf habits and mycorrhizal associations further modulated organ-specific strategies. Contrary to expectation, foliar and root St : Su varied little among biomes, but stems exhibited higher ratios in tropical rainforests than in boreal or arid regions, reflecting differences in species composition and adaptive storage under disturbance. Phylogeny constrained stem storage, whereas climatic variability, rather than mean conditions, dominated allocation in leaves and roots. These findings establish St : Su as a robust functional trait linking allocation strategies, growth, and resilience, which can be used to improve vegetation model prediction of forest productivity and mortality under climate variability.

Li, Weibin [Lanzhou Univ. (China)] (ORCID:00000001↗

EVSE DERMS Controls [SWR-26-010]

An MQTT (Message Queuing Telemetry Transport) and OCPP (Open Charge Point Protocol) based remote smart charging controller framework for AC Electric Vehicle Supply Equipments (EVSEs). The code in this repo allows for the National Laboratory of the Rockies (NLR) controls to interface with the real Distributed Energy Resource Management System (DERMS) and EVSEs in NLR's ESIF Optimization and Control Laboratory (OCL). Different charge management algorithms can be tested to determine which power allocation method is most effective with the overall goal of demonstrating clear and well documented test results as well as providing functional control algorithms which could be utilized to provide effective smart charge management (SCM) at EV charging stations. Different power allocation methods are programmed in lab_demo_controller.py and include allocation based on first come first served, equal sharing, state of charge (SOC), priority factors, and behind the meter control methods.

Panossian, Nadia [National Laboratory of the Rocki↗