Search NASA⌕ Search

SEARCH · Search NASA

Results for “Allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

OSIRIS-REx Curation: The First Year with Bennu Samples on Earth

The OSIRIS-REx (Origins, Spectral Interpretation, Resource Identification, and Security – Regolith Explorer) sample return capsule landed on the Utah Test and Training Range (UTTR) on September 24, 2023. Preparations for the curation of the sample from asteroid Bennu inside of this capsule spanned more than a decade. On the morning of landing, the sample return capsule was brought to a temporary cleanroom at UTTR for initial de-integration and connection of the sample canister to a nitrogen gas purge to protect the sample from modification by the terrestrial atmosphere. In the week following landing, the sample canister was flown to Houston while on nitrogen purge, transferred to a nitrogen atmosphere glovebox at NASA Johnson Space Center in which the canister lid was removed revealing small amounts of sample on the inside of the canister lid and avionics deck, some of this sample was allocated rapidly to the mission sample analysis team as “quick look” samples. Next, the Touch-and-Go sample acquisition mechanism (TAGSAM) head was disassembled inside of a specially designed glovebox. A challenge arose during one of the last stages of disassembly when two fasteners resisted being loosened. The curation team was able to remove 70.3 grams of asteroid sample from the TAGSAM head with those fasteners in-place and began initial sample processing which supported long-term curation of hermetically sealed and frozen samples, transfer of some samples to remote storage, and allocation of aggregate samples to the mission sample analysis team. Meanwhile, curation engineers developed a tool to remove the stubborn fasteners without contaminating the remaining sample, enabling the remaining bulk sample to be transferred to long-term storage trays in January 2024. With this second part of the bulk sample, the returned bulk asteroid sample reached 121.6 grams. During disassembly and prior to sealing the bulk sample trays into long-term storage containers, archival photographs were collected. Select particles are gradually being XCT scanned while inside of containers that hold a nitrogen atmosphere. The initial OSIRIS-REx sample catalog was released in spring 2024 with an update in fall 2024. The curation team will be busy working to allocate samples to scientists around the world for the foreseeable future.

Curation↗

Separation Assurance and Scheduling Coordination in the Arrival Environment

Separation assurance (SA) automation has been proposed as either a ground-based or airborne paradigm. The arrival environment is complex because aircraft are being sequenced and spaced to the arrival fix. This paper examines the effect of the allocation of the SA and scheduling functions on the performance of the system. Two coordination configurations between an SA and an arrival management system are tested using both ground and airborne implementations. All configurations have a conflict detection and resolution (CD&R) system and either an integrated or separated scheduler. Performance metrics are presented for the ground and airborne systems based on arrival traffic headed to Dallas/ Fort Worth International airport. The total delay, time-spacing conformance, and schedule conformance are used to measure efficiency. The goal of the analysis is to use the metrics to identify performance differences between the configurations that are based on different function allocations. A surveillance range limitation of 100 nmi and a time delay for sharing updated trajectory intent of 30 seconds were implemented for the airborne system. Overall, these results indicate that the surveillance range and the sharing of trajectories and aircraft schedules are important factors in determining the efficiency of an airborne arrival management system. These parameters are not relevant to the ground-based system as modeled for this study because it has instantaneous access to all aircraft trajectories and intent. Creating a schedule external to the CD&R and the scheduling conformance system was seen to reduce total delays for the airborne system, and had a minor effect on the ground-based system. The effect of an external scheduler on other metrics was mixed.

function allocation↗

A Closer Look at Automation Behavior During a Human-in-the-Loop Simulation

A 2012 Human-In-The-Loop air traffic control simulation investigated a gradual paradigm-shift in the allocation of functions between operators and automation. Air traffic controllers staffed five adjacent high-altitude en route sectors, and during the course of a two-week experiment, worked traffic under four different function allocation concepts aligned with increasingly mature NextGen operational environments. These NextGen time-frames ranged from near current-day operations to nearly fully-automated control, in which the ground systems automation was responsible for detecting conflicts, issuing strategic and tactical resolutions, and alerting controllers to exceptional circumstances. This paper continues the investigations reported in previous publications. Analyses of data surrounding the conflict-resolution task serve as the context in which we investigate the interactions between controllers and the automation.

Human-Automation Interaction↗

Aconcagua Basin Agriculture: Analyzing Hydrological Norms, Evapotranspiration, and Soil Moisture to Assess Crop Water Demand and Water Usage in Chile’s Aconcagua River Basin

The Aconcagua basin has experienced a prolonged drought since 2010, posing a significant concern to the agricultural sector, which contributes to 12% of the national agriculture output. Reduced precipitation and warmer conditions have led to water constraints for agricultural activities. As the agriculture sector relies more on irrigation, there has been a decline in surface water availability and a shrinking groundwater supply, both primarily sourced from snow and glacial melt. This study focuses on evaluating crop water demand and water usage in the Aconcagua Basin, leveraging in-situ and available satellite data from Aqua and Terra Moderate Resolution Imaging Spectroradiometer (MODIS), 1-km downscaled Soil Moisture Active Passive (SMAP), Global Precipitation Measurement Mission IMERG (GPM), and Landsat 8 Operational Land Imager (OLI). Remote sensing hydrologic norms from pre- and intra-drought conditions provided a baseline for our water use analysis. We have identified areas of the basin where water usage is exaggerated compared to other regions by analyzing soil moisture, evapotranspiration, and vegetation index trends across agricultural lands. The study highlights the presence of irrigation and exaggerated water usage categorized by crop type while normalizing the data by the quantity of water allocation (m3/s) to each subregion. The findings have the potential to assist our partners, the Centro de Información de Recursos Naturales (CIREN) and the Ministry of Agriculture, in refining water allocation approaches; showcasing the feasibility of leveraging remote sensing and earth observation datasets to monitor agricultural practices within the context of water scarcity.

Remote sensing↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗

DSN seven day/twelve week schedule program

Deep Space Network scheduling program allocates resources based on the users requirements. The system reviews and allocates the requests for equipment and resources. Depending upon the program input either the seven day or the twelve week schedule is generated.

Holzman, R. E.↗

Handbook for the calculation of approximate data for spaceborne sensors

In allocating the RF spectrum for the transmission of sensed data from space to earth, the characteristics of the data produced by each sensor are discussed. For example, data may be in the form of a continually varying voltage (analog) or may be a series of discrete pulses (digital). For the analog signal, its important characteristics to the spectrum allocator are its highest frequency component (bandwidth) and its range from minimum values (dynamic range or signal-to-noise ratio). For the digital signal, the characteristic of interest is the bit rate.

Source record↗

Modal analysis and control of flexible manipulator arms

The possibility of modeling and controlling flexible manipulator arms was examined. A modal approach was used for obtaining the mathematical model and control techniques. The arm model was represented mathematically by a state space description defined in terms of joint angles and mode amplitudes obtained from truncation on the distributed systems, and included the motion of a two link two joint arm. Three basic techniques were used for controlling the system: pole allocation with gains obtained from the rigid system with interjoint feedbacks, Simon-Mitter algorithm for pole allocation, and sensitivity analysis with respect to parameter variations. An improvement in arm bandwidth was obtained. Optimization of some geometric parameters was undertaken to maximize bandwidth for various payload sizes and programmed tasks. The controlled system is examined under constant gains and using the nonlinear model for simulations following a time varying state trajectory.

Neto, O. M.↗

Space Tug avionics definition study. Volume 2: Avionics functional requirements

Flight and ground operational phases of the tug/shuttle system are analyzed to determine the general avionics support functions that are needed during each of the mission phases and sub-phases. Each of these general support functions is then expanded into specific avionics system requirements, which are then allocated to the appropriate avionics subsystems. This process is then repeated at the next lower level of detail where these subsystem requirements are allocated to each of the major components that comprise a subsystem.

Source record↗

Modeling arson - An exercise in qualitative model building

A detailed example is given of the role of von Neumann and Morgenstern's 1944 'expected utility theorem' (in the theory of games and economic behavior) in qualitative model building. Specifically, an arsonist's decision as to the amount of time to allocate to arson and related activities is modeled, and the responsiveness of this time allocation to changes in various policy parameters is examined. Both the activity modeled and the method of presentation are intended to provide an introduction to the scope and power of the expected utility theorem in modeling situations of 'choice under uncertainty'. The robustness of such a model is shown to vary inversely with the number of preference restrictions used in the analysis. The fewer the restrictions, the wider is the class of agents to which the model is applicable, and accordingly more confidence is put in the derived results. A methodological discussion on modeling human behavior is included.

Heineke, J. M.↗

Satellite broadcasting - Capabilities for public service

Satellite broadcast services to support health-care and educational transmissions must work with small, low-cost terminals in allocated radio-frequency bands. The ATS-6 spacecraft has successfully demonstrated such capability in the bands of non-technical users. It supports interactive television broadcasting to simple, low-cost terminals in a nationwide series of experiments in the delivery of health-care and educational services. ATS-6 achieves this capability with a very large antenna and moderate transmitter power. The coverage limitations inherent in this approach will be overcome by the joint U.S.-Canadian Communications Technology Satellite to be launched in December 1975. The CTS will demonstrate broadcast capability with new, high-power technology in a newly-allocated radio-frequency band. This will make it possible to use smaller antennas, greatly enlarging the area coverage available to the many nontechnical experimenters using CTS for their own needs. A practical application of these technologies is now in development for operational broadcasting services in Japan.

Marsten, R. B.↗

Remote sensing - Potential interference problems and solutions

The paper discusses general radio frequency interference considerations associated with frequency and bandwidth allocations for satellite-borne microwave remote sensors. The interplay of frequency allocation and radio frequency interference is discussed for the cases of passive microwave sensors and active microwave sensors, the latter case involving shared band interference and out-of-band interference.

Freibaum, J.↗

Pilot interaction with automated airborne decision making systems

An investigation was made of interaction between a human pilot and automated on-board decision making systems. Research was initiated on the topic of pilot problem solving in automated and semi-automated flight management systems and attempts were made to develop a model of human decision making in a multi-task situation. A study was made of allocation of responsibility between human and computer, and discussed were various pilot performance parameters with varying degrees of automation. Optimal allocation of responsibility between human and computer was considered and some theoretical results found in the literature were presented. The pilot as a problem solver was discussed. Finally the design of displays, controls, procedures, and computer aids for problem solving tasks in automated and semi-automated systems was considered.

Rouse, W. B.↗

Two phase sampling for wheat acreage estimation

A two phase LANDSAT-based sample allocation and wheat proportion estimation method was developed. This technique employs manual, LANDSAT full frame-based wheat or cultivated land proportion estimates from a large number of segments comprising a first sample phase to optimally allocate a smaller phase two sample of computer or manually processed segments. Application to the Kansas Southwest CRD for 1974 produced a wheat acreage estimate for that CRD within 2.42 percent of the USDA SRS-based estimate using a lower CRD inventory budget than for a simulated reference LACIE system. Factor of 2 or greater cost or precision improvements relative to the reference system were obtained.

Thomas, R. W.↗

Two phase sampling for wheat acreage estimation

A two-phase Landsat-based sample allocation and wheat proportion estimation method was developed. The technique employs manual, Landsat full frame-based wheat or cultivated land proportion estimates from a large number of segments comprising a first sample phase to optimally allocate a small phase-two sample of computer or manually processed segments. Proportion estimates from each phase are then linked by regression or probability proportional to estimated size estimators to provide wheat proportion estimates and standard errors by reporting unit. Application to the Kansas Southwest CRD (Crop Reporting District) for 1974 produced a wheat acreage estimate for that CRD within 2.42% of the USDA SRS-based estimate using a lower CRD inventory budget than for a simulated reference LACIE (Large Area Crop Inventory Experiment) system.

Thomas, R. W.↗

The 1977 WARC on broadcasting satellites - Spectrum management aspects and implications

Broadcasting satellites are allocated as a primary service in the band 11.7-12.2 GHz (11.7-12.5 GHz in Europe, Africa, and the USSR), but the band is also allocated on a primary basis (equal sharing) to other services - fixed, mobile, broadcasting, and fixed satellite. Presented with these difficult sharing situations, delegates from over 100 countries met at an ITU World Administrative Radio Conference in 1977 to develop a plan for broadcasting satellites. Many nations wanted a plan that would assign to them now, reserved orbital locations and channel asignments for their future use. Other countries wanted a plan adopted now for future broadcasting satellites which assigned specific channels to specific areas on the ground so that they could use the remaining frequencies to provide terrestrial service right away. This paper describes the 'Plan' developed at the conference and points out how the principles of spectrum management were employed. It also discusses the implications for future international management of the spectrum growing out of this meeting.

Gould, R. G.↗

Regimes for the ocean, outer space, and weather

The allocation of resources among users of the oceans, outer space and the weather is discussed. Attention is given to the international management of maritime navigation, the control of fisheries, offshore oil and gas exploitation, mineral exploitation in the deep seabed (especially the mining of manganese nodules), and the regulation of oceanographic studies. The management of outer space is considered, with special reference to remote sensing by satellites, television broadcasting, the technical requirements of maritime satellites, and problems associated with satellite frequency and orbit allocation. Rainmaking and typhoon modification, as well as the distribution of weather modification capabilities in the world, are also mentioned. The United Nations, international agencies and tribunals, and multi- or bilateral agreements are some of the implements suggested for use in the regulation of the oceans, outer space and the weather.

Brown, S.↗