Search NASA⌕ Search

SEARCH · Search NASA

Results for “Backup Power”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

A Methodology for Loading the Advanced Test Reactor Driver Core for Experiment Analysis

The Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL) is one of the premier irradiation facilities in the world. The ATR hosts experiments from a variety of laboratories, companies, and disciplines. Because of its flexibility in providing customized irradiation conditions to experiments, such as coolant chemistry, temperature, and reactor power, analysis for experiments, both from a programmatic and safety perspective, can be a challenging endeavor. Because of these experiment variables, there is always an effort to improve upon the existing analysis methodology in order to provide the sponsor of any given experiment with the most accurate predictions possible. The paper discusses the effort to improve upon the methodology for loading the ATR driver core for experiment analysis. Experiment analysis at INL is generally broken up into three separate disciplines: neutronics, thermal-hydraulics, and structural. The focus of this paper is neutronics analysis. After the experiment has a preliminary design, the neutronics analyst will create a model in the Monte Carlo N-Particle (MCNP) transport code to calculate fuel and material heating rates from MCNP tallies and provide those to the thermal-hydraulics analyst, and calculate reactivity worths, perturbation on the axial fission profile of the ATR driver core by the experiment, void worths, and experiment backup worths. Also, there are usually several programmatic parameters that the experiment sponsor requests that the neutronics analyst calculates. These can include heat generation rates, burnup and displacements per atom (DPA). In order to accurately analyze these parameters, an important input into the physics analyst's MCNP model is the loading of the ATR driver core. The ATR driver core consists of 40, 19-plate highly-enriched uranium (HEU) fuel elements, arranged in a serpentine shape, as pictured in Figure 1. The ATR driver core is responsible for the vast majority of the thermal power of the reactor and the nuclear interactions with the experiments being irradiated in ATR. A unique feature of ATR is the 'power tilt' across the reactor. A power tilt means that the Northwest, Northeast, Southwest, and Southeast Lobes of ATR frequently operate at different powers, providing different irradiation conditions for the experiments in and around the lobes of the reactor. In order to achieve lobe power splits, different fuel elements for each of the 40 positions are chosen by ATR Reactor Engineering so that lobe power splits can be maintained during an operating cycle. A typical fuel loading for an ATR cycle consists of 14 to 18 new fuel elements and 2 to 26 depleted fuel elements. These loadings are typically chosen from three different types of fuel elements. All three ATR fuel element types share a common design, spelled out in Chapter 4 of the ATR Safety Analysis Report (SAR). The fuel element meat is HEU UAlx dispersion fuel sandwiched between aluminum cladding with a length of 121.92 cm (4 ft), with 19 plates per fuel element. The three variations of this common design are designated by the first two letters in their serial numbers: XA, YA, and NB. XA elements are most commonly used. These elements have nominally 1075 g of uranium-235 and 0.66 g of boron-10. The NB elements have the same uranium-235 loading as the XA elements, but no boron in any plates. These elements are used when excess reactivity is needed. The YA elements have the same loading as the XA elements, except that the outermost plate (Plate 19) has no boron or uranium. These elements are used to mitigate aged reflector damage. In order to accurately model the ATR driver core, all three types of fuel elements must be accounted for in the MCNP model. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement

The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Fast Beam Tuning for Accelerator Driven Systems

The biggest challenge for Accelerator Driven Systems (ADS) is the stringent availability requirement of >99% compared to ~80% achieved by a typical accelerators. In addition to overall availability, due to thermal stress problems, ADS is also sensitive to the length of each downtime. A significant source of downtime is re-adjustment tuning of the system to account for drift in component behavior, or substitution of a backup device for one that failed. Tuning at present is done by hand, i.e. with human observation, interpretation, and decision, a process which takes hours; whereas ADS requires recovery in minutes. In this research, we apply intelligent controls in a (simulated) proton linac to automate fine-tuning. Beam monitor data is fed into a controller which adjusts magnet currents and RF power to minimize beam loss. We consider fluctuations in ion source characteristics; drift in magnet behavior (mechanical motion, or change in calibration); and failure of an accelerating cavity.

43 PARTICLE ACCELERATORS↗

ASTP simulated lightning test report

A simulated lightning test was conducted on the backup spacecraft for the Apollo Soyuz Test Project mission (CSM-119) to determine the susceptibility of the Apollo spacecraft to damage from the indirect effects of lightning. It is demonstrated that induced lightning effects from low-level injected currents can be scaled linearly to those which are obtained in a full threat lightning stroke. Test results indicate that: (1) many of the power and signal critical circuits would fail if subjected to full-threat lightning, (2) pyrotechnic circuits are safe for full-threat lightning, and (3) common-mode voltages exceeded the failure criteria level for all but three of the circuits tested.

Blount, R. L.↗

Telemetry Boards Interpret Rocket, Airplane Engine Data

For all the data gathered by the space shuttle while in orbit, NASA engineers are just as concerned about the information it generates on the ground. From the moment the shuttle s wheels touch the runway to the break of its electrical umbilical cord at 0.4 seconds before its next launch, sensors feed streams of data about the status of the vehicle and its various systems to Kennedy Space Center s shuttle crews. Even while the shuttle orbiter is refitted in Kennedy s orbiter processing facility, engineers constantly monitor everything from power levels to the testing of the mechanical arm in the orbiter s payload bay. On the launch pad and up until liftoff, the Launch Control Center, attached to the large Vehicle Assembly Building, screens all of the shuttle s vital data. (Once the shuttle clears its launch tower, this responsibility shifts to Mission Control at Johnson Space Center, with Kennedy in a backup role.) Ground systems for satellite launches also generate significant amounts of data. At Cape Canaveral Air Force Station, across the Banana River from Kennedy s location on Merritt Island, Florida, NASA rockets carrying precious satellite payloads into space flood the Launch Vehicle Data Center with sensor information on temperature, speed, trajectory, and vibration. The remote measurement and transmission of systems data called telemetry is essential to ensuring the safe and successful launch of the Agency s space missions. When a launch is unsuccessful, as it was for this year s Orbiting Carbon Observatory satellite, telemetry data also provides valuable clues as to what went wrong and how to remedy any problems for future attempts. All of this information is streamed from sensors in the form of binary code: strings of ones and zeros. One small company has partnered with NASA to provide technology that renders raw telemetry data intelligible not only for Agency engineers, but also for those in the private sector.

Source record↗

Identifying emerging smart grid impacts to upstream and midstream natural gas operations.

The Smart Grid has come to describe a next-generation electrical power system that is typified by the increased use of communications and information technology in the generation, delivery and consumption of electrical energy. Much of the present Smart Grid analysis focuses on utility and consumer interaction. i.e. smart appliances, home automation systems, rate structures, consumer demand response, etc. An identified need is to assess the upstream and midstream operations of natural gas as a result of the smart grid. The nature of Smart Grid, including the demand response and role of information, may require changes in upstream and midstream natural gas operations to ensure availability and efficiency. Utility reliance on natural gas will continue and likely increase, given the backup requirements for intermittent renewable energy sources. Efficient generation and delivery of electricity on Smart Grid could affect how natural gas is utilized. Things that we already know about Smart Grid are: (1) The role of information and data integrity is increasingly important. (2) Smart Grid includes a fully distributed system with two-way communication. (3) Smart Grid, a complex network, may change the way energy is supplied, stored, and in demand. (4) Smart Grid has evolved through consumer driven decisions. (5) Smart Grid and the US critical infrastructure will include many intermittent renewables.

03 NATURAL GAS↗

Space Station Reboost with Electrodynamic Tethers

This paper presents the results of a study of an electrodynamic tether system to reboost the International Space Station (ISS). One recommendation is to use a partially bare tether for electron collection. Locations are suggested as to where the tether system is to be attached at the space station. The effects of the tether system on the microgravity environment may actually be beneficial, because the system can neutralize aerodrag during quiescent periods and, if deployed from a movable boom, can permit optimization of laboratory positioning with respect to acceleration contours. Alternative approaches to tether deployment and retrieval are discussed. It is shown that a relatively short tether system, 7 km long, operating at a power level of 5 kW could provide cumulative savings or over a billion dollars during a 10-year period ending in 2012. This savings is the direct result of a reduction in the number or nights that would otherwise be required to deliver propellant for reboost, with larger cost savings for higher tether usage. In addition to economic considerations, an electrodynamic tether promises a practical backup system that could ensure ISS survival in the event of an (otherwise) catastrophic delay in propellant delivery.

Vas, Irwin E.↗

CALIPSO Mission Status Update: Payload Status

The CALIPSO mission payload status update is presented. The contents include: 1) Wide Field Camera Overview; 2) WFC Temperatures; 3) WFC Voltages; 4) Imaging Infrared Radiometer (IIR) Health; 5) IIR Voltages; 6) Payload Control (PLC) Voltages; 7) PLC Temperatures; 8) Low Voltage Power Supply (LVPS) (CALOPS0025N); 9) PLC Radiation Effects; 10) SDS Status (CALOPS0020N); 11) CALIOP LIDAR; 12) Laser Energy Trends; 13) Laser Energy Zoom; 14) Laser Management Approach; 15) Green / Red Ratio; 16) Pedestal @ SHG Temperature Trends; 17) LOM Heater Duty Cycle Trends; 18) LOM Pressure Trends; 19) Boresight Trend; 20) 1064 Dark Noise Trend; 21) 532 SNR Trend; 22) Spike Trends; 23) LIDAR Highlights; 24) Backup Laser Status; and 25) Future Plans.

Verhappen, Ron↗

Variable Conductance Heat Pipe Cooling of Stirling Convertor and General Purpose Heat Source

In a Stirling Radioisotope Power System (RPS), heat must be continuously removed from the General Purpose Heat Source (GPHS) modules to maintain the modules and surrounding insulation at acceptable temperatures. The Stirling convertor normally provides this cooling. If the Stirling convertor stops in the current system, the insulation is designed to spoil, preventing damage to the GPHS at the cost of an early termination of the mission. An alkali-metal Variable Conductance Heat Pipe (VCHP) can be used to passively allow multiple stops and restarts of the Stirling convertor. In a previous NASA SBIR Program, Advanced Cooling Technologies, Inc. (ACT) developed a series of sodium VCHPs as backup cooling systems for Stirling RPS. The operation of these VCHPs was demonstrated using Stirling heater head simulators and GPHS simulators. In the most recent effort, a sodium VCHP with a stainless steel envelope was designed, fabricated and tested at NASA Glenn Research Center (GRC) with a Stirling convertor for two concepts; one for the Advanced Stirling Radioisotope Generator (ASRG) back up cooling system and one for the Long-lived Venus Lander thermal management system. The VCHP is designed to activate and remove heat from the stopped convertor at a 19 degC temperature increase from the nominal vapor temperature. The 19 degC temperature increase from nominal is low enough to avoid risking standard ASRG operation and spoiling of the Multi-Layer Insulation (MLI). In addition, the same backup cooling system can be applied to the Stirling convertor used for the refrigeration system of the Long-lived Venus Lander. The VCHP will allow the refrigeration system to: 1) rest during transit at a lower temperature than nominal; 2) pre-cool the modules to an even lower temperature before the entry in Venus atmosphere; 3) work at nominal temperature on Venus surface; 4) briefly stop multiple times on the Venus surface to allow scientific measurements. This paper presents the experimental results from integrating the VCHP with an operating Stirling convertor and describes the methodology used to achieve their successful combined operation.

Stirling Radioisotope Power System↗

Quantifying and Monetizing Renewable Energy Resiliency

Energy resiliency has been thrust to the forefront by recent severe weather events and natural disasters. Billions of dollars are lost each year due to power outages. This article highlights the unique value renewable energy hybrid systems (REHS), comprised of solar, energy storage, and generators, provide in increasing resiliency. We present a methodology to quantify the amount and value of resiliency provided by REHS, and ways to monetize this resiliency value through insurance premium discounts. A case study of buildings in New York City demonstrates how implementing REHS in place of traditional backup diesel generators can double the amount of outage survivability, with an added value of $781,200. For a Superstorm Sandy type event, results indicate that insurance premium reductions could support up to 4% of the capital cost of REHS, and the potential exists to prevent up to $2.5 billion in business interruption losses with increased REHS deployment.

14 SOLAR ENERGY↗

Advanced Lithium-Ion Cell Development for NASA's Constellation Missions

The Energy Storage Project of NASA s Exploration Technology Development Program is developing advanced lithium-ion batteries to meet the requirements for specific Constellation missions. NASA GRC, in conjunction with JPL and JSC, is leading efforts to develop High Energy and Ultra High Energy cells for three primary Constellation customers: Altair, Extravehicular Activities (EVA), and Lunar Surface Systems. The objective of the High Energy cell development is to enable a battery system that can operationally deliver approximately 150 Wh/kg for 2000 cycles. The Ultra High Energy cell development will enable a battery system that can operationally deliver 220 Wh/kg for 200 cycles. To accomplish these goals, cathode, electrolyte, separator, and safety components are being developed for High Energy Cells. The Ultra High Energy cell development adds lithium alloy anodes to the component development portfolio to enable much higher cell-level specific energy. The Ultra High Energy cell development is targeted for the ascent stage of Altair, which is the Lunar Lander, and for power for the Portable Life support System of the EVA Lunar spacesuit. For these missions, mass is highly critical, but only a limited number of cycles are required. The High Energy cell development is primarily targeted for Mobility Systems (rovers) for Lunar Surface Systems, however, due to the high risk nature of the Ultra High Energy cell development, the High Energy cell will also serve as a backup technology for Altair and EVA. This paper will discuss mission requirements and the goals of the material, component, and cell development efforts in further detail.

Reid, Concha M.↗

AGR-1 Irradiation Test Final As-Run Report, Rev. 3

This document presents the as-run analysis of the AGR-1 irradiation experiment. AGR-1 is the first of eight planned irradiations for the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program. Funding for this program is provided by the US Department of Energy (DOE) as part of the Next-Generation Nuclear Plant (NGNP) project. The objectives of the AGR-1 experiment are: 1. To gain experience with multi-capsule test train design, fabrication, and operation with the intent to reduce the probability of capsule or test train failure in subsequent irradiation tests. 2. To irradiate fuel produced in conjunction with the AGR fuel process development effort. 3. To provide data that will support the development of an understanding of the relationship between fuel fabrication processes, fuel product properties, and irradiation performance. In order to achieve the test objectives, the AGR-1 experiment was irradiated in the B-10 position of the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL) for a total duration of 620 effective full power days of irradiation. Irradiation began on December 24, 2006 and ended on November 6, 2009 spanning 13 ATR cycles and approximately three calendar years. The test contained six independently controlled and monitored capsules. Each capsule contained 12 compacts of a single type, or variant, of the AGR coated fuel. No fuel particles failed during the AGR-1 irradiation. Final burnup values on a per compact basis ranged from 11.5 to 19.6 %FIMA, while fast fluence values ranged from 2.21 to 4.39 x 10 25 n/m 2 (E >0.18 MeV). We’ll say something here about temperatures once thermal recalc is done. Thermocouples performed well, failing at a lower rate than expected. At the end of the irradiation, nine of the originally-planned 19 TCs were considered functional. Fission product release-to-birth (R/B) ratios were quite low. In most capsules, R/B values at the end of the irradiation were at or below 10 -7 with only one capsule significantly exceeding this value. A maximum R/B of around 2 x 10 -7 was reached at the end of the irradiation in Capsule 5. Several shakedown issues were encountered and resolved during the first three cycles. These include the repair of minor gas line leaks; repair of faulty gas line valves; the need to position moisture monitors in regions of low radiation fields for proper functioning; the enforcement of proper on-line data storage and backup, the need to monitor thermocouple performance, correcting for detector spectral gain shift, and a change in the mass flow rate range of the neon flow controllers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

High Performance Computing Peak Shaving for Microreactor Operation

There are multiple nuclear microreactors currently under development that are designed to provide autonomous power for as many as ten or more years without refueling and are designed to power high performance computing (HPC) datacenters. But the load-follow speeds for a nuclear microreactor will be much slower than grid power and slower than the power variance typical of a HPC system. HPC datacenters experience peak power load variance driven by several factors ranging from the operation of cooling systems to remove heat from the servers to supporting a wide range of user application workflows and architectures each with different power signatures. One mechanism to support the limited load-follow of a microreactor is peak shaving where an energy storage mechanism is used to shed peak load and reduce significant power variance. This work explores peak electrical load shaving using uninterruptible power supply (UPS) systems designed for HPC support in the context of peak shaving when operating using a nuclear microreactor with a load-follow limited to 10% of load per minute. Using a self contained HPC datacenter complete with stand-alone cooling system and provisioned with an x86 cluster, an ARM cluster, and a graphics processing unit (GPU) cluster, peak shaving for microreactor operation using the UPS battery backup is explored while running two classes of typical HPC user applications. HPC architecture suitability for microreactor operation under this type of peak shaving is examined.

97 MATHEMATICS AND COMPUTING↗

Real Time Applications Using Linear State Estimation Technology (RTA/LSE)

Electric Power Group, LLC (EPG) was awarded DOE OE0000849 to design, develop, and demonstrate three real-time applications for monitoring power system stability. The applications use phasor measurements and processing by a linear state estimator (LSE) to improve system visibility and accuracy. These applications leverage the large and expanding phasor measurement systems being deployed by utilities throughout the world, and specifically in the United States. Phasor measurements provide a much more detailed view of the power systems than traditional SCADA systems, so can provide better visibility of events and an early warning of developing problems. These three applications are real-time contingency analysis (RTCA), area angle monitoring (AAM), and a voltage stability index (VSI). The project was fully completed as proposed. All three applications were successfully implemented and demonstrated. There were challenges the caused project delays, however. While the RTCA is based on well-known concepts and readily available tools, its deployment using phasor measurements meant it needed to be adapted to sometimes sparse measurements and limited coverage areas. EPG met these challenges with extensive modeling and testing. The AAM is based on unproven research, so EPG had to deal with a lot of unknowns and develop additional methods for practical implementation. These activities took more time than anticipated, so required extra time for development. In addition, there was difficulty getting adequate measurement locations for successful deployment and utility installation delays. Consequently, the project required a time extension to complete. These three real-time applications, RTCA, AAM, and VSI, use only phasor measurement input. Since they do not require the EMS or other measurement systems, they can serve as a backup and security check for the EMS. Phasor measurements are validated and extended by an LSE. The LSE will always produce an output even when some inputs are impaired, so the RT applications will operate even when the EMS state estimator does not converge and the applications it supports cannot function. Consequently, these RT applications can provide valuable additional reliability for control center operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Teams and teamwork at NASA Langley Research Center

The recent reorganization and shift to managing total quality at the NASA Langley Research Center (LaRC) has placed an increasing emphasis on teams and teamwork in accomplishing day-to-day work activities and long-term projects. The purpose of this research was to review the nature of teams and teamwork at LaRC. Models of team performance and teamwork guided the gathering of information. Current and former team members served as participants; their collective experience reflected membership in over 200 teams at LaRC. The participants responded to a survey of open-ended questions which assessed various aspects of teams and teamwork. The participants also met in a workshop to clarify and elaborate on their responses. The work accomplished by the teams ranged from high-level managerial decision making (e.g., developing plans for LaRC reorganization) to creating scientific proposals (e.g., describing spaceflight projects to be designed, sold, and built). Teams typically had nine members who remained together for six months. Member turnover was around 20 percent; this turnover was attributed to heavy loads of other work assignments and little formal recognition and reward for team membership. Team members usually shared a common and valued goal, but there was not a clear standard (except delivery of a document) for knowing when the goal was achieved. However, members viewed their teams as successful. A major factor in team success was the setting of explicit a priori rules for communication. Task interdependencies between members were not complex (e.g., sharing of meeting notes and ideas about issues), except between members of scientific teams (i.e., reliance on the expertise of others). Thus, coordination of activities usually involved scheduling and attendance of team meetings. The team leader was designated by the team's sponsor. This leader usually shared power and responsibilities with other members, such that team members established their own operating procedures for decision making. Sponsors followed a hands-off policy during team operations, but they approved and reviewed team products. Most teams, particularly high-level decision-making teams, had little or no authority to carry out their decisions. Team members had few interpersonal conflicts. They monitored each other respectfully about meeting deadlines. Feedback and backup behaviors were seen as desirable aspects of teamwork, wanted by the members, and done appropriately.

Dickinson, Terry L.↗

Flight evaluation of modifications to a digital electronic engine control system in an F-15 airplane

The third phase of a flight evaluation of a digital electronic engine control system in an F-15 has recently been completed. It was found that digital electronic engine control software logic changes and augmentor hardware improvements resulted in significant improvements in engine operation. For intermediate to maximum power throttle transients, an increase in altitude capability of up to 8000 ft was found, and for idle to maximum transients, an increase of up to 4000 ft was found. A nozzle instability noted in earlier flight testing was investigated on a test engine at NASA Lewis Research Center, a digital electronic engine control software logic change was developed and evaluated, and no instability occurred in the Phase 3 flight evaluation. The backup control airstart modification was evaluated, and gave an improvement of airstart capability by reducing the minimum airspeed for successful airstarts by 50 to 75 knots.

Burcham, F. W., Jr.↗

Flight evaluation of modifications to a digital electronic engine control system in an F-15 airplane

The third phase of a flight evaluation of a digital electronic engine control system in an F-15 has recently been completed. It was found that digital electronic engine control software logic changes and augmentor hardware improvements resulted in significant improvements in engine operation. For intermediate to maximum power throttle transients, an increase in altitude capability of up to 8000 ft was found, and for idle to maximum transients, an increase of up to 4000 ft was found. A nozzle instability noted in earlier flight testing was investigated on a test engine at NASA Lewis Research Center, a digital electronic engine control software logic change was developed and evaluated, and no instability occurred in the Phase 3 flight evaluation. The backup control airstart modification was evaluated, and gave an improvement of airstart capability by reducing the minimum airspeed for successful airstarts by 50 to 75 knots.

Burcham, F. W., Jr.↗

Techno-economic implications and cost of forecasting errors in solar PV power production using optimized deep learning models

Accurate solar Photovoltaic (PV) power forecasting is important for enhancing both the performance and economic feasibility of PV systems. This study evaluates several deep learning models, including Dense Neural Networks (DNN), Long Short-Term Memory (LSTM), Convolutional Neural Networks (CNN), and a hybrid LSTMCNN model, for predicting PV power production one day in advance. Prior to optimization, the models exhibited relatively high errors, with the best model (DNN) achieving a Root Mean Square Error (RMSE) of 31.13 kW and a coefficient of determination (R 2 ) of 62.15 %. After employing Bayesian optimization, the LSTM-CNN model demonstrated the best performance, with the RMSE reduced to 9.79 kW and R 2 improved to 97.62 %, showcasing significant enhancement in predictive accuracy. Here, the economic evaluation considered three cases: rewards for underestimation (0.08 USD/kWh), no rewards, and penalties for both over-and underestimation (120 % of the utility tariff). In the rewards scenario, the LSTM-CNN model reduced the Levelized Cost of Electricity (LCOE) by 4 %, while in the penalty scenario, a backup diesel generator would have increased the LCOE by 49 %. Additionally, the LSTM-CNN model minimized financial losses, achieving the lowest penalties and maximizing net cash flow compared to other models, demonstrating its overall technical and economic superiority.

Deep learning↗