Search NASA⌕ Search

SEARCH · Search NASA

Results for “CAPACITY PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Capacity Density Considerations for Offshore Wind Plants in the United States

The United States is a rapidly emerging market for offshore wind energy, with a project pipeline estimated at over 52 GW as of May 31, 2023 (Musial et al. 2023). The capacity density, measured in megawatts per square kilometer (MW/km 2 ), is a crucial parameter for estimating the magnitude of the development pipeline and the nameplate potential of existing lease areas. The offshore wind energy industry is comprised of diversity of participants, including developers, governmental bodies, investors, environmental advocacy groups, and researchers. These various stakeholders use capacity density in different ways as a key metric for evaluating the potential of individual offshore wind lease area or even a section of ocean space. This report presents our assessment of capacity density values in the current pipeline of emerging U.S. offshore wind farms and a detailed list of the main factors that influence capacity density. This understanding is critical for planning of future lease areas, for estimating the technical resource potential for offshore wind on the U.S. outer continental shelf (OCS), and for estimating ocean space requirements needed for meeting state and national goals for a carbon neutral energy transition.

17 WIND ENERGY↗

Investigating the effects of cooperative transmission expansion planning on grid performance during heat waves with varying spatial scales

There is growing recognition of the advantages of interregional transmission capacity to decarbonize electricity grids. A less explored benefit is potential performance improvements during extreme weather events. This study examines the impacts of cooperative transmission expansion planning using an advanced modeling chain to simulate power grid operations of the United States Western Interconnection in 2019 and 2059 under different levels of collaboration between transmission planning regions. Two historical heat waves in 2019 with varying geographical coverage are replayed under future climate change in 2059 to assess the transmission cooperation benefits during grid stress. The results show that cooperative transmission planning yields the best outcomes in terms of reducing wholesale electricity prices and minimizing energy outages both for the whole interconnection and individual transmission planning regions. Compared to individual planning, cooperative planning reduces wholesale electricity prices by 64.3 % and interconnection-wide total costs (transmission investments + grid operations) by 34.6 % in 2059. It also helps decrease greenhouse gas emissions by increasing renewable energy utilization. However, the benefits of cooperation diminish during the widespread heat wave when all regions face extreme electricity demand due to higher space cooling needs. Despite this, cooperative transmission planning remains advantageous, particularly for California Independent System Operator with significant diurnal solar generation capacity. This study suggests that cooperation in transmission planning is crucial for reducing costs and increasing reliability both during normal periods and extreme weather events. It highlights the importance of optimizing the strategic investments to mitigate challenges posed by wider-scale extreme weather events of the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A new Security of supply mechanism for the Iberian market

So far, the Spanish electricity system is the only one in Europe to implement a security or reliability of supply mechanism from the outset. After 10 years of controversial operation, on the occasion of the regulatory harmonization required in the context of the Iberian electricity market, the Spanish regulator has finally decided to reform the system's so-called ''capacity guarantee mechanism''. (author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Final Technical Report - Kotzebue Wind Power Porject - Volume I

The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

17 WIND ENERGY↗

Final Technical Report - Kotzebue Wind Power Project - Volume II

The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

17 WIND ENERGY↗

Parameterizing the Variability and Uncertainty of Wind and Solar in CEMs

We present current and improved methods for estimating the capacity value and curtailment impacts from variable generation (VG) in capacity expansion models (CEMs). The ideal calculation of these variability metrics is through an explicit co-optimized investment-dispatch model using multiple years of VG and load data. Because of data and computational limitations, existing CEMs typically approximate these metrics using a subset of all hours from a single year and/or using statistical methods, which often do not capture the tail-event impacts or the broader set of interactions between VG, storage, and conventional generators. In our proposed new methods, we use hourly generation and load values across all hours of the year to characterize the (1) contribution of VG to system capacity during high load hours, (2) the curtailment level of VG, and (3) the reduction in VG curtailment due to storage and shutdown of select thermal generators. Using CEM model outputs from a preceding model solve period, we apply these methods to exogenously calculate capacity value and curtailment metrics for the subsequent model solve period. Preliminary results suggest that these hourly methods offer improved capacity value and curtailment representations of VG in the CEM from existing approximation methods without additional computational burdens.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NREL Screens Universities for Solar and Battery Storage Potential

In support of the U.S. Department of Energy's SunShot initiative, NREL provided solar photovoltaic (PV) screenings in 2016 and 2017 for universities seeking to go solar. Fifteen universities were selected for screenings based on campus solar and sustainability goals, plans for future solar projects and solar deployment capacity (megawatts), regional diversity, energy costs, and availability of campus energy data for the analysis.

14 SOLAR ENERGY↗

Remediation Guidance for Major Airports after a Bioterrorist Attack

This document provides general guidelines for airport managers, local officials, and other stakeholders for developing a response and recovery plan for a major airport following the release of a biological warfare agent, with specific guidance for remediation. San Francisco International Airport was selected as the example airport during development of the guidance to illustrate specific details. The spore-forming bacterium Bacillus anthracis was selected as the biological agent of primary concern because it is the most difficult of known bioterrorism agents to inactivate and is considered to be one of the agents most likely to be used as a biological weapon. The focus of the guidance is on cleanup and disposal activities associated with the Characterization, Decontamination, and Clearance Phases that are defined herein. Activities associated with the Notification and First-Response Phases are brieÀy discussed in Appendixes A and B, respectively. In addition to the main text of this Remediation Guidance document and associated appendixes, a data supplement was developed specifically for San Francisco International Airport. Requests for the data supplement must be made directly to the Emergency Planning Operations Division of San Francisco International Airport. This document does not describe public health responses to release of a biological warfare agent. If laboratory analytical results confirm the presence of a biological agent, the responsible public health agency involved in the response will commence appropriate public health actions, such as treatment (CDC 2004) and decontamination of potentially contaminated individuals, distribution of prophylaxis, and medical examinations. See the Centers for Disease Control and Prevention web site for more information on emergency public health responses (http://www.bt.cdc.gov/). Effective communication with the media and the public is an essential component of airport remediation and recovery. Whereas such communication is beyond the scope of this document, many helpful resources are available. (See Section 1.1 for more information.) The concept of operations described in this document for cleanup of a Bacillus anthracis release at a major airport conforms to the National Response Framework (NRF) (DHS 2008) and implementation of the National Incident Management System (NIMS 2004). In most cases, a Unified Command would be formed to direct the cleanup process jointly and to take ultimate responsibility for all cleanup decisions. The Unified Command would likely include the Airport Manager or Airport Emergency Operations Manager, representatives from state and local public health and emergency management agencies, and Federal agencies, such as the U.S. Environmental Protection Agency. The Unified Command and Incident Command Staff would ideally be co-located in an Incident Command Post in an uncontaminated area of the airport. If a release is large or complex, co-location of all key players may not be possible. If a major incident is declared, a Principal Federal Official may be appointed by the Department of Homeland Security to facilitate Federal support to the Unified Command. In some facilities and jurisdictions, additional response plans or procedures (such as BioWatch or other emergency response plans, procedures, or protocols) may govern notification and first response. Facility personnel, responders, and emergency management coordinators should be aware of all applicable plans and procedures and how to implement them. Cleanups following the anthrax attacks of 2001 in the U.S. pre-dated the NRF and NIMS and did not make use of a NIMS Incident Command System as we know it today. Most Incident Commanders for the larger of those cleanups chose to convene a Technical Working Group (TWG) of multi-agency, multi-disciplinary, outside experts to advise in developing sampling and decontamination plans. Most of the Incident Commanders also convened a separate Environmental Clearance Committee (ECC) to independently review pre- and post decontamination sampling data as well as data on decontamination parameters, to evaluate whether the decontamination was effective, and to add credibility regarding a decision that decontaminated areas may be reoccupied. Use of such specialized technical expertise is strongly recommended, although it would now operate within the construct of the NIMS Incident Command System. The TWG, if convened, would act in an advisory capacity to the Environmental Unit within the Planning Section. Likewise, the ECC, if convened, would provide independent peer review of products and recommendations by the Environmental Unit. For maximum impartiality, the ECC could also provide recommendations directly to the Unified Command. Cleanup activities commence with site characterization. The principal goal of characterization is to define the extent of contamination and to gather information needed to design the decontamination approach. Initial sampling data collected by first responders are assessed to approximate the location(s) of contamination. Confirmation of the agent type and viability is obtained from a Laboratory Response Network laboratory. Additional characterization data are collected to determine the extent of contamination and where decontamination actions are needed. Areas suspected of being contaminated are contained and isolated to the degree possible to prevent further movement of an agent to uncontaminated areas or the environment, and to reduce the potential for future exposure from the agent or fumigant, if fumigation is needed. Agent air monitoring in areas adjacent to the contained contamination zones is done to ensure the protection of remediation personnel and to monitor any release from the contained zones. Various sampling approaches are considered. For example, wipe samples can be used to sample hard, nonporous surfaces. Swab samples can be used to sample nooks, crannies, joints, and seams. Appendix I is a template for preparing an incident-specific, operational characterization plan. Upon completion of the characterization plan, an internal review is initiated. Upon approval of the plan by the Unified Command, characterization commences. The Site Safety Officer develops a Health and Safety Plan to ensure that coordinated health and safety measures are in place for all responding personnel. This plan describes physical, chemical, and biological hazards at the site, personal protective equipment, personal decontamination procedures, and emergency procedures to be used by sampling and remediation personnel. An incident-specific Remediation Action Plan is developed, which describes the decontamination methods to be used and other details, including waste disposal. Under NIMS, this overall plan, as well as other plans described below, are implemented through a series of standardized, shorter-term Incident Action Plans, which describe specific activities that will take place during a shift or a day. The template in Appendix J is designed to facilitate preparation of the Remediation Action Plan. If fumigation will be done, a Sampling and Analysis Plan will be needed, as well as an Ambient Air Monitoring Plan, which can be a component of the Remediation Action Plan. These three plans are needed to obtain a crisis exemption from the U.S. Environmental Protection Agency for authorized use of an unregistered sterilant or pesticide during cleanup. If pesticide products become registered for inactivation of B. anthracis in the future, the three plans will likely be required by the product’s labeling, but the plans would no longer be submitted to the U.S. Environmental Protection Agency for approval; rather, the Incident Commander would approve them. If fumigation is used, an Emergency Response Plan is also recommended, although such a plan is not required for a crisis exemption. For some nonpersistent biological warfare agents, natural attenuation may be an adequate decontamination option. In cases where contamination is not extensive or an agent is not persistent, application of surface decontaminants or other methods of medical infection control may be effective. For extensive contamination by persistent agents, such as Bacillus anthracis, fumigation may be necessary. In those cases, the Decontamination Phase commences with source reduction, such as pre-cleaning surfaces to reduce the contaminant load. To expedite cleanup and prevent costs from escalating unnecessarily, a cost–benefit analysis should be incorporated in the decision process related to retention versus disposal of facility items and materials. Certain materials and structural components can be decontaminated for reuse, but it may not be feasible or cost-effective to decontaminate other items. Those items must be pre-treated, packaged (with the package decontaminated externally), and removed for disposal as waste. Site preparation includes sealing openings to prevent leaks and setting up equipment. Decontamination reagents and delivery systems are selected, and pre-testing all systems is done before carrying out chemical treatment(s). The important choice of decontamination technologies depends on characteristics of the agent, the nature and extent of contamination, and other site parameters identified during characterization. Decontamination-related decisions can have a major impact on waste-disposal costs, and it is necessary to develop a disposal plan that identifies a means of disposal, necessary approvals, transportation, and other details. A clearance strategy is developed to ensure that after decontamination, the risk of exposure to residual contamination is negligible. A clearance sampling plan is developed, which sets clearance criteria, specifies how to determine whether the criteria have been met, and describes how and where to collect clearance samples after decontamination. In most cases, clearance sampling includes both surface and aggressive air samples. Appendix K is a clearance plan template that identifies the types of required information. To determine whether the decontaminated area may be reoccupied, the Environmental Unit (and the ECC separately, if one is convened) evaluates the results of clearance samples. For the anthrax incidents to date, and given methods that have been used, cleanup was considered successful only when there was no growth of B. anthracis cultured from any environmental samples taken after decontamination. Other factors that will be considered include the decontamination process parameters (e.g., temperature, relative humidity, decontaminant concentration, and contact time) and the results from post-decontamination culture of biological indicators that may have been used during fumigation or sterilization processes. From such an evaluation the Environmental Unit or ECC, or both, recommend whether the area may be reoccupied, or whether further decontamination is necessary. The UC makes the final decision that a facility is appropriately decontaminated for reoccupancy. The facility owner or responsible public health agency makes the final decision to reopen a decontaminated facility. A theme that is emphasized throughout this document is that many activities can greatly reduce the time required to restore airport operations if those activities are conducted prior to an actual release of biological warfare agent. A summary of specific resources (such as Federal, state, and local agency contacts; contractors; prospective team members; subject-matter experts; laboratory facilities; and other entities) that should be identified in advance by airport officials is provided in each pertinent section of this document, and summary contact lists of such resources are provided in Appendix L. A summary of overall pre-planning actions that should be completed by airport officials is presented at the end of this document.

59 BASIC BIOLOGICAL SCIENCES↗

Assessment of NuScale SMR Steam Heat Augmentation for Chemical Plant Decarbonization

Nearly 50% of the total energy consumed by the industrial sector in the United States is used to produce process steam with natural gas and coal-fired boilers1 . This project conducts a technoeconomic assessment of a NuScale Small Modular Reactor (SMR) coupled with a chemical plant as an Integrated Energy System (IES) where nuclear produces steam and electric power to meet the requirements of a large chemical plant. In a 2020 study, ORNL evaluated the feasibility of using advanced SMRs, including the NuScale design, to supply energy to the Eastman Chemical Plant. However, since that report was published, NuScale received NRC approval for its uprated 77 MWe design with 56% more power and has also introduced a high-temperature, high pressure, steam heat-augmentation system, a key focus of the new study. The new study also benefits from revised capital costs, a 10-day refueling outage time, reduced plant staffing, higher capacity factors, and a site boundary Emergency Planning Zone methodology. The study consists of a techno-economic assessment of two possible energy sources (nuclear and natural gas) in a number of steam and power generation configurations (NuScale Power Modules (NPMs), boilers and combinations of both) to satisfy the steam and power demand with the most reliable and cost competitive system. A total of 2,947.3 klb/hr of steam and 72.5 MWe of electricity are required for the demonstration case. A range of scenarios and solutions are explored, from a 12-NPM plant (3,000 MWth)—with excess capacity and redundancy, capable of supplying a significant amount of extra power to the grid—to a 4-NPM (1,000 MWth) plant—supplemented with existing boilers or grid power for redundancy. The study uses historical steam and power data from a chemical plant and examines the sensitivity to natural gas and grid power cost variations. Scenarios with up to two times gas and electricity costs were considered. Profitability in a 60-year time horizon was analyzed, consistent with NuScale’s design life specification. A steady-state site integration and reliability analysis was performed, and trade-offs were identified.

20 FOSSIL-FUELED POWER PLANTS↗

Helical Tomotherapy Planning for Lung Cancer Based on Ventilation Magnetic Resonance Imaging

To investigate the feasibility of lung ventilation-based treatment planning, computed tomography and hyperpolarized (HP) helium-3 (He-3) magnetic resonance imaging (MRI) ventilation images of 6 subjects were coregistered for intensity-modulated radiation therapy planning in Tomotherapy. Highly-functional lungs (HFL) and less-functional lungs (LFL) were contoured based on their ventilation image intensities, and a cylindrical planning-target-volume was simulated at locations adjacent to both HFL and LFL. Annals of an anatomy-based plan (Plan 1) and a ventilation-based plan (Plan 2) were generated. The following dosimetric parameters were determined and compared between the 2 plans: percentage of total/HFL volume receiving {>=}20 Gy, 15 Gy, 10 Gy, and 5 Gy (TLV{sub 20}, HFLV{sub 20}, TLV{sub 15}, HFLV{sub 15}, TLV{sub 10}, HFLV{sub 10}, TLV{sub 5}, HFLV{sub 5}), mean total/HFL dose (MTLD/HFLD), maximum doses to all organs at risk (OARs), and target dose conformality. Compared with Plan 1, Plan 2 reduced mean HFLD (mean reduction, 0.8 Gy), MTLD (mean reduction, 0.6 Gy), HFLV{sub 20} (mean reduction, 1.9%), TLV{sub 20} (mean reduction, 1.5%), TLV{sub 15} (mean reduction, 1.7%), and TLV{sub 10} (mean reduction, 2.1%). P-values of the above comparisons are less than 0.05 using the Wilcoxon signed rank test. For HFLV{sub 15}, HFLV{sub 10}, TLV{sub 5}, and HTLV{sub 5}, Plan 2 resulted in lower values than plan 1 but the differences are not significant (P-value range, 0.063-0.219). Plan 2 did not significantly change maximum doses to OARs (P-value range, 0.063-0.563) and target conformality (P = 1.000). HP He-3 MRI of patients with lung disease shows a highly heterogeneous ventilation capacity that can be utilized for functional treatment planning. Moderate but statistically significant improvements in sparing functional lungs were achieved using helical tomotherapy plans.

61 RADIATION PROTECTION AND DOSIMETRY↗

Optimal Gas-Electric Energy System Decarbonization Planning

As energy utilities implement climate change mitigation policies, system planners require strategies for achieving affordable emissions reductions. Coordinated planning of electric power and natural gas systems will allow synergistic investments to address cross-sector operational constraints, competing uses for net-zero emissions fuels, and shifts in energy demands across energy carriers. In this study, we develop a novel optimization program that finds the cost-minimizing mix of infrastructure expansion or reduction across gas and electric systems to satisfy sector-specific emissions constraints. Alongside energy supply resources, our framework allows for central-planning of end-use equipment stocks to allow switching between gas and electric appliances upon failure or premature replacement. The proposed model is used to simulate case study scenarios for a benchmark 24-pipe gas network coupled to a 24-node power system test network. We find that electrification of greater than 80% of core gas demands is a component of the least-cost solution for modeled energy systems. Despite this substitution, the gas system is maintained to service difficult-to-electrify customers and to deliver net-zero emissions gas to electricity generators in times of peak electricity demand. Restricting electrification of gas appliances increases reliance on power- to-gas technologies and increases annual costs by 15% in 2040. Neglecting constraints on pipeline blending of hydrogen can produce a misleading result that relies on hydrogen blend fractions of greater than 50%. In all cases, we find the average costs of delivered gas increase nearly 5-fold across the decarbonization transition, highlighting the importance of future work investigating cost-allocation strategies for ensuring an equitable energy transition.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Measuring the capacity impacts of demand response

Critical peak pricing and peak time rebate programs offer benefits by increasing system reliability, and therefore, reducing capacity needs of the electric power system. These benefits, however, decrease substantially as the size of the programs grows relative to the system size. More flexible schemes for deployment of demand response can help address the decreasing returns to scale in capacity value, but more flexible demand response has decreasing returns to scale as well. (author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

25 Year Lifetime for Flexible Buildings Integrated Photovoltaics

Although preliminary proof-of-principle of the efficacy of barrier materials and processes, first developed by Battelle at PNNL and commercialized by Vitex, has been demonstrated at the laboratory scale, there are several challenges to the practical commercial implementation of these developments in the Buildings Integrated Photovoltaics (BIPV) market. Two important issues that are addressed in this project are identifying a low cost substrate material that can survive in the outside environment (rain, heat, dust, hail, etc.) for 25 years and developing an encapsulation method for the photovoltaic (PV) cells that can meet the required barrier performance without driving the cost of the total barrier package out of range (remaining below $3.00/Wp). Without these solutions, current encapsulation technologies will limit the use of PV for BIPV applications. Flexible, light-weight packaging that can withstand 25 years in the field is required for a totally flexible integrated PV package. The benefit of this research is to make substantial progress in the development of a cost-effective, viable thin film barrier package which will be a critical enabling technology to meet the Solar America Initiative cost and device reliability goals, and to make photovoltaics (PV) more cost-competitive with electricity generated using fossil fuels. Increased PV installations will enable increased US electrical capacity and reduce dependence on imported oil through increased utilization of a widely abundant source of renewable energy (sunlight).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A new technology for manufacturing scheduling derived from space system operations

A new technology for producing finite capacity schedules has been developed in response to complex requirements for operating space systems such as the Space Shuttle, the Space Station, and the Deep Space Network for telecommunications. This technology has proven its effectiveness in manufacturing environments where popular scheduling techniques associated with Materials Resources Planning (MRPII) and with factory simulation are not adequate for shop-floor work planning and control. The technology has three components. The first is a set of data structures that accommodate an extremely general description of a factory's resources, its manufacturing activities, and the constraints imposed by the environment. The second component is a language and set of software utilities that enable a rapid synthesis of functional capabilities. The third component is an algorithmic architecture called the Five Ruleset Model which accommodates the unique needs of each factory. Using the new technology, systems can model activities that generate, consume, and/or obligate resources. This allows work-in-process (WIP) to be generated and used; it permits constraints to be imposed or intermediate as well as finished goods inventories. It is also possible to match as closely as possible both the current factory state and future conditions such as promise dates. Schedule revisions can be accommodated without impacting the entire production schedule. Applications have been successful in both discrete and process manufacturing environments. The availability of a high-quality finite capacity production planning capability enhances the data management capabilities of MRP II systems. These schedules can be integrated with shop-floor data collection systems and accounting systems. Using the new technology, semi-custom systems can be developed at costs that are comparable to products that do not have equivalent functional capabilities and/or extensibility.

Hornstein, R. S.↗

Moving Toward Consensus on a Photovoltaic Generation Capacity Valuation Methodology

Maintaining adequate generating capacity to meet electricity demand at all times is a fundamental principle for the electric utility industry. This is accomplished through a variety of means including providing/purchasing sufficient generation capacity as well as acquiring the associated ancillary services for the electricity grid. The generation capacity of dispatchable resources is assessed based on technology design parameters. While dispatchable resources have some uncertainty in their output due to unforeseen equipment failures, their dispatch is managed around the demand for electricity and their marginal operating costs. Photovoltaic resources are non-dispatchable because their electrical output is based on both technology design parameters (technology selection, installation characteristics, and site conditions) and a solar resource that varies over a range of time periods (seasonal, daily, hourly, second to second). These solar resource variations, however, are not random and there is an intuitively positive relationship between PV system output and summer peak electricity demand for many locations throughout the U.S. This is because system demand peaks for most utilities are driven by heat-wave cooling demand, and because heat waves are indirectly fed by solar gain, i.e., by the fuel for PV generation. Despite this relationship, there is no consensus across the utility or solar industries on a method for calculating PV capacity or its practical use in electricity markets and utility planning. The U.S. Department of Energy’s Solar America Initiative has provided funding to evaluate the variety of photovoltaic capacity valuation methods and to bring the solar industry, electric utility, and research communities together with the goal of moving toward consensus on what is the most appropriate PV generation capacity valuation methodology using a consensus-oriented process. Developing a framework for accurately and appropriately calculating photovoltaic capacity, and determining the risk of variation, will provide a means for utilities and generators to calculate and innovate around the new economic propositions that an industry recognized PV capacity value calculation method would present.

14 SOLAR ENERGY↗

Valuing variable renewable energy for peak demand requirements

The capacity credit for a generator is the fraction of its nameplate capacity that can contribute to meeting the system's resource adequacy. However, estimating the capacity credit of variable renewable energy is challenging due to the variability, uncertainty, and spatial diversity of the renewable resources. This study uses the Regional Energy Deployment System to quantify the impacts on the U.S. power sector through 2050 from misestimations of renewable capacity credit. Results show that small underestimates of the renewable capacity credit have little impact on system buildout, but that large underestimates (>50%) can reduce solar photovoltaic deployment by nearly 100 GW (50%) and wind by up to 43 GW (22.8%) in 2030s. Such large differences are possible because the capacity credit for variable renewable energy can substantially impact the overall costs and value of variable renewable energy relative to other technologies. Such effects are most strongly felt in the mid-term but are less relevant over the long-term due to the declining value of variable resources. Underestimating the capacity credit of variable renewable energy leads to increased system costs and emissions. Conversely, overvaluing the capacity credit of variable renewable energy reduces system costs at the risk of lower reliability.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗