Results for “Contingency planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Data Privacy for the Grid: Toward a Data Privacy Standard for Inverter-Based and Distributed Energy Resources

The traditional approach to planning the distribution grid has focused on reliability in the context of gradual and reasonably predictable load growth. Forecasts of load growth, combined with asset management practices, were used by system planners to identify upgrades to the system to maintain or improve reliability. The decisions, typically based within load flow analysis tools, included considerations about contingency scenarios and corporate forecasts (i.e., top-down predictions at a summary level of what would happen in a particular area that could impact load growth and behavior). As a result, today, this traditional approach no longer fits all purposes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

On Parallelizing Single Dynamic Simulation Using HPC Techniques and APIs of Commercial Software

Time-domain simulations are heavily used in today’s planning and operation practices to assess power system transient stability and post-transient voltage/frequency profiles following severe contingencies to comply with industry standards. Because of the increased modeling complexity, it is several times slower than real time for state-of-the-art commercial packages to complete a dynamic simulation for a large-scale model. With the growing stochastic behavior introduced by emerging technologies, power industry has seen a growing need for performing security assessment in real time. This paper presents a parallel implementation framework to speed up a single dynamic simulation by leveraging the existing stability model library in commercial tools through their application programming interfaces (APIs). Several high performance computing (HPC) techniques are explored such as parallelizing the calculation of generator current injection, identifying fast linear solvers for network solution, and parallelizing data outputs when interacting with APIs in the commercial package, TSAT. The proposed method has been tested on a WECC planning base case with detailed synchronous generator models and exhibits outstanding scalable performance with sufficient accuracy.

Diao, Ruisheng↗

Repair of major system elements on Skylab

In-flight maintenance, as conceived and pre-planned for the Skylab Mission, was limited to simple scheduled and unscheduled replacement tasks and minor contingency repairs. Failures during the mission dictated complicated and sophisticated repairs to major systems so that the mission could continue. These repairs include the release of a large structure that failed to deploy, the assembly and deployment of large mechanical devices, the installation and checkout of precision electronic equipment, troubleshooting and repair of precision electromechanical equipment and tapping into and recharging a cooling system. The Skylab experience proves conclusively that crewmen can, with adequate training, make major system repairs in space using standard or special tools.

Pace, R. E., Jr.↗

Study to evaluate the effect of EVA on payload systems. Volume 1: Executive summary

Programmatic benefits to payloads are examined which can result from the routine use of extravehicular activity (EVA) during space missions. Design and operations costs were compared for 13 representative baseline payloads to the costs of those payloads adapted for EVA operations. The EVA-oriented concepts developed in the study were derived from these baseline concepts and maintained mission and program objectives as well as basic configurations. This permitted isolation of cost saving factors associated specifically with incorporation of EVA in a variety of payload designs and operations. The study results were extrapolated to a total of 74 payload programs. Using appropriate complexity and learning factors, net EVA savings were extrapolated to over $551M for NASA and U.S. civil payloads for routine operations. Adding DOD and ESRO payloads increases the net estimated savings of $776M. Planned maintenance by EVA indicated an estimated $168M savings due to elimination of automated service equipment. Contingency problems of payloads were also analyzed to establish expected failure rates for shuttle payloads. The failure information resulted in an estimated potential for EVA savings of $1.9 B.

Patrick, J. W.↗

OMV servicing missions from Space Station

The Orbital Maneuvering Vehicle (OMV) will provide a means of bringing large observatories to the Space Station for servicing and redeployment to their operating altitudes. However, there are many constraints which must be met in mission planning. The missions must be designed so that propellant consumption is within the usable allowance, but contingency operations can still be accomplished. The vehicle was designed specifically to accommodate such missions, with emphasis upon servicing the Hubble Space Telescope. The OMV has been designed for operations from the Shuttle Orbiter and the Space Station. It will readily accommodate basing at the Space Station and executing observatory retrieval and redeployment missions. Mission profiles have been designed which allow retrieval with contingency hold before descent, and which allow contingency return of the observatory if it fails to reactivate properly. This capability will be a major addition to the Space Transportation System and will increase the utility of the Space Station.

Jennings, Jerry L.↗

KSC off-runway contingency operation - Mode 7

The possibility of a mishap during a space shuttle landing at Kennedy Space Center (KSC) dictates the need for plans to rescue astronauts from areas other than the Shuttle Landing Facility (SLF). All shuttle landings are unpowered, gliding flight maneuvers, and a deviation from the planned flight profile could result in a shuttle landing or crashing somewhere other than the SLF runway. The geography of the Kennedy Space Center makes helicopter airlifting the only universal means of transportation for the rescue crew. This rescue crew is composed of KSC contractor fire-rescuemen who would ride to the crash scene on USAF HH-3 helicopters. These crews are provided with personal protective suits and training in shallow water, swamp, and dry land rescues. They aid the egress of the crew to a safe area for helicopter pickup and subsequent triage and medevac.

Maples, Arthur↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I -- National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Thanks to advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India's RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU's anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD $920 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment - from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India's 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Global Rescue Response to a Multivehicle Deorbit from the International Space Station

The U.S. Department of Defense (DoD) has been tasked to support rescue efforts in the event of an off-nominal landing of a Commercial Crew Program vehicle transporting NASA crewmembers to or from the International Space Station. The DoD is further tasked to support returning U.S. and International Partner crewmembers on Russian Soyuz spacecraft missions, specifically to ensure aeromedical evacuation capability in the event of a crewmember injury at the time of launch or landing. This DoD mission is primarily considered during planned launch and landing operations, with forces placed in an alert posture to support if needed. However, overall mission concept of operations encompasses a no-notice rescue capability in the event of an on-orbit emergency. Such contingency scenarios are pre-coordinated and simulated to ensure a ready posture of associated DoD assets and to promote coordination of government, commercial, and military stakeholders. To date, planning and simulations have focused on execution of a single rescue mission; the possibility of a multi-vehicle evacuation and rescue scenario has not been adequately explored. This presentation will examine the process of responding to an emergency onboard the International Space Station that results in the early departure and deorbit of multiple docked vehicles to preserve the health and safety of the crew. We will highlight the complexity of this recovery scenario and discuss potential complications that could arise, as well as identify areas in which deliberate planning and simulation can better ensure successful preparation for such a multifaceted recovery operation.

Travis Levon Houser↗

NTESS Retirement Income Plan Summary Plan Description

National Technology & Engineering Solutions of Sandia LLC (NTESS) is pleased to sponsor for your benefit the NTESS Retirement Income Plan (RIP or Pension Plan), formerly known as the Sandia Corporation Retirement Income Plan, which is designed to provide a source of continuing income during retirement for covered employees. This Summary Plan Description (SPD) explains how to determine if you will be eligible for a benefit from the Pension Plan when you retire or terminate your employment. Under certain circumstances, reduced pension benefits can be continued to your Spouse or a contingent annuitant, following your death. This SPD includes the provisions of the RIP as of January 1, 2020. The pension benefits described in this SPD apply to Eligible Employees (as defined in Questions 1 and 2) who experience a Termination of Employment (as defined in Appendix A) with NTESS or another Affiliated Company (as defined in Appendix A) on or after this date. More detailed information is contained in the NTESS Retirement Income Plan document, which governs the operation of this Pension Plan. In the event there is or appears to be any discrepancy between the terms of the RIP document and this SPD, the terms of the RIP document control.

99 GENERAL AND MISCELLANEOUS↗

Develop Safety Plan for Installation and Operation of the Observation Wells (SECARB Phase III Task 3.1.3a [Early] Project at Cranfield)

Sandia Technologies developed and deployed a worker health and safety plan for the CFU31_F2 and CFU 31F3 observation wells, covering the SECARB activities following drilling the wells to total depth. The purpose of this health and safety plan (HASP) is to assign responsibilities, establish personnel protection standards, specify safe operating procedures, and provide for contingencies that may arise during the Cranfield Phase III Monitor Well installation. This HASP has been developed in accordance with Sandia Technologies, LLC (Sandia) safety and health standard operating procedures. Specific programs and procedures, as required by site activities, are identified herein.

01 COAL, LIGNITE, AND PEAT↗

STS-71, Space Shuttle Mission Report

The STS-71 Space Shuttle Program Mission Report summarizes the Payload activities and provides detailed data on the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Reusable Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance. STS-71 is the 100th United States manned space flight, the sixty-ninth Space Shuttle flight, the forty-fourth flight since the return-to-flight, the fourteenth flight of the OV-104 Orbiter vehicle Atlantis, and the first joint United States (U.S.)-Russian docking mission since 1975. In addition to the OV-104 Orbiter vehicle, the flight vehicle consisted of an ET that was designated ET-70; three SSMEs that were designated 2028, 2034, and 2032 in positions 1, 2, and 3, respectively; and two SRBs that were designated Bl-072. The RSRMs that were an integral part of the SRBs were designated 360L045A for the left SRB and 360W045B for the right SRB. The STS-71 mission was planned as a 1 0-day plus 1-day-extension mission plus 2 additional days for contingency operations and weather avoidance. The primary objectives of this flight were to rendezvous and dock with the Mir Space Station and perform on-orbit joint U.S.-Russian life sciences investigations, logistical resupply of the Mir Space Station, return of the United States astronaut flying on the Mir, the replacement of the Mir-18 crew with the two-cosmonaut Mir-19 crew, and the return of the Mir-18 crew to Earth. The secondary objectives were to perform the requirements of the IMAX Camera and the Shuttle Amateur Radio experiment-2 (SAREX-2).

Frike, Robert W., Jr.↗

STS-114: Discovery L-3 Countdown Status Briefing

Bruce Buckingham of NASA Public Affair hosted this briefing. Jeff Spaulding, NASA Test Director; Scott Higgenbotham, STS-114 Payload-Mission Manager; Cathy Winters, Shuttle Weather Officer were present. Jeff specifically noted that the mission represents NASA's first step towards fulfilling the President's visions of returning to the Moon and then on to Mars and beyond. Scott reports that the 28,000 pounds of ISS hardware that is in the payload bay of the Discovery is ready to go, and completed final close outs. Cathy mentioned that Hurricane Dennis is not a threat, however, main threat of inland thunderstorms would result to 30% weather prohibiting launch. Cathy further gave current weather forecast supported with charts: the Launch Forecast, Tanking Forecast, SRB (Shuttle Solid Rocket Booster) Forecast, CONUS and TAL Launch Sites Forecast and with 24 hours and 48 hours turn around plan. Final inspections, ice formation, ice inspection, effect of weather conditions to the external tank, delays and contingencies were some of the topics covered with the News Media.

Source record↗

Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

Source record↗

ATC contingency operations in the en-route flight regime

Air traffic control (ATC) operations were examined to learn what factors of controller performance should be given consideration in the design and development of future automation systems enhancing ATC. Contingencies were of two types: those constraining airspace usage or traffic flow (i.e., weather); and those related to system and equipment usage (i.e., radar/radio status). Examination of controller response to contingencies and workload pressures showed differing effects on controller allocations of effort among the three primary function of planning, monitoring, and informaton transfer. Automation advancements oriented towards aiding the controller in performing monitoring tasks may offer the most substantial safety benefit.

Lyman, E. G.↗

Re-scheduling as a tool for the power management on board a spacecraft

The scheduling of events on board a spacecraft is based on forecast energy levels. The real time values of energy may not coincide with the forecast values; consequently, a dynamic revising to the allocation of power is needed. The re-scheduling is also needed for other reasons on board a spacecraft like the addition of new event which must be scheduled, or a failure of an event due to many different contingencies. This need of rescheduling is very important to the survivability of the spacecraft. In this presentation, a re-scheduling tool will be presented as a part of an overall scheme for the power management on board a spacecraft from the allocation of energy point of view. The overall scheme is based on the optimal use of energy available on board a spacecraft using expert systems combined with linear optimization techniques. The system will be able to schedule maximum number of events utilizing most energy available. The outcome is more events scheduled to share the operation cost of that spacecraft. The system will also be able to re-schedule in case of a contingency with minimal time and minimal disturbance of the original schedule. The end product is a fully integrated planning system capable of producing the right decisions in short time with less human error. The overall system will be presented with the re-scheduling algorithm discussed in detail, then the tests and results will be presented for validations.

Albasheer, Omar↗

Contingency Management Requirements Document: Preliminary Version. Revision F

This is the High Altitude, Long Endurance (HALE) Remotely Operated Aircraft (ROA) Contingency Management (CM) Functional Requirements document. This document applies to HALE ROA operating within the National Airspace System (NAS) limited at this time to enroute operations above 43,000 feet (defined as Step 1 of the Access 5 project, sponsored by the National Aeronautics and Space Administration). A contingency is an unforeseen event requiring a response. The unforeseen event may be an emergency, an incident, a deviation, or an observation. Contingency Management (CM) is the process of evaluating the event, deciding on the proper course of action (a plan), and successfully executing the plan.

Source record↗

The Challenge of Achieving Site Closure of a Complex Groundwater Plume - 20531

Over the last three decades, DOE has made substantial progress in nearly every area of nuclear waste cleanup and has closed and transitioned 91 of the 107 sites in the EM complex. Several of the remaining groundwater plumes at Hanford, Los Alamos, Paducah, Oak Ridge, and Savannah River are complex and tend to have unique site or contaminant characteristics which provide an almost impossible challenge to remediate to regulatory levels. As a result, these complex sites will require a large investment to remediate. In order for DOE to achieve regulatory closure, a technically sound case must be developed and presented to regulators and stakeholders that clearly demonstrates that remedial goals have been or will be irreversibly achieved or that there is an alternate acceptable end-state. Five lines of evidence are required: - A conceptual site model that is as complete as possible, with the knowledge that it may continue to evolve with time; - Demonstration that trends in contaminant concentrations, or flux, versus time indicate that remedial goals will be achieved on schedule or within a reasonable time thereafter and that trends that deviate from this path are explainable by the conceptual model; - Demonstration that remobilization of attenuated contaminants is unlikely to occur in the future; - Explicit consideration of remedial contingencies, should deviations in the path toward remedial goals occur; - Development of an effective long-term monitoring plan to detect any conditions that might alter the path toward remedial goals. SRS has made significant progress in the remediation of contamination associated with the F-area and H-Area Seepage Basins, and it is currently developing a strategic closure path that addresses each of these lines of evidence and identifies both basic and applied scientific issues that will need to be addressed in order to obtain regulatory closure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contingency Analysis Post-Processing With Advanced Computing and Visualization

Contingency analysis is a critical function widely used in energy management systems to assess the impact of power system component failures. Its outputs are important for power system operation for improved situational awareness, power system planning studies, and power market operations. With the increased complexity of power system modeling and simulation caused by increased energy production and demand, the penetration of renewable energy and fast deployment of smart grid devices, and the trend of operating grids closer to their capacity for better efficiency, more and more contingencies must be executed and analyzed quickly in order to ensure grid reliability and accuracy for the power market. Currently, many researchers have proposed different techniques to accelerate the computational speed of contingency analysis, but not much work has been published on how to post-process the large amount of contingency outputs quickly. This paper proposes a parallel post-processing function that can analyze contingency analysis outputs faster and display them in a web-based visualization tool to help power engineers improve their work efficiency by fast information digestion. Case studies using an ESCA-60 bus system and a WECC planning system are presented to demonstrate the functionality of the parallel post-processing technique and the web-based visualization tool.

Chen, Yousu↗