Search NASA⌕ Search

SEARCH · Search NASA

Results for “DESIGN PHASE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Europa Clipper Mission: Onward to Implementation!

Europa, the fourth largest moon of Jupiter, is believed to be one of the best places in the solar system to look for extant life beyond Earth, and the Europa Clipper Mission is preparing to investigate. Now entering the fifth year of life as a formal project, the Europa Clipper Mission has completed its major design phase and is preparing for implementation. The mission envisions sending a flight system, consisting of a spacecraft equipped with a payload of NASA-selected scientific instruments, to execute numerous flybys of Europa while in Jupiter orbit. The mission is being formulated and implemented by a joint Jet Propulsion Laboratory (JPL) and Applied Physics Laboratory (APL) Project team. At the Project Preliminary Design Review (PDR) in August 2018, it was determined that the unique integration of the REASON instrument’s antennas with the spacecraft’s solar arrays required additional time for maturity and review. The required maturity was demonstrated, and in June 2019 the Clipper Mission passed its Delta Preliminary Design Review, and formal confirmation for entry into Phase C was announced by NASA in August 2019. The earliest launch opportunity is now in July 2023, one year later than originally planned. The Project is now working toward its Critical Design Review in May 2020. This paper will describe the progress of the Europa Clipper Mission since January 2019, including maturation of the spacecraft, subsystem and instrument designs, the beginning of fabrication of engineering models and the first flight models, planning for the verification & validation phase, and planning for operations.

Jackson, Maddalena↗

Dynamic phasing of multichannel cw laser radiation by means of a stochastic gradient algorithm

The phasing of a multichannel laser beam by means of an iterative stochastic parallel gradient (SPG) algorithm has been numerically and experimentally investigated. The operation of the SPG algorithm is simulated, the acceptable range of amplitudes of probe phase shifts is found, and the algorithm parameters at which the desired Strehl number can be obtained with a minimum number of iterations are determined. An experimental bench with phase modulators based on lithium niobate, which are controlled by a multichannel electronic unit with a real-time microcontroller, has been designed. Phasing of 16 cw laser beams at a system response bandwidth of 3.7 kHz and phase thermal distortions in a frequency band of about 10 Hz is experimentally demonstrated. The experimental data are in complete agreement with the calculation results. (control of laser radiation parameters)

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

A Recommended Procedure for Estimating the Cosmic Ray Spectral Parameter of a Simple Power Law

A simple power law model consisting of a single spectral index a(f(sub i)) is believed to be an adequate description of the galactic cosmic ray (GQ proton flux at energies below 1013 eV. Two procedures for estimating a(f(sub i)), referred as (1) the method of moments, and (2) maximum likelihood, are developed and their statistical performance compared. I concluded that the maximum likelihood procedure attains the most desirable statistical properties and is hence the recommended statistic estimation procedure for estimating a1. The maximum likelihood procedure is then generalized for application to a set of real cosmic ray data and thereby makes this approach applicable to existing cosmic ray data sets. Several other important results, such as the relationship between collecting power and detector energy resolution, as well as inclusion of a non-Gaussian detector response function, are presented. These results have many practical benefits in the design phase of a cosmic ray detector because they permit instrument developers to make important trade studies in design parameters as a function of one of the science objectives, which is particularly important for space-based detectors where physical parameters, such as dimension and weight, impose practical limits to the design envelope.

Howell, Leonard W.↗

Error Cost Escalation Through the Project Life Cycle

It is well known that the costs to fix errors increase as the project matures, but how fast do those costs build? A study was performed to determine the relative cost of fixing errors discovered during various phases of a project life cycle. This study used three approaches to determine the relative costs: the bottom-up cost method, the total cost breakdown method, and the top-down hypothetical project method. The approaches and results described in this paper presume development of a hardware/software system having project characteristics similar to those used in the development of a large, complex spacecraft, a military aircraft, or a small communications satellite. The results show the degree to which costs escalate, as errors are discovered and fixed at later and later phases in the project life cycle. If the cost of fixing a requirements error discovered during the requirements phase is defined to be 1 unit, the cost to fix that error if found during the design phase increases to 3 - 8 units; at the manufacturing/build phase, the cost to fix the error is 7 - 16 units; at the integration and test phase, the cost to fix the error becomes 21 - 78 units; and at the operations phase, the cost to fix the requirements error ranged from 29 units to more than 1500 units

Stecklein, Jonette M.↗

Sample Return Container Opening Process Concept for Potential Mars Sample Return

Proposed Mars Sample Return (MSR) missions would require a pristine and secure opening method to ensure sample Contamination Control and backward Planetary Protection. In order to reach the samples, a series of five containers would need to be opened inside of a Mars Returned Sample Handling (MRSH) facility. The process would include opening the Containment Assurance Module (CAM) aboard the Earth Entry Vehicle (EEV), the Secondary Containment Vessel (SCV), Primary Containment Vessel (PCV), and the Orbiting Sample (OS) container, and finally removing and opening the Returned Sample Tube Assemblies (RSTA). Some of these containers can be opened by reversing the mechanical assembly process while others would require destructive means. Several containers are still in a conceptual design phase while others are en route to Mars aboard the M2020 rover. In order to inform the design of the containers that are still in the conceptual stages, a study was performed at each level of the containment assembly. The studies were used to determine the least destructive and most robust methods to disassemble and open the containers while minimizing risk to the samples or the personnel. In addition to the envisioned disassembly and breaching method, contingency plans were made for completing the disassembly if damage to the vehicle and containment system occurred.

Liu, Yang↗

Design procedure for satisfying time domain bounds for nonminimum-phase systems

Design techniques are presented applicable to nonminimum-phase systems. They are designed to handle plants with one right-half-plane zero which may vary, and any other variation of the plant parameters within known limits. The specifications that must be designed are given as a set of step response bounds in the time domain. A completed design will yield responses that stay within the time domain bounds at all times and utilize the entire region of allowed variation.

Ostheimer, W. D.↗

The Kilopower Space Nuclear Fission Power Reactor

Nuclear fission power offers an attractive alternative to solar electric or radioisotope power systems for certain applications on the Moon, Mars, and deep space science missions. The advantages of independence from solar irradiance, high energy density, and abundance of fuel allow fission power systems to enable novel, high power mission architectures. While NASA has had numerous fission power programs throughout its history, few have gone far beyond the design phase. The recent test campaign called the Kilopower Reactor Using Stirling Technology project (KRUSTY) focused on a low power, kilowatt-scale design for simplicity and reduced cost, with the driving motivation to perform a full nuclear hardware prototype test. Following the successful completion of the KRUSTY nuclear hardware test in March of 2018, NASA has begun the formulation process for a Technology Demonstration Mission (TDM) using the Kilopower reactor technology. In support of NASA's lunar surface initiatives, the Kilopower TDM will target a 1-3 kW fission electric power system that can survive the lunar night and operate for one year. The system will be heavily influenced by the KRUSTY reactor design, using a solid Uranium metal core with high temperature heat pipes and Stirling engine power conversion. During this formulation phase, continued engineering efforts are ongoing to improve heat transfer efficiency in the system, examine fission radiation damage effects, and begin to address the thermal and structural requirements of a Kilopower flight system.

Chaiken, Max↗

Digital Engineering and Cybersecurity Decision Analysis in Early Phases of SMR-Driven IES Projects

Considerable efforts are underway to ensure cybersecurity is integrated into the systems engineering lifecycle. Cyber-informed engineering and security-by-design frameworks are intended to identify and engineer out cybersecurity risks throughout the lifecycle. While these approaches are valuable for promoting the need to include cybersecurity considerations in early design phases to create more secure systems, they may not consider the entirety of digital risks. Digital risks in a digital instrumentation and control system include adversarial and unintentional risks from internal and external factors, such as human performance errors, design flaws, environmental conditions, and equipment degradation or failure. This report provides a detailed discussion on digital risk prior to describing the background and concept of operations for a small modular reactor-driven integrated energy system connected to industrial applications. The challenges of competing objectives and competing stakeholder requirements are discussed and the impacts on digital engineering, security considerations, and interdependencies are evaluated for mission-level, facility-level, and system-level decisions.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Cost estimating methods for advanced space systems

Parametric cost estimating methods for space systems in the conceptual design phase are developed. The approach is to identify variables that drive cost such as weight, quantity, development culture, design inheritance, and time. The relationship between weight and cost is examined in detail. A theoretical model of cost is developed and tested statistically against a historical data base of major research and development programs. It is concluded that the technique presented is sound, but that it must be refined in order to produce acceptable cost estimates.

Cyr, Kelley↗

The unique challenge of managing an undergraduate Get-Away-Special experiment

A group of Bringham Young University (BYU) undergraduate students has undertaken an experiment to design and build a normal incidence soft x ray robotics telescope for solar observations. The design phase of this, GOLDHELOX project, has now been completed and final construction and modifications are in progress. The design and manufacture of the payload is under the direction of team leaders and a system's integrator. A goal of this project is educating and furnishing experiences in space engineering and physics for undergraduate students. Our main source of funding is NASA and the BYU Colleges of Physical and Mathematical Sciences and Engineering and Technology. This project is possible because of the NASA Get-Away Special (GAS) program. The only feasible alternative is using an expensive sounding rocket. We estimate the sun tracking and guidance package alone would cost upwards of a million dollars -- at least ten times our entire budget. Because of the GAS program, we simplified the construction, operation, and programming of the instruments with resulting savings in weight, cost, and time spent.

Roming, Peter W. A.↗

MIT Space Engineering Research Center

The Space Engineering Research Center (SERC) at MIT, started in Jul. 1988, has completed two years of research. The Center is approaching the operational phase of its first testbed, is midway through the construction of a second testbed, and is in the design phase of a third. We presently have seven participating faculty, four participating staff members, ten graduate students, and numerous undergraduates. This report reviews the testbed programs, individual graduate research, other SERC activities not funded by the Center, interaction with non-MIT organizations, and SERC milestones. Published papers made possible by SERC funding are included at the end of the report.

Crawley, Edward F.↗

Landing Gear Integration in Aircraft Conceptual Design

The design of the landing gear is one of the more fundamental aspects of aircraft design. The design and integration process encompasses numerous engineering disciplines, e.g., structure, weights, runway design, and economics, and has become extremely sophisticated in the last few decades. Although the design process is well-documented, no attempt has been made until now in the development of a design methodology that can be used within an automated environment. As a result, the process remains to be a key responsibility for the configuration designer and is largely experience-based and graphically-oriented. However, as industry and government try to incorporate multidisciplinary design optimization (MDO) methods in the conceptual design phase, the need for a more systematic procedure has become apparent. The development of an MDO-capable design methodology as described in this work is focused on providing the conceptual designer with tools to help automate the disciplinary analyses, i.e., geometry, kinematics, flotation, and weight. Documented design procedures and analyses were examined to determine their applicability, and to ensure compliance with current practices and regulations. Using the latest information as obtained from industry during initial industry survey, the analyses were in terms modified and expanded to accommodate the design criteria associated with the advanced large subsonic transports. Algorithms were then developed based on the updated analysis procedures to be incorporated into existing MDO codes.

Chai, Sonny T.↗

A Recommended Procedure for Estimating the Cosmic-Ray Spectral Parameter of a Simple Power Law With Applications to Detector Design

A simple power law model consisting of a single spectral index alpha-1 is believed to be an adequate description of the galactic cosmic-ray (GCR) proton flux at energies below 10(exp 13) eV. Two procedures for estimating alpha-1 the method of moments and maximum likelihood (ML), are developed and their statistical performance compared. It is concluded that the ML procedure attains the most desirable statistical properties and is hence the recommended statistical estimation procedure for estimating alpha-1. The ML procedure is then generalized for application to a set of real cosmic-ray data and thereby makes this approach applicable to existing cosmic-ray data sets. Several other important results, such as the relationship between collecting power and detector energy resolution, as well as inclusion of a non-Gaussian detector response function, are presented. These results have many practical benefits in the design phase of a cosmic-ray detector as they permit instrument developers to make important trade studies in design parameters as a function of one of the science objectives. This is particularly important for space-based detectors where physical parameters, such as dimension and weight, impose rigorous practical limits to the design envelope.

Howell, L. W.↗

Data Used in Quantified Reliability Models

Data is the crux to developing quantitative risk and reliability models, without the data there is no quantification. The means to find and identify reliability data or failure numbers to quantify fault tree models during conceptual and design phases is often the quagmire that precludes early decision makers consideration of potential risk drivers that will influence design. The analyst tasked with addressing a system or product reliability depends on the availability of data. But, where is does that data come from and what does it really apply to? Commercial industries, government agencies, and other international sources might have available data similar to what you are looking for. In general, internal and external technical reports and data based on similar and dissimilar equipment is often the first and only place checked. A common philosophy is "I have a number - that is good enough". But, is it? Have you ever considered the difference in reported data from various federal datasets and technical reports when compared to similar sources from national and/or international datasets? Just how well does your data compare? Understanding how the reported data was derived, and interpreting the information and details associated with the data is as important as the data itself.

DeMott, Diana↗

Development of a Model Following Control Law for Inflight Simulation and Flight Controls Research

The U.S. Army and NASA are currently developing the Rotorcraft Aircrew Systems Concepts Airborne Laboratory (RASCAL) at the Ames Research Center. RASCAL, shown in Figure 1, is a UH-60, which is being modified in a phased development program to have a research fly-by-wire flight control system, and an advanced navigation research platform. An important part of the flight controls and handling qualities research on RASCAL will be an FCS design for the aircraft to achieve high bandwidth control responses and disturbance rejection characteristics. Initially, body states will be used as feedbacks, but research into the use of rotor states will also be considered in later stages to maximize agility and maneuverability. In addition to supporting flight controls research, this FCS design will serve as the inflight simulation control law to support basic handling qualities, guidance, and displays research. Research in high bandwidth controls laws is motivated by the desire to improve the handling qualities in aggressive maneuvering and in severely degraded weather conditions. Naturally, these advantages will also improve the quality of the model following, thereby improving the inflight simulation capabilities of the research vehicle. High bandwidth in the control laws provides tighter tracking allowing for higher response bandwidths which can meet handling qualities requirements for aggressive maneuvering. System sensitivity is also reduced preventing variations in the response from the vehicle due to changing flight conditions. In addition, improved gust rejection will result from this reduced sensitivity. The gust rejection coupled with a highly stable system will make more precise maneuvering and pointing possible in severely degraded weather conditions. The difficulty in achieving higher bandwidths from the control laws in the feedback and in the responses arises from the complexity of the models that are needed to produce a satisfactory design. In this case, high quality models that include rotor dynamics in a physically meaningful context must be available. A non-physical accounting of the rotor, such as lumping the effect as a time delay, is not likely to produce the desired results. High order simulation models based on first principals are satisfactory for the initial design phase in order to work out the control law design concept and get an initial set of gains. These models, however, have known deficiencies, which must be resolved in the final control law design. The error in the pitch-roll cross coupling is one notable deficiency that even sophisticated rotorcraft models including complex wake aerodynamics have yet to capture successfully. This error must be accounted for to achieve the desired decoupling. The approach to design the proposed inflight simulation control law is based on using a combination of simulation and identified models. The linear and nonlinear higher order models were used to develop an explicit model following control structure. This structure was developed to accommodate the design of control laws compliant to many of the quantitative requirements in ADS-33C. Furthermore, it also allows for control law research using rotor-state feedback and other design methodologies such as Quantitative Feedback and H-Infinity. Final gain selection will be based on higher order identified models which include rotor degrees of freedom.

Takahashi, Mark↗

High and low energy gamma beam dump designs for the gamma beam delivery system at ELI-NP

The Extreme Light Infrastructure - Nuclear Physics (ELI-NP) is under construction in Magurele, Bucharest, Romania. The facility will use two 10 PW lasers and a high intensity, narrow bandwidth gamma beam for stand-alone and combined laser-gamma experiments. The accurate estimation of particle doses and their restriction within the limits for both personel and general public is very important in the design phase of any nuclear facility. In the present work, Monte Carlo simulations are performed using FLUKA and MCNPX to design 19.4 and 4 MeV gamma beam dumps along with shielding of experimental areas. Dose rate contour plots from both FLUKA and MCNPX along with numerical values of doses in experimental area E8 of the facility are performed. The calculated doses are within the permissible limits. Furthermore, a reasonable agreement between both codes enhances our confidence in using one or both of them for future calculations in beam dump designs, radiation shielding, radioactive inventory, and other calculations releated to radiation protection. Residual dose rates and residual activity calculations are also performed for high-energy beam dump and their effect is negligible in comparison to contributions from prompt radiation.

43 PARTICLE ACCELERATORS↗

A disturbance based control/structure design algorithm

Some authors take a classical approach to the simultaneous structure/control optimization by attempting to simultaneously minimize the weighted sum of the total mass and a quadratic form, subject to all of the structural and control constraints. Here, the optimization will be based on the dynamic response of a structure to an external unknown stochastic disturbance environment. Such a response to excitation approach is common to both the structural and control design phases, and hence represents a more natural control/structure optimization strategy than relying on artificial and vague control penalties. The design objective is to find the structure and controller of minimum mass such that all the prescribed constraints are satisfied. Two alternative solution algorithms are presented which have been applied to this problem. Each algorithm handles the optimization strategy and the imposition of the nonlinear constraints in a different manner. Two controller methodologies, and their effect on the solution algorithm, will be considered. These are full state feedback and direct output feedback, although the problem formulation is not restricted solely to these forms of controller. In fact, although full state feedback is a popular choice among researchers in this field (for reasons that will become apparent), its practical application is severely limited. The controller/structure interaction is inserted by the imposition of appropriate closed-loop constraints, such as closed-loop output response and control effort constraints. Numerical results will be obtained for a representative flexible structure model to illustrate the effectiveness of the solution algorithms.

Mclaren, Mark D.↗

A Multi-Encoding Approach for LTL Symbolic Satisfiability Checking

Formal behavioral specifications written early in the system-design process and communicated across all design phases have been shown to increase the efficiency, consistency, and quality of the system under development. To prevent introducing design or verification errors, it is crucial to test specifications for satisfiability. Our focus here is on specifications expressed in linear temporal logic (LTL). We introduce a novel encoding of symbolic transition-based Buchi automata and a novel, "sloppy," transition encoding, both of which result in improved scalability. We also define novel BDD variable orders based on tree decomposition of formula parse trees. We describe and extensively test a new multi-encoding approach utilizing these novel encoding techniques to create 30 encoding variations. We show that our novel encodings translate to significant, sometimes exponential, improvement over the current standard encoding for symbolic LTL satisfiability checking.

Rozier, Kristin Y.↗