Search NASA⌕ Search

SEARCH · Search NASA

Results for “DIRECTIONAL DRILLING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Geothermal Deep Direct Use for Turbine Inlet Cooling in East Texas

The National Renewable Energy Laboratory (NREL), the Southern Methodist University Geothermal Laboratory (SMU), Eastman Chemical (Longview, TX), and TAS (Houston, TX) evaluated the feasibility of using geothermal heat to improve the performance of a natural-gas power plant in East Texas. The area of interest is the Eastman Chemical plant in Longview, Texas, which is on the northwestern margin of a geologic region known as the Sabine Uplift. The feasibility study focused on determining the potential for accessing a subsurface hot-water geothermal resource within a 10-km radius of the site to provide thermal energy for absorption chillers. Wells within a 20-km radius are included for broader geological comparison to determine the heat flow, temperature-at-depth, field porosity and permeability. The lithologies of most interest are the Lower Cretaceous Trinity Group and Upper Jurassic Cotton Valley Group. The deeper Cotton Valley formations are hotter (averaging 117 to 130°C), yet permeability and porosity are low. The shallower Trinity Group contains more variability in permeability and porosity and lower temperatures averaging about 98 to 117°C. The shallower formations are considered despite the lower temperature because of increased ability to produce larger volumes of water and extract enough heat before reinjection. The complete SMU analysis is available in the National Geothermal Data System (NGDS). Tapping such deep geothermal sources for direct heating (as opposed to power generation) is known as geothermal deep direct use (DDU). Geothermal DDU has potential across a wide swath of the United States but is underutilized due to challenging project economics associated with developing a deep geothermal resource for what are typically small-scale, variable-demand projects. This project examines the feasibility of geothermal energy integration in a natural-gas combined cycle power station in East Texas. The DDU resource is tapped to drive absorption chillers (24/7) for production of chilled water at 5-10°C (41-50°F). This chilled water is stored until needed, which allows for continuous operation with a relatively small-capacity geothermal/absorption chiller system. When conditions are favorable, the chilled water is dispatched to cool the air entering the compressor stage of a gas combustion turbine. This process, known as turbine inlet cooling (TIC), boosts power production during periods of high temperature and high-power demand. Such systems can enhance grid reliability and reduce the cost for peak-demand power. A simulation model of the power plant was developed in IPSEpro software and validated against operational data from the plant. This model allowed the team to estimate the additional power that could be produced by applying TIC under different operating and ambient conditions. Absorption chiller performance was estimated from vendor sources to determine the production rate of chilled water from the geothermal resource. Geothermal drilling and development costs were estimated using NREL's GEOPHIRES 2.0. The expected lower drilling costs in this region led to an estimated cost of geothermal heat of about $4/MMBtu (1.4 cents/kWh t ). The estimated cost for the absorption chillers and TIC hardware were obtained from literature sources and project partners. Hourly data were obtained for weather, natural gas and electricity prices, and plant operating state for 2017, which served as a representative year. NREL estimated the capital cost, operating cost, and additional electricity production and revenue for different combinations of geothermal capacity, chiller capacity, and water storage-tank size. The analysis drove toward smaller geothermal and chiller systems to reduce equipment cost. A relatively low-cost water storage tank accumulated the near-continuous chilled water output for later use when TIC was most valued.

15 GEOTHERMAL ENERGY↗

The Atomic Drill Bit: Precision Controlled Atomic Fabrication of 2D Materials

The ability to deterministically fabricate nanoscale architectures with atomic precision is the central goal of nanotechnology, whereby highly localized changes in the atomic structure can be exploited to control device properties at their fundamental physical limit. Here, an automated, feedback-controlled atomic fabrication method is reported and the formation of 1D–2D heterostructures in MoS 2 is demonstrated through selective transformations along specific crystallographic orientations. The atomic-scale probe of an aberration-corrected scanning transmission electron microscope (STEM) is used, and the shape and symmetry of the scan pathway relative to the sample orientation are controlled. The focused and shaped electron beam is used to reliably create Mo 6 S 6 nanowire (MoS-NW) terminated metallic-semiconductor 1D–2D edge structures within a pristine MoS 2 monolayer with atomic precision. From these results, it is found that a triangular beam path aligned along the zig-zag sulfur terminated (ZZS) direction forms stable MoS-NW edge structures with the highest degree of fidelity without resulting in disordering of the surrounding MoS 2 monolayer. Density functional theory (DFT) calculations and ab initio molecular dynamic simulations (AIMD) are used to calculate the energetic barriers for the most stable atomic edge structures and atomic transformation pathways. These discoveries provide an automated method to improve understanding of atomic-scale transformations while opening a pathway toward more precise atomic-scale engineering of materials.

2D materials↗

Rulison Monitoring Plan

The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile radionuclides created by the test are unlikely to migrate appreciable distances (hundreds of feet) from the detonation zone (Cooper et al. 2007, 2009). The Monitoring Plan was developed to provide a cautious and comprehensive approach for detecting any potential contaminant migration from the Rulison test site. It also provides an independent confirmation of results from the industry sampling and analysis plan while effectively increasing the sampling frequency of wells near the site.

54 ENVIRONMENTAL SCIENCES↗

Validation Analysis of the Shoal Groundwater Flow and Transport Model

Environmental restoration at the Shoal underground nuclear test is following a process prescribed by a Federal Facility Agreement and Consent Order (FFACO) between the U.S. Department of Energy, the U.S. Department of Defense, and the State of Nevada. Characterization of the site included two stages of well drilling and testing in 1996 and 1999, and development and revision of numerical models of groundwater flow and radionuclide transport. Agreement on a contaminant boundary for the site and a corrective action plan was reached in 2006. Later that same year, three wells were installed for the purposes of model validation and site monitoring. The FFACO prescribes a five-year proof-of-concept period for demonstrating that the site groundwater model is capable of producing meaningful results with an acceptable level of uncertainty. The corrective action plan specifies a rigorous seven step validation process. The accepted groundwater model is evaluated using that process in light of the newly acquired data. The conceptual model of ground water flow for the Project Shoal Area considers groundwater flow through the fractured granite aquifer comprising the Sand Springs Range. Water enters the system by the infiltration of precipitation directly on the surface of the mountain range. Groundwater leaves the granite aquifer by flowing into alluvial deposits in the adjacent basins of Fourmile Flat and Fairview Valley. A groundwater divide is interpreted as coinciding with the western portion of the Sand Springs Range, west of the underground nuclear test, preventing flow from the test into Fourmile Flat. A very low conductivity shear zone east of the nuclear test roughly parallels the divide. The presence of these lateral boundaries, coupled with a regional discharge area to the northeast, is interpreted in the model as causing groundwater from the site to flow in a northeastward direction into Fairview Valley. Steady-state flow conditions are assumed given the absence of groundwater withdrawal activities in the area. The conceptual and numerical models were developed based upon regional hydrogeologic investigations conducted in the 1960s, site characterization investigations (including ten wells and various geophysical and geologic studies) at Shoal itself prior to and immediately after the test, and two site characterization campaigns in the 1990s for environmental restoration purposes (including eight wells and a year-long tracer test). The new wells are denoted MV-1, MV-2, and MV-3, and are located to the northnortheast of the nuclear test. The groundwater model was generally lacking data in the north-northeastern area; only HC-1 and the abandoned PM-2 wells existed in this area. The wells provide data on fracture orientation and frequency, water levels, hydraulic conductivity, and water chemistry for comparison with the groundwater model. A total of 12 real-number validation targets were available for the validation analysis, including five values of hydraulic head, three hydraulic conductivity measurements, three hydraulic gradient values, and one angle value for the lateral gradient in radians. In addition, the fracture dip and orientation data provide comparisons to the distributions used in the model and radiochemistry is available for comparison to model output. Goodness-of-fit analysis indicates that some of the model realizations correspond well with the newly acquired conductivity, head, and gradient data, while others do not. Other tests indicated that additional model realizations may be needed to test if the model input distributions need refinement to improve model performance. This approach (generating additional realizations) was not followed because it was realized that there was a temporal component to the data disconnect: the new head measurements are on the high side of the model distributions, but the heads at the original calibration locations themselves have also increased over time. This indicates that the steady-state assumption of the groundwater model is in error. To test the robustness of the model despite the transient nature of the heads, the newly acquired MV hydraulic head values were trended back to their likely values in 1999, the date of the calibration measurements. Additional statistical tests are performed using both the backward-projected MV heads and the observed heads to identify acceptable model realizations. A jackknife approach identified two possible threshold values to consider. For the analysis using the backward-trended heads, either 458 or 818 realizations (out of 1,000) are found acceptable, depending on the threshold chosen. The analysis using the observed heads found either 284 or 709 realizations acceptable. The impact of the refined set of realizations on the contaminant boundary was explored using an assumed starting mass of a single radionuclide and the acceptable realizations from the backward-trended analysis.

54 ENVIRONMENTAL SCIENCES↗

Life in Ice: Implications to Astrobiology

During the 2008 Tawani International Expedition Schirmacher Oasis/Lake Untersee Antarctica Expedition, living and instantly motile bacteria were found in freshly thawed meltwater from ice of the Schirmacher Oasis Lakes, the Anuchin Glacier ice and samples of the that perennial ice sheet above Lake Untersee. This phenomenon of living bacteria encased in ice had previously been observed in the 32,000 year old ice of the Fox Tunnel. The bacteria found in this ice included the strain FTR1T which was isolated and published as valid new species (Carnobacterium pleistocenium) the first validly published living Pleistocene organism still alive today. Living bacteria were also extracted from ancient ice cores from Vostok, Antarctica. The discovery that many strains of bacteria are able to survive and remain alive while frozen in ice sheets for long periods of time may have direct relevance to Astrobiology. The abundance of viable bacteria in the ice sheets of Antarctica suggests that the presence of live bacteria in ice is common, rather than an isolated phenomenon. This paper will discuss the results of recent studies at NSSTC of bacteria cryopreserved in ice. This paper advances the hypothesis that cryopreserved cells, and perhaps even viable bacterial cells, may exist today--frozen in the water-ice of lunar craters, the Polar Caps or craters of Mars; or in the permafrost of Mars; ice and rocks of comets or water bearing asteroids; or in the frozen crusts of the icy moons of Jupiter and Saturn. The existence of bacterial life in ice suggests that it may not be necessary to drill through a thick ice crust to reach liquid water seas deep beneath the icy crusts of Europa, Ganymede and Enceladus. The presence of viable bacteria in the ice of the Earth s Polar Caps suggests that the possibility that cryo-panspermia (i.e., the trans-planetary transfer of microbial life by impact ejection/spallation of bacteria-rich polar ice masses) deserves serious consideration and study as a possible natural phenomenon of the solar system that may have played a profoundly important role in the Origin of Life on Earth and the Distribution of Life in the Cosmos. The paper concludes with a consideration of the protective properties of ice by absorption of UV-B, UV-C, h-rays, gamma-rays and the high energy proton environment of the Jupiter Radiation Belt. A proposed instrument that may provide additional data on the potential survivability of microbial extremophiles encased in ice and subjected to the simulated space environment will be briefly described.

Hoover, Richard B.↗

Fostering Geothermal Machine Learning Success: Elevating Big Data Accessibility and Automated Data Standardization in the Geothermal Data Repository

The Department of Energy's (DOE's) Geothermal Data Repository (GDR) has implemented improvements to both its data lakes and its data standards and automated data pipelines. The GDR data lakes have reduced storage and compute-related barriers to using large geothermal datasets, enabling these large datasets to be accessed by anyone with a modern computer and internet access. More recently, the GDR has been working to further reduce barriers through streamlining the data intake process, educating users on the process and requirements, and helping users access data from the data lakes. These improvements have augmented the quantity of datasets the GDR is able to accept into its data lakes and have enabled users who are new to cloud tools to access these datasets more easily, overall increasing the accessibility of big geothermal data for use in machine learning and other projects. In addition, the GDR now has built-in data standards and pipelines for drilling data, geospatial data, and distributed acoustic sensing (DAS) data. These standardization efforts aim to enhance the real-world applicability of geothermal machine learning outcomes by improving the quality of training data. Specifically, through standardizing high-value datasets, the GDR is reducing project-specific data curation requirements, thus allowing more time for actual research. By automating this process, the burden of standardization is lifted from the user, ultimately increasing the availability of standardized data. This paper provides an update on recent improvements made to the GDR's data lakes and automated data pipelines, including: (1) streamlining the data lake intake process, (2) better educating users on the process and requirements through a new data lakes page, (3) adding data lake direct access links to GDR data lake submission pages, (4) implementing a DAS data pipeline to convert DAS data uploaded in SEG-Y format to a standardized hierarchical data format v5 (HDF5), (5) extending this pipeline to encompass data in the GDR data lake, (6) adding metadata requirements for geospatial data, (7) making user interface/user experience (UX) enhancements to the data pipelines' documentation pages, and (8) improving the GDR's data standards and pipelines pages to better guide users in ensuring that their data is standardized by the GDR's automated data pipelines. 2024 Geothermal Resources Council. All rights reserved.

accessibility↗

In-Situ Detection of Process-Induced Porosity During Cure of Out-of-Autoclave Composites

Composite materials offer unique benefits in aerospace applications, including high strength-to-weight ratio, and are becoming increasingly used by industry manufacturers. Current manufacturing and processing methods can lead to defects in the composites, which are identified after fabrication using inspection methods. This study utilized a high-temperature ultrasonic inspection system to detect process-induced porosity in an out-of-autoclave (OOA) composite panel during cure. In order to perform ultrasonic scans in-situ during cure, the system needed to be able to operate at oven temperatures up to 200 °C. There are no commercially available ultrasonic scanning systems that can operate continuously at these temperatures, so an enclosure was fabricated to insulate the ultrasonic system in the curing oven. The enclosure housed a MISTRAS® motorized X-Y raster scanner and contact transducer (Olympus® X2002). The Olympus® X2002 contact transducer is a continuous high-temperature delay line transducer with a center frequency of 2.25 MHz. In order to prevent the inside of the enclosure from reaching high temperatures, a sparge pipe inside the cooling enclosure was connected to a liquid nitrogen (LN2) tank outside of the oven via insulated hoses. The cooling system was automatically controlled by a temperature controller that was programmed to open a solenoid valve along the hose at 31 ℃ and close at 28 ℃ inside the cooling enclosure. When the solenoid valve was open, LN2 would flow from the LN2 tank and vaporize prior to reaching cooling enclosure. A U-shaped sparge pipe had holes drilled along its length to uniformly introduce cold nitrogen gas into the cooling enclosure. This prevented the motors from ever reaching the maximum desired operating temperature of 38 ℃. In the bottom of the enclosure, the tool plate was placed with the composite facing the outside of the enclosure, exposing it to the temperatures of the oven. The tool plate was 63.5 mm thick borosilicate glass, which was chosen for its low ultrasonic attenuation and moderate thermal conductivity. A thin layer of ultrasonic couplant was placed on the tool plate. The transducer sent and received ultrasonic waves through the tool plate into the composite. A MISTRAS® Remote UT System performed all wave generation, analog to digital conversion, and data acquisition and processing. The transducer was connected directly to the Remote UT System via a high-temperature BNC cable (CD International, RG-316). Polyimide insulated copper wire was used to connect the scanner to a 2-axis motor drive, which was connected to the Remote UT System. The motor drive and Remote UT System were located outside the industrial oven. A diagram of the ultrasonic system is shown in Figure 1. Figure 1: Diagram of ultrasonic in-situ defect detection system. In this study, a porosity gradient was introduced into the carbon fiber reinforced polymer (CFRP) composite through a misfit of the part and caul plate. A 24-ply quasi-isotropic ([0/90, ±45]12S) composite panel was laid up using Newport® AS4C-M/NB321 out-of-autoclave (OOA) plain weave (PW) prepreg (42% resin content, 195 g/m2). The first 16 plies were 203 mm × 203 mm. Ply drops were incorporated into the panel by decreasing the length of plies 17-24. The sizes of each ply are included in Table 1. All plies were centered along their length (x-axis) creating a trapezoidal type cross-section. Table 1: Ply sizes Plies Length (mm) Width (mm) 1-16 203 203 17-18 102 203 19-20 85 203 21-22 68 203 23-24 51 203 A 15-5 stainless steel caul plate (Size: 203 × 203 × 1.2 mm) was placed on the laminate. The composite and caul plate were vacuum bagged to the tool plate. Per the product datasheet, Newport 321 can be cured between 121 °C and 149 °C, depending on service temperature, with a hold for 90-120 minutes. Based on prior thermal testing of the cooling enclosure, the desired composite temperature cycle could be attained when the air temperature of the oven was ramped to 160 °C at a rate of 1.7 °C/min with a 3 hour hold. The extended hold was not necessary to cure the composite, but did allow for additional scans at the cure temperature during preliminary testing. The composite panel was under vacuum pressure for the entire cure cycle. Under vacuum, the caul plate deformed causing high and low pressure regions. The low-pressure regions formed high porosity in the composite part. The ultrasonic data collected showed that the inspection system was able to monitor the evolution of porosity within the composite throughout the cure cycle. Fifty scans of a 203 mm × 51 mm (8 in. × 2 in.) area of the composite were completed throughout the cure cycle. The scan speed was set to 43 mm/s in the x-direction and 36 mm/s in the y-direction, with a 1.0 mm/pixel resolution in both directions. Each scan took approximately five minutes to complete. Figure 2 shows C-scan amplitude data (top view) from one scan during the cure cycle. The color map indicates the maximum amplitude (%) measured with a time gate that contains reflections from the back surface (furthest from the transducer in contact with the caul plate) of the composite. Because porosity in the composite increases the ultrasonic attenuation in the composite part, a higher amplitude (red) indicates low porosity and a lower amplitude (blue) indicates high porosity. The regions where the caul plate was applying increased pressure (center and ends of the panel) resulted in reduced porosity, whereas the ply drop regions had reduced pressure and thus had higher porosity. Figure 2: Amplitude C-scan (top view) of OOA composite from one scan during the 160 °C temperature hold. Higher amplitude (red) indicates low porosity. Lower amplitude (blue) indicates high porosity. A B-scan is a two-dimensional image plotting the ultrasonic signals from a single y-position at every x-location of the composite panel. The travel time (μs) of the ultrasonic wave (representing the through-thickness location) is plotted along the y-axis, and the ultrasonic wave signal is represented as a contour map. Based on the B-scan data, the location of the defects with respect to the composite thickness was able to be determined. The ply drop regions had high porosity near the front (tool plate) surface of the composite (Figure 3). Figure 3: B-scan (cross-section view) of OOA composite from one scan during the 160 °C temperature hold. Using the data obtained from amplitude C-scans and B-scans throughout the cure cycle, the high and low porosity regions within the composite laminate were detected and localized with high spatial resolution. This paper will discuss the evolution of porosity content in the OOA composite during cure. OOA tests aided the transition of this system to an autoclave, which is the primary method of curing aerospace-grade thermoset composites.

Tyler B. Hudson↗

Protracted oxygenation across the Cambrian–Ordovician transition: A key initiator of the Great Ordovician Biodiversification Event?

Fluctuations in marine oxygen concentrations have been invoked as a primary driver for changes in biodiversity throughout Earth history. Expansions in reducing marine conditions are commonly invoked as key causal mechanisms for mass extinctions, while increases in marine oxygenation are becoming an increasingly common causal mechanism invoked for biodiversification events. Here we utilize a multiproxy approach to constrain local and global marine paleoredox conditions throughout the late Cambrian–Early Ordovician from two drill core successions in Baltoscandia. Local paleoredox proxies such as manganese concentrations and iron speciation reveal that both sites in the Baltic paleobasin had persistently anoxic and predominantly euxinic (anoxic and sulfidic) bottom water conditions throughout the study interval. Corresponding trace metal datasets indicate nuanced contraction and expansion of global anoxic and euxinic conditions along continental margins during the late Cambrian–Early Ordovician. Lastly, thallium isotope data from these locally reducing sections suggest a global expansion of oxygenated shelf and deeper marine environments from the late Cambrian into the Early Ordovician. This evidence for increasingly oxic marine environments coincides with increases in burrowing depth and tiering in marine animals, as well as diversification of body fossils throughout this ~8-million-year interval. The collective geochemical datasets provide some of the first direct paleoredox evidence for an increase in marine oxygen concentrations as a key mechanism for the Ordovician radiation of marine life

anoxia↗

Petrophysical and geomechanical properties of gas hydrate-bearing sediments recovered from Alaska North Slope 2018 Hydrate-01 Stratigraphic Test Well

Knowledge of petrophysical and geomechanical properties of gas hydrate-bearing sediments are essential for predicting reservoir response due to gas production from gas hydrate reservoirs. That information will be critical parameters for designing production well completion such as specification of depressurization pump, water storage tank, and mesh size of sand screen. In December 2018, Stratigraphic Test Well Hydrate-01 was drilled in the western part of the Prudhoe Bay Unit, Alaska North Slope as part of the technical planning effort for a future long-term production test by collaborative team of DOE/NETL, USGS, and MH21-S (Boswell et al., 2020, Collett et al., 2020, Okinaka et al., 2020). Data set of logging-while-drilling (LWD) were acquired (Haines et al., 2020, Suzuki et al., 2019) and core sampling depth was determined on-site.Side-wall pressure coring was conducted to recover gas hydrate-bearing sediments from two reservoir sections named Unit-B and Unit-D. A total of 34 cores were successfully recovered by 5 runs of a wire-line deployed pressure corer (CoreVault® System - Halliburton). Core analysis scheme of this project are shown in Figure 1. All cores were quenched in liquid nitrogen while at high pressure in the laboratory of Stratum Reservoir, LLC. at Anchorage (Figure 1, a)). And the cores were removed from the pressure corer autoclave with temperature support of dry ice and stored under liquid nitrogen at atmospheric pressure. 19 damaged cores were processed to index property measurements directly such as grain size, grain density. 4 of another 17 cores were depressurized and trimmed for making a plug to analyze petrophysical properties of host sediments. Unsteady-state permeability test was conducted to obtain relative water permeability to gas and core scale NMR T2 distribution measurement was performed for evaluating pore size distribution at Houston (Figure 1, b)). Remained high quality 13 cores were preserved with gas hydrate for advanced laboratory analysis. National Institute of Advanced Industrial Science and Technology, as a part of the Japanese National Hydrate Research Program (MH21-S, funded by Ministry of Economy, Trade and Industry), received the samples at Sapporo, Japan for advanced core analysis. High-resolution X-ray CT was used to analyze the quality of the samples, which showed undisturbed lithological layers. Cores were lathed into cylindrical shape and distributed for multi property measurements (Figure 1, c)).<p>As a result, sediment from Unit-D is categorized as silty sand at ~37% porosity with ~80% gas hydrate saturation. An average hydration number n = 6.16 was measured by Raman spectroscopy. An average intrinsic permeability of ~400 mD and in situ effective permeability (with hydrate) on the order of ~10 mD. The Unit B recovered cores consisted of well sorted sand at ~40% porosity with ~95% gas hydrate saturation. An average intrinsic permeability of ~1 Darcy and in situ effective permeability on the order of ~30 mD was measured for the Unit B cores. There was a small permeability reduction due to porosity loss with increasing effective stress that simulated consolidation behavior along with depressurization in the highly permeable sandy sediment. The apparent minimum change in porosity and permeability may be caused by the low compressibility of quartz sand grains in the recovered cores. XRD and thermal conductivity analysis also suggested high quartz content. Triaxial compression tests established internal friction angles based on the Mohr-Coulomb's failure criterion, which are 40° for hydrate-bearing sediment and 29.8° for hydrate free sediment.</p>

Yoneda, Jun↗

The TRANSCEND University Consortium: Theme 2 - Site Decommissioning, Deconstruction and Remediation - 20329

This paper will discuss the aims, objectives and progress to-date under Theme 2 of the TRANSCEND consortium project: Site decommissioning, deconstruction and remediation. Decommissioning nuclear sites involves waste retrieval, decontamination, deconstruction and, where necessary, containment and/or remediation of the remaining structure and surrounding land. Critical to management of these processes is limiting radiation exposure for the workforce, restricting the spread of radionuclides in groundwater, surface water and airborne particulates, and minimising the volume of contaminated waste for disposal. The aim of Theme 2 research is to develop new technologies for monitoring, remediation and containment that serve to minimise the volume of radioactively contaminated waste for disposal, for application prior to, during and after retrieval, deconstruction and decontamination operations. Prior research, conducted under the previous DISTINCTIVE project, demonstrated that colloidal silica grout can penetrate low permeability materials (including cement) for hydraulic barrier formation, and improved sorption capacity. The silica grout can be injected at surface using extremely small (potentially gravity-driven) fluid pressures, without the need for borehole drilling. Current work is investigating the erodibility of silica-grouted soils for inhibition of airborne and water-borne particulates as well as enhancing the grout's sorption capacity by addition of other materials to provide a chemical, as well as hydraulic, barrier to subsurface migration. EK remediation uses low voltage DC current to control migration of contaminants in porous media as well as to remove or degrade them. Researchers in the consortium have already demonstrated that low-energy ex-situ EK techniques can be used to provide remediation and volume minimisation for AWE legacy wastes in the UK. Under the current project researchers are building EK test cells containing simulated site materials at laboratory and intermediate(m)-scales to: remove, focus or degrade contaminants (remediation or waste minimisation); and direct subsurface water, chemical and colloid flow (fencing/containment or forced migration). This lab-based research is being informed by numerical models of EK processes that can subsequently be used to design full-scale on-site applications by nuclear site holders. Research under theme 2 of TRANSCEND will ultimately combine novel non-invasive detection technologies with EK techniques and colloidal silica grout barriers, to optimise the containment of radionuclide contamination in soils. Thus, allowing us to detect in-situ contamination, mobilise it to a selected location and grout it in-situ, prior to the initiation of decommissioning and deconstruction operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydrate-filled Fracture Formation at Keathley Canyon 151, Gulf of Mexico, and Implications for Non-vent Sites

Near-vertical hydrate-filled fractures are found in subseafloor marine muds, at both advective methane vent sites and at sites without obvious methane and fluid advection (non-vent sites). At non-vent sites, the mechanisms that transport methane to the fractures and control how hydrate-filled fractures form are not well understood. However, these mechanisms are important to establish, as most of Earth's natural gas hydrate is likely bound in marine mud systems. In this work, we focus on understanding the origin of hydrate and how fracture form at non-vent sites by examining previously hydrate-bearing fractures in conventional cores taken from Keathley Canyon 151, U.S. northern Gulf of Mexico, drilled by the Gas Hydrate Joint Industry Project in 2005. We combine information from well logs, sediment cores, and science party results and add new X-ray computed tomography of archival sections and scanning electron microcopy of core samples to develop a conceptual model. We propose that locally generated microbial methane is transported via diffusion from small pores in marine mud into biomineralized burrows with larger pore size in a process called short-range migration. Hydrate forms in burrows once the methane diffuses into them and the dissolved methane concentration exceeds the solubility threshold. When hydrate fills a burrow, heave from additional hydrate growth places stress on the burrow edges, expands the fracture, and creates additional void space in which methane can diffuse and continue forming hydrate. Fractures slowly propagate in the direction of maximum principal stress.

58 GEOSCIENCES↗

Initial Field Testing in the Deep Subsurface for the Thermal Breakout Project for Measuring In Situ Stress

The current state-of-the-art technology for in situ stress measurements involves an integrated approach that combines borehole breakout observations, drilling-induced tensile fractures, and hydraulic fracturing tests (i.e., mini-fracs); however, this methodology has several limitations that often prevent successful in situ stress measurements. One major limitation is that breakouts do not appear in every borehole and are generally a natural occurrence that cannot easily be controlled. Because borehole breakouts are used to measure the maximum horizontal in situ stress magnitude, the absence of borehole breakouts presents a major data gap for in situ stress measurements. As a response to this data gap a new thermal breakout technology is being developed that will provide a method for thermally inducing borehole breakouts and obtaining consistent measurements of the maximum horizontal stress magnitude. This thermal breakout technology involves heating the borehole and increasing the thermoelastic compressive stress in the rock until a breakout develops, which is directly correlated to the maximum horizontal stress magnitude. An initial component of the thermal breakout project involves developing a prototype downhole tool and performing field testing in the deep subsurface. The primary objective of the initial tool development and field testing is to provide a physical proof of concept for the thermal breakout technology. Three thermal breakout field tests were performed at approximately 4850 feet deep in the Sanford Underground Research Facility. Each test was performed in a borehole that had been previously used for overcoring stress measurements. The third and final test successfully created two diametrically opposed breakouts after deploying the thermal breakout tool for approximately 3 hours of continuous heating. Post-analysis of the thermally induced breakouts confirmed that the thermal breakout orientation directly corresponds to the known in situ stress orientation and magnitude.

Voegeli, Sam↗

Hybrid Manufacturing of Conformal Cooling Channels for Tooling

Computer-aided manufacturing (CAM) techniques for hybrid manufacturing have led to new application areas in the manufacturing industry. In the tooling industry, cooling channels are used to enable specific heating and cooling cycles to improve the performance of the process. These internal cooling channels have been designed with limited manufacturing processes in mind, so, until recently, they were often straight in shape for cross-drilling operations and manufactured from a cast billet. To show a novel application of this common technology, a tool with integrated conformal cooling channels was manufactured using hybrid manufacturing (blown-powder DED and CNC machining) techniques. The computer-aided manufacturing strategy used, and the lessons learned are presented and discussed to enable future work in this industrial application space.

36 MATERIALS SCIENCE↗

INTEGRITY - Integrated Human Exploration Mission Simulation Facility

It is proposed to develop a high-fidelity ground facility to carry out long-duration human exploration mission simulations. These would not be merely computer simulations - they would in fact comprise a series of actual missions that just happen to stay on earth. These missions would include all elements of an actual mission, using actual technologies that would be used for the real mission. These missions would also include such elements as extravehicular activities, robotic systems, telepresence and teleoperation, surface drilling technology-all using a simulated planetary landscape. A sequence of missions would be defined that get progressively longer and more robust, perhaps a series of five or six missions over a span of 10 to 15 years ranging in duration from 180 days up to 1000 days. This high-fidelity ground facility would operate hand-in-hand with a host of other terrestrial analog sites such as the Antarctic, Haughton Crater, and the Arizona desert. Of course, all of these analog mission simulations will be conducted here on earth in 1-g, and NASA will still need the Shuttle and ISS to carry out all the microgravity and hypogravity science experiments and technology validations. The proposed missions would have sufficient definition such that definitive requirements could be derived from them to serve as direction for all the program elements of the mission. Additionally, specific milestones would be established for the "launch" date of each mission so that R&D programs would have both good requirements and solid milestones from which to .build their implementation plans. Mission aspects that could not be directly incorporated into the ground facility would be simulated via software. New management techniques would be developed for evaluation in this ground test facility program. These new techniques would have embedded metrics which would allow them to be continuously evaluated and adjusted so that by the time the sequence of missions is completed, the best management techniques will have been developed, implemented, and validated. A trained cadre of managers experienced with a large, complex program would then be available.

Henninger, Donald L.↗

Environmental Restoration of Diesel-Range Organics from Project Chariot, Cape Thompson, Alaska - 16147

Cape Thompson, Alaska, is located approximately 120 miles north of Kotzebue, Alaska, within the Ogotoruk Creek valley. The remote Alaskan location is also home to the US Atomic Energy Commission (AEC) Project Chariot study area. Project Chariot was part of the Plowshare Program, created in 1957 by the AEC to study peaceful uses for atomic energy. Project Chariot began in 1958 when a scientific field team chose Cape Thompson as a potential site to excavate a harbor using a series of nuclear explosions. Between 1959 and 1962, AEC was responsible for over 40 pretest bio-environmental and geotechnical studies of the Cape Thompson area. Strong public opposition to the tests developed, which caused the project to be cancelled with no nuclear explosions ever conducted at the site. In the early 1960's, several deep boreholes were drilled to obtain subsurface, temperature, and high-explosive testing data. Refrigerated diesel was used as a drilling fluid to keep the boreholes open so that thermistors could measure subsurface temperatures. The test boreholes were named Able, Baker, Charlie, Dog, and X-1. In the summer of 2014, the US Department of Energy, Office of Legacy Management (LM) completed the remediation of remnant diesel at these sites. Prior to the 2014 remediation activities, LM conducted two separate characterization field studies to determine the nature and extent of the contamination from the 1960's drilling activities. In 2013, LM developed a remediation plan that was submitted and approved by the Alaska Department of Environmental Conservation (ADEC). The 2014 Project Chariot remediation had some unique logistical challenges and historic issues with stakeholders to overcome. Many of the historic issues centered on previous AEC scientific actions and a general mistrust of the government by the local stakeholders. Prior to and during the 2014 remediation work, an outreach campaign was implemented to discuss prior activities at the site and include stakeholders from Point Hope, Alaska, in the remediation-planning process. The remoteness of the region also provided unique logistical challenges. Because of the short field season, LM initiated several subcontracts over a year in advance. The field camp, heavy equipment, and soil storage containers were shipped by barge to the site. Personnel, food, and small materials were flown in by bush plane from Kotzebue, Alaska. Previous site characterization had identified diesel-range organics (DROs) as the primary contaminant. The cleanup levels for the site were provided by the Alaska Administrative Code (AAC) for the Arctic Zone region. The AAC cleanup level for DROs on gravel pads is 500 mg/kg and 12,500 mg/kg tundra in the arctic-zone region. To help determine the extent and direct soil excavation in the field, photoionization detectors (PIDs) were used for field screening. While the PID results provided rough limits for excavation, laboratory confirmation sampling was required to provide actual excavation guidance. All excavation locations remained open until laboratory results met AAC criteria and ADEC approved closure. The laboratory sample protocol required the bush plane to pick up samples almost daily and transfer them to Anchorage for analysis. In order to meet holding time requirements, all laboratory samples were analyzed on an expedited basis. Analytical results and ADEC approval notifications were e-mailed back to the site via satellite connection. A total of 202 laboratory analyses were needed to complete the remediation effort. At each location (Able, Baker, Charlie, Dog, and X-1), the boreholes were plugged and abandoned in accordance with ADEC regulations. Contaminated soil was excavated, and the material was placed in super-sacks and hauled to connex boxes located near the sea shore. Approximately 786 tons of material was removed and shipped by barge to the Columbia Ridge Landfill in Arlington, Oregon, for disposal. The well casings were cut and sealed below ground surface. Each location was graded to its original contours and reclaimed with native vegetation, and a geodetic survey was conducted. Tours with leaders of the Village of Point Hope and the land owner (Arctic Slope Regional Corporation) were conducted prior to the final demobilization. All remediation equipment and camp facilities were removed at the completion of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radionuclide Partitioning in an Underground Nuclear Test Cavity

In 2004, a borehole was drilled into the 1983 Chancellor underground nuclear test cavity to investigate the distribution of radionuclides within the cavity. Sidewall core samples were collected from a range of depths within the re-entry hole and two sidetrack holes. Upon completion of drilling, casing was installed and a submersible pump was used to collect groundwater samples. Test debris and groundwater samples were analyzed for a variety of radionuclides including the fission products {sup 99}Tc, {sup 125}Sb, {sup 129}I, {sup 137}Cs, and {sup 155}Eu, the activation products {sup 60}Co, {sup 152}Eu, and {sup 154}Eu, and the actinides U, Pu, and Am. In addition, the physical and bulk chemical properties of the test debris were characterized using Scanning Electron Microscopy (SEM) and Electron Microprobe measurements. Analytical results were used to evaluate the partitioning of radionuclides between the melt glass, rubble, and groundwater phases in the Chancellor test cavity. Three comparative approaches were used to calculate partitioning values, though each method could not be applied to every nuclide. These approaches are based on: (1) the average Area 19 inventory from Bowen et al. (2001); (2) melt glass, rubble, and groundwater mass estimates from Zhao et al. (2008); and (3) fission product mass yield data from England and Rider (1994). The U and Pu analyses of the test debris are classified and partitioning estimates for these elements were calculated directly from the classified Miller et al. (2002) inventory for the Chancellor test. The partitioning results from this study were compared to partitioning data that were previously published by the IAEA (1998). Predictions of radionuclide distributions from the two studies are in agreement for a majority of the nuclides under consideration. Substantial differences were noted in the partitioning values for {sup 99}Tc, {sup 125}Sb, {sup 129}I, and uranium. These differences are attributable to two factors: chemical volatility effects that occur during the initial plasma condensation, and groundwater remobilization that occurs over a much longer time frame. Fission product partitioning is very sensitive to the early cooling history of the test cavity because the decay of short-lived (t{sub 1/2} < 1 hour) fission-chain precursors occurs on the same time scale as melt glass condensation. Fission product chains that include both volatile and refractory elements, like the mass 99, 125, and 129 chains, can show large variations in partitioning behavior depending on the cooling history of the cavity. Uranium exhibits similar behavior, though the chemical processes are poorly understood. The water temperature within the Chancellor cavity remains elevated (75 C) more than two decades after the test. Under hydrothermal conditions, high solubility chemical species such as {sup 125}Sb and {sup 129}I are readily dissolved and transported in solution. SEM analyses of melt glass samples show clear evidence of glass dissolution and secondary hydrothermal mineral deposition. Remobilization of {sup 99}Tc is also expected during hydrothermal activity, but moderately reducing conditions within the Chancellor cavity appear to limit the transport of {sup 99}Tc. It is recommended that the results from this study should be used together with the IAEA data to update the range in partitioning values for contaminant transport models at the Nevada National Security Site (formerly known as the Nevada Test Site).

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Iron transformation pathways and redox micro-environments in seafloor sulfide-mineral deposits: Spatially resolved Fe XAS and δ 57/54 Fe observations

Hydrothermal sulfide chimneys located along the global system of oceanic spreading centers are habitats for microbial life during active venting. Hydrothermally extinct, or inactive, sulfide deposits also host microbial communities at globally distributed sites. The main goal of this study is to describe Fe transformation pathways, through precipitation and oxidation-reduction (redox) reactions, and examine transformation products for signatures of biological activity using Fe mineralogy and stable isotope approaches. The study includes active and inactive sulfides from the East Pacific Rise 9°50'N vent field. First, the mineralogy of Fe(III)-bearing precipitates is investigated using microprobe X-ray absorption spectroscopy (μXAS) and X-ray diffraction (μXRD). Second, laser-ablation (LA) and micro-drilling (MD) are used to obtain spatially-resolved Fe stable isotope analysis by multicollector-inductively coupled plasma-mass spectrometry (MC-ICP-MS). Eight Fe-bearing minerals representing three mineralogical classes are present in the samples: oxyhydroxides, secondary phyllosilicates, and sulfides. For Fe oxyhydroxides within chimney walls and layers of Si-rich material, enrichments in both heavy and light Fe isotopes relative to pyrite are observed, yielding a range of δ 57 Fe values up to 6‰. Overall, several pathways for Fe transformation are observed. Pathway 1 is characterized by precipitation of primary sulfide minerals from Fe(II)aq-rich fluids in zones of mixing between vent fluids and seawater. Pathway 2 is also consistent with zones of mixing but involves precipitation of sulfide minerals from Fe(II)aq generated by Fe(III) reduction. Pathway 3 is direct oxidation of Fe(II) aq from hydrothermal fluids to form Fe(III) precipitates. Finally, Pathway 4 involves oxidative alteration of pre-existing sulfide minerals to form Fe(III). The Fe mineralogy and isotope data do not support or refute a unique biological role in sulfide alteration. The findings reveal a dynamic range of Fe transformation pathways consistent with a continuum of micro-environments having variable redox conditions. Lastly, these micro-environments likely support redox cycling of Fe and S and are consistent with culture-dependent and -independent assessments of microbial physiology and genetic diversity of hydrothermal sulfide deposits.

mineral alteration↗