Search NASA⌕ Search

SEARCH · Search NASA

Results for “DISPATCHES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Methods for Computing Physically Realistic Estimates of Electric Water Heater Demand Response Resource Suitable for Bulk Power System Planning Models

Demand response is commonly called on to reduce load during system peak times or to respond to contingency events. In future power systems with higher shares of wind and solar generation (which we describe together as variable generation [VG]), demand response could have more opportunities to provide energy shifting or operating reserve services. This report evaluates the ability of residential electric water heaters, both electric resistance water heaters (ERWHs) and heat pump water heaters (HPWHs), to provide such services starting from detailed whole-building energy models that realistically represent New England single family home stock. We use a parsimonious surrogate model to represent operational flexibility in a form suitable for linear and mixed integer programming. This enables relatively fast determination of aggregate contingency reserve resource, price-taking energy shifting outcomes, and in some cases the determination of aggregate models at the megawatt (MW) scale that can be directly included in large-scale grid models. After selecting modeling methods and parameters through various computational experiments, we find interquartile ranges of contingency reserve resource in ISO-NE for about 603,400 ERWHs of 45 MW - 69 MW for Claim10 (50 minute responses provided with 10 minutes of advanced notification) and 65 MW - 102 MW for Claim30 (30 minute responses provided with 30 minutes of advanced notification), and for about 619,000 HPWHs of 48 MW - 88 MW for Claim10 and 52 MW - 90 MW for Claim30. The overall reserve resource is up to 32% of total load for ERWHs providing Claim10 service, 47% for ERWHs providing Claim30 service, 93% for HPWHs providing Claim10 service, and 97% for HPWHs providing Claim30 service. More work is required to determine if HPWHs are inherently more suitable than ERWHs for providing contingency reserve or if these results reflect idiosyncrasies of the single family home stock model used in this study. The value of this contingency resource in a Near-term VG model of ISO-NE is $\$ 0.40$ to $\$1.20$ per water heater-year, and significantly larger, $\$ 3.80$ to $\$ 5.30$ per water heater-year in a Mid-term VG model of ISONE. Aggregating surrogate models to the MW-scale for energy shifting service is more challenging than for contingency service and we only present such results for ERWHs, because we were unable to determine satisfactory ways to deal with HPWHs' time-varying and path dependent operational characteristics. Individual surrogate models suitable for evaluating the energy shifting resource from both ERWHs and HPWHs are created, however, and dispatched against day-ahead prices from the Near-Term VG and Mid-Term VG models of ISO-NE. The individual surrogate models are able to access and potentially shift all 640 GWh of HPWH load and 1,547 GWh of ERWH load we modeled in two different single family home stock models. In contrast, the most effective model of aggregate ERWH shifting resource we created only captured 34.7% of the total ERWH load. Energy shifting affected by price-taking dispatch against modeled day-ahead energy prices produces per water heater year profits of $\$19.44$ - $\$22.93$ for individual HPWHs, $\$39.11$ - $\$40.54$ for individual ERWHs, and up to $\$4.00$ - $\$4.24$ for aggregated ERWHs, with the variations mainly due to grid conditions (more or less VG). When the supply-side response to these changes is accounted for, the per water heater year production cost savings for ISO-NE are $\$7.50$ to $\$17.70$ for the most effective set of endogenously dispatched aggregate ERWHs, $\$15.60$ to $\$15.70$ for individual ERWHs dispatched against the DA prices, and $\$10.70$ to $\$11.20$ for individual HPWHs dispatched against DA prices. Those ranges primarily represent the difference between Near-Term VG and Mid-Term VG grid conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A coordination theory for intelligent machines

A formal model for the coordination level of intelligent machines is established. The framework of the coordination level investigated consists of one dispatcher and a number of coordinators. The model called coordination structure has been used to describe analytically the information structure and information flow for the coordination activities in the coordination level. Specifically, the coordination structure offers a formalism to (1) describe the task translation of the dispatcher and coordinators; (2) represent the individual process within the dispatcher and coordinators; (3) specify the cooperation and connection among the dispatcher and coordinators; (4) perform the process analysis and evaluation; and (5) provide a control and communication mechanism for the real-time monitor or simulation of the coordination process. A simple procedure for the task scheduling in the coordination structure is presented. The task translation is achieved by a stochastic learning algorithm. The learning process is measured with entropy and its convergence is guaranteed. Finally, a case study of the coordination structure with three coordinators and one dispatcher for a simple intelligent manipulator system illustrates the proposed model and the simulation of the task processes performed on the model verifies the soundness of the theory.

Wang, Fei-Yue↗

Residential Battery Modeling for Control-Oriented Techno-Economic Studies: Preprint

Electrochemical batteries, which serve as electric energy storage devices, are becoming increasingly popular among residential buildings that incorporate solar photovoltaic (PV) systems to help meet their energy needs. Battery economics are affected by performance degradation over time, and managing this degradation can help extend the battery's lifespan. The tradeoff between operational costs/benefits and managing battery degradation is of significant research interest. One of the key factors for assessing battery degradation is the dispatch strategy used to control the charging and discharging of the battery. Conventional dispatch strategies typically use simple rule-based methods, and these overly aggressive charging/discharging cycles can significantly reduce a battery’s life span. Our research seeks to develop optimized dispatch strategies for grid-connected PV homes with a goal of extending battery life while simultaneously taking into consideration utility costs and occupant comfort. To achieve this goal, we adapted lithium-ion battery life- and cyclic-degradation models for use in high-fidelity building simulations, so whole-building and grid-interactive controllers can dispatch the batteries along with other flexible loads. With the help of a co-simulation platform, we performed a simulation study to compute the optimized dispatch strategies for relevant operating conditions brought about by changing geographical locations, weather conditions, and utility pricing. Comparing the optimized strategies with the conventional strategies resulted in a >50% decrease in capacity degradation and >10% average reduction in operational costs during the months of January and July in Fort Collins, Colorado; Phoenix, Arizona; and Portland, Oregon.

30 DIRECT ENERGY CONVERSION↗

Absorbing the Sun: Operational Practices and Balancing Reserves in Florida's Municipal Utilities

The Florida Reliability Coordinating Council (FRCC) power system is comprised of multiple balancing authorities ranging in size from Gainesville Regional Utilities (GRU) with a 2019 summer net firm demand of 429 MW to Florida Power & Light with a 2019 summer net firm demand of 22,510 MW; and including cooperative, municipal, and investor-owned utilities. As all of these balancing authorities are and have plants to continue installing significant quantities of utility-scale solar photovoltaics, one relevant question is how much operating reserves they will need to hold as solar penetrations increase. While there are estimates of how regulating and flexibility reserve requirements change with solar penetration, the literature almost exclusively focuses on large balancing authorities with sub-hourly dispatch. In this work we analyze how reserve needs change not only with solar photovoltaic penetration, but also balancing authority size and operational practices. We find that, measured as a fraction of load, smaller balancing authorities with less frequent load and solar forecasts and less frequent dispatch need more reserves. Such utilities' reserve needs also increase more with increasing solar deployment as compared to larger or more frequently dispatched balancing authorities. These impacts are most acute for GRU. We find that moving from day-ahead to hour-ahead load and solar forecasting and system dispatch could enable GRU to incorporate 32% solar generation with median reserves at 20% instead of 60% of load; and that median reserve needs could drop further to about 10% of load if Florida's municipal utilities formed a reserve sharing group and moved to sub-hourly dispatch.

balancing authority↗

An economic assessment of behind-the-meter photovoltaics paired with batteries on the Hawaiian Islands.

Due to natural variability and uncertainty, the ever-increasing penetration of solar generation in Hawaii presents challenges to power grid operators to maintain reliable system operation. Demand response (DR) has the potential to be a cost-effective tool for Hawaii to reach its aggressive renewable energy goals while maintaining the reliability of power grids. The Hawaii Public Utilities Commission has approved the Hawaiian Electric Company's revised portfolio of DR programs. The companies have released a grid services purchase agreement and subscribed an initial tranche of load into their DR programs. This paper presents innovative analytical methods and comprehensive economic assessment for distributed photovoltaics (PV) paired with battery energy storage systems (BESSs) for two new DR programs, including fast frequency response and capacity grid service. Optimal dispatch and sizing methods are proposed for the paired system considering different tariff schedules and PV compensation programs across five islands. It was found that while the best resource configuration and potential economic benefits vary with tariff structure, a BESS paired with PV can be optimally dispatched to generate multiple value streams simultaneously. Compensation from DR programs is an important value stream to help increase the cost-effectiveness of the integrated system.

Battery energy storage system↗

Modelling wind power spatial-temporal correlation in multi-interval optimal power flow: A sparse correlation matrix approach

The significantly increasing deployment of wind power necessitates that system operation considers the spatial-temporal correlation of power forecast from different wind power plants. How to model this spatial-temporal correlation in the actual system dispatch is challenging. In this paper, a sparse correlation matrix is utilized to efficiently model the spatial-temporal correlation of wind power forecast in the generation dispatch model. A novel, adjustable, and distributionally-robust chance-constrained multi-interval optimal power flow (ADRCC-MIOPF) model is proposed to obtain reliable economic dispatch (ED) solutions. The spatial-temporal correlation of wind power plants power forecasts is represented by the sparse correlation covariance matrix obtained from historical, time series wind power forecast error data. The chance constraints in the ADRCC-MIOPF model are transformed into a set of second-order-cone (SOC) constraints in which an adjustable coefficient in the chance constraints controls the robustness of the ADRCC-MIOPF model to the wind power forecast errors distribution. Case studies performed on the PJM 5-bus system and IEEE 118-bus system verify the proposed method to improve the system security and reduce the cost especially under the high wind penetration levels. All the cases can be solved within several minutes for both the small and large cases which validates the efficiency of the proposed sparse matrix model. In addition, considering the spatial-temporal correlation of wind power forecast and the distributional robustness of wind power forecast error leads to a more reliable economic dispatch with lower system violations.

17 WIND ENERGY↗

Experimental Analysis of Distribution Network Voltage Regulation Using Smart Inverters

Smart inverters (SIs) have demonstrated their potential to provide grid services for both transmission and distribution systems. One of these grid services, distribution network voltage regulation by SIs, has the potential to improve network voltage regulation through controlling the reactive and active power output of the SIs. Voltage regulation by SIs will be distributed and might be better suited to controlling local conditions to complement traditional voltage-regulating assets, e.g., tap-changing transformers, capacitor banks, and line voltage regulators. There is a gap in the literature on comparing the SI response characteristics when the SIs are controlled by a local controller or external control signals. This paper presents an experimental study to characterize SI reactive power regulation responses to two different control methods: autonomous control and remote dispatch. We found that SI reactive power regulation responses exhibit important differences between these methods in terms of delays and ramp rate. Finally, power-hardware-in-the-loop (PHIL) tests were conducted to evaluate the performance of these two methods. The PHIL test results show that the SI response characteristics for autonomous control and remote dispatch need to be considered when planning for distribution network voltage regulation using SIs.

autonomous control↗

Control Strategies and Validation in the Hybrid Optimization and Performance Platform (HOPP)

The Hybrid Optimization and Performance Platform (HOPP) is a tool that simulates hybrid power plants in various configurations, and also calculates the financial feasibility of these plants. This report outlines an overview of HOPP and the energy storage dispatch strategies available. It then presents three case studies which demonstrate different applications of HOPP. The first case looks at the profitability of hybrid power plants in different locations in the USA. The second case examines the availability of hybrid power plants to provide energy reliability services. The third case presents a plant that produces both hydrogen and electricity, and demonstrates a dispatch strategy that chooses the most profitable energy vector based on price signals. The next section shows the validation of HOPP on operational data, using data from both unit-scale and utility-scale power plants. This validation process demonstrated that HOPP can simulate the power output of both wind and solar PV plants at both scales with comparable fidelity to an existing commercial software tool. Finally, HOPP is applied in a field test which applies an optimal dispatch strategy to a physical battery in a unit-scale hybrid plant at NREL. HOPP's optimal dispatch strategy, applied in a real-world setting, improved this hybrid plant's ability to meet a load signal while minimizing operational costs.

14 SOLAR ENERGY↗

Advancing Concentrating Solar Thermal Modeling Using System Advisor Model (SAM)

Concentrating solar thermal (CST) technologies play a critical role in enabling dispatchable power and high-temperature industrial heat applications. Accurate and flexible modeling tools are essential for evaluating system performance, guiding technology research and development, and informing investment decisions. The National Laboratory of the Rockies's System Advisor Model (SAM) is a widely used techno-economic simulation platform for CST systems, providing detailed performance and financial modeling capabilities for multiple CST system configurations. SAM integrates physics-based performance models with financial analysis to simulate the behavior of complex energy systems under realistic operating conditions. For CST technologies (including tower, parabolic trough, and linear Fresnel), SAM enables hourly simulations using site-specific weather data that ensure feasible operating conditions and convergence of mass and energy between core system components (i.e., solar field, receiver, thermal energy storage, and power cycle). These capabilities allow researchers and developers to evaluate annual energy production, capacity factors, levelized cost of energy (LCOE), and system dispatch strategies. A key advantage of SAM lies in its flexibility for parametric analysis and large-scale computational studies. Users can vary system design parameters such as heliostat field layout, receiver dimensions, thermal energy storage capacity, power block sizing, and installation cost assumptions to investigate their impact on system performance and financial metrics. When combined with automated scripting through LK, SDKTool, or Python interfaces, SAM enables high-throughput simulation workflows that support sensitivity analysis, technology benchmarking, and optimization studies. These approaches are particularly valuable for next-generation CST concepts, where design spaces are large and system interactions are complex. Another important capability of SAM is its support for dispatch optimization and thermal energy storage modeling, which are central to the value proposition of CST technologies. The ability to simulate integrated storage and flexible power generation allows researchers to explore strategies that maximize grid value, improve capacity utilization, and enhance integration with variable resources such as photovoltaic and wind generation. This poster will present an overview of SAM's thermal system modeling capabilities including concentrating solar. Additionally, we will highlight new feature developments including: 1) implementing Google's OR-Tools optimization platform for faster and more robust dispatch optimization, 2) developing a new power load following controller for modeling behind-the-meter applications, 3) enabling direct modeling of CSP-PV hybrid systems with the inclusion of battery storage, and 4) developing a multi-receiver falling particle Gen3 system model.

14 SOLAR ENERGY↗

Optimal Strategies for Hybrid Battery‐Storage Systems Design

As stationary hybrid energy‐storage systems (HESS) for power systems applications have recently drawn interest due to their enhanced performance and decreasing cost, developing systematic approaches for HESS design while considering controls is gaining traction. Herein, a method is presented to optimally design hybrid battery storage by proposing a mathematical modeling framework, formulated as a mixed integer linear programming model. The optimization is capable of handling multiple subsystems of batteries, considering their economic and technological performance. Decisions involve sizing of the batteries, optimal temporal and strategic dispatch to end uses, and energy sources for charging each battery. The applicability of the model is tested on four case studies for three battery chemistries representing distinct objectives: high‐power, high‐energy, and second life. Compared to traditionally designed battery storage with a homogeneous battery, optimally designed hybrid systems can save 12%–26% of system costs, depending on the nature of the dispatch profile. Findings point to design preference toward the second life battery supplemented with some high‐power or high‐energy battery capacity, or both. With the utilized electricity price structure, customers can experience approximately 10%–35% reduction in their bills.

Koleva, Mariya↗

Multi-stage charging and discharging of electric vehicle fleets

Fleets of electric vehicles will likely shift electricity demand, and the effect of upstream charging emissions will come from generation sources that are dispatched in response. This study proposes a multi-stage charging and discharging problem to translate low-cost energy transactions into vehicle dispatch decisions. A day-ahead charging optimization problem minimizes electricity purchases and marginal emissions damages, with energy transactions becoming targets in an optimization-based dispatch strategy for an on-demand shared autonomous electric vehicle (SAEV) fleet. The framework was tested for Austin, Texas, using an agent-based simulator. Fleets can schedule charging to lower daily power costs (averaging 15.5% or $\$0.79$/day/SAEV) while reducing health damages from generation-related pollution (2.8% or $\$0.43$/day/SAEV). Finally, fleet managers can increase profits ($\$8$ per SAEV per day) by adopting a multi-stage charging and discharging strategy that can serve more passengers per day than price-agnostic dispatch strategies.

33 ADVANCED PROPULSION SYSTEMS↗

Two-stage minimax stochastic unit commitment

The study proposes a stochastic optimisation approach based on discrete scenarios and the minimax criterion to deal with demand uncertainty in the two-stage unit commitment problem. To avoid making an over-conservative decision, the approach is designed to assign a probability-based weight to each demand scenario and provide a unit commitment schedule that minimises the maximum possible-weighted generation cost. Unit commitment is determined in the first stage and the economic dispatch under the scenario that corresponds to the maximum possible-weighted generation cost is determined in the second stage. The problem is formulated as a type of min-max-min mixed integer programming model. By introducing an auxiliary variable, the model is further transformed into a minimisation problem. A Benders decomposition algorithm is developed to solve the problem. The Benders master problem determines the unit commitment decision, while the Benders subproblem determines the dispatch decision. Multiple Benders feasibility cuts are constructed when the Benders subproblem is infeasible. Valid inequalities are derived to improve the lower bound provided by the Benders master problem. Numerical results show the performance of the algorithm.

Che, Ping↗

Review and Future Perspective of Central Receiver Design and Performance

Concentrating solar power (CSP) technology provides a commercial solar option to the utility-scale electricity market. CSP is unique in its ability to include low-cost thermal storage; thus, it can generate electricity when the sun is not available and dispatch electricity to meet varying load requirements. Within the suite of CSP technologies, the central receiver design represents the state-of-the-art technology, promising low cost, high performance, and dispatchable energy production. Current total capacity of central receiver plants worldwide is about 1.0 gigawatt (electric) with operating plants in Spain and the United States, as well as projects under construction in Asia, the Middle East, and North Africa. Central receiver technology has been under development since the 1950s, and a variety of central receiver designs have been explored. A distinguishing feature is the heat transfer medium. Central receiver designs exist that use dense fluids, gases, and solid particles in this role. Water/steam and molten salt receivers have been adopted in current commercial plants and are often coupled with a steam-Rankine power cycle with an operating temperature of less than 600 degrees C. Many new central receiver concepts, such as the volumetric air, supercritical carbon dioxide (sCO2), solid particle, and liquid-metal receiver designs, are under active research and development (R&D). New designs target operating temperatures generally higher than 700 degrees C-800 degrees C -- and even above 1000 degrees C -- so that higher-performance power cycles such as the sCO2-Brayton cycle or air-Brayton/steam-Rankine combined cycle can be used to promote greater overall system efficiency. Central receiver thermal storage provides dispatchability unavailable from variable-output renewables such as solar photovoltaic and wind power. Case study analysis of the California grid shows that there is a limit on the amount of non-dispatchable renewable generation that the grid can accommodate, beyond which overgeneration, spillage, and instability may occur. Energy storage may well become a necessity in some areas in order to maintain reliability. Next-generation central receiver technologies will have higher operating temperatures and additional features that allow higher-efficiency power generation and deliver other cost-performance advantages. The underlying innovations will come from areas such as multi-physics modeling, high-temperature materials, novel power cycles and heat exchanger designs, and collector field sensing and performance monitoring technologies. Technology innovation is expected to improve the cost and performance of central receiver designs. To deliver value as a generation and storage option, central receiver technology must also be supported by flexible and robust financial models and comprehensive energy and ancillary service markets justifying the capital-intensive investment. Progress in these areas will position CSP central receiver technology for future deployment.

14 SOLAR ENERGY↗

Model Predictive Control-based Optimal Coordination of Distributed Energy Resources

Distributed energy resources, such as renewable energy resources (wind, solar), energy storage and demand response, can be used to complement conventional generators. The uncertainty and variability due to high penetration of wind makes reliable system operations and controls challenging, especially in isolated systems. In this paper, an optimal control strategy is proposed to coordinate energy storage and diesel generators to maximize wind penetration while maintaining system economics and normal operation performance. The goals of the optimization problem are to minimize fuel costs and maximize the utilization of wind while considering equipment life of generators and energy storage. Model predictive control (MPC) is used to solve a look-ahead dispatch optimization problem and the performance is compared to an open loop look-ahead dispatch problem. Simulation studies are performed to demonstrate the efficacy of the closed loop MPC in compensating for uncertainties and variability caused in the system.

Mayhorn, Ebony T.↗

Distribution Feeder-Scale Fast Frequency Response via Optimal Coordination of Net-load Resources Part II: Large-Scale Demonstration

This work is the second of a two-part series in which we develop and experimentally demonstrate a hierarchical control solution for optimally coordinating thousands of deferrable loads and distributed energy resources (DERs) to provide fast frequency response (FFR) from an entire distribution feeder. In Part I, we developed and proved practical algorithms for fast, cost-based optimal dispatch and for determining the optimal amount of headroom to operate solar inverters with to support FFR dispatch while minimizing opportunity cost. Simulation results in Part I demonstrated the advantages of the hierarchical dispatch approach in being able to maintain fast solution times needed for FFR even when the problem size increases. In Part II, we implement the algorithms developed in Part I in a novel, large-scale power hardware-in-the-loop experiment including embedded controllers and more than 100 powered appliance loads and DER connected to a simulated real-world distribution system with more than 10,000 controlled devices. Experimental results from multiple scenarios confirm that the optimal FFR dispatch approach scales well and can optimally coordinate more than 10,000 net-load resources across a distribution network while achieving hardware response times within 500 ms, which is not possible using state-of-the-art optimal coordination approaches.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric System Intra-hour Operation Simulator

ESIOS is a software program developed at Pacific Northwest National Laboratory (PNNL) that performs intra-hour dispatch and automatic generation control (AGC) simulations for electric power system frequency regulation and load/variable generation following. The program dispatches generation resources at minute interval to meet control performance requirements, while incorporating stochastic models of forecast errors and variability with generation, load, interchange and market behaviors. The simulator also contains an operator model that mimics manual actions to adjust resource dispatch and maintain system reserves. Besides simulating generation fleet intra-hour dispatch, ESIOS can also be used as a test platform for the design and verification of energy storage, demand response, and other technologies helping to accommodate variable generation.

Lu, Shuai↗

NYSEG Seneca Compressed Air Energy Storage (CAES) Demonstration Project

Compressed Air Energy Storage (CAES) is a hybrid energy storage and generation concept that has many potential benefits especially in a location with increasing percentages of intermittent wind energy generation. The objectives of the NYSEG Seneca CAES Project included: for Phase 1, development of a Front End Engineering Design for a 130MW to 210 MW utility-owned facility including capital costs; project financials based on the engineering design and forecasts of energy market revenues; design of the salt cavern to be used for air storage; draft environmental permit filings; and draft NYISO interconnection filing; for Phase 2, objectives included plant construction with a target in-service date of mid-2016; and for Phase 3, objectives included commercial demonstration, testing, and two-years of performance reporting. This Final Report is presented now at the end of Phase 1 because NYSEG has concluded that the economics of the project are not favorable for development in the current economic environment in New York State. The proposed site is located in NYSEG’s service territory in the Town of Reading, New York, at the southern end of Seneca Lake, in New York State’s Finger Lakes region. The landowner of the proposed site is Inergy, a company that owns the salt solution mining facility at this property. Inergy would have developed a new air storage cavern facility to be designed for NYSEG specifically for the Seneca CAES project. A large volume, natural gas storage facility owned and operated by Inergy is also located near this site and would have provided a source of high pressure pipeline quality natural gas for use in the CAES plant. The site has an electrical take-away capability of 210 MW via two NYSEG 115 kV circuits located approximately one half mile from the plant site. Cooling tower make-up water would have been supplied from Seneca Lake. NYSEG’s engineering consultant WorleyParsons Group thoroughly evaluated three CAES designs and concluded that any of the designs would perform acceptably. Their general scope of work included development of detailed project construction schedules, capital cost and cash flow estimates for both CAES cycles, and development of detailed operational data, including fuel and compression energy requirements, to support dispatch modeling for the CAES cycles. The Dispatch Modeling Consultant selected for this project was Customized Energy Solutions (CES). Their general scope of work included development of wholesale electric and gas market price forecasts and development of a dispatch model specific to CAES technologies. Parsons Brinkerhoff Energy Storage Services (PBESS) was retained to develop an air storage cavern and well system design for the CAES project. Their general scope of work included development of a cavern design, solution mining plan, and air production well design, cost, and schedule estimates for the project. Detailed Front End Engineering Design (FEED) during Phase 1 of the project determined that CAES plant capital equipment costs were much greater than the $\$$125.6- million originally estimated by EPRI for the project. The initial air storage cavern Design Basis was increased from a single five million cubic foot capacity cavern to three, five million cubic foot caverns with associated air production wells and piping. The result of this change in storage cavern Design Basis increased project capital costs significantly. In addition, the development time required to complete the three cavern system was estimated at approximately six years. This meant that the CAES plant would initially go into service with only one third of the required storage capacity and would not achieve full capability until after approximately five years of commercial operation. The market price forecasting and dispatch modeling completed by CES indicated that the CAES technologies would operate at only 10 to 20% capacity factors and the resulting overall project economics were not favorable for further development. As a result of all of these factors, the Phase 1 FEED developed an installed CAES plant cost estimate of approximately $\$$2,300/KW for the 210MW CAES 1A and 2 cycles. The capital cost for the 136 MW CAES 1 cycle was even higher due to the lower generating capacity of the cycle. Notably, the large equipment could have generated additional capacity (up to 270MW) which would have improved the cost per KW; however, the output was limited by the night time transmission system capability. The research herein, therefore, is particular to the site-specific factors that influenced the design and the current and forecasted generation mix and energy prices in Upstate New York and may not necessarily indicate that CAES plants cannot be economically constructed in other places in New York State or the world.

25 ENERGY STORAGE↗

Fossil fleet transition with fuel changes and large scale variable renewable integration

Variability in demand as seen by grid-connected dispatchable generators can increase due to factors such as greater production from variable generation assets (for example, wind and solar), increased reliance on demand response or customer-driven automation, and aggregation of loads. This variability results a need for these generators to operate in a range of different modes, collectively referred to as “flexible operations.” This study is designed to inform power companies, researchers, and policymakers of the scope and trends in increasing levels of flexible operations as well as reliability challenges and impacts for dispatchable assets. Background Because there is rarely a direct monetization of the value of operational flexibility, the decision to provide such flexibility is typically dependent on unit- and region-specific decisions made by asset owners. It is very likely that much greater and more widespread flexible operations capabilities will be needed due to increased variability in demand seen by grid-connected generators, uncertainty regarding investment in new units to provide adequate operational flexibility, and the retirement of older, uncontrolled sub-critical pulverized coal units. Objective To enhance understanding of the technical challenges and operational impacts associated with dispatchable assets needed to increase operational flexibility and support variable demand. Approach The study approach consists of three elements: a literature review of relevant prior studies, analysis of detailed scenarios for evolution of the future fleet over the next 35 years, and engineering assessment of the degree and scope of technical challenges associated with transformation to the future fleet. The study approach integrated two key elements rarely brought together in a single analysis—1) long-term capacity planning, which enables modeling of unit retirements and new asset investments, and 2) unit commitment analysis, which permits examination of hourly unit dispatch while considering operational limitations relevant to flexible operations capabilities.

James, Revis↗