Search NASA⌕ Search

SEARCH · Search NASA

Results for “EQUIPMENT SPECIFICATIONS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Penn State Get Away Special

Three proposed spaceborne experiments to be conducted by equipment in the Get Away Special (GAS) payload are described. The specific contribution and effect of convection in heat transfer is discussed. Investigations of the surface tension of two liquids in space environment and the problem of liquid slosh in spin stabilized satellites are reviewed.

Thames, M.↗

Removing Dross From Molten Solder

Automatic device helps to assure good solder connections. Machine wipes dross away from area on surface of molten solder in pot. Sweeps across surface of molten solder somewhat in manner of windshield wiper. Each cycle of operation triggered by pulse from external robot. Equipment used wherever precise, automated soldering must be done to military specifications.

Webb, Winston S.↗

Space station common module network topology and hardware development

Conceptual space station common module power management and distribution (SSM/PMAD) network layouts and detailed network evaluations were developed. Individual pieces of hardware to be developed for the SSM/PMAD test bed were identified. A technology assessment was developed to identify pieces of equipment requiring development effort. Equipment lists were developed from the previously selected network schematics. Additionally, functional requirements for the network equipment as well as other requirements which affected the suitability of specific items for use on the Space Station Program were identified. Assembly requirements were derived based on the SSM/PMAD developed requirements and on the selected SSM/PMAD network concepts. Basic requirements and simplified design block diagrams are included. DC remote power controllers were successfully integrated into the DC Marshall Space Flight Center breadboard. Two DC remote power controller (RPC) boards experienced mechanical failure of UES 706 stud-mounted diodes during mechanical installation of the boards into the system. These broken diodes caused input to output shorting of the RPC's. The UES 706 diodes were replaced on these RPC's which eliminated the problem. The DC RPC's as existing in the present breadboard configuration do not provide ground fault protection because the RPC was designed to only switch the hot side current. If ground fault protection were to be implemented, it would be necessary to design the system so the RPC switched both the hot and the return sides of power.

Anderson, P.↗

ATLS: Catheter and tube placement

The specific objectives of this experiment are: to evaluate the rack mounted equipment and medical supplies necessary for medical procedures; to evaluate the attachments, mounting points, and inner drawer assemblies for the medical supplies; and to evaluate the procedures for performing medical scenarios. The resources available in the HMF miniracks to accomplish medical scenarios and/or procedures include: medical equipment mounted in the racks; a patch panel with places to attach tubing and catheters; self contained drawers full of critical care medical supplies; and an ALS 'backpack' for deploying supplies. The attachment lines, tubing and associated medical supplies will be deployed and used with the equipment and a patient mannequin. Data collection is provided by direct observations by the inflight experimenters, and analysis of still and video photography.

Gosbee, John↗

Catalog of Apollo experiment operations

This catalog reviews Apollo mission reports, preliminary science reports, technical crew debriefings, lunar surface operations plans, and various relevant lunar experiment documents, collecting engineering- and operation-specific information by experiment. It is organized by discrete experimental and equipment items emplaced or operated on the lunar surface or at zero gravity during the Apollo missions. It also attempts to summarize some of the general problems encountered on the surface and provides guidelines for the design of future lunar surface experiments with an eye toward operations. Many of the problems dealt with on the lunar surface originated from just a few novel conditions that manifested themselves in various nasty ways. Low gravity caused cables to stick up and get caught on feet, and also made it easy for instruments to tip over. Dust was a problem and caused abrasion, visibility, and thermal control difficulties. Operating in a pressure suit limited a person's activity, especially in the hands. I hope to capture with this document some of the lessons learned from the Apollo era to make the jobs of future astronauts, principle investigators, engineers, and operators of lunar experiments more productive.

Sullivan, Thomas A.↗

Experiences with Testing the Largest Ground System NASA Has Ever Built

In the 1980s, the National Aeronautics and Space Administration (NASA) embarked upon a major Earth-focused program called Mission to Planet Earth. The Goddard Space Flight Center (GSFC) was selected to manage and develop a key component - the Earth Observing System (EOS). The EOS consisted of four major missions designed to monitor the Earth. The missions included 4 spacecraft. Terra (launched December 1999), Aqua (launched May 2002), ICESat (Ice, Cloud, and Land Elevation Satellite, launched January 2003), and Aura (scheduled for launch January 2004). The purpose of these missions was to provide support for NASA s long-term research effort for determining how human-induced and natural changes affect our global environment. The EOS Data and Information System (EOSDIS), a globally distributed, large-scale scientific system, was built to support EOS. Its primary function is to capture, collect, process, and distribute the most voluminous set of remotely sensed scientific data to date estimated to be 350 Gbytes per day. The EOSDIS is composed of a diverse set of elements with functional capabilities that require the implementation of a complex set of computers, high-speed networks, mission-unique equipment, and associated Information Technology (IT) software along with mission-specific software. All missions are constrained by schedule, budget, and staffing resources, and rigorous testing has been shown to be critical to the success of each mission. This paper addresses the challenges associated with the planning, test definition. resource scheduling, execution, and discrepancy reporting involved in the mission readiness testing of a ground system on the scale of EOSDIS. The size and complexity of the mission systems supporting the Aqua flight operations, for example, combined with the limited resources available, prompted the project to challenge the prevailing testing culture. The resulting success of the Aqua Mission Readiness Testing (MRT) program was due in no small measure to re-structuring the traditional programmatic and technical approach to a more efficient and robust program. Programmatically, it meant gaining the endorsement, commitment, and cooperation of the numerous subsystem element managers and other stakeholder organizations. Technically, it required an MRT program that was agile, could rapidly adapt to requirements changes, and was flexible in its overall approach. Furthermore, this paper addresses the following questions: 1. What are the key ingredients (e.g., test tools, organization) needed to conduct a successful MRT program? 2. What distinguishes EOS MRT from the traditional system testing approach? 3. Where should the focus of testing be since it is infeasible to test every element or subsystem? 4. How can MRT be applied effectively to other systems or missions? To provide answers to these questions, this paper relies heavily on real-life, hands-on experiences ("lessons learned") gained during mission readiness testing of the Terra ground system and, most recently, the Aqua and ICESat missions. Moreover, this paper explores how lessons learned were turned into lessons applied for the upcoming Aura mission. Although derived from the EOS missions, MRT techniques and strategies can be applied to enhance the testing of other missions.

Lehtonen, Ken↗

Measurement Assurance for End-Item Users

The goal of a Quality Management System (QMS) as specified in ISO 9001 and AS9100 is to assure the end product meets specifications and customer requirements. Measuring devices, often called measuring and test equipments (MTE), provide the evidence of product conformity to the prescribed requirements. Therefore the processes which employ MTE can become a weak link to the overall QMS if proper attention is not given to development and execution of these processes. Traditionally, calibration of MTE is given more focus in industry standards and process control efforts than the equally important proper usage of the same equipment. It is a common complaint of calibration laboratory personnel that MTE users are only interested in "a sticker." If the QMS requires the MTE "to demonstrate conformity of the product," then the quality of the measurement process must be adequate for the task. This leads to an ad hoc definition; measurement assurance is a discipline that assures that all processes, activities, environments, standards, and procedures involved in making a measurement produce a result that can be rigorously evaluated for validity and accuracy. To evaluate that the existing measurement processes are providing an adequate level of quality to support the decisions based upon this measurement data, an understanding of measurement assurance basics is essential. This topic is complimentary to the calibration standard, ANSI/NCSL Z540.3-2006, which targets the calibration of MTE at the organizational level. This paper will discuss general measurement assurance when MTE is used to provide evidence of product conformity, therefore the target audience of this paper is end item users of MTE. A central focus of the paper will be the verification of tolerances and the associated risks, so calibration professionals may find the paper useful in communication with their customers, MTE users.

Mimbs, Scott M.↗

Intuitive Tools for the Design and Analysis of Communication Payloads for Satellites

In an effort to make future communications satellite payload design more efficient and accessible, two tools were created with intuitive graphical user interfaces (GUIs). The first tool allows payload designers to graphically design their payload by using simple drag and drop of payload components onto a design area within the program. Information about each picked component is pulled from a database of common space-qualified communication components sold by commerical companies. Once a design is completed, various reports can be generated, such as the Master Equipment List. The second tool is a link budget calculator designed specifically for ease of use. Other features of this tool include being able to access a database of NASA ground based apertures for near Earth and Deep Space communication, the Tracking and Data Relay Satellite System (TDRSS) base apertures, and information about the solar system relevant to link budget calculations. The link budget tool allows for over 50 different combinations of user inputs, eliminating the need for multiple spreadsheets and the user errors associated with using them. Both of the aforementioned tools increase the productivity of space communication systems designers, and have the colloquial latitude to allow non-communication experts to design preliminary communication payloads.

communication↗

Identifying and Inactivating Bacterial Spores

Problems associated with, and new strategies for, inactivating resistant organisms like Bacillus canaveralius (found at Kennedy Space Center during a survey of three NASA cleanrooms) have been defined. Identifying the particular component of the spore that allows its heightened resistance can guide the development of sterilization procedures that are targeted to the specific molecules responsible for resistance, while avoiding using unduly harsh methods that jeopardize equipment. The key element of spore resistance is a multilayered protein shell that encases the spore called the spore coat. The coat of the best-studied spore-forming microbe, B. subtilis, consists of at least 45 proteins, most of which are poorly characterized. Several protective roles for the coat are well characterized including resistance to desiccation, large toxic molecules, ortho-phthalaldehyde, and ultraviolet (UV) radiation. One important long-term specific goal is an improved sterilization procedure that will enable NASA to meet planetary protection requirements without a terminal heat sterilization step. This would support the implementation of planetary protection policies for life-detection missions. Typically, hospitals and government agencies use biological indicators to ensure the quality control of sterilization processes. The spores of B. canaveralius that are more resistant to osmotic stress would serve as a better biological indicator for potential survival than those in use currently.

Newcombe, David↗

Electrical, Electronic, and Electromechanical (EEE) parts management and control requirements for NASA space flight programs

This document establishes electrical, electronic, and electromechanical (EEE) parts management and control requirements for contractors providing and maintaining space flight and mission-essential or critical ground support equipment for NASA space flight programs. Although the text is worded 'the contractor shall,' the requirements are also to be used by NASA Headquarters and field installations for developing program/project parts management and control requirements for in-house and contracted efforts. This document places increased emphasis on parts programs to ensure that reliability and quality are considered through adequate consideration of the selection, control, and application of parts. It is the intent of this document to identify disciplines that can be implemented to obtain reliable parts which meet mission needs. The parts management and control requirements described in this document are to be selectively applied, based on equipment class and mission needs. Individual equipment needs should be evaluated to determine the extent to which each requirement should be implemented on a procurement. Utilization of this document does not preclude the usage of other documents. The entire process of developing and implementing requirements is referred to as 'tailoring' the program for a specific project. Some factors that should be considered in this tailoring process include program phase, equipment category and criticality, equipment complexity, and mission requirements. Parts management and control requirements advocated by this document directly support the concept of 'reliability by design' and are an integral part of system reliability and maintainability. Achieving the required availability and mission success objectives during operation depends on the attention given reliability and maintainability in the design phase. Consequently, it is intended that the requirements described in this document are consistent with those of NASA publications, 'Reliability Program Requirements for Aeronautical and Space System Contractors,' NHB 5300.4(1A-l); 'Maintainability Program Requirements for Space Systems,' NHB 5300.4(1E); and 'Quality Program Provisions for Aeronautical and Space System Contractors,' NHB 5300.4(1B).

Source record↗

Assessment of Intelligent Processing Equipment in the National Aeronautics and Space Administration, 1991

Summarized here is an assessment of intelligent processing equipment (IPE) within NASA. An attempt is made to determine the state of IPE development and research in specific areas where NASA might contribute to the national capability. Mechanisms to transfer NASA technology to the U.S. private sector in this critical area are discussed. It was concluded that intelligent processing equipment is finding extensive use in the manufacture of space hardware, especially in the propulsion components of the shuttle. The major benefits are found in improved process consistency, which lowers cost as it reduces rework. Advanced feedback controls are under development and being implemented gradually into shuttle manufacturing. Implementation is much more extensive in new programs, such as in the advanced solid rocket motor and the Space Station Freedom.

Jones, C. S.↗

Shield to Pin Coupling of Lightning-Like Transients on Payload Umbilical Cables on a Launch Pad

In this paper we describe in-situ testing of a long payload umbilical, on a launch site, injected with “lightning- like” transients and describe resulting pin-to-pin voltages. Injections and voltage measurements near the ground support equipment room, as well as at a location near the payload junction box, are made. The umbilical cables tested include an outer over-braid and the inner conductor coupling is examined for open circuit, short-circuit and various loads representative of spacecraft input impedances. This testing is important because the Kennedy Space Center (KSC) where the lightning occurrence is the highest in the United States, is the primary launch site for Launch Services Program spacecraft customers. Lightning planning is essential but developing a lightning plan is often overlooked or not adequately analyzed leaving the spacecraft vulnerable to time delays or even damage when lightning occurs. At other popular launch sites like Vandenberg Air Force Base (VAFB) where lightning occurs less often, although at the same or greater intensity when it does occur, lightning planning is often completely ignored by the spacecraft. The two major questions to be addressed in the lightning plan are what retesting should be done to establish a “goodness” level and what is the trigger criteria for this testing? The spacecraft will typically use a standard spacecraft check-out procedure to address the necessary retesting, but determining the trigger criteria is often an issue. For instance, a spacecraft needs to understand what their immunity is to a certain lightning magnitude and location. Determining the amount of current that can be coupled onto a spacecraft umbilical can be calculated by using worst case assumptions or measured with current probes and current measurement devices. Spacecraft can also determine what pin-to-pin voltages they are sensitive to, however pin-to-pin voltage measurements are not typically taken during the strike due to the invasive nature of this measurement. In this paper, we present detailed data on the shield to pin voltage transfer functions to provide insight to the spacecraft developers for lightning retest criteria planning. The results from this unique testing opportunity provide essential details on specific coupling mechanisms affecting spacecraft hardware that interfaces with the ground support equipment. This missing link between cable shield currents and payload susceptibility voltages has been methodically tested and representative data presented.

Trout, Dawn↗

Standards and Specifications for Ground Processing of Space Vehicles: From an Aviation-Based Shuttle Project to Global Application

Proprietary or unique designs and operations are expected early in any industry's development, and often provide a competitive early market advantage. However, there comes a time when a product or industry requires standardization for the whole industry to advance...or survive. For the space industry, that time has come. Here, we will focus on standardization of ground processing for space vehicles and their ground systems. With the retirement of the Space Shuttle, and emergence of a new global space race, affordability and sustainability are more important now than ever. The growing commercialization of the space industry and current global economic environment are driving greater need for efficiencies to save time and money. More RLV's (Reusable Launch Vehicles) are being developed for the gains of reusability not achievable with traditional ELV's (Expendable Launch Vehicles). More crew/passenger vehicles are also being developed. All of this calls for more attention needed for ground processing-repeatedly before launch and after landing/recovery. RLV's should provide more efficiencies than ELV's, as long as MRO (Maintenance, Repair, and Overhaul) is well-planned-even for the unplanned problems. NASA's Space Shuttle is a primary example of an RLV which was supposed to thrive on reusability savings with efficient ground operations, but lessons learned show that costs were (and still are) much greater than expected. International standards and specifications can provide the commonality needed to simplify design and manufacturing as well as to improve safety, quality, maintenance, and operability. There are standards organizations engaged in the space industry, but ground processing is one of the areas least addressed. Challenges are encountered due to various factors often not considered during development. Multiple vehicle elements, sites, customers, and contractors pose various functional and integration difficulties. Resulting technical publication structures and methods are incongruent. Some processing products are still done on paper, some electronic, and many being converted in between. Business systems then are not fully compatible, and paper as well as electronic conversions are time-consuming and costly. NASA and its Shuttle contractors setup rules and systems to handle what has produced over 130 RLV launches, but they have had many challenges. Attempts have been made to apply aviation industry specifications to make the Shuttle more efficient with its ground processing. One efficiency project example was to make a Shuttle Maintenance Manual (SMM) based on the commercial ATA (Air Transport Association of America) Spec 100 for technical publications. This industry standard, along with others, has been a foundation for efficient global MRO of commercial airlines for years. A modified version was also made for some military aircraft. The SMM project found many similarities in Spec 100 which apply to the Shuttle, and room for expansion for space systems/structures not in aircraft. The SMM project team met with the ATA and representatives from NASA's X-33 and X-34 programs to discuss collaboration on a national space standard based on Spec 100. A pilot project was enabled for a subset of Shuttle systems. Full implementation was not yet achieved, X-33 and X-34 were cancelled, and the Shuttles were then designated for retirement. Nonetheless, we can learn from this project how to expand this concept to all space vehicle products. Since then, ATA has joined with ASD (AeroSpace and Defence Industries Association of Europe) and AIA (Aerospace Industries Association) to form a much-enhanced and expanded international specification: Sl000D, International Specification for Technical Publications. It includes air, land, and sea vehicles, missiles, support equipment, ordnance, and communications. It is used by a growing number of countries for commercial and government products. Its modular design is supported by a Common Source Dabase (CSDB), and COTS (commercial off-the-shelf) software is available for production of IETP's (Interactive Electronic Technical Publications). A few space industry products in Europe have begun to apply Sl000D already. Also, there are other related standards/specifications which have global implications. We have an opportunity to adapt Sl000D and possibly other standards for use with space vehicles and ground systems. Sl000D has plenty of flexibility to apply to any product needed. To successfully grow the viability of the space industry, all members, commercial and government, will need to engage cooperatively in developing and applying standards to move toward interoperability. If we leverage and combine the best existing space standards and specifications, develop new ones to address known gaps, and adapt the best applicable features from other industries, we can establish an infrastructure to not only accelerate current development, but also build longevity for a more cohesive international space community.

Ingalls, John↗

A strapdown laser gyro navigator

A broad spectrum of commercial and military vehicles employ some form of inertial measurement equipment. In general this equipment has a special purpose in that it was tailored for each specific application thereby resulting in high installation and maintenance costs. Recently the emphasis has been directed toward developing low cost building blocks from which the desired inertial functions can be derived. This paper describes a National Aeronautics and Space Administration (NASA) program that combines inertial system sensor and computational advances into a flight demonstration configuration. Specifically, an inertial navigation system employing strapdown laser gyro angular rate sensors and a miniature, modular digital flight computer is described. The objective of this program is to demonstrate, via flight test evaluation, the capabilities of the advanced sensor and computer as they apply to future low cost, high reliability inertial system applications.

Garret, H.↗

TERSSE: Definition of the Total Earth Resources System for the Shuttle Era. Volume 6: An Early Shuttle Pallet Concept for the Earth Resources Program

A space shuttle sortie mission which can be performed inexpensively in the early shuttle era and which, if the necessary intermediate steps are accomplished provides a major technological advance for the user organization-the U.S. Bureau of Census is described. The orbital configuration created for the Urban Land Use/1980 Census mission is illustrated including sensors and ground support equipment along with the information flow for the mission. Factors discussed include: specific Census Bureau functions to be supported by the mission; hardware and flight operations necessary for implementation of the mission; and integration of the TERSSE pallet into a shuttle mission.

Source record↗

The George C. Marshall Space Flight Center High Reynolds Number Wind Tunnel Technical Handbook

The High Reynolds Number Wind Tunnel at the George C. Marshall Space Flight Center is described. The following items are presented to illustrate the operation and capabilities of the facility: facility descriptions and specifications, operational and performance characteristics, model design criteria, instrumentation and data recording equipment, data processing and presentation, and preliminary test information required.

Gwin, H. S.↗

Shuttle/TDRSS Ku-band downlink study

Assessing the adequacy of the baseline signal design approach, developing performance specifications for the return link hardware, and performing detailed design and parameter optimization tasks was accomplished by completing five specific study tasks. The results of these tasks show that the basic signal structure design is sound and that the goals can be met. Constraints placed on return link hardware by this structure allow reasonable specifications to be written so that no extreme technical risk areas in equipment design are foreseen. A third channel can be added to the PM mode without seriously degrading the other services. The feasibility of using only a PM mode was shown to exist, however, this will require use of some digital TV transmission techniques. Each task and its results are summarized.

Meyer, R.↗

High voltage design guide for airborne equipment

The report supplies the theoretical background and design techniques needed by an engineer who is designing electrical insulation for high-voltage high-power components, equipment, and systems on aircraft. A literature survey and abundant bibliography identify references that provide further data on the subjects of partial discharges, corona, field theory and plotting, voids and processes for applying insulation. Both gaseous and solid insulations are treated. Cryogenic and liquid design notes are included. Tests and test equipment for high voltage insulation and equipment are defined. Requirements of test plans and procedures for high-voltage high-power equipment are identified and illustrated by examples. Suggestions for high-voltage specifications are provided. Very few of the Military and Government specifications deal with system voltages above 10kv, thus most aircraft high-voltage specifications will have to be derived from the power industry specifications and standards produced by ASTM, IEEE, and NEMA.

W G Dunbar↗