Search NASA⌕ Search

SEARCH · Search NASA

Results for “ESA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

The Asteroid Impact and Deflection Assessment Mission and its Potential Contributions to Human Exploration of Asteroids

The joint ESA and NASA Asteroid Impact and Deflection Assessment (AIDA) mission will directly address aspects of NASA's Asteroid Initiative and will contribute to future human exploration. The NASA Asteroid Initiative is comprised of two major components: the Grand Challenge and the Asteroid Mission. The first component, the Grand Challenge, focuses on protecting Earth's population from asteroid impacts by detecting potentially hazardous objects with enough warning time to either prevent them from impacting the planet, or to implement civil defense procedures. The Asteroid Mission, involves sending astronauts to study and sample a near-Earth asteroid (NEA) prior to conducting exploration missions of the Martian system, which includes Phobos and Deimos. AIDA's primary objective is to demonstrate a kinetic impact deflection and characterize the binary NEA Didymos. The science and technical data obtained from AIDA will aid in the planning of future human exploration missions to NEAs and other small bodies. The dual robotic missions of AIDA, ESA's Asteroid Impact Monitor (AIM) and NASA's Double Asteroid Redirection Test (DART), will provide a great deal of technical and engineering data on spacecraft operations for future human space exploration while conducting in-depth scientific examinations of the binary target Didymos both prior to and after the kinetic impact demonstration. The knowledge gained from this mission will help identify asteroidal physical properties in order to maximize operational efficiency and reduce mission risk for future small body missions. The AIDA data will help fill crucial strategic knowledge gaps concerning asteroid physical characteristics that are relevant for human exploration considerations at similar small body destinations.

Abell, Paul A.↗

Implementation of the Orbital Maneuvering Systems Engine and Thrust Vector Control for the European Service Module

The European Space Agency (ESA) has entered into a partnership with the National Aeronautics and Space Administration (NASA) to develop and provide the Service Module (SM) for the Orion Multipurpose Crew Vehicle (MPCV) Program. The European Service Module (ESM) will provide main engine thrust by utilizing the Space Shuttle Program Orbital Maneuvering System Engine (OMS-E). Thrust Vector Control (TVC) of the OMS-E will be provided by the Orbital Maneuvering System (OMS) TVC, also used during the Space Shuttle Program. NASA will be providing the OMS-E and OMS TVC to ESA as Government Furnished Equipment (GFE) to integrate into the ESM. This presentation will describe the OMS-E and OMS TVC and discuss the implementation of the hardware for the ESM.

Orbital Maneuvering System↗

JPL VLBI Analysis Center Report for 2012

This report describes the activities of the JPL VLBI Analysis Center for the year 2012. The highlight of the year was the successful MSL rover Mars landing, which was supported by VLBI-based navigation using our combined spacecraft, celestial reference frame, terrestrial reference frame, earth orientation, and planetary ephemeris VLBI systems. We also supported several other missions with VLBI navigation measurements. A combined NASA-ESA network was demonstrated with first Ka-band fringes to ESA's Malargue, Argentina 35 m. We achieved first fringes with our new digital back end and Mark 5C recorders.

Jacobs, Chris↗

Relay Support for the Mars Science Laboratory and the Coming Decade of Mars Relay Network Evolution

In the past decade, an evolving network of Mars relay orbiters has provided telecommunication relay services to the Mars Exploration Rovers, Spirit and Opportunity, and to the Mars Phoenix Lander, enabling high-bandwidth, energy-efficient data transfer and greatly increasing the volume of science data that can be returned from the Martian surface, compared to conventional direct-to-Earth links. The current relay network, consisting of NASA's Odyssey and Mars Reconnaissance Orbiter and augmented by ESA's Mars Express Orbiter, stands ready to support the Mars Science Laboratory, scheduled to arrive at Mars on Aug 6, 2012, with new capabilities enabled by the Electra and Electra-Lite transceivers carried by MRO and MSL, respectively. The MAVEN orbiter, planned for launch in 2013, and the ExoMars/Trace Gas Orbiter, planned for launch in 2016, will replenish the on-orbit relay network as the current orbiter approach their end of life. Currently planned support scenarios for this future relay network include an ESA EDL Demonstrator Module deployed by the 2016 ExoMars/TGO orbiter, and the 2018 NASA/ESA Joint Rover, representing the first step in a multimission Mars Sample Return campaign.

MAVEN↗

Performance Evaluation of the T6 Ion Engine

The T6 ion engine is a 22-cm diameter, 4.5-kW Kaufman-type ion thruster produced by QinetiQ, Ltd., and is baselined for the European Space Agency BepiColombo mission to Mercury and is being qualified under ESA sponsorship for the extended range AlphaBus communications satellite platform. The heritage of the T6 includes the T5 ion thruster now successfully operating on the ESA GOCE spacecraft. As a part of the T6 development program, an engineering model thruster was subjected to a suite of performance tests and plume diagnostics at the Jet Propulsion Laboratory. The engine was mounted on a thrust stand and operated over its nominal throttle range of 2.5 to 4.5 kW. In addition to the typical electrical and flow measurements, an E x B mass analyzer, scanning Faraday probe, thrust vector probe, and several near-field probes were utilized. Thrust, beam divergence, double ion content, and thrust vector movement were all measured at four separate throttle points. The engine performance agreed well with published data on this thruster. At full power the T6 produced 143 mN of thrust at a specific impulse of 4120 seconds and an efficiency of 64%; optimization of the neutralizer for lower flow rates increased the specific impulse to 4300 seconds and the efficiency to nearly 66%. Measured beam divergence was less than, and double ion content was greater than, the ring-cusp-design NSTAR thruster that has flown on NASA missions. The measured thrust vector offset depended slightly on throttle level and was found to increase with time as the thruster approached thermal equilibrium.

Snyder, John Steven↗

Return to Europa: Overview of the Jupiter Europa Orbiter Mission

Missions to explore Europa have been imagined ever since the Voyager mission first suggested that Europa was geologically very young. Subsequently, Galileo supplied fascinating new insights into that satellite's secrets. The Jupiter Europa Orbiter (JEO) would be the NASA-led portion of the Europa Jupiter System Mission (EJSM), an international mission with orbiters developed by NASA, ESA and possibly JAXA. JEO would address a very important subset of the complete EJSM science objectives and is designed to function alone or in conjunction with ESA's Jupiter Ganymede Orbiter (JGO).

radiation↗

Alert Exchange Process Protocol

The National Aeronautics and Space Administration of the United States of America (NASA), and the European Space Agency (ESA), and the Japanese Aerospace Exploration Agency (JAXA), acknowledging that NASA, ESA and JAXA have a mutual interest in exchanging Alerts and Alert Status Lists to enhance the information base for each system participant while fortifying the general level of cooperation between the policy agreement subscribers, and each Party will exchange Alert listings on regular basis and detailed Alert information on a need to know basis to the extent permitted by law.

data exchange↗

Development of Onboard Computer Complex for Russian Segment of ISS

Report present a description of the Onboard Computer Complex (CC) that was developed during the period of 1994-1998 for the Russian Segment of ISS. The system was developed in co-operation with NASA and ESA. ESA developed a new computation system under the RSC Energia Technical Assignment, called DMS-R. The CC also includes elements developed by Russian experts and organizations. A general architecture of the computer system and the characteristics of primary elements of this system are described. The system was integrated at RSC Energia with the participation of American and European specialists. The report contains information on software simulators, verification and de-bugging facilities witch were been developed for both stand-alone and integrated tests and verification. This CC serves as the basis for the Russian Segment Onboard Control Complex on ISS.

Branets, V.↗

Paving the Path for Human Space Exploration: The Challenges and Opportunities

Lauri Hansen, Director of Engineering at NASA Johnson Space Center will discuss the challenges of human space exploration. The future of human exploration begins with our current earth reliant missions in low earth orbit. These missions utilize the International Space Station to learn how to safely execute deep space missions. In addition to serving as an exploration test bed and enabling world class research, the International Space Station enables NASA to build international and commercial partnerships. NASA's next steps will be to enable the commercialization of low earth orbit while concentrating on developing the spacecraft and infrastructure necessary for deep space exploration and long duration missions. The Orion multi-purpose crew vehicle and the Space Launch System rocket are critical building blocks in this next phase of exploration. There are many challenges in designing spacecraft to perform these missions including safety, complex vehicle design, and mass challenges. Orion development is proceeding well, and includes a significant partnership with the European Space Agency (ESA) to develop and build the Service Module portion of the spacecraft. Together, NASA and ESA will provide the capability to take humans further than we have ever been before - 70,000 km past the moon. This will be the next big step in expanding the frontiers of human exploration, eventually leading to human footprints on Mars.

Hansen, Lauri↗

Large Observatory for X-ray Timing (LOFT-P): A Probe-Class Mission Concept Study

LOFT-P is a mission concept for a NASA Astrophysics Probe-Class (less than $1B) X-ray timing mission, based on the LOFT M-class concept originally proposed to ESA's M3 and M4 calls. LOFT-P requires very large collecting area, high time resolution, good spectral resolution, broadband spectral coverage (2-30 keV), highly flexible scheduling, and an ability to detect and respond promptly to time-critical targets of opportunity. Many of LOFTP's targets are bright, rapidly varying sources, so these measurements are synergistic to imaging and high-resolution spectroscopy instruments, addressing much smaller distance scales than are possible without very long baseline X-ray interferometry, and using complementary techniques to address the geometry and dynamics of emission regions. LOFT-P was presented as an example mission to the head of NASA's Astrophysics Division, to demonstrate the strong community support for creation of a probe-class, for missions costing between $500M and $1B. We submitted a white paper4 in response to NASA PhysPAG's call for white papers: Probe-class Mission Concepts, describing LOFT-P science and a simple extrapolation from the ESA study costs. The next step for probe-class missions will be input into the NASA Astrophysics Decadal Survey to encourage the creation of a probe-class opportunity. We report on a 2016 study by MSFC's Advanced Concepts Office of LOFT-P, a US-led probe-class LOFT concept.

x-ray↗

S&MA Internship to Support Orion and the European Service Module

As a University Space Research Association (USRA) intern for NASA Johnson Space Center (JSC) during the summer 2016 work term, I worked on three main projects for the Space Exploration Division (NC) of the Safety and Mission Assurance (S&MA) Directorate. I worked on all three projects concurrently. One of the projects involved facilitating the status and closure of technical actions that were created during European Service Module (ESM) safety reviews by the MPCV Safety & Engineering Review Panel (MSERP). The two main duties included accurately collecting and summarizing qualitative data, and communicating that information to the European Space Agency (ESA) and Airbus (ESA's prime contractor) in a clear, succinct and precise manner. This project also required that I create a report on the challenges and opportunities of international S&MA. With its heavy emphasis on soft skills, this project taught me how to communicate better, by showing me how to present and share information in an easy-to-read and understandable format, and by showing me how to cooperate with and culturally respect international partners on a technical project. The second project involved working with the Orion Thermal Protection System (TPS) Process Failure Modes and Effects Analysis (PFMEA) Working Group to create the first full version of the Orion TPS PFMEA. The Orion TPS PFMEA Working Group met twice a week to analyze the Avcoat block installation process for failure modes, the failure modes effects, and how such failure modes could be controlled. I was in charge of implementing changes that were discussed in meeting, but were not implemented real time. Another major task included creating a significant portion of the content alongside another team member outside the two weekly meetings. This project caused me to become knowledgeable about TPS, heatshields, space-rated manufacturing, and non-destructive evaluation (NDE). The project also helped me to become better at working with a small team and helped improved my technical communication skills. My main duty for the third project was creating a Safety Verification Tracking Log (SVTL) for the Orbital Maneuvering System Engine (OMS-E), and contacting subject matter experts to close Hazard Report (HR) control verifications. This project also required me to support other OMS-E safety process tasks, like monitoring OMS-E vibration testing for Quality Assurance (QA) purposes. This project helped me become even more proficient in Excel. Throughout the project, I gained knowledge about the OMS-E system and improved my understanding of pressure systems and propellant systems. In terms of education goals, this work term has affirmed my desire to take a few more space-related courses, like orbital mechanics, so that I can have a better understanding of human spaceflight and the industry surrounding it. However, the work term did not persuade me to pursue a master's degree. In terms of career goals, this work term has helped me clarify the direction I would like to head in the future. The perspective of three summer terms working for NASA in S&MA has allowed me to observe that most S&MA employees joined S&MA after working in other NASA directorates, such as Engineering or Flight Operations. It is my belief that it would be advantageous for both NASA and I for me to broaden my knowledge base and technical skill set by completing hands-on technical work on human spaceflight projects, and for me to integrate my safety experience directly into technical work in other directorates. The other significant advantage to this proposed situation is that if I were to eventually return to S&MA, I would be returning with a substantial set of hands-on technical experience and knowledge, which would be a significant resource for S&MA tasks and projects.

Hutcheson, Connor↗

NASA Collaborative Approach Mitigates Environmentally-Driven Obsolescence

National Aeronautics and Space Administration (NASA) missions, like Department of Defense (DoD) organizations, require the rigorous testing and qualification of critical materials. Obsolescence supply risks created by environmental requirements can affect the cost, schedule and performance of NASA missions and the resilience of critical infrastructure. The NASA Technology Evaluation for Environmental Risk Mitigation (TEERM) Principal Center helps to identify obsolescence supply risks driven by environmental requirements and works proactively with NASA Centers and Programs, the DoD, the European Space Agency (ESA) and other agencies and partners to identify and evaluate environmentally friendly alternatives. TEERM tracks environmental regulations, identifies the potential loss of material availability and works with NASA programs and Centers to evaluate potential impacts through a risk assessment approach. TEERM collaborative projects identify, demonstrate and evaluate commercially viable alternative technologies and materials. A major focus during the Space Shuttle Program was the need to replace ozone depleting substances that were used in spray foam and cleaning applications. The potential obsolescence of coatings containing hexavalent chromium and the risks associated with lead free solder were also of concern for the Space Shuttle and present ongoing risks to new programs such as the Space Launch System. One current project teams NASA and ESA in the evaluation and testing of individual coatings and coating systems as replacements for hexavalent chromium coatings in aerospace applications. The proactive, collaborative approach used by TEERM helps reduce the cost burden on any one team partner, reduces duplication of effort, and enhances the technical quality and overall applicability of the testing and analysis.

environmentall-driven obsolescence↗

NASA GSFC Report on CCSDS Recommendations 2.1.8A B Minimum Earth Station Transmitter Frequency Resolution for Spacecraft Receiver Acquisition

In Fall 2016, ESA presented paper SLS-RFM 16-10 documenting a possible issue with the frequency lock-in range specification in Recommendation 2.1.8A of typically 267 to 1067 Hz in considerings (b) from considerings (a) for loop bandwidths [2B(sub LO)] in the range of 200 to 800 Hz with a recommendation of 100 Hz step size for frequency sweeping. The paper calculated the lock-in range to be (+/-)266 to (+/-)1064 rad/s or (+/-)42 to (+/-)168 Hz. Also, Recommendation 2.1.8B has the same issue for considering (a) and (b), i.e. for 2B(sub LO) =10 Hz, a lock-in range of 13 Hz was specified and a recommendation of 5 Hz step size for frequency sweeping. ESA also provided test results from the Rosetta and Exomars transponders. The results were somewhat inconsistent since the tests to verify lock-in and pull-in range did not include acquisition time, which is vital to the definition of these performance measures. This paper will address these test results below. However, we first examine the rationale for Recommendation 2.1.8A/B and its consistency with the theory of 2nd order phase lock loop operations. Our approach is to design a digital phase locked loop (DPLL) from phase locked loop (PLL) requirements. All analysis will be performed with a DPLL.

digital phase locked loop↗

Turbulence Heating ObserveR: - Satellite Mission Proposal

The Universe is permeated by hot, turbulent, magnetized plasmas. Turbulent plasma is a major constituent of active galactic nuclei, supernova remnants, the intergalactic and interstellar medium, the solar corona, the solar wind and the Earths magnetosphere, just to mention a few examples. Energy dissipation of turbulent fluctuations plays a key role in plasma heating and energization, yet we still do not understand the underlying physical mechanisms involved. THOR is a mission designed to answer the questions of how turbulent plasma is heated and particles accelerated, how the dissipated energy is partitioned and how dissipation operates in different regimes of turbulence. THOR is a single-spacecraft mission with an orbit tuned to maximize data return from regions in near-Earth space magnetosheath, shock, foreshock and pristine solar wind featuring different kinds of turbulence. Here we summarize the THOR proposal submitted on 15 January 2015 to the Call for a Medium-size mission opportunity in ESAs Science Programme for a launch in 2025 (M4). THOR has been selected by European Space Agency (ESA) for the study phase.

Vaivads, A.↗

On the Execution Control of HLA Federations using the SISO Space Reference FOM

In the Space domain the High Level Architecture (HLA) is one of the reference standard for Distributed Simulation. However, for the different organizations involved in the Space domain (e.g. NASA, ESA, Roscosmos, and JAXA) and their industrial partners, it is difficult to implement HLA simulators (called Federates) able to interact and interoperate in the context of a distributed HLA simulation (called Federation). The lack of a common FOM (Federation Object Model) for the Space domain is one of the main reasons that precludes a-priori interoperability between heterogeneous federates. To fill this lack a Product Development Group (PDG) has been recently activated in the Simulation Interoperability Standards Organization (SISO) with the aim to provide a Space Reference FOM (SRFOM) for international collaboration on Space systems simulations. Members of the PDG come from several countries and contribute experiences from projects within NASA, ESA and other organizations. Participants represent government, academia and industry. The paper presents an overview of the ongoing Space Reference FOM standardization initiative by focusing on the solution provided for managing the execution of an SRFOM-based Federation.

Moller, Bjorn↗

GPS and Galileo Developments on Board the International Space Station With the Space Communications and Navigation (SCaN) Testbed

The Space Communications and Navigation (SCaN) is a facility developed by NASA and hosted on board the International Space Station (ISS) on an external truss since 2013.It has the objective of testing navigation and communication experimentations with a Software Defined Radio (SDR) approach, which permits software updates for testing new experimentations.NASA has developed the Space Telecommunications Radio System (STRS) architecture standard for SDRs used in space and ground-based platforms to provide commonality among radio developments to provide enhanced capability. The hardware is equipped with both L band front-end radios and the NASA space network communicates with it using S-band, Ku-band and Ka-band links.In May 2016 Qascom started GARISS (GPS and Galileo Receiver for the ISS), an activity of experimentation in collaboration with ESA and NASA that has the objective to develop and validate the acquisition and processing of combined GPS and Galileo signals on board the ISS SCaN testbed. This paper has the objective to present the mission, and provide preliminary details about the challenges in the design, development and verification of the waveform that will be installed on equipment with limited resources. GARISS is also the first attempt to develop a waveform for the ISS as part of an international collaboration between US and Europe. Although the final mission objective is to target dual frequency processing, initial operations will foresee a single frequency processing. Initial results and trade-off between the two options, as well as the final decision will be presented and discussed. The limited resources on board the SCaN with respect to the challenging requirements to acquire and track contemporaneously two satellite navigation systems, with different modulations and data structure, led to the need to assess the possibility of aiding from ground through the S-band. This option would allow assistance to the space receiver in order to provide knowledge of GNSS orbits and reduce the processing on board. Trade off and various options for telemetry and uplink data are presented and discussed. Finally, integration and validation of the waveform are one of the major challenges of GARISS: The Experiment Development System (EDS) and the the Ground Integration Unit (GIU) for VV will be used prior to conducting the experiment on the ISS. The EDS can be used in lab environment and allows prototyping and verification activities with the simulator, but does not include all hardware components. The GIU on the other side is the flight model which replicates the flying equipment, but has limited flexibility for testing.As conclusion, the project is now approaching the Preliminary Design Review (PDR) and indeed only preliminary results are available. This paper is an opportunity to present the GARISS mission as part of an International cooperation between ESA, NASA and Qascom. The preliminary results include GPS and Galileo processing from space signals, the challenges and trade off decisions, the high level STRS architecture and foreseen experimentation campaign. Detailed results from the test campaigns are expected in 2017.

space navigation↗

Dynamic Control System Mode Performance of the Space Technology-7 Disturbance Reduction System

The Space Technology-7 (ST-7) Disturbance Reduction System (DRS) is an experiment package aboard the European Space Agency (ESA) LISA Pathfinder spacecraft, launched on December 3, 2015. DRS consists of three primary components: Colloidal MicroNewton Thrusters (CMNTs), an Integrated Avionics Unit (IAU), and flight-software implementing the Command and Data Handling (C&DH) and Dynamic Control System (DCS) algorithms. The CMNTs were designed to provide thrust from 5 to 30 micro Newton, with thrust controllability and resolution of 0.1 micro Newton and thrust noise of 0.1 micro Newton/(square root of (Hz)) in the measurement band from 1-30 mHz. The IAU hosts the C&DH and DCS flight software, as well as interfaces with both the CMNT electronics and the LISA Pathfinder spacecraft. When in control, the DCS uses star tracker attitude data and capacitive or optically-measured position and attitude information from LISA Pathfinder and the LISA Technology Package (LTP) to control the attitude and position of the spacecraft and the two test masses inside the LTP. After completion of the nominal ESA LISA Pathfinder mission, the DRS experiment was commissioned followed by its nominal mission. DRS operations extended over the next five months, interspersed with station keeping, anomaly resolution, and periods where control was handed back to LISA Pathfinder for them to conduct further experiments. The primary DRS mission ended on December 6, 2016, with the experiment meeting all of its Level 1 requirements. The DCS, developed at the NASA Goddard Space Flight Center, consists of five spacecraft control modes and six test mass control modes, combined into six 'DRS Mission Modes'. Attitude Control and Zero-G were primarily used to control the spacecraft during initial handover and during many of the CMNT characterization experiments. The other Mission Modes, Drag Free Low Force, 18-DOF Transitional, and 18-DOF, were used to provide drag-free control of the spacecraft about the test masses. This paper will discuss the performance of these DCS spacecraft and test mass control modes. Flight data will be shown from each mode throughout the mission, both from nominal operations and during various flight experiments. The DCS team also made some changes to controller, filter, and limit parameters during operations; the motivation and results of these changes will be shown and discussed.

O'Donnell, James R., Jr.↗

Orion European Service Module (ESM) Development, Integration and Qualification Status

ESA and the European Industry are supplying the European Service Module for Orion. An overview of the system and subsystem configuration of the Orion European Service Module (ESM) as designed and built for the EM-1 mission is provided as well as an outline of its development, assembly, integration and verification process performed by ESA and NASA in coordination with their respective Industrial prime contractors, Airbus Defence and Space and Lockheed Martin.

Berthe, Philippe↗