Search NASA⌕ Search

SEARCH · Search NASA

Results for “Evolvable Hardware”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

NDE detectability of fatigue-type cracks in high-strength alloys: NDI reliability assessments

This program was conducted to generate quantitative flaw detection capability data for the nondestructive evaluation (NDE) techniques typically practiced by aerospace contractors. Inconel 718 and Haynes 188 alloy test specimens containing fatigue flaws with a wide distribution of sizes were used to assess the flaw detection capabilities at a number of contractor and government facilities. During this program 85 inspection sequences were completed presenting a total of 20,994 fatigue cracks to 53 different inspectors. The inspection sequences completed included 78 liquid penetrant, 4 eddy current, and 3 ultrasonic evaluations. The results of the assessment inspections are presented and discussed. In generating the flaw detection capability data base, procedures for data collection, data analysis, and specimen care and maintenance were developed, demonstrated, and validated. The data collection procedures and methods that evolved during this program for the measurement of flaw detection capabilities and the effects of inspection variables on performance are discussed. The Inconel 718 and Haynes 188 test specimens that were used in conducting this program and the NDE assessment procedures that were demonstrated, provide NASA with the capability to accurately assess the flaw detection capabilities of specific inspection procedures being applied or proposed for use on current and future fracture control hardware program.

Christner, Brent K.↗

Open control/display system for a telerobotics work station

A working Advanced Space Cockpit was developed that integrated advanced control and display devices into a state-of-the-art multimicroprocessor hardware configuration, using window graphics and running under an object-oriented, multitasking real-time operating system environment. This Open Control/Display System supports the idea that the operator should be able to interactively monitor, select, control, and display information about many payloads aboard the Space Station using sets of I/O devices with a single, software-reconfigurable workstation. This is done while maintaining system consistency, yet the system is completely open to accept new additions and advances in hardware and software. The Advanced Space Cockpit, linked to Grumman's Hybrid Computing Facility and Large Amplitude Space Simulator (LASS), was used to test the Open Control/Display System via full-scale simulation of the following tasks: telerobotic truss assembly, RCS and thermal bus servicing, CMG changeout, RMS constrained motion and space constructible radiator assembly, HPA coordinated control, and OMV docking and tumbling satellite retrieval. The proposed man-machine interface standard discussed has evolved through many iterations of the tasks, and is based on feedback from NASA and Air Force personnel who performed those tasks in the LASS.

Keslowitz, Saul↗

A synopsis of test results and knowledge gained from the Phase-0 CSI evolutionary model

The Phase-0 CSI Evolutionary Model (CEM) is a testbed for the study of space platform global line-of-sight (LOS) pointing. Now that the tests have been completed, a summary of hardware and closed-loop test experiences is necessary to insure a timely dissemination of the knowledge gained. The testbed is described and modeling experiences are presented followed by a summary of the research performed by various investigators. Some early lessons on implementing the closed-loop controllers are described with particular emphasis on real-time computing requirements. A summary of closed-loop studies and a synopsis of test results are presented. Plans for evolving the CEM from phase 0 to phases 1 and 2 are also described. Subsequently, a summary of knowledge gained from the design and testing of the Phase-0 CEM is made.

Belvin, W. Keith↗

Lessons learned about spaceflight and cell biology experiments

Conducting cell biology experiments in microgravity can be among the most technically challenging events in a biologist's life. Conflicting events of spaceflight include waiting to get manifested, delays in manifest schedules, training astronauts to not shake your cultures and to add reagents slowly, as shaking or quick injection can activate signaling cascades and give you erroneous results. It is important to select good hardware that is reliable. Possible conflicting environments in flight include g-force and vibration of launch, exposure of cells to microgravity for extended periods until hardware is turned on, changes in cabin gases and cosmic radiation. One should have an on-board 1-g control centrifuge in order to eliminate environmental differences. Other obstacles include getting your funding in a timely manner (it is not uncommon for two to three years to pass between notification of grant approval for funding and actually getting funded). That said, it is important to note that microgravity research is worthwhile since all terrestrial life evolved in a gravity field and secrets of biological function may only be answered by removing the constant of gravity. Finally, spaceflight experiments are rewarding and worth your effort and patience.

manned↗

An MBSE Approach to Space Suit Development

The EVA/Space Suit Development Office (ESSD) Systems Engineering and Integration (SE&I) team has utilized MBSE in multiple programs. After developing operational and architectural models, the MBSE framework was expanded to link the requirements space to the system models through functional analysis and interfaces definitions. By documenting all the connections within the technical baseline, ESSD experienced significant efficiency improvements in analysis and identification of change impacts. One of the biggest challenges presented to the MBSE structure was a program transition and restructuring effort, which was completed successfully in 4 months culminating in the approval of a new EVA Technical Baseline. During this time three requirements sets spanning multiple DRMs were streamlined into one NASA-owned Systems Requirement Document (SRD) that successfully identified requirements relevant to the current hardware development effort while remaining extensible to support future hardware developments. A capability-based hierarchy was established to provide a more flexible framework for future space suit development that can support multiple programs with minimal rework of basic EVA/Space Suit requirements. This MBSE approach was most recently applied for generation of an EMU Demonstrator technical baseline being developed for an ISS DTO. The relatively quick turnaround of operational concepts, architecture definition, and requirements for this new suit development has allowed us to test and evolve the MBSE process and framework in an extremely different setting while still offering extensibility and traceability throughout ESSD projects. The ESSD MBSE framework continues to be evolved in order to support integration of all products associated with the SE&I engine.

Cordova, Lauren↗

Resource Prospector Instrumentation for Lunar Volatiles Prospecting, Sample Acquisition and Processing

Data gathered from lunar missions within the last two decades have significantly enhanced our understanding of the volatile resources available on the lunar surface, specifically focusing on the polar regions. Several orbiting missions such as Clementine and Lunar Prospector have suggested the presence of volatile ices and enhanced hydrogen concentrations in the permanently shadowed regions of the moon. The Lunar Crater Observation and Sensing Satellite (LCROSS) mission was the first to provide direct measurement of water ice in a permanently shadowed region. These missions with other orbiting assets have laid the groundwork for the next step in the exploration of the lunar surface; providing ground truth data of the volatiles by mapping the distribution and processing lunar regolith for resource extraction. This next step is the robotic mission Resource Prospector (RP). Resource Prospector is a lunar mission to investigate 'strategic knowledge gaps' (SKGs) for in-situ resource utilization (ISRU). The mission is proposed to land in the lunar south pole near a permanently shadowed crater. The landing site will be determined by the science team with input from broader international community as being near traversable landscape that has a high potential of containing elevated concentrations of volatiles such as water while maximizing mission duration. A rover will host the Regolith & Environment Science and Oxygen & Lunar Volatile Extraction (RESOLVE) payload for resource mapping and processing. The science instruments on the payload include a 1-meter drill, neutron spectrometer, a near infrared spectrometer, an operations camera, and a reactor with a gas chromatograph-mass spectrometer for volatile analysis. After the RP lander safely delivers the rover to the lunar surface, the science team will guide the rover team on the first traverse plan. The neutron spectrometer (NS) and near infrared (NIR) spectrometer instruments will be used as prospecting tools to guide the traverse path. The NS will map the water-equivalent hydrogen concentration as low as 0.5% by weight to an 80 centimeter depth as the rover traverses the lunar landscape. The NIR spectrometer will measure surficial H2O/OH as well as general mineralogy. When the prospecting instruments identify a potential volatile-rich area during the course of a traverse, the prospect is then mapped out and the most promising location identified. An augering drill capable of sampling to a depth of 100 centimeters will excavate regolith for analysis. A quick assay of the drill cuttings will be made using an operations camera and NIR spectrometer. With the water depth confirmed by this first auguring activity, a regolith sample may be extracted for processing. The drill will deliver the regolith sample to a crucible that will be sealed and heated. Evolved volatiles will be measured by a gas chromatograph-mass spectrometer and the water will be captured and photographed. RP is a solar powered mission, which given the polar location translates to a relatively short mission duration on the order of 4-15 days. This short mission duration drives the concept of operations, instrumentation, and data analysis towards critical real time analysis and decision support. Previous payload field tests have increased the fidelity of the hardware, software, and mission operations. Current activities include a mission level field test to optimize interfaces between the payload and rover as well as better understand the interaction of the science and rover teams during the mission timeline. This paper will include the current status of the science instruments on the payload as well as the integrated field test occurring in fall of 2015. The concept of operations will be discussed, including the real time science and engineering decision-making process based on the critical data from the instrumentation. The path to flight will be discussed with the approach to this ambitious low cost mission.

ISRU↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations program is transforming Kennedy Space Center into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton (t) Block 1 configuration, and will then evolve to an ultimate capability of 130 t. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS -- Exploration Mission-1 (EM-1), an un-crewed mission to orbit the moon and return. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Additive Manufacturing of NASA HR-1 Material for Liquid Rocket Engine Component Applications

NASA HR-1 is a high-strength Fe-Ni superalloy designed to resist high pressure, hydrogen environment embrittlement, oxidation, and corrosion. NASA HR-1 was originally developed at NASA in the 1990’s and derived from JBK-75 to increase strength and ductility in high-pressure hydrogen environments. The NASA HR-1 chemistry was formulated to meet requirements for liquid rocket engine applications, specifically components used in a high-pressure hydrogen environment. Recent developments using additive manufacturing (AM) have made this material an attractive option for channel-cooled nozzles under the Rapid Analysis and Manufacturing Propulsion Technology (RAMPT) program and other liquid rocket engine component applications. The RAMPT program has baselined to fully evolve and characterize NASA HR-1 material. NASA HR-1 meets materials requirements for liquid rocket engine components, including good hydrogen resistance, high conductivity, good low cycle fatigue performance, and high elongation and strength for channel-cooled nozzles in high heat flux environments. Initial development and characterization has been completed using blown powder Directed Energy Deposition (DED) and Laser Powder Bed Fusion (L-PBF) additive manufacturing techniques to develop material test samples and nozzle hardware. NASA HR-1 powder has been sourced and characterized from several powder suppliers, and a series of development and hardware samples completed fabrication using DED and L-PBF. Characterization of the material has included heat treatment development, metallography, chemistry evaluations, mechanical testing, measurement of thermophysical properties, and fabrication of relevant nozzle hardware to demonstrate feasibility. This paper presents results from the process and early materials development and provide future development work including hardware fabrication.

Katsarelis, Colton↗

NASA's Space Launch System Takes Shape: Progress Toward Safe, Affordable, Exploration

Development of NASA's Space Launch System (SLS) exploration-class heavy lift rocket has moved from the formulation phase to implementation in 3 years and will make significant progress this year toward its first launch, slated December 2017. SLS represents a safe, affordable, and evolutionary path to development of an unprecedented capability for future human and robotic exploration and use of space. For the United States current development is focused on a configuration with a 70 metric ton (t) payload to low Earth orbit (LEO), more than double any operational vehicle. This version will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back, as well as the first crewed Orion flight. SLS is designed to evolve to a 130 t lift capability that can reduce mission costs, simplify payload design, reduce trip times, and lower overall risk. Each vehicle element completed its respective Preliminary Design Reviews, followed by the SLS Program. The Program also completed the Key Decision Point-C milestone to move from formulation to implementation in 2014. NASA hasthorized the program to proceed to Critical Design Review, scheduled for 2015. Accomplihments to date include: manufacture of core stage test hardware, as well as preparations for testing the world's most powerful solid rocket boosters and main engines that flew 135 successful Space Shuttle missions. The Program's success to date is due to prudent use of existing technology, infrastructure, and workforce; streamlined management approach; and judicious use of new technologies. This paper will discuss SLS Program successes over the past year and examine milestones and challenges ahead. The SLS Program and its elements are managed at NASA's Marshall Space Flight Center (MSFC).

Askins, Bruce R.↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton Block 1 configuration, and will then evolve to an ultimate capability of 130 metric tons. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS - Exploration Mission-1 (EM-1), an uncrewed mission to orbit the moon and return, and progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance (ULA) in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Overview of the Development and Mission Application of the Advanced Electric Propulsion System (AEPS)

NASA remains committed to the development and demonstration of a high-power solar electric propulsion capability for the Agency. NASA is continuing to develop the 14 kilowatt Advanced Electric Propulsion System (AEPS), which has recently completed an Early Integrated System Test and System Preliminary Design Review. NASA continues to pursue Solar Electric Propulsion (SEP) Technology Demonstration Mission partners and mature high-power SEP mission concepts. The recent announcement of the development of a Power and Propulsion Element (PPE) as the first element of an evolvable human architecture to Mars has replaced the Asteroid Redirect Robotic Mission as the most probable first application of the AEPS Hall thruster system. This high-power SEP capability, or an extensible derivative of it, has been identified as a critical part of an affordable, beyond-low-Earth-orbit, manned-exploration architecture. This paper presents the status of the combined NASA and Aerojet AEPS development activities and updated mission concept for implementation of the AEPS hardware as part of the ion propulsion system for a PPE.

ion engines↗

Development of High Power Hall Thruster Systems to Enable the NASA Exploration Vision

The next phase of space exploration missions requires high power Solar Electric Propulsion (SEP) systems for large-scale science missions and cargo transportation. Development is underway at Aerojet Rocketdyne on Hall thruster systems that are intended to bracket the needs of future NASA SEP missions in support of space exploration. The Advanced Electric Propulsion System (AEPS) program is developing and qualifying a 13.3kW Hall thruster system to be demonstrated on the Power and Propulsion Element (PPE), which is intended to be the first element of a Lunar Outpost Platform - Gateway (LOP-G). The NextSTEP program is integrating a nested Hall thruster into a 100kW system and testing it for 100 hours. These two programs will provide a path to efficient in-space propulsion that will allow NASA to transfer the large amounts of cargo that is needed to support human missions - first to the moon and then on to Mars. The Advanced Electric Propulsion System (AEPS) program is completing development, qualification and delivery of five flight 13.3kW EP systems to NASA. The flight AEPS system includes a magnetically shielded long-life Hall thruster, Power Processing Unit (PPU) and a Xenon Flow Controller (XFC). The Hall thruster, developed and demonstrated by NASA, operates at input powers up to 12.5kW while providing a specific impulse over an estimated 2800s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95-140V, consistent with operation beyond the orbit of Mars. The integrated system input power is continuously throttleable between 3 and 13.3kW. Component level testing of the EP String has begun with prototype hardware. The NextSTEP program is developing a 100kW Electric Propulsion (EP) system using a nested Hall thruster designed for powers up to 250kW, a modular power processor and a modular mass flow controller. While the program objective is to operate the integrated EP system continuously at 100kW for 100hrs to demonstrate thermal stability and support the development of system life time models, it builds on decades of experience with long-life Hall thrusters and the design is evolvable to a capability of 250kW. Design upgrades that demonstrate the 100kW EP system have been completed and tested. Aerojet Rocketdyne (AR) is excited to support NASA as it extends human reach into deep space and believes that these programs will provide the propulsion to make such missions affordable and sustainable. These systems provide NASA with a range of options to power its deep space transport vehicles. This paper presents the mission requirements for supporting the NASA exploration vision, as well as the status for the high power Hall thruster systems in development.

Jackson, Jerry↗

A Testbed Demonstration of an Intelligent Archive in a Knowledge Building System

The last decade's influx of raw data and derived geophysical parameters from several Earth observing satellites to NASA data centers has created a data-rich environment for Earth science research and applications. While advances in hardware and information management have made it possible to archive petabytes of data and distribute terabytes of data daily to a broad community of users, further progress is necessary in the transformation of data into information, and information into knowledge that can be used in particular applications in order to realize the full potential of these valuable datasets. In examining what is needed to enable this progress in the data provider environment that exists today and is expected to evolve in the next several years, we arrived at the concept of an Intelligent Archive in context of a Knowledge Building System (IA/KBS). Our prior work and associated papers investigated usage scenarios, required capabilities, system architecture, data volume issues, and supporting technologies. We identified six key capabilities of an IA/KBS: Virtual Product Generation, Significant Event Detection, Automated Data Quality Assessment, Large-Scale Data Mining, Dynamic Feedback Loop, and Data Discovery and Efficient Requesting. Among these capabilities, large-scale data mining is perceived by many in the community to be an area of technical risk. One of the main reasons for this is that standard data mining research and algorithms operate on datasets that are several orders of magnitude smaller than the actual sizes of datasets maintained by realistic earth science data archives. Therefore, we defined a test-bed activity to implement a large-scale data mining algorithm in a pseudo-operational scale environment and to examine any issues involved. The application chosen for applying the data mining algorithm is wildfire prediction over the continental U.S. This paper reports a number of observations based on our experience with this test-bed. While proof-of-concept for data mining scalability and utility has been a major goal for the research reported here, it was not the only one. The other five capabilities of an WKBS named above have been considered as well, and an assessment of the implications of our experience for these other areas will also be presented. The lessons learned through the testbed effort and presented in this paper will benefit technologists, scientists, and system operators as they consider introducing IA/KBS capabilities into production systems.

Ramapriyan, Hampapuram↗

Space Launch System Development Status

Development of NASA's Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than three years after formal program approval. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of Core Stage test panels; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for testing the RS-25 Core Stage engine; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. Objectives of this Earth-orbit flight include validating the performance of Orion's heat shield and the MSA design, which will be manufactured again for SLS missions to deep space. The Program successfully completed Preliminary Design Review in 2013 and Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

NASA's Space Launch System Development Status

Development of the National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than 3 years after formal program establishment. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of core stage test barrels and domes; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for RS- 25 core stage engine testing; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. The Program successfully completed Preliminary Design Review in 2013 and will complete Key Decision Point C in 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS Program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

Overview of the Development and Mission Application of the Advanced Electric Propulsion System (AEPS)

NASA remains committed to the development and demonstration of a high-power solar electric propulsion capability for the Agency. NASA is continuing to develop the 14 kW Advanced Electric Propulsion System (AEPS), which has recently completed an Early Integrated System Test and System Preliminary Design Review. NASA continues to pursue Solar Electric Propulsion (SEP) Technology Demonstration Mission partners and mature high-power SEP mission concepts. The recent announcement of the development of a Power and Propulsion Element (PPE) as the first element of an evolvable human architecture to Mars has replaced the Asteroid Redirect Robotic Mission (ARRM) as the most probable first application of the AEPS Hall thruster system. This high-power SEP capability, or an extensible derivative of it, has been identified as a critical part of an affordable, beyond-low-Earth-orbit, manned exploration architecture. This paper presents the status of the combined NASA and Aerojet Rocketdyne AEPS development activities and updated mission concept for implementation of the AEPS hardware as part of the ion propulsion system for a PPE.

Herman, Daniel A.↗

Development of High Power Hall Thruster Systems to Enable the NASA Exploration Vision

The next phase of space exploration missions requires high power Solar Electric Propulsion (SEP) systems for large-scale science missions and cargo transportation. Development is underway at Aerojet Rocketdyne on Hall thruster systems that are intended to bracket the needs of future NASA SEP missions in support of space exploration. The Advanced Electric Propulsion System (AEPS) program is developing and qualifying a 13.3kW Hall thruster system to be demonstrated on the Power and Propulsion Element (PPE), which is intended to be the first element of a Lunar Outpost Platform - Gateway (LOP-G). The NextSTEP program is integrating a nested Hall thruster into a 100 kW system and testing it for 100 hours. These two programs will provide a path to efficient in-space propulsion that will allow NASA to transfer the large amounts of cargo that is needed to support human missions - first to the moon and then on to Mars. The Advanced Electric Propulsion System (AEPS) program is completing development, qualification and delivery of five flight 13.3kW EP systems to NASA. The flight AEPS system includes a magnetically shielded long-life Hall thruster, Power Processing Unit (PPU) and a Xenon Flow Controller (XFC). The Hall thruster, developed and demonstrated by NASA, operates at input powers up to 12.5 kW while providing a specific impulse over an estimated 2800s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95-140V, consistent with operation beyond the orbit of Mars. The integrated system input power is continuously throttleable between 3 and 13.3kW. Component level testing of the EP String has begun with prototype hardware. The NextSTEP program is developing a 100kW Electric Propulsion (EP) system using a nested Hall thruster designed for powers up to 250kW, a modular power processor and a modular mass flow controller. While the program objective is to operate the integrated EP system continuously at 100kW for 100 hours to demonstrate thermal stability and support the development of system life time models, it builds on decades of experience with long-life Hall thrusters and the design is evolvable to a capability of 250kW. Design upgrades that demonstrate the 100kW EP system have been completed and tested. Aerojet Rocketdyne is excited to support NASA as it extends human reach into deep space and believes that these programs will provide the propulsion to make such missions affordable and sustainable. These systems provide NASA with a range of options to power its deep space transport vehicles. This paper presents the mission requirements for supporting the NASA exploration vision, as well as the status for the high power Hall thruster systems in development.

Jackson, Jerry↗

Developing an Intelligent Computer-Aided Trainer

The Payload-assist module Deploys/Intelligent Computer-Aided Training (PD/ICAT) system was developed as a prototype for intelligent tutoring systems with the intention of seeing PD/ICAT evolve and produce a general ICAT architecture and development environment that can be adapted by a wide variety of training tasks. The proposed architecture is composed of a user interface, a domain expert, a training session manager, a trainee model and a training scenario generator. The PD/ICAT prototype was developed in the LISP environment. Although it has been well received by its peers and users, it could not be delivered toe its end users for practical use because of specific hardware and software constraints. To facilitate delivery of PD/ICAT to its users and to prepare for a more widely accepted development and delivery environment for future ICAT applications, we have ported this training system to a UNIX workstation and adopted use of a conventional language, C, and a C-based rule-based language, CLIPS. A rapid conversion of the PD/ICAT expert system to CLIPS was possible because the knowledge was basically represented as a forward chaining rule base. The resulting CLIPS rule base has been tested successfully in other ICATs as well. Therefore, the porting effort has proven to be a positive step toward our ultimate goal of building a general purpose ICAT development environment.

Hua, Grace↗