Search NASA⌕ Search

SEARCH · Search NASA

Results for “Infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Airports as Energy Nodes Activity Summary

Advanced aircraft concepts that use non-traditional aviation energy storage methods such as batteries or cryogenic hydrogen are in development and expected to enter regular service at airports worldwide within the next decade. The energy needs for these aircraft may quickly overwhelm the existing energy infrastructure at airports, particularly at smaller and more remote facilities. Without energy upgrades, these airports will not be able to host these advanced vehicles, but without the advanced vehicle traffic, these airports will not have the rationale or funding to build up their energy infrastructure. The Airports as Energy Nodes (ÆNodes) activity, a collaboration between the National Aeronautics and Space Administration (NASA) and the National Renewable Energy Laboratory (NREL), was executed to understand and model the energy needs that advanced aircraft concepts may levy on these smaller airports, determine cost-effective approaches to enhance the airport energy infrastructure, and demonstrate the enhanced resilience of these energy infrastructure upgrades to the airport and surrounding community via “digital twin” simulation at relevant energy and dynamic time scales. The ÆNodes team also investigated future reference aircraft designs and materials to enable cryogenic hydrogen storage for aircraft. The ÆNodes team conducted analysis at two U.S. airport partner sites — Winchester Regional Airport in Winchester, Virginia, and Tweed/New Haven Airport in New Haven, Connecticut. The goal of this partnership was to develop data and reference infrastructure designs that could accommodate advanced aircraft in the future at these airports while also enhancing the resiliency of the energy supply to the surrounding airport community, which could be used to capture funding to enable the infrastructure upgrades. Over the course of the study, a method was developed to estimate air traffic requiring advanced energy services over the course of a year using a mix of historical data and companion studies on advanced aircraft transportation networks. The study has concluded at NASA but continues at NREL, who will develop a final report discussing the energy infrastructure upgrades and digital twin results. Preliminary results indicate that unrestricted adoption of advanced battery-electric aircraft may double traffic at these airports and increase peak daily power usage by an order of magnitude, while increase electricity energy needs by a factor of two to four. The infrastructure upgrades necessary to accommodate these increased energy needs could be used to provide enhanced energy services to the airport community to offset the cost and increase the utility of the upgrades, which will be described in the NREL final report.

Airports↗

Airport Financing and User Charge Systems in the USA

This paper examines the financing of U.S. public airports in a turbulent era of change, and projects toward the future. It begins by briefly outlining historical patterns that have changed the industry, and airport facilities in particular. It then develops basic principles of public finance as applied to public infrastructure, followed by the applicable principles of management. Following that, the current airport financing system is analyzed and contrasted with a socially optimal financing system. A concluding section suggests policy reforms and their likely benefits. The principles of finance and management discussed here are elementary. However, their implications are radical for U.S. airport policy. There is a great deal of room to improve the allocation of aviation infrastructure resources. The application of these basic principles makes it evident that in many cases, current practice is wasteful, environmentally unsound, overly costly, and inequitable. Future investments in public aviation capital will continue to be wasteful until more efficient pricing systems are instituted. Thus, problem in the U.S. is not one of insufficient investment in airport infrastructure, but investment in the wrong types of infrastructure. In the U.S., the vast majority of publically-owned airports are owned by local governments. Thus, while the federal government bad a great deal of influence in financing airports, ultimately these are local decisions. The same is true with many other public infrastructure issues. Katz and Herman (1997) report that in 1995, U.S. net public capital stock equaled almost $4.6 trillion, 72% of which ($3.9 trillion) was owned by state and local governments, most of it in buildings, highways, Streets, sewer systems, and water supply facilities. Thus, public infrastructure finance is fundamentally a local government issue, with implications for federal and state governments in the design of their aid programs.

Bartle, John R.↗

Development of Network-based Communications Architectures for Future NASA Missions

Since the Vision for Space Exploration (VSE) announcement, NASA has been developing a communications infrastructure that combines existing terrestrial techniques with newer concepts and capabilities. The overall goal is to develop a flexible, modular, and extensible architecture that leverages and enhances terrestrial networking technologies that can either be directly applied or modified for the space regime. In addition, where existing technologies leaves gaps, new technologies must be developed. An example includes dynamic routing that accounts for constrained power and bandwidth environments. Using these enhanced technologies, NASA can develop nodes that provide characteristics, such as routing, store and forward, and access-on-demand capabilities. But with the development of the new infrastructure, challenges and obstacles will arise. The current communications infrastructure has been developed on a mission-by-mission basis rather than an end-to-end approach; this has led to a greater ground infrastructure, but has not encouraged communications between space-based assets. This alone provides one of the key challenges that NASA must encounter. With the development of the new Crew Exploration Vehicle (CEV), NASA has the opportunity to provide an integration path for the new vehicles and provide standards for their development. Some of the newer capabilities these vehicles could include are routing, security, and Software Defined Radios (SDRs). To meet these needs, the NASA/Glenn Research Center s (GRC) Network Emulation Laboratory (NEL) has been using both simulation and emulation to study and evaluate these architectures. These techniques provide options to NASA that directly impact architecture development. This paper identifies components of the infrastructure that play a pivotal role in the new NASA architecture, develops a scheme using simulation and emulation for testing these architectures and demonstrates how NASA can strengthen the new infrastructure by implementing these concepts.

Slywczak, Richard A.↗

Road Extraction from AVIRIS Using Spectral Mixture and Q-Tree Filter Techniques

Accurate road location and condition information are of primary importance in road infrastructure management. Additionally, spatially accurate and up-to-date road networks are essential in ambulance and rescue dispatch in emergency situations. However, accurate road infrastructure databases do not exist for vast areas, particularly in areas with rapid expansion. Currently, the US Department of Transportation (USDOT) extends great effort in field Global Positioning System (GPS) mapping and condition assessment to meet these informational needs. This methodology, though effective, is both time-consuming and costly, because every road within a DOT's jurisdiction must be field-visited to obtain accurate information. Therefore, the USDOT is interested in identifying new technologies that could help meet road infrastructure informational needs more effectively. Remote sensing provides one means by which large areas may be mapped with a high standard of accuracy and is a technology with great potential in infrastructure mapping. The goal of our research is to develop accurate road extraction techniques using high spatial resolution, fine spectral resolution imagery. Additionally, our research will explore the use of hyperspectral data in assessing road quality. Finally, this research aims to define the spatial and spectral requirements for remote sensing data to be used successfully for road feature extraction and road quality mapping. Our findings will facilitate the USDOT in assessing remote sensing as a new resource in infrastructure studies.

Gardner, Margaret E.↗

Handling Emergency Management in [an] Object Oriented Modeling Environment

It has been understood that protection of a nation from extreme disasters is a challenging task. Impacts of extreme disasters on a nation's critical infrastructures, economy and society could be devastating. A protection plan itself would not be sufficient when a disaster strikes. Hence, there is a need for a holistic approach to establish more resilient infrastructures to withstand extreme disasters. A resilient infrastructure can be defined as a system or facility that is able to withstand damage, but if affected, can be readily and cost-effectively restored. The key issue to establish resilient infrastructures is to incorporate existing protection plans with comprehensive preparedness actions to respond, recover and restore as quickly as possible, and to minimize extreme disaster impacts. Although national organizations will respond to a disaster, extreme disasters need to be handled mostly by local emergency management departments. Since emergency management departments have to deal with complex systems, they have to have a manageable plan and efficient organizational structures to coordinate all these systems. A strong organizational structure is the key in responding fast before and during disasters, and recovering quickly after disasters. In this study, the entire emergency management is viewed as an enterprise and modelled through enterprise management approach. Managing an enterprise or a large complex system is a very challenging task. It is critical for an enterprise to respond to challenges in a timely manner with quick decision making. This study addresses the problem of handling emergency management at regional level in an object oriented modelling environment developed by use of TopEase software. Emergency Operation Plan of the City of Hampton, Virginia, has been incorporated into TopEase for analysis. The methodology used in this study has been supported by a case study on critical infrastructure resiliency in Hampton Roads.

Tokgoz, Berna Eren↗

Space Telecommunications Radio System (STRS) Compliance Testing

The Space Telecommunications Radio System (STRS) defines an open architecture for software defined radios. This document describes the testing methodology to aid in determining the degree of compliance to the STRS architecture. Non-compliances are reported to the software and hardware developers as well as the NASA project manager so that any non-compliances may be fixed or waivers issued. Since the software developers may be divided into those that provide the operating environment including the operating system and STRS infrastructure (OE) and those that supply the waveform applications, the tests are divided accordingly. The static tests are also divided by the availability of an automated tool that determines whether the source code and configuration files contain the appropriate items. Thus, there are six separate step-by-step test procedures described as well as the corresponding requirements that they test. The six types of STRS compliance tests are: STRS application automated testing, STRS infrastructure automated testing, STRS infrastructure testing by compiling WFCCN with the infrastructure, STRS configuration file testing, STRS application manual code testing, and STRS infrastructure manual code testing. Examples of the input and output of the scripts are shown in the appendices as well as more specific information about what to configure and test in WFCCN for non-compliance. In addition, each STRS requirement is listed and the type of testing briefly described. Attached is also a set of guidelines on what to look for in addition to the requirements to aid in the document review process.

Handler, Louis M.↗

Kennedy Space Center: Apollo to Multi-User Spaceport

NASA Kennedy Space Center (KSC) was established as the gateway to exploring beyond earth. Since the establishment of KSC in December 1963, the Center has been critical in the execution of the United States of Americas bold mission to send astronauts beyond the grasp of the terra firma. On May 25, 1961, a few weeks after a Soviet cosmonaut became the first person to fly in space, President John F. Kennedy laid out the ambitious goal of landing a man on the moon and returning him safely to the Earth by the end of the decade. The resultant Apollo program was massive endeavor, driven by the Cold War Space Race, and supported with a robust budget. The Apollo program consisted of 18 launches from newly developed infrastructure, including 12 manned missions and six lunar landings, ending with Apollo 17 that launched on December 7, 1972. Continuing to use this infrastructure, the Skylab program launched four missions. During the Skylab program, KSC infrastructure was redesigned to meet the needs of the Space Shuttle program, which launched its first vehicle (STS-1) on April 12, 1981. The Space Shuttle required significant modifications to the Apollo launch pads and assembly facilities, as well as new infrastructure, such as Orbiter and Payload Processing Facilities, as well as the Shuttle Landing Facility. The Space Shuttle was a workhorse that supported many satellite deployments, but was key for the construction and maintenance of the International Space Station, which required additional facilities at KSC to support processing of the flight hardware. After reaching the new Millennium, United States policymakers searched for new ways to reduce the cost of space exploration. The Constellation Program was initiated in 2005 with a goal of providing a crewed lunar landing with a much smaller budget. The very successful Space Shuttle made its last launch on July 8, 2011, after 135 missions. In the subsequent years, KSC continues to evolve, and this paper will address past and future efforts of the transformation of the KSC Apollo and Space Shuttle heritage infrastructure into a more versatile, multi-user spaceport. The paper will also discuss the US Congressional and NASA initiatives for developing and supporting multiple commercial partners, while simultaneously supporting NASAs human exploration initiative, consisting of Space Launch System (SLS), Orion spacecraft and associated ground launch systems. In addition, the paper explains the approach with examples for NASA KSC to leverage new technologies and innovative capabilities developed to reduce the cost to individual users.

launchpad↗

Lunar Mega Project: Processes, Work Flow and Terminology of the Terrestrial Construction Industry versus the Space Industry

Recent developments around the world show an increased interest and international activity toward developing a lunar surface human and robotic presence with a long term, sustainable vision. In Europe, the construction of a "Moon Village" has been proposed, and China has stated its intention to build a research station with a crew at the lunar South Pole. Russia stated it will land cosmonauts on the Moon in the 2030's. India has sent an orbiter, a robotic lander, and rover to the Moon. The USA intends to land the first woman and a man on the Moon by 2024 to initiate a sustained human lunar presence.A lunar research station with associated commercial activities will require infrastructure to become a permanent capability. Landing and launch pads, propellant storage and distribution farms, spacecraft access and handling structures, cranes, blast protection berms or walls, roads, graded areas, dust stabilized areas, foundations, parking lots, radiation shelters, micro-meteorite protection hangars, habitats and other human shelters, greenhouse farms, utility trenches, power plants, industrial water and oxygen extraction plants, communications antenna towers, thermal protection, mining zones, crater access and sub-surface access will be required to create a safe and sustainable lunar operations capability. This infrastructure will require significant construction activities in an extreme environment, with risky and expensive operations. On Earth, there are similar large and expensive projects (>$1 Billion) in difficult locations that attract a lot of public attention. These are known as "Mega Projects" and examples include bridges, tunnels, highways, railways, airports, seaports, power plants, dams, wastewater projects, Special Economic Zones (SEZ), oil and natural gas extraction projects, public buildings, information technology systems, aerospace projects, and weapons systems. Large consortiums consisting of public and private entities typically implement these infrastructure Mega-Projects.This paper will compare the typical design process, project management process, and work flow in the terrestrial construction industry to the space industry in order to create a better understanding between the terrestrial construction industry and the space industry, to further enable collaboration on a lunar Mega Project to build infrastructure on the Moon. In addition, a glossary of respective industry terminology with annotated linkages and definitions has been compiled. This information will enable contracts and business practices to be formulated for generating requests for proposals (RFP) by governments to consortiums consisting of construction and space industry companies that will bid on Lunar Infrastructure Projects that could lead to contracts to build the permanent capabilities.

Robert P Mueller↗

Operational Workflow in a Sample Receiving Facility: Input from the MSR Operation Definition Team

The return of scientifically selected samples from Mars would provide a rare opportunity for investigation with the full range of the latest technology available. To take full advantage of this opportunity, it is important to plan ahead to ensure the pristine nature of the samples upon arrival within the Earth environment until scientific investigations can begin. The NASA/ESA science community-driven MSR Science Planning Group – Phase 2 (MSPG2) delivered recommendations and guidance regarding curation (1) and science (2,3) activities to be performed on the samples under containment. High-level requirements for the infrastructure were also developed by MSPG2 (4). In order to prepare infrastructure-targeted input for the ESA and NASA facility studies planned in the 2022-2023 timeframe, the MSR agency-led Operational Scenarios Definition Team (MOSDT) was assembled to conceptualize the sample operations that will inform future architecture teams. Emphasis was placed on the responsibility of MOSDT to use community-defined requirements and to represent the view of the international scientific community. The main deliverable of MOSDT was an operational workflow for a Sample Receiving Facility (SRF). Two other deliverables were produced: a report to narrate the workflow, and a list of instruments (see Hutzler et al., this conference). Activities described in the main sequence of the workflow range from engineering operations to curation to science, with the latter term being used here as the science to be done within a SRF. Side sequences (e.g. engineering inspection of hardware, head gas extraction) were also identified, and detailed when they would have a significant impact on the infrastructure of a SRF. It was necessary for the MOSDT to rely on assumptions for some steps and activities, and though these were kept to a minimum (and are described in both the report supporting the workflow and in the full presentation), in general, the assumptions and overall work were very conservative, as the impact of underestimating the scope of the SRF infrastructure was considered more detrimental than overestimating it. It is expected that future work will be able to confirm or inform these assumptions. The community was consulted during the course of the MOSDT work. This abstract’s aim is two-fold: on one hand, inform the scientific community and overall MSR stakeholders, to make the infrastructure studies and trade-off more understandable; on the other hand, to solicit feedback from a larger community audience for the next iterations planning for SRF design and activities.

Mars Sample Return↗

Development of a Ground Multi-Mission Low-Cost Optical Terminal (LCOT) for Free-Space Optical Communications

Once confined to the realm of laboratory experiments and theoretical papers, space-based laser communications (lasercomm) are on the verge of achieving mainstream status. Organizations from Facebook to NASA, and missions from cubesats to Orion are employing lasercomm to achieve gigabit communication speeds at mass and power requirements lower than that of traditional radio frequency (RF) methods. Since first demonstrating free-space optical communications services with Lunar Laser Communications Demonstration (LLCD) in 2013, NASA has invested in developing optical communications technologies and capabilities to enhancing its space communications networks. Along with evolving optical space terminals, NASA is also developing lasercomm grounds stations capable of meeting the rapidly increasing data volume demands of upcoming missions, from low-earth to lunar orbits and beyond and integrating these advanced capabilities into its Near-Space and Deep Space Networks. To meet this emerging need, the Low-Cost Optical Terminal (LCOT) project at NASA’s Goddard Space Flight Center (GSFC) is designing, building and validating a prototype for a flexible, multi-mission, and economical optical ground terminal that could be used as a blueprint for a global network of optical ground stations, capable of supporting a wide variety of missions. To date a major impediment to widespread adoption of laser communication has been the lack of an existing ground network infrastructure. A mission that wishes to take advantage of laser communication not only needs to invest in an optical space terminal, but it must also finance the creation of ground terminals to receive the downlink signal. This adds significant additional cost. Missions that do decide to incur the cost of financing a network of ground terminals end up building highly specialized optical receivers that are operable as receivers for that specific mission only. Significant Non-Recurring Engineering (NRE) cost is invested to build highly specialized one-of-a-kind ground terminals that go into storage after that particular mission is over. This is not an economical approach and does nothing to grow the number of optical ground stations available to future missions. In essence each mission that wants to take advantage of the benefits of lasercom has to start from scratch to provide a ground terminal network to support it. As long as this is the case, the cost for using laser communications will be too high for most missions to consider. LCOT intends to close this gap in technology by designing and developing a standard optical ground terminal design that is flexible enough to serve as a receiver for a wide range of future missions – a ground terminal that can be quickly reconfigured to receive downlinks at different wavelengths using different signal formats. Not only does LCOT have the industry-building objectives of utilizing commercial-off-the-shelf (COTS) components to the maximum extent possible, but also spurs the commercial development of other necessary lasercomm components not currently offered by industry. Finally, LCOT will give NASA scientists and engineers a facility where they can gain real-world experience with optical communications. It will give engineers a cost-effective way to try out new concepts and processes by providing the infrastructure for such testing. In this way it is hoped LCOT will serve as a stimulus for innovation in optical communications and speed its widespread adoption by future missions. The LCOT is comprised of five subsystems: Free-Space Optical, Transceiver, Amplifier, Monitor and Control, and Observatory Infrastructure. In August 2021, the LCOT team installed a 70 cm telescope, developed by Planewave Instruments that was optimized for optical communications. Free-Space Optical subsystem comprises of the telescope and its associated hardware, including a transmitter optical assembly, wide field cameras, two optical benches, and an adaptive optics subsystem. The transmit optical assembly, a unique concept design, is a cluster of four functionally independent transmit subassemblies located on the receive telescope. In addition to receiving optical signals and directing the expanded beam with high precision to the space terminal, it also performs tracking functions. The transmit optical assembly will support operations from Low Earth Orbit (LEO) through lunar and will be used as a template for industry manufacturing. The Optical Infrastructure subsystem is responsible for providing environmentally controlled shelters for LCOT equipment and various other systems. To maintain the safety and proper functionality of the telescope, a 16 ft Astrohaven clamshell dome procured which provides all-sky coverage without the need to rotate the dome. Additionally, Atmospheric Monitoring Assembly (AMA) will be part of optical infrastructure subsystem to ensure accurate performance of the LCOT. Like existing optical ground stations, LCOT will measure standard weather station parameters, infrared all sky image of cloud cover, and cloud height. LCOT, however, adds requirements for measuring night time seeing and, in the future, daytime seeing. Unlike other optical ground terminals, the LCOT is transceiver agnostic; user transceivers may be duplex transceivers, standalone receivers, or standalone transmitters with or without acquisition beacon functionality. As such, the LCOT project accommodates testing with external customer transceivers in a flexible manor, further complimenting its intended multi-mission goals. Another unique component of LCOT is the use of a new amplifier technology – the Very Large Mode Area (VLMA) amplifiers. This new technology allows LCOT to avoid the issues faced by previous laser communications ground terminals, gives users more flexibility and modular capability, and is capable of reaching an order of magnitude higher peak power than traditional High Power Optical Amplifiers (HPOA). One drawback of the VLMA HPOA approach is that the amplified light is output into free-space. The solution developed by LCOT is an optics train that couples the output of the VLMA amplifier into a short fiber for transport to the transmit telescopes with high efficiency. Like many of the LCOT components, a set of detailed manufacturing drawings have been created for the optics train to allow any machine shop with a multi-axis Computer Numerical Control (CNC) machine to fabricate the piece parts from commonly available materials. In line with the goals of LCOT, the monitor and control functions are developed as a modular and flexible system with the ability to support future hardware or algorithm changes, minimizing disruptions. A main priority of development in the Monitor and Control Subsystem (MCS) is the safety monitor system.

laser communication↗

Development of a Ground Multi-mission Low Cost Optical Terminal(LCOT) for Free-Space Optical Communication

Once confined to the realm of laboratory experiments and theoretical papers, space-based laser communications (lasercomm) are on the verge of achieving mainstream status. Organizations from Facebook to NASA, and missions from cubesats to Orion are employing lasercomm to achieve gigabit communication speeds at mass and power requirements lower than that of traditional radio frequency (RF) methods. Since first demonstrating free-space optical communications services with Lunar Laser Communications Demonstration (LLCD) in 2013, NASA has invested in developing optical communications technologies and capabilities to enhancing its space communications networks. Along with evolving optical space terminals, NASA is also developing lasercomm grounds stations capable of meeting the rapidly increasing data volume demands of upcoming missions, from low-earth to lunar orbits and beyond and integrating these advanced capabilities into its Near-Space and Deep Space Networks. To meet this emerging need, the Low-Cost Optical Terminal (LCOT) project at NASA’s Goddard Space Flight Center (GSFC) is designing, building and validating a prototype for a flexible, multi-mission, and economical optical ground terminal that could be used as a blueprint for a global network of optical ground stations, capable of supporting a wide variety of missions. To date a major impediment to widespread adoption of laser communication has been the lack of an existing ground network infrastructure. A mission that wishes to take advantage of laser communication not only needs to invest in an optical space terminal, but it must also finance the creation of ground terminals to receive the downlink signal. This adds significant additional cost. Missions that do decide to incur the cost of financing a network of ground terminals end up building highly specialized optical receivers that are operable as receivers for that specific mission only. Significant Non-Recurring Engineering (NRE) cost is invested to build highly specialized one-of-a-kind ground terminals that go into storage after that particular mission is over. This is not an economical approach and does nothing to grow the number of optical ground stations available to future missions. In essence each mission that wants to take advantage of the benefits of lasercom has to start from scratch to provide a ground terminal network to support it. As long as this is the case, the cost for using laser communications will be too high for most missions to consider. LCOT intends to close this gap in technology by designing and developing a standard optical ground terminal design that is flexible enough to serve as a receiver for a wide range of future missions – a ground terminal that can be quickly reconfigured to receive downlinks at different wavelengths using different signal formats. Not only does LCOT have the industry-building objectives of utilizing commercial-off-the-shelf (COTS) components to the maximum extent possible, but also spurs the commercial development of other necessary lasercomm components not currently offered by industry. Finally, LCOT will give NASA scientists and engineers a facility where they can gain real-world experience with optical communications. It will give engineers a cost-effective way to try out new concepts and processes by providing the infrastructure for such testing. In this way it is hoped LCOT will serve as a stimulus for innovation in optical communications and speed its widespread adoption by future missions. The LCOT is comprised of five subsystems: Free-Space Optical, Transceiver, Amplifier, Monitor and Control, and Observatory Infrastructure. In August 2021, the LCOT team installed a 70 cm telescope, developed by Planewave Instruments that was optimized for optical communications. Free-Space Optical subsystem comprises of the telescope and its associated hardware, including a transmitter optical assembly, wide field cameras, two optical benches, and an adaptive optics subsystem. The transmit optical assembly, a unique concept design, is a cluster of four functionally independent transmit subassemblies located on the receive telescope. In addition to receiving optical signals and directing the expanded beam with high precision to the space terminal, it also performs tracking functions. The transmit optical assembly will support operations from Low Earth Orbit (LEO) through lunar and will be used as a template for industry manufacturing. The Optical Infrastructure subsystem is responsible for providing environmentally controlled shelters for LCOT equipment and various other systems. To maintain the safety and proper functionality of the telescope, a 16 ft Astrohaven clamshell dome procured which provides all-sky coverage without the need to rotate the dome. Additionally, Atmospheric Monitoring Assembly (AMA) will be part of optical infrastructure subsystem to ensure accurate performance of the LCOT. Like existing optical ground stations, LCOT will measure standard weather station parameters, infrared all sky image of cloud cover, and cloud height. LCOT, however, adds requirements for measuring night time seeing and, in the future, daytime seeing. Unlike other optical ground terminals, the LCOT is transceiver agnostic; user transceivers may be duplex transceivers, standalone receivers, or standalone transmitters with or without acquisition beacon functionality. As such, the LCOT project accommodates testing with external customer transceivers in a flexible manor, further complimenting its intended multi-mission goals. Another unique component of LCOT is the use of a new amplifier technology – the Very Large Mode Area (VLMA) amplifiers. This new technology allows LCOT to avoid the issues faced by previous laser communications ground terminals, gives users more flexibility and modular capability, and is capable of reaching an order of magnitude higher peak power than traditional High Power Optical Amplifiers (HPOA). One drawback of the VLMA HPOA approach is that the amplified light is output into free-space. The solution developed by LCOT is an optics train that couples the output of the VLMA amplifier into a short fiber for transport to the transmit telescopes with high efficiency. Like many of the LCOT components, a set of detailed manufacturing drawings have been created for the optics train to allow any machine shop with a multi-axis Computer Numerical Control (CNC) machine to fabricate the piece parts from commonly available materials. In line with the goals of LCOT, the monitor and control functions are developed as a modular and flexible system with the ability to support future hardware or algorithm changes, minimizing disruptions. A main priority of development in the Monitor and Control Subsystem (MCS) is the safety monitor system.

Haleh Safavi↗

Cape Hatteras Ecological Conservation: Delineating Shoreline and Mapping Change Along the Cape Hatteras National Seashore for Coastline Management and Transportation Corridor Adaptation Strategies

The National Park Service at Cape Hatteras National Seashore works to protect North Carolina’s Outer Banks where frequent storms bring heavy winds and flooding, leading to overwash events on the main highway, North Carolina Highway 12. Shorelines are susceptible to erosion directly affecting transportation and housing infrastructures. Storm events can disrupt transportation on NC-12 and ferry service from Ocracoke Island to Hatteras Island, leaving inhabitants stranded on Ocracoke Island for indefinite amounts of time. The National Park Service’s current decision-making practices involve mitigating infrastructure damage by enlisting the help of North Carolina’s Department of Transportation and finding ways to relocate this infrastructure, as well as dredging and sediment placement that support beach nourishment efforts. Our NASA DEVELOP team partnered with the National Park Service to explore the use of optical data to delineate shoreline and map coastline change from 2014 to 2024. We used Earth observations collected by Landsat 8 Operational Land Imager, Landsat 9 Operational Land Imager-2, and Sentinel-2 MultiSpectral instrument to support decision-making related to prioritizing strategic planning for transportation corridor adaptations including potential relocation of infrastructure, and beach nourishment efforts. We derived coastline maps by consolidating images from each year to create composite images for winter and summer coastline seasonal oscillation patterns. The results highlight shoreline loss over the ~10-year study period, and the difference in shoreline inundation in the winter and summer seasons. These observations create a better understanding of successful mitigation efforts and allow the National Park Service to continue to focus on plans for infrastructure updates.

Ella Haugen↗

Report of the Interagency Optical Network Testbeds Workshop 2, NASA Ames Research Center, September 12-14, 2005

The Optical Network Testbeds Workshop 2 (ONT2), held on September 12-14, 2005, was cosponsored by the Department of Energy Office of Science (DOE/SC) and the National Aeronautics and Space Administration (NASA), in cooperation with the Joint Engineering Team (JET) of the Federal Networking and Information Technology Research and Development (NITRD) Program's Large Scale Networking (LSN) Coordinating Group. The ONT2 workshop was a follow-on to an August 2004 Workshop on Optical Network Testbeds (ONT1). ONT1 recommended actions by the Federal agencies to assure timely development and implementation of optical networking technologies and infrastructure. Hosted by the NASA Ames Research Center in Mountain View, California, the ONT2 workshop brought together representatives of the U.S. advanced research and education (R&E) networks, regional optical networks (RONs), service providers, international networking organizations, and senior engineering and R&D managers from Federal agencies and national research laboratories. Its purpose was to develop a common vision of the optical network technologies, services, infrastructure, and organizations needed to enable widespread use of optical networks; recommend activities for transitioning the optical networking research community and its current infrastructure to leading-edge optical networks over the next three to five years; and present information enabling commercial network infrastructure providers to plan for and use leading-edge optical network services in that time frame.

OEP(Open Exchange Points)↗

NASA’s Moon-to-Mars Planetary Autonomous Construction Technology Project: Overview and Status

NASA plans to land the first woman and next man on the Moon by 2025 through the initial Artemis missions. NASA and its international partners plan to establish a sustainable long-term presence on the lunar surface and build up infrastructure in the subsequent Artemis missions. The Lunar Surface Innovation Initiative (LSII), within NASA’s Space Technology Mission Directorate, aims to spur the creation of novel technologies needed for lunar surface exploration and accelerate the technology readiness of key systems and components. The primary thrust areas of LSII include sustainable power; dust mitigation; in-situ resource utilization; surface excavation, construction, and outfitting; and extreme access/extreme environments. The Moon-to-Mars Planetary Autonomous Construction Technology (MMPACT) projectwas initiated to address the lunar surface construction thrust area of LSII. The goal of the MMPACT project is to develop, deliver, and demonstrate on-demand capabilities to protect astronauts and create infrastructure on the lunar surface via construction of landing pads, habitats, shelters, roadways, berms and blast shields using lunar regolith-based materials. The MMPACT project is leveraging technology derived from NASA’s 3D Printed Mars Habitat Challenge along with contributions from other Government agencies, and multiple partners within industry and academia. The MMPACT project is comprised of three interrelated elements, construction hardware and process development; feedstock materials development; and microwave structure construction capabilities. These elements are working together to address the multiple challenges of infrastructure construction on the surface of the Moon including increased autonomy of operations, hardware operation and manufacturing under lunar environmental conditions, long-duration operation of mechanisms and parts, scale of construction activities, and material and construction requirements and standards. This presentation will summarize the status of development activities in each of the three elements, including testing of the various candidate materials, preliminary design concepts for future lunar infrastructure elements, and the vision for future technology demonstrations on the lunar surface. These demonstrations, targeting the mid-to-late 2020’s, are expected to enable landing pad construction and habitat construction resulting in commercial capabilities early in the next decade.

lunar infrastructure↗

NASA’s Moon-to-Mars Planetary Autonomous Construction Technology Project: Overview and Status

NASA plans to land the first woman and next man on the Moon by 2025 through the initial Artemis missions. NASA and its international partners plan to establish a sustainable long-term presence on the lunar surface and build up infrastructure in the subsequent Artemis missions. The Lunar Surface Innovation Initiative (LSII), within NASA’s Space Technology Mission Directorate, aims to spur the creation of novel technologies needed for lunar surface exploration and accelerate the technology readiness of key systems and components. The primary thrust areas of LSII include sustainable power; dust mitigation; in-situ resource utilization; surface excavation, construction, and outfitting; and extreme access/extreme environments. The Moon-to-Mars Planetary Autonomous Construction Technology (MMPACT) project was initiated to address the lunar surface construction thrust area of LSII. The goal of the MMPACT project is to develop, deliver, and demonstrate on-demand capabilities to protect astronauts and create infrastructure on the lunar surface via construction of landing pads, habitats, shelters, roadways, berms and blast shields using lunar regolith-based materials. The MMPACT project is leveraging technology derived from NASA’s 3D Printed Mars Habitat Challenge along with contributions from other Government agencies, and multiple partners within industry and academia. The MMPACT project is comprised of three interrelated elements, construction hardware and process development; feedstock materials development; and microwave structure construction capabilities. These elements are working together to address the multiple challenges of infrastructure construction on the surface of the Moon including increased autonomy of operations, hardware operation and manufacturing under lunar environmental conditions, long-duration operation of mechanisms and parts, scale of construction activities, and material and construction requirements and standards. This presentation will summarize the status of development activities in each of the three elements, including testing of the various candidate materials, preliminary design concepts for future lunar infrastructure elements, and the vision for future technology demonstrations on the lunar surface. These demonstrations, targeting the mid-to-late 2020’s, are expected to enable landing pad construction and habitat construction resulting in commercial capabilities early in the next decade.

Additive construction, regolith processing, lunar ↗

Communications system evolutionary scenarios for Martian SEI support

In the Space Exploration Initiative (SEI) mission scenarios, expanding human presence is the primary driver for high data rate Mars-Earth communications. To support an expanding human presence, the data rate requirement will be gradual, following the phased implementation over time of the evolving SEI mission. Similarly, the growth and evolution of the space communications infrastructure to serve this requirement will also be gradual to efficiently exploit the useful life of the installed communications infrastructure and to ensure backward compatibility with long-term users. In work conducted over the past year, a number of alternatives for supporting high data rate Mars-Earth communications have been analyzed with respect to their compatibility with gradual evolution of the space communications infrastructure. The alternatives include RF, millimeter wave (MMW), and optical implementations, and incorporate both surface and space-based relay terminals in the Mars and Earth regions. Each alternative is evaluated with respect to its ability to efficiently meet a projected growth in data rate over time, its technology readiness, and its capability to satisfy the key conditions and constraints imposed by evolutionary transition. As a result of this analysis, a set of attractive alternative communications architectures have been identified and described, and a road map is developed that illustrates the most rational and beneficial evolutionary paths for the communications infrastructure.

Kwong, Paulman W.↗

Potential markets for advanced satellite communications

This report identifies trends in the volume and type of traffic offered to the U.S. domestic communications infrastructure and extrapolates these trends through the year 2011. To describe how telecommunications service providers are adapting to the identified trends, this report assesses the status, plans, and capacity of the domestic communications infrastructure. Cable, satellite, and radio components of the infrastructure are examined separately. The report also assesses the following major applications making use of the infrastructure: (1) Broadband services, including Broadband Integrated Services Digital Network (BISDN), Switched Multimegabit Data Service (SMDS), and frame relay; (2) mobile services, including voice, location, and paging; (3) Very Small Aperture Terminals (VSAT), including mesh VSAT; and (4) Direct Broadcast Satellite (DBS) for audio and video. The report associates satellite implementation of specific applications with market segments appropriate to their features and capabilities. The volume and dollar value of these market segments are estimated. For the satellite applications able to address the needs of significant market segments, the report also examines the potential of each satellite-based application to capture business from alternative technologies.

Adamson, Steven↗

The formal verification used for the AAMP5 and AAMP-FV

The main goal of the project was two-fold: First, to investigate the feasibility of formally specifying and verifying a complex commercial microprocessor that was not expressly designed for formal verification. Second, to explore effective ways to transfer the technology to an industrial setting. The choice of the AAMP5 satisfied the first goal since the AAMP5 was not designed for formal verification, but to provide a more than threefold performance improvement while remaining object-code-compatible with the earlier AAMP2, which is used in numerous avionics applications, including the Boeing 737, 747, 757, and 767. To satisfy the technology transfer objective, we had to develop a suitable verification methodology and a formal infrastructure to make the technology usable by practicing engineers. This infrastructure includes techniques for decomposing the microcompressor verification problem into a st of verification conditions that the engineers can formulate and strategies to automate the proof of the verification conditions. The development of the infrastructure was one of the key accomplishments of the project. Most of the infrastructure and methodology are general enough to be reused for other microprocessors, certainly in the verification of another member of the AAMP family. This methodology was used to formally specify the entire microarchitecture and more than half of the instruction set and to verify a core set of eleven AAMP5 instructions representative of several instruction classes. However, the methodology and the formal machinery developed are adequate to cover most of the remaining AAMP5 instructions. Although PVS was the vehicle of the experiment, the methodology is applicable to other sufficiently powerful theorem provers.

Srivas, Mandayam↗