At least 379 records · Page 21

Toward a MILP Modeling Framework for Distribution System Restoration

Large-scale blackouts and extreme weather events in recent decades raise the concern for improving the resilience of electric power infrastructures. Distribution service restoration (DSR), a fundamental application in outage management systems, allows restoration solutions for system operators when power outages happen. As distribution generators (DGs) and remotely controllable devices are increasingly installed in distribution systems, an advanced DSR framework is critical to perform optimally coordinated restoration that can achieve maximal restoration performance. This work introduces a DSR modeling framework, which can generate optimal switching sequences and estimated time of restoration in the presence of remotely controllable switches, manually operated switches, and dispatchable DGs. Two mathematical models, a variable time step model and a fixed time step model, are presented and compared. The proposed models are formulated as a mixed-integer linear programming model, and their effectiveness is evaluated via the IEEE 123 node test feeder.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mean-Variance Optimization-Based Energy Storage Scheduling Considering Day-Ahead and Real-Time LMP Uncertainties

In this letter, a new mean-variance optimization-based energy storage scheduling method is proposed with the consideration of both day-ahead (DA) and real-time (RT) energy markets price uncertainties. It considers the locational marginal price (LMP) forecast uncertainties in the DA and RT markets. The energy storage arbitrage risk associated with the LMP forecast uncertainty is explicitly modeled through the variance component in the objective function. The quadratic term of this variance is transformed into a second-order cone constraint using the charging and discharging power complementarity of the energy storage system. Finally, the proposed model is formulated as a mixed-integer conic programming problem. Numerical case studies demonstrate the effectiveness of the proposed model for energy storage scheduling considering price uncertainty.

25 ENERGY STORAGE↗

Multi-Time Step Service Restoration for Advanced Distribution Systems and Microgrids

Modern power systems are facing increased risk of disasters that can cause extended outages. The presence of remote control switches (RCSs), distributed generators (DGs), and energy storage systems (ESS) provides both challenges and opportunities for developing post-fault service restoration methodologies. Inter-temporal constraints of DGs, ESS, and loads under cold load pickup (CLPU) conditions impose extra complexity on problem formulation and solution. In this paper, a multi-time step service restoration methodology is proposed to optimally generate a sequence of control actions for controllable switches, ESSs, and dispatchable DGs to assist the system operator with decision making. The restoration sequence is determined to minimize the unserved customers by energizing the system step by step without violating operational constraints at each time step. The proposed methodology is formulated as a mixed-integer linear programming (MILP) model and can adapt to various operation conditions. Furthermore, the proposed method is validated through several case studies that are performed on modified IEEE 13-node and IEEE 123-node test feeders.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Approach to Reasoning Service Migration in Data and Reasoning Fabric (DRF) Implementation

In this paper we consider service migration problem for Data and Reasoning Fabric (DRF) enabled airspace operations assuming a fixed cloud/edge infrastructure with allocated computing, storage and power resources, where cloud/edge servers, and communication stations are in a wired connected network, while vehicles use a wireless network for communication. The objective is to automatically select the best location for the requested service execution, which achieves minimum cost while satisfying the user quality of service (QoS) and available resources constraints. To this end, estimates of the response time, consumed energy and total cost are defined for each potential compute location. A mixed-integer linear program is then formulated and solved to identify optimal compute locations given QoS constraints, network infrastructure limitations, with worst-case vehicle positioning. The approach is applied to trajectory re-planning use case to avoid a collision with an emergency vehicle in real time.

Air mobility↗

Partition-based Feasible Integer Solution Pre-computation for Hybrid Model Predictive Control

For multiparametric mixed-integer convex programming problems such as those encountered in hybrid model predictive control, we propose an algorithm for generating a feasible partition of a subset of the parameter space. The result is a static map from the current parameter to a suboptimal integer solution such that the remaining convex program is feasible. Convergence is proved with a new insight that the overlap among the feasible parameter sets of each integer solution governs the partition complexity. The partition is stored as a tree which makes querying the feasible solution efficient. The algorithm can be used to warm start a mixed integer solver with a real-time guarantee or to provide a reference integer solution in several suboptimal MPC schemes. The algorithm is tested on randomly generated systems with up to six states, demonstrating the effectiveness of the approach.

Bayard, David S.↗

Delivery drone route planning over a battery swapping network

Many enterprises invest on drone delivery research and development to drop off packages at consumers’ doorsteps in a matter of minutes. We study delivery drone route planning over a battery swapping network allowing farther reach by penetrating current battery capacity constraints. A mixed-integer nonlinear programming model is created to plan efficient drone routing over the swapping machines by minimizing the delivery lead time. We develop an exact solution method, evaluate its performance, and compare it with a straightforward nonlinear solver application. A case study highlights the applicability of the model. Data and source code to the solver are publicly shared.

drone battery swapping↗

An MILP-Based Distributed Energy Management for Coordination of Networked Microgrids

An MILP-based distributed energy management for the coordination of networked microgrids is proposed in this paper. Multiple microgrids and the utility grid are coordinated through iteratively adjusted price signals. Based on the price signals received, the microgrid controllers (MCs) and distribution management system (DMS) update their schedules separately. Then, the price signals are updated according to the generation–load mismatch and distributed to MCs and DMS for the next iteration. The iteration continues until the generation–load mismatch is small enough, i.e., the generation and load are balanced under agreed price signals. Through the proposed distributed energy management, various microgrids and the utility grid with different economic, resilient, emission and socio-economic objectives are coordinated with generation–load balance guaranteed and the microgrid customers’ privacy preserved. In particular, a piecewise linearization technique is employed to approximate the augmented Lagrange term in the alternating direction method of multipliers (ADMM) algorithm. Thus, the subproblems are transformed into mixed integer linear programming (MILP) problems and efficiently solved by open-source MILP solvers, which would accelerate the adoption and deployment of microgrids and promote clean energy. The proposed MILP-based distributed energy management is demonstrated through various case studies on a networked microgrids test system with three microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Designing a drone delivery network with automated battery swapping machines

Drones are projected to alter last-mile delivery, but their short travel range is a concern. In this study, we propose a drone delivery network design using automated battery swapping machines (ABSMs) to extend ranges. The design minimizes the long-term delivery costs, including ABSM investment, drone ownership, and cost of the delivery time, and locates ABSMs to serve a set of customers. We build a mixed-integer nonlinear program that captures the nonlinear waiting time of drones at ABSMs. To solve the problem, we create an exact solution algorithm that finds the globally optimal solution using a derivative-supported cutting-plane method. To validate the applicability of our program, we conduct a case study on the Chicago Metropolitan area using cost data from leading ABSM manufacturer and geographical data from the planning and operations language for agent-based regional integrated simulation (more commonly known as POLARIS). A sensitivity analysis identifies that ABSM service times and costs are the key parameters impacting the long-term adoption of drone delivery.

25 ENERGY STORAGE↗

Unit Commitment With Continuous-Time Generation and Ramping Trajectory Models

There is increasing evidence of shortage of ramping resources in the real-time operation of power systems. To explain and remedy this problem systematically, we take a novel look at the way the day-ahead unit commitment (UC) problem represents the information about load, generation and ramping constraints. We specifically investigate the approximation error made in mapping of the original problem, that would decide the continuous-time generation and ramping trajectories of the committed generating units, onto the discrete-time problem that is solved in practice. We first show that current practice amounts to approximating the trajectories with linear splines. We then offer a different representation through cubic splines that provides physically feasible schedules and increases the accuracy of the continuous-time generation and ramping trajectories by capturing sub-hourly variations and ramping of load in the day-ahead power system operation. The corresponding day-ahead UC model is formulated as an instance of mixed-integer linear programming (MILP), with the same number of binary variables as the traditional UC formulation. Numerical simulation over real load data from the California ISO demonstrate that the proposed UC model reduces the total day-ahead and real-time operation cost, and the number of events of ramping scarcity in the real-time operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Sizing and Dispatch of Solar Power with Storage

Designers of utility-scale solar plants with storage, seeking to maximize some aspect of plant performance, face multiple challenges. In many geographic locations, there is significant penetration of photovoltaic generation, which depresses energy prices during the hours of solar availability. An energy storage system affords the opportunity to dispatch during higher-priced time periods, but complicates plant design and dispatch decisions. Solar resource variability compounds these challenges, because determining optimal system sizes requires simultaneously considering how the plant will be operated under the imposed market and weather conditions. We develop an approach to analyze the economic performance of hybrid and single-technology solar power plants, which incorporates optimal dispatch, and considers the expected electricity market and weather conditions. We utilize the System Advisor Model software package to simulate the operation of multiple renewable generation and energy storage technologies, in conjunction with hourly-fidelity generation decisions determined by a revenue-maximizing, mixed-integer linear program. We show that, under our assumed market and weather conditions, the lifetime benefit-to-cost ratio can be improved by 6 to 19 percent, relative to a baseline design without optimizing, and that a concentrating solar power with thermal energy storage design produces significantly more energy per year, but is less profitable under our cost assumptions.

black-box optimization↗

Distributionally robust facility location problem under decision-dependent stochastic demand

While the traditional facility location problem considers exogenous demand, in some applications, locations of facilities could affect the willingness of customers to use certain types of services, e.g., carsharing, and therefore they also affect realizations of random demand. Moreover, a decision maker may not know the exact distribution of such endogenous demand and how it is affected by location choices. In this paper, we consider a distributionally robust facility location problem, in which we interpret the moments of stochastic demand as functions of facility-location decisions. We reformulate a two-stage decision-dependent distributionally robust optimization model as a monolithic formulation, and then derive exact mixed-integer linear programming reformulation as well as valid inequalities when the means and variances of demand are piecewise linear functions of location solutions. We conduct extensive computational studies, in which we compare our model with a decision-dependent deterministic model, as well as stochastic programming and distributionally robust models without the decision-dependent assumption. Here, the results show superior performance of our approach with remarkable improvement in profit and quality of service under various settings, in addition to computational speed-ups given by formulation enhancements. These results draw attention to the need of considering the impact of location decisions on customer demand within this strategic-level planning problem.

97 MATHEMATICS AND COMPUTING↗

Effective restoration strategies of interdependent power system and communication network

The power system is continuously evolving towards a smarter grid by adding intelligent electrical devices that leverage communication technologies to provide visualisation, control and automation. The integration of power system and communication network has brought challenges into the resilience of interdependent networks. Following an outage or blackout, system operators cannot only restore one network while simply ignoring the interconnection with the other network. Effective restoration strategies that involve co‐ordination between power system and communication network have become critical in enhancing the resilience. An optimisation‐based restoration strategy is developed to coordinate the restoration actions between two networks. The problem is modelled as a mixed integer linear programming problem, with the objective of activating every node in both networks with the minimum number of activation/energisation of branches. The developed strategies are tested on the modified IEEE 14‐bus system incorporating communication network. Simulation results demonstrate that the coordinated restoration strategies are effective and critical in the successful recovery of interdependent networks. The developed model could also provide insights in network design and planning to enhance the resilience of interdependent power system and communication network.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Robust trajectory-constrained frequency control for microgrids considering model linearization error

Grid supportive modes integrated within inverter-based resources can improve the frequency response of renewable-rich microgrids. The synthesis of grid supportive modes to guarantee frequency trajectory constraints under a predefined disturbance set is challenging but essential. To tackle this challenge, a numerical optimal control (NOC)-based control synthesis methodology is proposed. Without loss of generality, a wind-diesel fed microgrid is studied, where we aim to design grid supportive functions in the wind turbine. In the control design, linearized models are used, and the linearization-induced errors are quantitatively analyzed by reachability and interval arithmetics and represented in the form of interval uncertainties. Then, the NOC problem can be formulated into a robust mixed-integer linear program. The control structure is strategically configured into two levels to realize online deployment. The proposed control is verified on the modified 33-node microgrid with a full-order three-phase nonlinear model in Simulink. In conclusion, the simulation results show the effectiveness of the proposed control paradigm and the necessity of considering linearization-induced uncertainty.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deterministic symbolic regression with derivative information: General methodology and application to equations of state

Symbolic regression methods simultaneously determine the model functional form and the regression parameter values by generating expression trees. Symbolic regression can capture the complexity of real–world phenomena but the use of deterministic optimization for symbolic regression has been limited due to the complexity of the search space of existing formulations. Herein we present a novel deterministic mixed–integer nonlinear programming formulation for symbolic regression that incorporates derivative constraints through auxiliary expression trees. By applying the chain rule to mathematical operations, binary expression trees are capable of representing the calculation of first and second derivatives. We apply this formulation to illustrative examples using derivative information to show increased model discrimination capability. In addition, we perform a case study of a thermodynamic equation of state to gain insight on valid functional forms with thermodynamics–based constraints on the first and second derivatives.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Data-Driven Energy Resilience Assessment and Enhancement in Urban Communities: A Case Study in Detroit

This paper presents a data-driven framework for assessing and enhancing energy resilience in urban communities. The resilience assessment is based on two datasets: 1) annual aggregated power outage data and 2) 15-minute interval outage data. High-impact, low-probability (HILP) events are identified within these datasets to evaluate community resilience under extreme conditions. To enhance resilience, an optimization framework utilizing mixed integer linear programming is developed to determine the optimal sizing and placement of solar photovoltaic (PV) systems and battery energy storage systems (BESS). This method offers a cost-effective and practical solution for improving energy resilience in vulnerable communities. Furthermore, a case study of the City of Detroit in Michigan demonstrates the effectiveness of the framework through simulation and validation.

Energy resilience assessment↗

Bidding strategy for microgrid in day-ahead market based on hybrid stochastic/robust optimization

In this paper, we propose an optimal bidding strategy in the day-ahead market of a microgrid consisting of intermittent distributed generation (DG), storage, dispatchable DG and price responsive loads. The microgrid coordinates the energy consumption or production of its components and trades electricity in both the day-ahead and real-time markets to minimize its operating cost as a single entity. The bidding problem is challenging due to a variety of uncertainties, including power output of intermittent DG, load variation, day-ahead and real-time market prices. A hybrid stochastic/robust optimization model is proposed to minimize the expected net cost, i.e., expected total cost of operation minus total benefit of demand. This formulation can be solved by mixed integer linear programming. The uncertain output of intermittent DG and day-ahead market price are modeled via scenarios based on forecast results, while a robust optimization is proposed to limit the unbalanced power in real-time market taking account of the uncertainty of real-time market price. Numerical simulations on a microgrid consisting of a wind turbine, a PV panel, a fuel cell, a micro-turbine, a diesel generator, a battery and a responsive load show the advantage of stochastic optimization in addition to robust optimization.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Optimizing Vehicle Fleet and Assignment for Concentrating Solar Power Plant Heliostat Washing

Concentrating solar power central-receiver plants use thousands of sun-tracking mirrors, i.e., heliostats, to reflect sunlight to a central receiver, which collects and uses the heat to generate electricity. Over time, soiling reduces the reflectivity of the heliostats and, therefore, the efficiency of the system. Current industry practice sends vehicles to wash heliostats in an ad hoc fashion. We present a mixed-integer nonlinear program that determines wash vehicle fleet size, mix, and assignment of wash crews to heliostats to minimize the sum of (i) the revenues lost due to heliostat soiling, (ii) the costs of hiring wash crews and operating the vehicles, and (iii) the costs of purchasing wash vehicles. We establish conditions for convexity of the objective function, and then propose a decomposition method that enables near-optimal solutions to the wash vehicle fleet sizing and assignment problem on the order of a couple of minutes. Furthermore, these solutions yield hundreds of thousands of dollars in savings per year over current industry practices.

14 SOLAR ENERGY↗