Search NASA⌕ Search

SEARCH · Search NASA

Results for “Lab Capabilities”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Deep Neural Network Assisted Distributed Strain and Temperature Fiber Sensor System for Natural Gas Pipeline Monitoring

Natural gas pipeline integrity monitoring is crucial to detect potential leaks, find structural issues, and prevent environmental damage. This article presents a system of natural gas pipeline monitoring that uses a specialized double Brillouin peak sensing fiber along with the Brillouin optical time domain analysis (BOTDAs) technique. The calibrated sensing fiber coefficients for strain and temperature are 41.8 kHz/ με and 0.9 MHz/°C for peak 1; and 47.2 kHz/ με , and 1.11 MHz/°C for peak 2, respectively. Initially, lab tests were performed by installing a short section of double Brillouin peak fiber (DBPF) on a 1-in steel pipe under pressure up to 1000 per square inch (psi) at elevated temperatures. Simultaneous distributed measurements of temperature and pressure-induced hoop strain were successfully measured. Considering the long processing speed to extract Brillouin frequency shift (BFS), we employ a novel probabilistic deep neural network (PDNN) framework for rapid BFS prediction. Additionally, using the Finite Element Method, the effects of the pipeline pressure on hoop strain were modeled and compared to the experimental hoop strain under the same set of pipeline conditions. Finally, an actual 4-in outer diameter steel natural gas pipeline was used for pilot-scale tests, where hoop strain was measured at various pressure levels. Leaks were simulated to demonstrate accurate pipeline integrity monitoring. At an internal pipe pressure of 1000 psi, hoop strain of approximately 300 με was observed, and the sensitivity was calculated as 0.28 με /psi. The results of this pilot-scale study demonstrated that the system is capable of performing distributed monitoring sufficient to detect pipeline pressure and the presence of leaks to ensure the safe operation of gas pipelines in the field.

03 NATURAL GAS↗

Design, Fabrication and On-Sun Performance Evaluation of SiC Receiver Feature Specimens for CST Applications Using Additively Manufactured SiC Materials

Increasing operating temperatures of solar receivers is paramount to the efficiency of concentrated solar thermal (CST) and solar power (CSP) systems. Successful development of CST systems to generate heat for industrial applications requires significant increase in temperature capability and techno-economically viability of the receiver systems. Supported by an award from the Solar Technology Office (SETO), US Department of Energy (DOE), GE Aerospace Research in collaboration with Heliogen Holdings Inc and Sandia National Lab, is engaged in the development of ultra-High Operating Temperature SiC-matrix Solar Thermal Air Receiver (HOTSSTAR) enabled by additive manufacturing. The program objective is to demonstrate SiC receiver with air exit temperatures up to 1100 oC and high thermal efficiencies. We report design, fabrication and on-sun test results of SiC components of a prototype 50kW (thermal) HOTSSTAR module. The receiver module architecture is based on a radial airflow design and consists of a series of radial SiC receiver sectors organized around a SiC center absorber. The SiC components are fabricated using binder-jet printed SiC followed by melt-infiltration reaction bonding process. To enhance the reliability and to minimize the risk of cracking damage of SiC test articles in thermal gradient and thermal shock environment of the application, the components were laminated with GE’s MI SiC-SiC CMC. Following extensive design and lab test analyses, selected SiC component designs are tested at Heliogen Lancaster Solar field under highly concentrated solar fluxes around 2000 suns to assess the thermal performance characteristics under realistic field conditions. We report on the test results and compare the thermal performances of different HOTSSTAR SiC absorbers. Finally, we discuss fabrication and initial assembly of a 50kW prototype test module in preparation of on-sun field tests to assess the performance of our final design.

CST, CSP, high temperature, air receiver, SiC, add↗

Flight-Tested Hardware Options Currently Available to Support Fruit Fly Science Missions on ISS

The Fruit Fly Lab team at Ames Research Center has developed and flown several versions of hardware to ISS that have been utilized to conduct research using the model organism, Drosophila melanogaster. These sets of hardware vary in complexity and capabilities and can be matched to experiments based on specific aims objectives and considerations for cost, updownmass, and crew time requirements. The team has multiple investigators slated to utilize this hardware on near-term missions to ISS, and is expecting more from future calls for proposals.

Fruit Fly↗

Wearable Biosensor Monitor to Support Autonomous Crew Health and Readiness to Perform

For future human exploration missions, NASA needs a health monitoring system composed of hardware that is compact, fully interoperable with an integrated data management system, and requires minimal consumables. Such a system will be achieved through the integration of small, easy to use biomedical sensors that will have the ability to measure, store and transmit physiological parameters during operational and ambulatory activity. Since 2012, the Canadian Space Agency (CSA) has been active in funding the development of wearable biomonitoring sensors. The Astroskin is the first prototype and consists of a shirt-based garment and headband with embedded sensors, and associated software and technology that measure vital signs, sleep quality and activity level of the wearer. NASA and CSA have been collaborating since 2014 to test and validate this system in a lab environment at Ames Research Center and more recently in the Human Exploration Research Analog (HERA) located at Johnson Spaceflight Center. Specific objectives of the HERA study were: 1) to assess the performance of the Astroskin biosensor system for long-term health monitoring (24-hours) capabilities and during exercise as a measure of crew fitness; 2) to obtain crew feedback on comfort and usability of the Astroskin system; 3) to demonstrate performance of Bluetooth communication during real-time transmission and for verification of data in this environment; and 4) to obtain baseline data for further development of algorithms and tools that facilitate decision support for diagnosing and monitoring of a sick or injured crewmember. HERA Campaign 3 included four missions (each 30-days in duration) with four crewmembers assigned to each mission. A total of 9 men and 7 women participated in the Astroskin evaluation that included continuous physiological monitoring (24-hours) on mission days MD-11, MD1 (high workload), MD15 (low workload), MD19, MD29, and MD+7. Mission days 19 and 29 also included 30 minutes of sub-maximal exercise on a cycle ergometer. Following each 24-hour monitoring session crew physiological data were downloaded to laptops and each crewmember completed a 28 question survey on their experiences with the Astroskin hardware and software. This presentation will focus on lessons learned from the HERA missions. Specifically it will address Astroskin system performance in terms of data loss and data quality (no comparison to lab standard devices), wireless communication with the onboard mobile device, crew usability and comfort, and future development of a next generation biomonitoring system.

crew fitness↗

Planning for Crew Exercise for Future Deep Space Mission Scenarios

Providing the necessary exercise capability to protect crew health for deep space missions will bring new sets of engineering and research challenges. Exercise has been found to be a necessary mitigation for maintaining crew health on‐orbit and preparing the crew for return to earth's gravity. Health and exercise data from Apollo, Space Lab, Shuttle, and International Space Station missions have provided insight into crew deconditioning and the types of activities that can minimize the impacts of microgravity on the physiological systems. The hardware systems required to implement exercise can be challenging to incorporate into spaceflight vehicles. Exercise system design requires encompassing the hardware required to provide mission specific anthropometrical movement ranges, desired loads, and frequencies of desired movements as well as the supporting control and monitoring systems, crew and vehicle interfaces, and vibration isolation and stabilization subsystems. The number of crew and operational constraints also contribute to defining the what exercise systems will be needed. All of these features require flight vehicle mass and volume integrated with multiple vehicle systems. The International Space Station exercise hardware requires over 1,800 kg of equipment and over 24 m3 of volume for hardware and crew operational space. Improvements towards providing equivalent or better capabilities with a smaller vehicle impact will facilitate future deep space missions. Deep space missions will require more understanding of the physiological responses to microgravity, understanding appropriate mitigations, designing the exercise systems to provide needed mitigations, and integrating effectively into vehicle design with a focus to support planned mission scenarios. Recognizing and addressing the constraints and challenges can facilitate improved vehicle design and exercise system incorporation.

Moore, Cherice↗

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.

Aaron Rodriguez↗

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.

Aaron Rodriguez↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Pathfinder for Artemis Gateway

The Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission was developed by NASA in collaboration with Advanced Space, LLC of Westminster, Colorado. This technology demonstration mission serves as a pathfinder for near rectilinear halo orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) is the intended orbit for NASA’s Artemis Gateway, a small, human-tended space station planned for lunar orbit. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for Gateway’s Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The CAPSTONE mission consists of a 12-unit (U) CubeSat developed, integrated, and tested by the Terran Orbital Corporation that carries a payload communications system capable of cross-link ranging with NASA’s Lunar Reconnaissance Orbiter (LRO). CAPSTONE contains a chip scale atomic clock (CSAC) for a one-way ranging experiment with NASA’s Deep Space Network, a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA’s Launch Services Program, was provided by Rocket Lab on its Electron launch vehicle utilizing their Photon upper stage to deploy the CAPSTONE spacecraft into lunar orbit. The mission launched June 28, 2022. The CAPSTONE spacecraft deployed from Rocket Lab’s Photon stage and traversed an approximately 4 month highly efficient transfer phase entering the NRHO Novermber 13, 2022 for a six-month primary mission phase. The mission is currently in a twelve-month technology enhancement operations phase. The CAPSTONE technology demonstration mission is lead by Advanced Space, LLC. Spacecraft development and mission operations is conducted by Terran Orbital Corporation of Irvine, California. Noted accomplishments for the CAPSTONE mission include demonstration of the accessibility of NHROs, validation of key operational concepts in the NHRO environment, laying the foundation for commercial support of future lunar operations, and accelerating the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology (SST) program, which is one of several programs within NASA’s Space Technology Mission Directorate. The program is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The CAPSTONE mission launch was provided by NASA’s Exploration Systems Development Missions Directorate’s Advanced Exploration Systems Division. Coordination and acquisition of the launch was managed by NASA’s Launch Services Program. The CAPSTONE mission and project status will be presented.

Elwood Agasid↗

Rice-obot 1: An intelligent autonomous mobile robot

The Rice-obot I is the first in a series of Intelligent Autonomous Mobile Robots (IAMRs) being developed at Rice University's Cooperative Intelligent Mobile Robots (CIMR) lab. The Rice-obot I is mainly designed to be a testbed for various robotic and AI techniques, and a platform for developing intelligent control systems for exploratory robots. Researchers present the need for a generalized environment capable of combining all of the control, sensory and knowledge systems of an IAMR. They introduce Lisp-Nodes as such a system, and develop the basic concepts of nodes, messages and classes. Furthermore, they show how the control system of the Rice-obot I is implemented as sub-systems in Lisp-Nodes.

Defigueiredo, R.↗

A New Simulator for Assessing Subjective Effects of Sonic Booms

A man rated and computer driven sonic boom simulator which has been constructed and placed in operational use at NASA-Langley is described. The simulator is used to study human subjective reactions to sonic booms and has the capability of producing a wide range of signatures under controlled conditions. Results are presented to illustrate the capability of the simulator to generate user specified N-wave and shaped booms having rise times as low as 0.5 milliseconds and peak overpressures up to 191 Pa (4 psf). The validity of the simulator as a lab research tool for studying human subjective response to sonic booms was demonstrated by successful completion of a preliminary test designed to compare loudness of N-wave sonic booms with results obtained by other investigators. Excellent agreement of the preliminary test data with existing data was observed. This provided confidence in the experimental methodology and established the simulator as a viable tool for performing detailed evaluations of sonic boom loudness and acceptability within the lab. environment.

Leatherwood, Jack D.↗

Performance experiments with alternative advanced teleoperator control modes for a simulated solar maximum satellite repair

Experiments are described which were conducted at the JPL Advanced Teleoperator Lab to demonstrate and evaluate the effectiveness of various teleoperator control modes in the performance of a simulated Solar Max Satellite Repair (SMSR) task. THe SMSR was selected as a test because it is very rich in performance capability requirements and it actually has been performed by two EVA astronauts in the Space Shuttle Bay in 1984. The main subtasks are: thermal blanket removal; installation of a hinge attachment for electrical panel opening; opening of electrical panel; removal of electrical connectors; relining of cable bundles; replacement of electrical panel; securing parts and cables; re-mate electrical connectors; closing of electrical panel; and reinstating thermal blanket. The current performance experiments are limited to thermal blanket cutting, electrical panel unbolting and handling electrical bundles and connectors. In one formal experiment even different control modes were applied to the unbolting and reinsertion of electrical panel screws subtasks. The seven control modes are alternative combinations of manual position and rate control with force feedback and remote compliance referenced to force-torque sensor information. Force-torque sensor and end effector position data and task completion times were recorded for analysis and quantification of operator performance.

Das, H.↗

Nucleobases in Space: Laboratory Studies of Polycyclic Aromatic Nitrogen Heterocycles

Polycyclic Aromatic Nitrogen Heterocycles (PANHs) are heterocyclic aromatics Le., PAHs with carbon atoms replaced by a nitrogen atom. These molecules have been detected in meteorite extracts, and in general these nitrogen heterocycles are of astrobiological interest since this class of molecules include nucleobases, basic components of our nucleic acids. These compounds are predicted to be present in the interstellar medium and in Titan tholin, but have received relatively little attention. We will present spectra and reactions of PANHs, frozen in solid H2O at 12 K, conditions germane to astronomical observations. In contrast to simple PAHs, that do not interact strongly with solid H2O, the nitrogen atoms in PANHs are potentially capable of hydrogen bonding with H20 changing their spectra, complicating their remote detection on the surfaces of icy bodies. Moreover, we have studied the photo-chemistry of these interesting compounds under astrophysical conditions and will use our lab studies to assess a potential interstellar heritage of these compounds in carbonaceous chondrites.

Elsila, Jamie↗

Commercial Implementation of Ultrasonic Velocity Imaging Methods via Cooperative Agreement Between NASA Lewis Research Center and Sonix, Inc.

This article describes the commercial implementation of ultrasonic velocity imaging methods developed and refined at NASA Lewis Research Center on the Sonix c-scan inspection system. Two velocity imaging methods were implemented: thickness-based and non-thickness-based reflector plate methods. The article demonstrates capabilities of the commercial implementation and gives the detailed operating procedures required for Sonix customers to achieve optimum velocity imaging results. This commercial implementation of velocity imaging provides a 100x speed increase in scanning and processing over the lab-based methods developed at LeRC. The significance of this cooperative effort is that the aerospace and other materials development-intensive industries which use extensive ultrasonic inspection for process control and failure analysis will now have an alternative, highly accurate imaging method commercially available.

Roth, Don J.↗

Space Power

For almost 50 years, the National Laboratory of the Rockies (NLR) has developed solar cells to power satellites and spacecraft. Today, NLR is working to improve the durability, performance, and affordability of several photovoltaic (PV) materials for space and power beaming applications. The lab works closely with partners to ensure this research can be quickly and widely adopted.

14 SOLAR ENERGY↗

Capability of the Gas Analysis and Testing Laboratory at the NASA Johnson Space Center

The Gas Analysis and Testing Laboratory is an integral part of the testing performed at the NASA Johnson Space Center. The Gas Analysis and Testing Laboratory is a high performance laboratory providing real time analytical instruments to support manned and unmanned testing. The lab utilizes precision gas chromatographs, gas analyzers and spectrophotometers to support the technology development programs within the NASA community. The Gas Analysis and Testing Laboratory works with a wide variety of customers and provides engineering support for user-specified applications in compressed gas, chemical analysis, general and research laboratory

Broerman, Craig↗

Capability of the Gas Analysis and Testing Laboratory at the NASA Johnson Space Center

The Gas Analysis and Testing Laboratory is an integral part of the testing performed at the NASA Johnson Space Center. The Gas Analysis and Testing Laboratory is a high performance laboratory providing real time analytical instruments to support manned and unmanned testing. The lab utilizes precision gas chromatographs, gas analyzers and spectrophotometers to support the technology development programs within the NASA community. The Gas Analysis and Testing Laboratory works with a wide variety of customers and provides engineering support for user-specified applications in compressed gas, chemical analysis, general and research laboratory.

Broerman, Craig↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Pathfinder for Artemis Gateway

The Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission was developed by NASA in collaboration with Advanced Space, LLC of Westminster, Colorado. This technology demonstration mission serves as a pathfinder for near rectilinear halo orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) is the intended orbit for NASA’s Artemis Gateway, a small, human-tended space station planned for lunar orbit. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and stationkeeping requirements for Gateway’s Power and Propulsion Element. Therefore, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The CAPSTONE mission consists of a 12-unit (U)+ CubeSat developed, integrated, and tested by the Terran Orbital Corporation that carries a payload communications system capable of crosslink ranging with NASA’s Lunar Reconnaissance Orbiter (LRO). CAPSTONE contains a chip-scale atomic clock (CSAC) for a one-way ranging experiment with NASA’s Deep Space Network, a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA’s Launch Services Program, was provided by Rocket Lab on its Electron launch vehicle using their Photon upper stage to deploy the CAPSTONE spacecraft. The mission launched June 28, 2022. The CAPSTONE spacecraft deployed from the Photon stage and traversed an approximately 4-month, highly fuel-efficient transfer phase entering the NRHO November 13, 2022, for a six-month primary mission phase. The mission is currently in a twelve-month technology enhancement operations phase. The CAPSTONE technology demonstration mission is led by Advanced Space, LLC. Spacecraft development and mission operations are conducted by Terran Orbital Corporation of Irvine, California. Noted accomplishments for the CAPSTONE mission include demonstrating the accessibility of NHROs; validating key operational concepts in the NHRO environment; laying the foundation for commercial support of future lunar operations; and accelerating the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA’s Small Spacecraft Technology (SST) program, which is one of several programs within NASA’s Space Technology Mission Directorate. The program is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The CAPSTONE mission launch was provided by NASA’s Exploration Systems Development Missions Directorate’s Advanced Exploration Systems Division. Coordination and acquisition of the launch was managed by NASA’s Launch Services Program. The CAPSTONE mission and project status will be presented.

Elwood Agasid↗

Extending Component Lifetime And Improving Inverter Reliability (ECLAIIR)

Inverter reliability remains one of the most persistent challenges limiting the performance, availability, and economic viability of utility‑scale photovoltaic (PV) plants. Industry data consistently show that inverters account for the highest share of corrective maintenance events and unplanned outages across PV fleets. These failures result in energy losses, increased O&M costs, and reduced confidence in long‑term solar asset performance. Motivated by these challenges, this project—Extending Component Lifetime and Improving Inverter Reliability (ECLAIIR)—was undertaken to systematically investigate inverter degradation and failure mechanisms, develop predictive maintenance capabilities, and establish data‑driven pathways to improve service life and reduce the Levelized Cost of Energy (LCOE) for large‑scale PV systems. The primary goal of the project was to identify pre‑failure signatures in string inverters using both lab‑based accelerated lifetime testing and field‑based data and to develop predictive maintenance algorithms that can anticipate inverter faults before they occur. Through collaboration with inverter testing laboratory, solar PV plant owner, and failure‑analysis experts, the project advanced the technical understanding of inverter reliability. By instrumenting inverters with thermistors, humidity sensors, power‑quality meters, and acoustic sensors, the research established how multiple sensing modalities can reliably detect deviations from normal behavior hours to days before failure. These findings substantially enhance scientific understanding of inverter failure kinetics and provide the PV industry with the most comprehensive cross‑OEM characterization of early‑stage failure indicators reported to date. Technically, the project demonstrated the effectiveness of predictive maintenance by developing and validating the PreDICT (Predictive Diagnostics of PV Inverters Using Condition Monitoring and Trend Analysis) framework—a multi‑layer diagnostic architecture combining peer‑to‑peer analytics, historical trend modeling, and advanced machine‑learning techniques such as the Sequential Conditional Variational Autoencoder (SCVAE). This predictive model achieved more than 90% accuracy in detecting pre‑failure conditions and provided up to four days of lead time before inverter failure in field scenarios. Economically, the project’s LCOE analysis showed that predictive maintenance can reduce lifetime energy losses and minimize corrective maintenance interventions. Modeling indicated that, depending on inverter failure rates and replacement timelines, predictive maintenance can significantly reduce LCOE impacts associated with inverter downtime: from as high as 19.4% under conventional maintenance strategies to 0.1%–10.17% when predictive analytics are adopted. These results confirm that predictive maintenance is both technically feasible and economically advantageous for utilities and plant operators. The project’s findings also have broad public benefit. By improving inverter reliability and reducing downtime, predictive maintenance directly increases electricity generation from existing PV assets. Enhanced reliability lowers operational costs for utilities, which can translate over time into lower energy costs for consumers. Furthermore, the project’s technical publications, conference presentations, and industry workshops ensure that knowledge gained is shared broadly across the solar industry, supporting workforce development and enabling utilities of all sizes to adopt modern asset‑health monitoring practices. The retrofitting case study and service‑life prediction framework further support informed decision‑making for aging PV fleets, helping operators extend system life and reduce electronic waste. In summary, the ECLAIIR project significantly advanced the state of knowledge on inverter degradation, demonstrated the technical and economic value of predictive maintenance, and delivered actionable tools and insights that support more reliable, cost‑effective, and sustainable PV plant operation. The outcomes of this project will continue to inform utility practices, guide inverter design improvements, and strengthen the long‑term performance of solar assets nationwide.

14 SOLAR ENERGY↗