Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Optics at Marshall Space Flight Center

Marshall Space Flight Center optical research programs technology base for launch vehicle development support, discussing Apollo Telescope Mount

Johnson, W. G.↗

The Kennedy Space Center story

History of Cape Kennedy launch complex noting origin, initial construction, organization, launching sites, ground support equipment, and significant accomplishments

Source record↗

Application of NASA management approach to solve complex problems on earth

The application of NASA management approach to solving complex problems on earth is discussed. The management of the Apollo program is presented as an example of effective management techniques. Four key elements of effective management are analyzed. Photographs of the Cape Kennedy launch sites and supporting equipment are included to support the discussions.

Potate, J. S.↗

Skylab SO71/SO72 circadian periodicity experiment

The circadian rhythm hardware activities from 1965 through 1973 are considered. A brief history of the programs leading to the development of the combined Skylab SO71/SO72 Circadian Periodicity Experiment (CPE) is given. SO71 is the Skylab experiment number designating the pocket mouse circadian experiment, and SO72 designates the vinegar gnat circadian experiment. Final design modifications and checkout of the CPE, integration testing with the Apollo service module CSM 117 and the launch preparation and support tasks at Kennedy Space Center are reported.

Fairchild, M. K.↗

Floated pallet definition study. Volume 4: Summary volume

The conceptual design of a suspension system for the Floated Pallet and a retention system to support the pallet during launch, maneuvering and descent are described. In addition, a control moment gyroscope support equipment configuration study including installation and an experiment mount and erection study was performed. The impact of these separate hardware studies on the existing pallet configuration was assessed and a modified pallet common module defined.

Source record↗

Sensor data autonomy

'Smart' sensors onboard NASA space missions will require variable data output bandwidth as they respond to phenomena of interest. An Instrument Telemetry Packet (ITP) approach has been developed which encodes experimental instrument data into an autonomous data package, along with pertinent engineering parameters and ancillary data (time, position, attitude, etc.). New requirements for onboard concentration and buffering, as well as for end-to-end error control, arise from this approach. Emphasis is placed on packet protocols compatible with the data link standard ADCCP, to enable one set of ground support equipment to readily support instrument development, launch site checkout and mission operations phases.

Greene, E. P.↗

Analysis of space systems study for the space disposal of nuclear waste. Study report, volume 1: Executive summary

Space systems concepts were identified and defined and evaluated as to their performance, risks, and technical viability in order to select the most attractive approach for disposal of high level nuclear wastes in space. Major study areas discussed include: (1) mission and operations analysis; (2) waste payload systems; (3) flight support system; (4) launch site systems; (5) launch vehicle systems; (6) orbit transfer system; (7) space disposal destinations; and (8) systems integration and evaluation.

Source record↗

Defense Meteorological Satellite Program (DMSP)

The Defense Meteorological Satellite Program is a total satellite system composed of spacecraft with meteorological sensors, an Earth-based command and control network, user stations, launch vehicle and support; with a communication network linking the various segments together. The various system segments are described.

Rivers, J. W., Jr.↗

Space Shuttle solid rocket booster dewatering system

After the launch of the Space Shuttle, the two solid rocket boosters (SRB's) are jettisoned into the ocean where they float in a spar (vertical) mode. It is cost effective to recover the SRB's. A remote controlled submersible vehicle has been developed to aid in their recovery. The vehicle is launched from a support ship, maneuvered to the SRB, then taken to depth and guided into the rocket nozzle. It then dewaters the SRB, using compressed air from the ship, and seals the nozzle. When dewatered, the SRB floats in a log (horizontal) mode and can be towed to port for reuse. The design of the remote controlled vehicle and its propulsion system is presented.

Fishel, K. R.↗

The case for a centralized repair depot for Space Shuttle

The first priority of the NSTS program is to make the Space Shuttle system fully operational and cost effective in providing routine access to space. In support of this priority an integrated logistics support system was planned, structured and is being implemented to support a launch-on-time goal of 95 percent. In achieving a 95 percent spares 'fill rate' in an environment of small fleet size, highly unique and high cost assets, significant spares cost can be incurred. A major portion of these costs are for the additional spares required when repair or acquisition times are lengthy. This paper provides a fundamental analysis of the costs and other factors involved in the spare and repair process and provides an optimized cost and process solution for the Space Shuttle program - a centralized repair depot located at KSC.

Enlow, R. D.↗

Space Flight Operations Center local area network

The existing Mission Control and Computer Center at JPL will be replaced by the Space Flight Operations Center (SFOC). One part of the SFOC is the LAN-based distribution system. The purpose of the LAN is to distribute the processed data among the various elements of the SFOC. The SFOC LAN will provide a robust subsystem that will support the Magellan launch configuration and future project adaptation. Its capabilities include (1) a proven cable medium as the backbone for the entire network; (2) hardware components that are reliable, varied, and follow OSI standards; (3) accurate and detailed documentation for fault isolation and future expansion; and (4) proven monitoring and maintenance tools.

Goodman, Ross V.↗

Microspacecraft and Earth observation: Electrical field (ELF) measurement project

The Utah State University space system design project for 1989 to 1990 focuses on the design of a global electrical field sensing system to be deployed in a constellation of microspacecraft. The design includes the selection of the sensor and the design of the spacecraft, the sensor support subsystems, the launch vehicle interface structure, on board data storage and communications subsystems, and associated ground receiving stations. Optimization of satellite orbits and spacecraft attitude are critical to the overall mapping of the electrical field and, thus, are also included in the project. The spacecraft design incorporates a deployable sensor array (5 m booms) into a spinning oblate platform. Data is taken every 0.1 seconds by the electrical field sensors and stored on-board. An omni-directional antenna communicates with a ground station twice per day to down link the stored data. Wrap-around solar cells cover the exterior of the spacecraft to generate power. Nine Pegasus launches may be used to deploy fifty such satellites to orbits with inclinations greater than 45 deg. Piggyback deployment from other launch vehicles such as the DELTA 2 is also examined.

Olsen, Tanya↗

A comprehensive cost model for NASA data archiving

A simple archive cost model has been developed to help predict NASA's archiving costs. The model covers data management activities from the beginning of the mission through launch, acquisition, and support of retrospective users by the long-term archive; it is capable of determining the life cycle costs for archived data depending on how the data need to be managed to meet user requirements. The model, which currently contains 48 equations with a menu-driven user interface, is available for use on an IBM PC or AT.

Green, J. L.↗

Geostationary Operational Environmental Satellite (GOES I-M) METSAT project

The primary objective of the METSAT project is to provide a satellite system that meets the National Environmental Satellite Data and Information Service (NESDIS) requirements as specified by NOAA. For the GOES I-M spacecraft, these requirements include an imager and sounder system, a data collection system, and a search and rescue system. The Space Transportation System and GOES I-M development philosophy and the satellite transfer orbit philosophy are explained. The spacecraft will be launched from the Kennedy Space Center using Atlas G/Centaur D-1A expendable launch vehicles. The coverage required for launch and the support of transfer and drift orbits will consist of the 26-m antenna as prime and the TBD antenna as backup for 11 days at all complexes. There will be contingency support 15 days for on-station spacecraft checkout. After the initial 30 to 45 days, the Deep Space Network (DSN) is committed for emergency support. Contingency and emergency support will be provided by Goldstone only. Information is given in tabular form for DSN support, frequency assignments, telemetry, command, and tracking support responsibility.

Blaney, K.↗