Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launching”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Design of a Ram Accelerator mass launch system

The Ram Accelerator, a chemically propelled, impulsive mass launch system, is presented as a viable concept for directly launching acceleration-insensitive payloads into low Earth orbit. The principles of propulsion are based on those of an airbreathing supersonic ramjet. The payload vehicle acts as the ramjet centerbody and travels through a fixed launch tube that acts as the ramjet outer cowling. The launch tube is filled with premixed gaseous fuel and oxidizer mixtures that combust at the base of the vehicle and produce thrust. Two modes of in-tube propulsion involving ramjet cycles are used in sequence to accelerate the vehicle from 0.7 km/sec to 9 km/sec. Requirements for placing a 2000 kg vehicle into a 500-km circular orbit, with a minimum amount of onboard rocket propellant for orbital maneuvers, are examined. It is shown that in-tube propulsion requirements dictate a launch tube length of 5.1 km to achieve an exit velocity of 9 km/sec, with peak accelerations not to exceed 1000 g's. Aerodynamic heating due to atmospheric transit requires minimal ablative protection and the vehicle retains a large percentage of its exit velocity. An indirect orbital insertion maneuver with aerobraking and two apogee burns is examined to minimize the required onboard propellant mass. An appropriate onboard propulsion system design to perform the required orbital maneuvers with minimum mass requirements is also determined. The structural designs of both the launch tube and the payload vehicle are examined using simple structural and finite element analysis for various materials.

Source record↗

Advanced transportation system studies technical area 2(TA-2): Heavy lift launch vehicle development: Executive summary - volume 1

The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 1, provides a summary description of the technical activities that were performed over the entire contract duration, covering three distinct launch vehicle definition activities: heavy-lift (300,000 pounds injected mass to low Earth orbit) launch vehicles for the First Lunar Outpost (FLO), medium-lift (50,000-80,000 pounds injected mass to low Earth orbit) launch vehicles, and single-stage-to-orbit (SSTO) launch vehicles (25,000 pounds injected mass to a Space Station orbit).

McCurry, J.↗

Reusable Launch Vehicle Technology Program

Industry/NASA reusable launch vehicle (RLV) technology program efforts are underway to design, test, and develop technologies and concepts for viable commercial launch systems that also satisfy national needs at acceptable recurring costs. Significant progress has been made in understanding the technical challenges of fully reusable launch systems and the accompanying management and operational approaches for achieving a low cost program. This paper reviews the current status of the RLV technology program including the DC-XA, X-33 and X-34 flight systems and associated technology programs. It addresses the specific technologies being tested that address the technical and operability challenges of reusable launch systems including reusable cryogenic propellant tanks, composite structures, thermal protection systems, improved propulsion and subsystem operability enhancements. The recently concluded DC-XA test program demonstrated some of these technologies in ground and flight test. Contracts were awarded recently for both the X-33 and X-34 flight demonstrator systems. The Orbital Sciences Corporation X-34 flight test vehicle will demonstrate an air-launched reusable vehicle capable of flight to speeds of Mach 8. The Lockheed-Martin X-33 flight test vehicle will expand the test envelope for critical technologies to flight speeds of Mach 15. A propulsion program to test the X-33 linear aerospike rocket engine using a NASA SR-71 high speed aircraft as a test bed is also discussed. The paper also describes the management and operational approaches that address the challenge of new cost effective, reusable launch vehicle systems.

Freeman, Delma C., Jr.↗

Application of Reconfigurable Avionics for the Bantam Launch Vehicle

The modern aerospace market is placing increasing pressure on launch costs. This is particularly true for small university science payloads, where the cost of the experiment itself is relatively low, and the launch frequency is potentially very high. It is the stated goal of NASA's Bantam Program to reduce dramatically the costs of launching this class of payloads to the order of $1,000,000 per launch for a single 200 pound payload. The envisioned Bantam vehicle is a multi-stage reusable launch system. Meeting the Program's goal for this versatile type of vehicle requires reductions in production cost, maintenance cost, and the operation cost. However, the cost of avionics is a relatively small fraction of the overall cost of launching a payload, and a simple reduction in the avionics costs will not achieve the Bantam goal. Only by reducing weight, volume, and power, while enhancing computational capability can the avionics be used to address the system-level cost reduction requirements.

Wallace, Kevin Shawn↗

Future X Pathfinder: Quick, Low Cost Flight Testing for Tomorrow's Launch Vehicles

The DC-X and DC-XA Single Stage Technology flight program demonstrated the value of low cost rapid prototyping and flight testing of launch vehicle technology testbeds. NASA is continuing this important legacy through a program referred to as Future-X Pathfinder. This program is designed to field flight vehicle projects that cost around $100M each, with a new vehicle flying about every two years. Each vehicle project will develop and extensively flight test a launch vehicle technology testbed that will advance the state of the art in technologies directly relevant to future space transportation systems. There are currently two experimental, or "X" vehicle projects in the Pathfinder program, with additional projects expected to follow in the near future. The first Pathfinder project is X-34. X-34 is a suborbital rocket plane capable of flights to Mach 8 and 75 kilometers altitude. There are a number of reusable launch vehicle technologies embedded in the X-34 vehicle design, such as composite structures and propellant tanks, and advanced reusable thermal protection systems. In addition, X-34 is designed to carry experiments applicable to both the launch vehicle and hypersonic aeronautics community. X-34 is scheduled to fly later this year. The second Pathfinder project is the X-37. X-37 is an orbital space plane that is carried into orbit either by the Space Shuttle or by an expendable launch vehicle. X-37 provides NASA access to the orbital and orbital reentry flight regimes with an experimental testbed vehicle. The vehicle will expose embedded and carry-on advanced space transportation technologies to the extreme environments of orbit and reentry. Early atmospheric approach and landing tests of an unpowered version of the X-37 will begin next year, with orbital flights beginning in late 2001. Future-X Pathfinder is charting a course for the future with its growing fleet of low-cost X- vehicles. X-34 and X-37 are leading the assault on high launch costs and enabling the flight testing of technologies that will lead to affordable access to space.

London, John, III↗

The Ceres S'COOL Project: Two Years After First Launch

The idea for the Students' Cloud Observations OnLine (S'COOL) project as an outreach and education element of NASA's Clouds and the Earth's Radiant Energy System (CERES) research program was conceived in late 1996 during a conversation with a middle school science teacher. S'COOL was implemented in a series of increasingly developed test phases during 1997, as the launch of the first CERES instrument approached. Even before launch, the reception of the project in schools far exceeded expectations. After several delays the first instrument, on the Tropical Rainfall Measuring Mission (TRMM) spacecraft, was launched on Thanksgiving Day, 1997. Since the first launch, development and expansion of the project has continued with expectations for launch of Terra carrying two CERES instruments into a polar orbit in mid-1998. That launch is now expected in fall 1999, and will finally provide overflight of all participating schools. In two years, the project has grown from three initial test participants to over 300 schools now participating in 23 countries on five continents. Students from first grade through university level are involved (most participants are ages 10-15). S'COOL is also being used by a few education professors to teach about Internet use in the classroom. The project continues to grow through word of mouth, presentations at teacher workshops, and now increasingly through teachers who find it during web searches. Participants in the S'COOL project are part of the CERES validation team. They provide ground truth measurements at the time the CERES instrument flies over their location, to be compared with the retrieval of cloud properties by remote sensing from CERES. Quantities reported include cloud type, height, fraction and opacity; information on contrails; surface temperature, pressure and relative humidity; and ground cover (snow/ice, wet, dry; leaves on trees or not). in addition, a comment field on the report form serves as a catch-all for all kinds of interesting observations, including similes written by some classes to describe more exactly the clouds they see. Several not totally unexpected complications with the CERES instrument and processing software mean that the CERES team has not yet reached the point of computing the cloud properties, a high level product at the end of the processing stream. However, progress is being made and we anticipate that we will soon be populating the S'COOL database with a large number of satellite retrievals for comparison with the students' observations. Some satellite retrievals from the initial test phases are already available in the database, The CERES instruments are planned to operate at least through 2006, and the S'COOL Project is planned to continue at least that long, providing motivational learning to as many students as possible. This paper reports on the first several years of the S'CCOL project. It further reports on some of the noteworthy observations and comparisons made possible by this project. Schools are often located in interesting places, in terms of the clouds found there and the satellite's ability to observe these clouds. The paper also reports on the learning opportunities delivered by this project, and on new questions about the planet and its climate which arise in the students' minds as a result of their active participation.

Chambers, Lin H.↗

DELTA/WIND Pre-Launch Press Conference

Live footage shows the participants in the Pre Launch Press Conference disclosing the status of the Delta/Wind flight. The panelists consists of Jim Womack NASA Launch Manager from KSC (Kennedy Space Center), Dan Miller NASA Delta Launch Vehicle Manager from GSFC (Goddard Space Flight Center), Bill Huddleston NASA Wind Program Manager from NASA HQ (Headquarter), and Joel Tumbiolo Launch Weather Officer from USAF (United States Air Force). Panelists' discuss launch vehicle specification - the first Russian instrument in an American Spacecraft, the total cost of the mission, and the weather condition. The panelists also answer questions from the audience and NASA HQ about the Delta/Wind launch.

Source record↗

Delta II/Geotail Pre-Launch Press Conference

This video presents a live coverage of a pre-launch press conference on the Delta II/Geotail Mission. George Diller, NASA Public Affairs, presents the panel. The panel consists of James Womack, NASA Launch Manager, Kennedy Space Center; Mario Acuna, Project Scientist, Goddard Space Flight Center; Atsuiro Nishida, Project Manager, ISAS (Institute of Space and Astronautical Science) Tokyo; Michael Calabrese, Program Manager, NASA Headquarters; Kenneth Sizemore, Project Manager, GSFC; Tono Uesugi, Project Manager, ISAS; John Beckham, Delta Launch Manager, GSFC; and Joel Tumbiolo, Launch Weather Officer, CCAFS (Cape Canaveral Air Force Station). Atsuiro Nishida presents the objectives of the Geotail Mission which are: 1) To determine the characteristics of the Geomagnetic Tail; 2) To understand the internal instability that leads to sudden energy releases; 3) To clarify the source of plasma in the tail; and 4) To study the structure of important interfaces such as the Magnetopause. Mario Acuna gives illustrations of the Magnetosphere. James Womack discusses the countdown and status of the mission. Tono Uesugi discusses spacecraft readiness for the July 24, 1992 launch, and Joel Tumbiolo gives the weather forecast for the launch. The press conference concludes with a question and answer period. See NONP-NASA-VT-200078605 for additional questions and footage.

Source record↗

Human Exploration Missions Study Launch Window from Earth Orbit

The determination of orbital launch window characteristics is of major importance in the analysis of human interplanetary missions and systems. The orbital launch window characteristics are directly involved in the selection of mission trajectories, the development of orbit operational concepts, and the design of orbital launch systems. The orbital launch window problem arises because of the dynamic nature of the relative geometry between outgoing (departure) asymptote of the hyperbolic escape trajectory and the earth parking orbit. The orientation of the escape hyperbola asymptotic relative to earth is a function of time. The required hyperbola energy level also varies with time. In addition, the inertial orientation of the parking orbit is a function of time because of the perturbations caused by the Earth's oblateness. Thus, a coplanar injection onto the escape hyperbola can be made only at a point in time when the outgoing escape asymptote is contained by the plane of parking orbit. Even though this condition may be planned as a nominal situation, it will not generally represent the more probable injection geometry. The general case of an escape injection maneuver performed at a time other than the coplanar time will involve both a path angle and plane change and, therefore, a Delta(V) penalty. Usually, because of the Delta(V) penalty the actual departure injection window is smaller in duration than that determined by energy requirement alone. This report contains the formulation, characteristics, and test cases for five different launch window modes for Earth orbit. These modes are: (1) One impulsive maneuver from a Low Earth Orbit (LEO), (2) Two impulsive maneuvers from LEO, (3) Three impulsive maneuvers from LEO, (4) One impulsive maneuvers from a Highly Elliptical Orbit (HEO), (5) Two impulsive maneuvers from a Highly Elliptical Orbit (HEO) The formulation of these five different launch window modes provides a rapid means of generating realistic parametric data for space exploration studies. Also the formulation provides vector and geometrical data sufficient for use as a good starting point in detail trajectory analysis based on calculus of variations, steepest descent, or parameter optimization program techniques.

Young, Archie↗

Web-based Weather Expert System (WES) for Space Shuttle Launch

The Web-based Weather Expert System (WES) is a critical module of the Virtual Test Bed development to support 'go/no go' decisions for Space Shuttle operations in the Intelligent Launch and Range Operations program of NASA. The weather rules characterize certain aspects of the environment related to the launching or landing site, the time of the day or night, the pad or runway conditions, the mission durations, the runway equipment and landing type. Expert system rules are derived from weather contingency rules, which were developed over years by NASA. Backward chaining, a goal-directed inference method is adopted, because a particular consequence or goal clause is evaluated first, and then chained backward through the rules. Once a rule is satisfied or true, then that particular rule is fired and the decision is expressed. The expert system is continuously verifying the rules against the past one-hour weather conditions and the decisions are made. The normal procedure of operations requires a formal pre-launch weather briefing held on Launch minus 1 day, which is a specific weather briefing for all areas of Space Shuttle launch operations. In this paper, the Web-based Weather Expert System of the Intelligent Launch and range Operations program is presented.

Bardina, Jorge E.↗

Launch Characteristics of the X-15 Research Airplane as Determined in Flight

The first 16 air launches of the X-15 airplane demonstrated the feasibility of air launch from an asymmetric position under the wing of the B-52 carrier airplane. With all dampers operating, launch transients were minimized and no stability problems were encountered. But, when the roll damper failed to function, the X-15 experienced relatively large roll rates in the presence of the carrier airplane, creating the possibility of the X-15 upper vertical tail hitting the cutout in the B-52 wing. Specific flight data demonstrated that left-aileron settings of from 6 deg to 8 deg at launch minimized the right-roll transient. The altitude loss of 3,000 to 9,000 feet before climbout could be effected was a function of launch altitude and recovery angle of attack. The average time for the X-15 to separate 10 feet from the B-52 carrier airplane was about 0.8 second. Flight-measured separation rates and launch transients agree well with predicted values where the initial conditions and control motions are similar.

Matranga, Gene J.↗

Magellan Post Launch Mission Operation Report

Magellan was successfully launched by the Space Shuttle Atlantis from the Kennedy Space Center at 2:47 p.m. EDT on May 4, 1989. The Inertial Upper Stage (IUS) booster and attached Magellan Spacecraft were successfully deployed from Atlantis on Rev. 5 as planned, at 06:14 hrs Mission Elapsed Time (MET). The two IUS propulsion burns which began at 07:14 hrs MET and were completed at 07:22 hrs MET, placed the Magellan Spacecraft almost perfectly on its preplanned trajectory to Venus. The IUS was jettisoned at 07:40 hrs MET and Magellan telemetry was immediately acquired by the Deep Space Network (DSN). A spacecraft trajectory correction maneuver was performed on May 21 and the spacecraft is in the planned standard cruise configuration with all systems operating nominally. An initial attempt was made to launch Atlantis on April 28, 1989, but the launch was scrubbed at T-31 sec due to a failure of the liquid hydrogen recirculation pump on Space Shuttle Main Engine #1. The countdown had proceeded smoothly until T-20 min when the Magellan radio receiver "locked-on" the MIL 71 Unified S-Band (USB) transmission as the transmitter power was increased fro 2 kw to 10 kw in support of the orbiter launch. During the planned hold at T-9 min, the USB was confirmed as the source of the receiver "lock" and Magellan's launch readiness was reaffirmed. In addition a five-minute extension of the T-9 hold occurred when a range safety computer went off-line, creating a loss of redundancy in the range safety computer network. Following resumption of the countdown, both the orbiter and Magellan flows proceeded smoothly until the launch was scrubbed at T-31 sec.

Source record↗

The DARPA/USAF Falcon Program Small Launch Vehicles

Earlier in this decade, the U.S. Air Force Space Command and the Defense Advanced Research Projects Agency (DARPA), in recognizing the need for low-cost responsive small launch vehicles, decided to partner in addressing this national shortcoming. Later, the National Aeronautics and Space Administration (NASA) joined in supporting this effort, dubbed the Falcon Program. The objectives of the Small Launch Vehicle (SLV) element of the DARPA/USAF Falcon Program include the development of a low-cost small launch vehicle(s) that demonstrates responsive launch and has the potential for achieving a per mission cost of less than $5M when based on 20 launches per year for 10 years. This vehicle class can lift 1000 to 2000 lbm payloads to a reference low earth orbit. Responsive operations include launching the rocket within 48 hours of call up. A history of the program and the current status will be discussed with an emphasis on the potential impact on small satellites.

Weeks, David J.↗

The Crossbow Air Launch Trade Space

Effective air launching of a rocket is approached from a broad systems engineering viewpoint. The elementary reasons for why and how a rocket might be launched from a carrier aircraft are examined. From this, a carefully crafted set of guiding principles is presented. Rules are generated from a fundamental foundation, derived from NASA systems study analyses and from an academic vantage point. The Appendix includes the derivation of a revised Mass Multiplier Equation, useful in understanding the rocket equation as it applies to real vehicles, without the need of complicated weight and sizing programs. The rationale for air launching, being an enormously advantageous Earth-To-Orbit (ETO) methodology, is presented along with the realization that the appropriate air launch solution may lie in a very large class of carrier aircraft; the pod-hauler. Finally, a unique area of the system trade space is defined and branded Crossbow. Crossbow is not a specific hardware design for air launch, but represents a comprehensive vision for commercial, military and space transportation. This document serves as a starting point for future technical papers that evaluate the air launch hypotheses and assertions produced during the past several years of study on the subject.

Bonometti, Joseph A.↗

Results and Lessons from MODIS Reflective Solar Bands Calibration: Pre-launch to On-orbit

MODIS is a major instrument for the NASA EOS Terra (1aunched in December 1999) and Aqua (launched in May 2002) missions. It was designed and built to enhance and extend its heritage sensors' measurements and data records with applications covering a wide range of studies of the Earth's land, oceans, and atmosphere. MODIS has 36 spectral bands (0.41 - 14.4 micrometers) located on four focal plane assemblies (FPAs). It makes measurements at three nadir spatial resolutions: 250m (bands 1-2), 500m (bands 3-7), and lkm (bands 8-36). Because of instrument design complexity and stringent calibration requirements, extensive calibration and characterization activities were conducted pre-launch by the sensor vendor (Raytheon / Santa Barbara Remote Sensing) for both Tesa and Aqua MODIS. For the 20 reflective solar bands (RSB), these activities include measurements for the detectors noise characterization and radiometric performance, system level response versus scan-angle (RVS), polarization sensitivity, and relative spectral response (RSR). Key radiometric performance was evaluated using thermal vacuum observations. On-orbit MODIS RSB calibration is performed using a solar diffuser (SD) and solar diffuser stability monitor (SDSM) system. The SD bi-directional reflectance factor (BRF) was characterized pre-launch by the sensor vendor with reference samples traceable to NIST reflectance standards. This paper provides a summary of Terra and Aqua MODIS RSB pre-launch and on-orbit calibration and characterization activities and results with focus on the detectors' noise characterization and radiometric performance. Challenging and concerning issues and lessons learned from RSB pre-launch calibration and their impact on post launch performance are also presented. A similar summary for MODIS thermal emissive bands (TEB) is reported in a separate paper in these proceedings.

Xiong, X.↗

Crew Exploration Vehicle Launch Abort System Flight Test Overview

The Constellation program is an organization within NASA whose mission is to create the new generation of spacecraft that will replace the Space Shuttle after its planned retirement in 2010. In the event of a catastrophic failure on the launch pad or launch vehicle during ascent, the successful use of the launch abort system will allow crew members to escape harm. The Flight Test Office is the organization within the Constellation project that will flight-test the launch abort system on the Orion crew exploration vehicle. The Flight Test Office has proposed six tests that will demonstrate the use of the launch abort system. These flight tests will be performed at the White Sands Missile Range in New Mexico and are similar in nature to the Apollo Little Joe II tests performed in the 1960s. An overview of the launch abort system flight tests for the Orion crew exploration vehicle is given. Details on the configuration of the first pad abort flight test are discussed. Sample flight trajectories for two of the six flight tests are shown.

Williams-Hayes, Peggy S.↗

Launching to the Moon, Mars, and Beyond

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission today, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed to return people to the Moon and go to Mars. Unlike the Apollo program of the 1960s, this phase of exploration will be a journey, not a race. In 1966, the NASA's budget was 4 percent of federal spending. Today, with 6/10 of 1 percent of the budget, NASA must incrementally develop the vehicles, infrastructure, technology, and organization to accomplish this goal. Fortunately, our knowledge and experience are greater than they were 40 years ago. NASA's goal is a return to the Moon by 2020. The Moon is the first step to America's exploration of Mars. Many questions about the Moon's history and how its history is linked to that of Earth remain even after the brief Apollo explorations of the 1960s and 1970s. This new venture will carry more explorers to more diverse landing sites with more capable tools and equipment. The Moon also will serve as a training ground in several respects before embarking on the longer, more perilous trip to Mars. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, the Ares V Cargo Launch Vehicle, the Orion Crew Exploration Vehicle, and the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit on the Ares I and a second launch to orbit the lunar lander and the Earth Departure Stage to send the lander and crew vehicle to the Moon. In order to reach the Moon and Mars within a lifetime and within budget, NASA is building on proven hardware and decades of experience derived from the Apollo Saturn, Space Shuttle, and contemporary commercial launch vehicle programs. Less than one year after the Exploration Launch Projects Office was formed at NASA's Marshall Space Flight Center, engineers are testing engine components, firing test rocket motors, refining vehicle designs in wind tunnel tests, and building hardware for the first flight test of Ares I, scheduled for spring 2009. The Vision for Exploration will require this nation to develop tools, machines, materials, and processes never before invented, technologies and capabilities that can be turned over to the private sector to benefit nearly all aspects of life on Earth. This new pioneering venture, as did the Apollo Program before it, will contribute to America's economic leadership, national security, and technological global competitiveness and serve as an inspiration for all its citizens.

Sumrall, John P.↗

Ares V Launch Capability Enables Future Space Telescopes

NASA's Ares V cargo launch vehicle offers the potential to completely change the paradigm of future space science mission architectures. A major finding of the NASA Advanced Telescope and Observatory Capability Roadmap Study was that current launch vehicle mass and volume constraints severely limit future space science missions. And thus, that significant technology development is required to package increasingly larger collecting apertures into existing launch shrouds. The Ares V greatly relaxes these constraints. For example, while a Delta IV has the ability to launch approximate a 4.5 meter diameter payload with a mass of 13,000 kg to L2, the Ares V is projected to have the ability to launch an 8 to 12 meter diameter payload with a mass of 60,000 kg to L2 and 130,000 kg to Low Earth Orbit. This paper summarizes the Ares V payload launch capability and introduces how it might enable new classes of future space telescopes such as 6 to 8 meter class monolithic primary mirror observatories, 15 meter class segmented telescopes, 6 to 8 meter class x-ray telescopes or high-energy particle calorimeters.

Stahl, H. Philip↗