Search NASA⌕ Search

SEARCH · Search NASA

Results for “Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

African Easterly Jet: Structure and Maintenance

This article investigates the African Easterly Jet (AEJ), its structure and the forcings contributing to its maintenance, critically revisiting previous work which attributed the maintenance of the jet to soil moisture gradients over tropical Africa. A state-of-the-art global model in a high-end computer framework is used to produce a 3-member 73-year ensemble run forced by observed SST to represent the Control run. The AEJ as produced by the Control is compared with the representation of the AEJ in the European Center for Medium Range Forecast Reanalyses (ERA-40) and other observational data sets and found very realistic. Five Experiments are then performed, each represented by sets of 3-member 22 year long (1980-2001) ensemble runs. The goal of the Experiments is to investigate the role of meridional soil moisture gradients, different land surface properties and orography. Unlike previous studies, which have suppressed soil moisture gradients within a highly idealized framework (i.e., the so-called bucket model), terrestrial evaporation control is here achieved with a highly sophisticated landsurface treatment and with an extensively tested and complex methodology. The results show that the AEJ is suppressed by a combination of absence of meridional evaporation gradients over Africa and constant vegetation, even if the individual forcings taken separately do not lead to the AEJ disappearance, but only its modification. Moreover, the suppression of orography also leads to a different circulation in which there is no AEJ. This work suggests that it is not just soil moisture gradients, but a unique combination of geographical features present only in northern tropical Africa, which causes and maintains the jet.

Wu, Man-Li C.↗

Embracing Safe Ground Test Facility Operations and Maintenance

Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

Dunn, Steven C.↗

International Space Station Mechanisms and Maintenance Flight Control Documentation and Training Development

International Space Station (ISS) crew and flight controller training documentation is used to aid in training operations. The Generic Simulations References SharePoint (Gen Sim) site is a database used as an aid during flight simulations. The Gen Sim site is used to make individual mission segment timelines, data, and flight information easily accessible to instructors. The Waste and Hygiene Compartment (WHC) training schematic includes simple and complex fluid schematics, as well as overall hardware locations. It is used as a teaching aid during WHC lessons for both ISS crew and flight controllers. ISS flight control documentation is used to support all aspects of ISS mission operations. The Quick Look Database and Consolidated Tool Page are imagery-based references used in real-time to help the Operations Support Officer (OSO) find data faster and improve discussions with the Flight Director and Capsule Communicator (CAPCOM). A Quick Look page was created for the Permanent Multipurpose Module (PMM) by locating photos of the module interior, labeling specific hardware, and organizing them in schematic form to match the layout of the PMM interior. A Tool Page was created for the Maintenance Work Area (MWA) by gathering images, detailed drawings, safety information, procedures, certifications, demonstration videos, and general facts of each MWA component and displaying them in an easily accessible and consistent format. Participation in ISS mechanisms and maintenance lessons, mission simulation On-the-Job Training (OJT), and real-time flight OJT was used as an opportunity to train for day-to-day operations as an OSO, as well as learn how to effectively respond to failures and emergencies during mission simulations and real-time flight operations.

Daugherty, Colin C.↗

Magnetically Attached Multifunction Maintenance Rover

A versatile mobile telerobot, denoted the magnetically attached multifunction maintenance rover (MAGMER), has been proposed for use in the inspection and maintenance of the surfaces of ships, tanks containing petrochemicals, and other large ferromagnetic structures. As its name suggests, this robot would utilize magnetic attraction to adhere to a structure. As it moved along the surface of the structure, the MAGMER would perform tasks that could include close-up visual inspection by use of video cameras, various sensors, and/or removal of paint by water-jet blasting, laser heating, or induction heating. The water-jet nozzles would be mounted coaxially within compressed-air-powered venturi nozzles that would collect the paint debris dislodged by the jets. The MAGMER would be deployed, powered, and controlled from a truck, to which it would be connected by hoses for water, compressed air, and collection of debris and by cables for electric power and communication (see Figure 1). The operation of the MAGMER on a typical large structure would necessitate the use of long cables and hoses, which can be heavy. To reduce the load of the hoses and cables on the MAGMER and thereby ensure its ability to adhere to vertical and overhanging surfaces, the hoses and cables would be paid out through telescopic booms that would be parts of a MAGMER support system. The MAGMER would move by use of four motorized, steerable wheels, each of which would be mounted in an assembly that would include permanent magnets and four pole pieces (see Figure 2). The wheels would protrude from between the pole pieces by only about 3 mm, so that the gap between the pole pieces and the ferromagnetic surface would be just large enough to permit motion along the surface but not so large as to reduce the magnetic attraction excessively. In addition to the wheel assemblies, the MAGMER would include magnetic adherence enhancement fixtures, which would comprise arrays of permanent magnets and pole pieces that could be adjusted to maximize or minimize the overall attractive magnetic force. Even with a paint thickness of 2 mm, a preliminary design provides a safety factor of 5 in the magnetic force in the upside- down, water-jets-operating condition, in which the total load (including the weight of the MAGMER and cables and the water-jet force) would be about 260 lb (the weight of 118 kg). Optionally, the MAGMER could carry magnetic shielding and/or could be equipped with a demagnetizing module to remove residual magnetism from the structure. The MAGMER would carry four charge-coupled-device cameras for visual inspection, monitoring of operation, navigation, and avoidance of collisions with obstacles. The control system of the MAGMER would include navigation and collision-avoidance subsystems that would utilize surface features as landmarks, in addition to direct images of obstacles.

Bar-Cohen, Yoseph↗

Oil-Free Turbomachinery Technologies for Long-Life, Maintenance-Free Power Generation Applications

Turbines have long been used to convert thermal energy to shaft work for power generation. Conventional turbines rely upon oil-lubricated rotor supports (bearings, seals, etc.) to achieve low wear, high efficiency and reliability. Emerging Oil-Free technologies such as gas foil bearings and magnetic bearings offer a path for reduced weight and complexity and truly maintenance free systems. Oil-Free gas turbines, using gaseous and liquid fuels are commercially available in power outputs to at least 250kWe and are gaining acceptance for remote power generation where maintenance is a challenge. Closed Brayton Cycle (CBC) turbines are an approach to power generation that is well suited for long life space missions. In these systems, a recirculating gas is heated by nuclear, solar or other heat energy source then fed into a high-speed turbine that drives an electrical generator. For closed cycle systems such as these, the working fluid also passes through the bearing compartments thus serving as a lubricant and bearing coolant. Compliant surface foil gas bearings are well suited for the rotor support systems of these advanced turbines. Foil bearings develop a thin hydrodynamic gas film that separates the rotating shaft from the bearing preventing wear. During start-up and shut down when speeds are low, rubbing occurs. Solid lubricants are used to reduce starting torque and minimize wear. Other emerging technologies such as magnetic bearings can also contribute to robust and reliable Oil-Free turbomachinery. In this presentation, Oil-Free technologies for advanced rotor support systems will be reviewed as will the integration and development processes recommended for implementation.

turbomachinery↗

Converter Compressor Building, SWMU 089, Hot Spot Areas 1, 2, and 5 Operations, Maintenance, and Monitoring Report, Kennedy Space Center, Florida

This Operations, Maintenance, and Monitoring Report (OMMR) presents the findings, observations, and results from operation of the air sparging (AS) interim measure (IM) for Hot Spot (HS) Areas 1, 2, and 5 at the Converter Compressor Building (CCB) located at Kennedy Space Center (KSC), Florida. The objective of the IM at CCB HS Areas 1, 2, and 5 is to decrease concentrations of volatile organic compounds (VOCs) in groundwater in the treatment zones via AS to levels that will enable a transition to a monitored natural attenuation (MNA) phase. This OMMR presents system operations and maintenance (O&M) information and performance monitoring results since full-scale O&M began in June 2014 (2 months after initial system startup in April 2014), including quarterly performance monitoring events in July and October 2014 and January and May 2015. Based on the results to date, the AS system is operating as designed and is meeting the performance criteria and IM objective. The performance monitoring network is adequately constructed for assessment of IM performance at CCB HS Areas 1, 2, and 5. At the March 2014 KSC Remediation Team (KSCRT) Meeting, team consensus was reached for the design prepared for expansion of the system to treat the HS 4 area, and at the November 2014 KSCRT Meeting, team consensus was reached that HS 3 was adequately delineated horizontally and vertically and for selection of AS for the remedial approach for HS 3. At the July 2015 KSCRT meeting, team consensus was reached to continue IM operations in all zones until HSs 3 and 4 is operational, once HS 3 and 4 zones are operational discontinue operations in HS 1, 2, and 5 zones where concentrations are less than GCTLs to observe whether rebounding conditions occur. Team consensus was also reached to continue quarterly performance monitoring to determine whether operational zones achieve GCTLs and to continue annual IGWM of CCB-MW0012, CCBMW0013, and CCB-MW0056, located south of the treatment area. The next performance monitoring event is scheduled for July 2015.

Converter Compressor Building↗

Using Modern Methodologies with Maintenance Software

Jet Propulsion Laboratory uses multi-mission software produced by the Mission Planning and Sequencing (MPS) team to process, simulate, translate, and package the commands that are sent to a spacecraft. MPS works under the auspices of the Multi-Mission Ground Systems and Services (MGSS). This software consists of nineteen applications that are in maintenance. The MPS software is classified as either class B (mission critical) or class C (mission important). The scheduling of tasks is difficult because mission needs must be addressed prior to performing any other tasks and those needs often spring up unexpectedly. Keeping track of the tasks that everyone is working on is also difficult because each person is working on a different software component. Recently the group adopted the Scrum methodology for planning and scheduling tasks. Scrum is one of the newer methodologies typically used in agile development. In the Scrum development environment, teams pick their tasks that are to be completed within a sprint based on priority. The team specifies the sprint length usually a month or less. Scrum is typically used for new development of one application. In the Scrum methodology there is a scrum master who is a facilitator who tries to make sure that everything moves smoothly, a product owner who represents the user(s) of the software and the team. MPS is not the traditional environment for the Scrum methodology. MPS has many software applications in maintenance, team members who are working on disparate applications, many users, and is interruptible based on mission needs, issues and requirements. In order to use scrum, the methodology needed adaptation to MPS. Scrum was chosen because it is adaptable. This paper is about the development of the process for using scrum, a new development methodology, with a team that works on disparate interruptible tasks on multiple software applications.

Scrum↗

Supply Warehouse#3, SWMU 088 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This document presents the findings, observations, and results associated with Operations, Maintenance, and Monitoring (OM&M) activities of Corrective Measures Implementation (CMI) activities conducted at Supply Warehouse #3 (SW3) located at John F. Kennedy Space Center (KSC), Florida from October 8, 2015, to September 12, 2016, and performance monitoring results for semi-annual sampling events conducted in March and September 2016. The primary objective of SW3 CMI is to actively decrease concentrations of trichloroethene (TCE) and vinyl chloride (VC) to less than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs), and the secondary objective is to reduce TCE, cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), 1,1-dichloroethene (11DCE), and VC concentrations to less than FDEP Groundwater Cleanup Target Levels (GCTLs). The SW3 facility has been designated Solid Waste Management Unit (SWMU) 088 under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Based on the results to date, the SW3 air sparging (AS) system is operating at or below the performance criteria as presented in the 2008 SW3 Corrective Measures Implementation (CMI) Work Plan and 2009 and 2012 CMI Work Plan Addenda. Since the start of AS system operations on December 19, 2012, through the September 2016 groundwater sampling event, TCE concentrations have decreased to less than the GCTL in all wells within the Active Remediation Zone (ARZ), and VC results remain less than NADC but greater than GCTL. Based on these results, team consensus was reached at the October 2016 KSC Remediation Team (KSCRT) meeting to continue AS system operations and semi-annual performance monitoring of volatile organic compounds in March 2017 at ten monitoring wells at select locations, and in September 2017 at four monitoring wells at select locations to reduce VC concentrations to below GCTL. Additionally, surface water samples will be collected at locations SW0001, SW0002, and SW0003 during both the March and September 2017 events. Team consensus was also reached at the October 2017 KSCRT meeting to continue with operation and maintenance (O&M) of the AS system at SW3.

REPORT↗

Hypergol Maintenance Facility North, SWMU 090, Air Sparge System Construction Completion and Performance Monitoring Report, Kennedy Space Center, Florida

This Air Sparge (AS) System Construction Completion and Performance Monitoring Report (CC-PMR) presents field implementation activities, as well as Year 1 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) at the Hypergol Maintenance Facility North (HMFN) at Kennedy Space Center (KSC), Florida. The timeframe for activities included in this report extends from December 2019 to August 2021.

Christopher A Hook↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Hypergol Maintenance Facility North SWMU 090 Year 2 Air Sparge System Performance Monitoring Report Kennedy Space Center, Florida

This Air Sparge (AS) System Performance Monitoring Report (PMR) presents Year 2 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) at the Hypergol Maintenance Facility North (HMFN) at Kennedy Space Center (KSC), Florida. HMFN has been designated Solid Waste Management Unit (SWMU) 090 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities included in this report extends from August 2021 to August 2022.

Christopher Hook↗

Hypergol Maintenance Facility North, SWMU 090, Year 3 Air Sparge System Performance Monitoring Report, Kennedy Space Center, Florida

This Performance Monitoring Report (PMR) presents Year 3 Air Sparge (AS) System operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) at the Hypergol Maintenance Facility North (HMFN) at Kennedy Space Center (KSC), Florida. HMFN has been designated Solid Waste Management Unit (SWMU) 090 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities included in this report extends from September 2022 to August 2023. The HMFN AS IM was implemented in 2019-2020 to treat a chlorinated solvent groundwater plume that resulted from historical operations supporting the National Aeronautics and Space Administration (NASA) Space Program. The system includes 213 AS wells, with screen depths ranging from 25 feet to 45 feet below land surface (bls) and treats approximately 1.62 acres of contaminated groundwater. The objective of the AS IM is to actively reduce groundwater concentrations exceeding Florida Department of Environmental Protection Natural Attenuation Default Concentrations (NADCs) (identified as the High Concentration Plume [HCP]) to levels that facilitate transition into a Long-Term Monitoring program. The AS IM targets all of the HCP, except for a source zone area within the HCP where trichloroethene (TCE) concentrations exceed 11,000 micrograms per liter (μg/L) at depths greater than 45 feet bls. This is because site lithology was found to not be conducive to the AS treatment technology at these deeper depths. NASA will re-visit plans for potentially utilizing another remedial technology for residual deeper contamination following completion of the AS IM. OM&M activities and results from Year 3 indicate that the AS system at HMFN is operating as designed and is meeting performance criteria. Groundwater performance monitoring results indicate that following the third year of AS system operation, TCE concentrations in wells across all treated depth intervals have been reduced by an average of more than 99 percent. Overall, the areal extent of the plume showed a reduction following Year 3 of AS operations; however, continued operation of the AS system is required to meet the IM objective.

VOCs↗

Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned

The U.S. Department of Energy's (DOE's) Rocky Flats Site was established in 1951 as part of the United States' nationwide nuclear weapons complex to manufacture nuclear weapons components. In 1992 weapons production halted, and the Rocky Flats mission changed to include environmental investigations, cleanup, and site closure. In October 2005, DOE and its contractor completed an accelerated 10-year, $7 billion cleanup of chemical and radiological contamination left from nearly 50 years of production. The cleanup required the decommissioning, decontamination, demolition, and removal of more than 800 structures; removal of more than 500,000 cubic meters of low-level radioactive waste; and remediation of more than 360 potentially contaminated environmental sites. The final remedy for the site was selected in September 2006 and included institutional controls, physical controls, and continued monitoring for the former industrial portion of the site. The remainder of the site, which served as a buffer zone surrounding the former industrial area, was transferred to the U.S. Fish and Wildlife Service in July 2007 for a national wildlife refuge. DOE's Office of Legacy Management is responsible for the long-term surveillance and maintenance of Rocky Flats, which includes remedy implementation activities and general site maintenance. Several factors have complicated the transition from closure to post-closure at Rocky Flats. The early experiences associated with the two years since the physical cleanup and closure work were completed have led to several valuable lessons learned. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bradwell - The first UK Nuclear Site to Enter Care and Maintenance - 18152

Magnox Ltd, a Cavendish Fluor company, is currently decommissioning twelve nuclear sites on behalf of the UK Nuclear Decommissioning Authority (NDA). Ten of these sites are former Power Stations; the other two are closed Research and Development facilities. An overall strategy for decommissioning the Magnox sites has been agreed between Magnox and the NDA. For all but one of these sites the decommissioning strategy involves an extended quiescent period, known as Care and Maintenance (C and M), during which remaining radiological hazards reduce naturally through radioactive decay. After this quiescent period the sites will be restored to an agreed end state through further decommissioning and clearance work. Sites in C and M will not be permanently manned. They will be passively safe such that prompt action will not be required in response to an alarm or fault. Preparing a nuclear site for C and M involves several inter-related strands of work including definition of the intended physical configuration of the site during C and M (the C and M entry state), establishing a safety case to support that configuration, carrying out the physical works needed to deliver the C and M entry state, preparing arrangements and a team to manage the site during C and M and consolidating the knowledge and information needed to support C and M and final clearance of the site. To enter C and M there needs to be a carefully controlled transition of site, personnel and management system into the agreed C and M configuration. Bradwell, a site on the east coast of England, was selected as part of the overall decommissioning strategy for 'early' entry into C and M; Bradwell is scheduled to enter C and M in late 2018, several years in advance of the next scheduled site, with the intent of carrying learning forward from Bradwell to the subsequent sites. Bradwell is now in the final stages of preparation for C and M. Decommissioning commenced on completion of defueling in 2005. A clearly defined C and M entry state was established early in decommissioning and, through interaction with Regulators and internal and external stakeholders, developed as a shared target, thus providing certainty to the scope of the overall decommissioning project. The site has subsequently been systematically decommissioned to meet this target C and M entry state. All legacy waste has been retrieved and packaged into robust disposal containers, the reactor buildings have a new weather envelope, and much of the site is empty space with concrete hardstanding where facilities used to exist and bare rooms where plant used to operate. The remaining radiological and environmental hazards are not significant. During C and M, which is anticipated to last for 70 years, Bradwell will be managed remotely without the requirement for personnel to be present on site, with the possible exception of an ongoing security presence when the site first enters C and M. In terms of UK decommissioning, many of the projects undertaken at Bradwell were first of a kind. The company operates under a programmed organisational and delivery model, which will enable innovation and learning from Bradwell to be carried forward across the whole Magnox fleet. In addition to decommissioning tools and techniques, processes to manage decommissioning, optimise the C and M entry state to reduce the burden on the UK taxpayer and to transition a site into C and M have been developed. This, in addition to taking people from Bradwell and seeding them into Magnox and the broader UK nuclear industry, should help to provide long term cost savings and delivery efficiencies across the entire NDA estate. This paper describes the journey of Bradwell Site through decommissioning and into C and M, highlighting the innovation and challenges that have contributed to the success of delivering the first UK nuclear site into Care and Maintenance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Radiation Cross-Talk Effects on Biological Dose Rates in Maintenance Areas Inside the ITER Tokamak - Paper 107

The intense plasma neutron source of ITER requires careful consideration of radiation safety during the design of the machine, its operation plan and licensing process. One important issue is that of occupational radiation exposure (ORE) during in-situ maintenance activities inside the cryostat, and particularly in the port inter-space area (PI) where up keeping of port systems should take place (diagnostics, tritium breeding test modules, heating antennas). ITER ports and port plugs (PP) become activated by neutron irradiation during plasma operation; from the subsequent decay and gamma emission of irradiated materials, the so-called shutdown dose rate field (SDR) appears. A project requirement of 100 uSv/h after 12 days exists for the SDR in the PI in order to limit exposure during maintenance and meet ORE regulatory limits. This requirement is particularly challenging for equatorial ports (EP) due to, among others, background neutron radiation and activation from/by neighbouring components (a.k.a. 'cross-talk'), and particularly the lower ports (LP). For a particular port inter-space, the SDR field is a combination of: (i) the gamma dose due to the activation of components local to the PI, typically referring to the PI itself plus the port plug, port duct and bellows, vessel extension and blankets in its vicinity; (ii) the gamma dose due to activation of components far away from the PI, a.k.a. the cross-talk, which typically refers to other ports, cryostat and rest of the vacuum vessel and blankets. The situation is complicated to some extent by the fact that both these components can arise from a combination of irradiation by local neutrons, i.e. those permeating through the vicinity of the port itself, and by cross-talk neutrons, i.e. those permeating via other paths. In simple terms, the so-called 'neutron cross-talk' refers to neutron leakage through other ports and components producing activation, decay gammas and dose locally in the PI of interest, whereas the 'gamma cross-talk' refers to activation and decay gammas in other ports producing dose in the PI from far away. The study reported here focuses on the evaluation of the effect of radiation cross-talk from a torus cryopump (TCP) LP located directly underneath a generic diagnostics equatorial port plug (DEPP) in the equatorial port itself. This is considered the worst case scenario, as the TCP-LP has a large aperture and has to be mostly empty in order to meet TCP pumping requirements. For the reference case and R1, the neutron cross-talk from the LP activating the EP is responsible for 109 uSv/h. In addition, a gamma cross-talk of 51 uSv/h from LP activation has been found. The total cross-talk contribution is therefore responsible for 160 uSv/h of SDR at EP PI. The local SDR contribution, i.e. that from activation of the EP with 'local-only' neutrons, is 166 uSv/h. The total SDR at R1 is 360 uSv/h, including some minor contributions from the UP, lateral EPs, cryostat and bio-shield. The total SDR at R2 is 349 uSv/hr, with a cross-talk contribution of 203 uSv/h. In R2 the gamma cross-talk is more intense, as it is closer to the highly activated TCPH. These results illustrate how the SDR field produced by radiation cross-talk through a TCP-LP is comparable in magnitude with that produced by neutron leakage and activation local to the EP. Shielding options are currently under consideration. Local gamma shielding at the EP PI is found to be effective in reducing gamma cross-talk from the LP and TCPH, and also in reducing the local contribution from the port duct and bellows. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Wind Turbine Maintenance Costs: Assessing the Potential of Gear Oil Improvements

Wind turbine operations & maintenance (O&M) costs constitute a sizable portion of total energy cost for wind power. There are many components in a utility-scale wind turbine that need to be lubricated with either oil or grease. This study uses gearbox oil as an example and assesses how lubricant technology improvements may impact wind turbine power production and levelized cost of energy. Using the modeling tools (i.e., WOMBAT, reV, and SAM) developed at National Renewable Energy Laboratory and lubrication oil technology scenarios defined based on inputs provided by ExxonMobil and industry stakeholders, we quantify the potential for increasing energy production and reducing maintenance costs across the current and future U.S. fleet of wind turbines as a result of improvements in lubrication technologies. The modeled improvements reduce the median levelized cost of energy by 1-2% across the U.S. fleet. Cumulative saving from gear oil technology improvements in 2050 for U.S. fleet is estimated to be approximately $6 billion. Extending the lubricant replacement interval has a larger impact on total cost and energy production than reducing lubricant cost.

costs↗

Heuristic Evaluation Methods Applied to a Predictive Maintenance Chatbot

The need for an accessible iterative approach for evaluating prospective artificial intelligence (AI)/ML based technologies in the nuclear industry is needed, given the nature of algorithms and rapid advancements. This paper explores existing heuristic design principles for user-centered design and evaluates them based on their relevancy and usefulness for evaluating AI/ ML based technologies. Researchers at the Idaho National Laboratory (INL) have developed a machine learning software application called VIsualization for PrEdictive maintenance Recommendation (VIPER), which is used to help users understand and engage with the tool to learn more about work orders, data used, predictive maintenance, and machine learning (ML) algorithms. Early user research studies used to access VIPER’s technology readiness level have occurred; however, there is room for further improvement of the software through heuristic evaluations along with other methods and user testing. This work describes the applicability of heuristic evaluation methods and cognitive walkthroughs to help ensure human readiness for prospective AI/ ML based applications, using VIPER as a candidate use case. This work supports industry in ensuring that prospective AI/ML based technologies are usable and useful for plant personnel at nuclear power plants, ultimately leading to their safe, reliable, and efficient use.

99 - GENERAL AND MISCELLANEOUS↗

Heuristic Evaluation Methods Applied to a Predictive Maintenance Chatbot

The need for an accessible iterative approach for evaluating prospective artificial intelligence (AI)/ML based technologies in the nuclear industry is needed, given the nature of algorithms and rapid advancements. This paper explores existing heuristic design principles for user-centered design and evaluates them based on their relevancy and usefulness for evaluating AI/ ML based technologies. Researchers at the Idaho National Laboratory (INL) have developed a machine learning software application called VIsualization for PrEdictive maintenance Recommendation (VIPER), which is used to help users understand and engage with the tool to learn more about work orders, data used, predictive maintenance, and machine learning (ML) algorithms. Early user research studies used to access VIPER?s technology readiness level have occurred; however, there is room for further improvement of the software through heuristic evaluations along with other methods and user testing. This work describes the applicability of heuristic evaluation methods and cognitive walkthroughs to help ensure human readiness for prospective AI/ ML based applications, using VIPER as a candidate use case. This work supports industry in ensuring that prospective AI/ML based technologies are usable and useful for plant personnel at nuclear power plants, ultimately leading to their safe, reliable, and efficient use. PowerPoint for conference that was reviewed in PRS and LRS PRS/CON-25-05379 and INL/CON-25-82946

99 - GENERAL AND MISCELLANEOUS↗