Search NASA⌕ Search

SEARCH · Search NASA

Results for “Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Business Models for Scaling Demand Flexibility Volume III – Stakeholder ecosystem management challenges, and lessons learned from U.S. programs

Load growth at the grid edge is driving increased attention to the distribution system and its ability to enable customer technology adoption in an affordable and timely manner. Key industry stakeholders, including electric utilities and regulators, can benefit from strategies to manage and balance customer needs with infrastructure investments, such as demand flexibility. This report focuses on demand flexibility—the ability to reduce, shift, shed, generate, or modulate loads in response to building and grid needs—to reduce the need for costly grid upgrades by deferring investment needs and increase system reliability by shifting electricity usage during periods of high risk. Specifically, we focus on the emerging characteristics of business models for demand flexibility as a framework to understand how demand flexibility programs generate value. In this report, we focus on demand flexibility program stakeholder ecosystem management strategies, which provide information on value delivery and describe how program implementers leverage partner capabilities and collaborate to deliver customer and grid benefits. This report discusses the role of stakeholder ecosystem management in demand flexibility programs, identifies existing challenges to effective stakeholder management, and describes lessons learned. This report is part of a series that includes reports on value propositions, customer relationship management strategies, and program life cycle.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Connected and Learning Based Optimal Freight Management for Efficiency

The management of the future heterogenous fleet is a complex decision-making problem. The heterogenous fleet is emerging as decarbonization technologies are deployed by fleets toward lowering the freight operation emissions in Medium and Heavy-duty vehicles. Traditionally, in fleets characterized by a homogeneous Diesel Internal Combustion Engine (ICE) powertrain, the process of fleet planning and operational optimization unfolds sequentially without the necessity to account for powertrain and vehicle-specific characteristics during dispatch decisions. Fleets with trucks less than 5 years old tend to maintain stable vehicle efficiency with minimal operational reliability risks for fleet managers. However, the landscape changes with the incorporation of emerging powertrain technologies, which lack extensive operational data and service experiences. This includes technologies like hybrid, Electric, Fuel Cell, or alternative fuel ICE. Operational decisions for fleets featuring heterogeneous powertrain technologies and facing limited access to alternative fueling and charging stations become intricate, requiring careful consideration and optimization at each dispatch. The difference in efficiency characteristics of emerging technologies, their range limitations, and the restricted availability of charging/alternative fueling infrastructure, coupled with sensitivity to driving conditions (e.g., EV range reduction in low temperatures) and their impact on component aging (such as batteries), become pivotal factors influencing the reliable and efficient freight transportation. To make the path toward low emission freight transportation efficient and reliable, an AI-assisted fleet management software is developed in this project to help fleet managers in optimizing both adoption of emerging powertrain decarbonization, connected and automated technologies and also operating the fleet after such technologies are deployed as schematically. Freight transportation requirements are different depending on the cargos to be shipped, customer requirements and regions of operations. This further highlights the need for software and digital solutions to tailor deployment and operation of emerging powertrain, connectivity, and automation technologies toward the specific fleet operation requirements. The fleet management optimizer was also integrated with a model of the fleet to simulate the operation of the fleet over 1 year of the baseline fleet operation (250,000+ shipments) indicating the significance of day-to-day variations on emissions and energy consumption of a freight transportation fleet. The results demonstrate ≥20% improvement in freight efficiency in terms of WTW CO2 per ton-mile of cargo shipments while all fleet operation constraints are enforced, and the cost (CapEx and OpEx) is minimized.

33 ADVANCED PROPULSION SYSTEMS↗

A Managed Tokens Service for Securely Keeping and Distributing Grid Tokens

Fermilab is transitioning authentication and authorization for grid operations to using bearer tokens based on the WLCG Common JWT (JSON Web Token) Profile. One of the functionalities that Fermilab experimenters rely on is the ability to automate batch job submission, which in turn depends on the ability to securely refresh and distribute the necessary credentials to experiment job submit points. Thus, with the transition to using tokens for grid operations, we needed to create a service that would obtain, refresh, and distribute tokens for experimenters’ use. This service would avoid the need for experimenters to be experts in obtaining their own tokens and would better protect the most sensitive long-lived credentials. Further, the service needed to be widely scalable, as we are currently keeping credentials active for approximately 15 experiments, each with 1-3 different credentials, and distributing those credentials to 2-20 submit points per experiment, with those numbers steadily increasing. To address these issues, we created and deployed a Managed Tokens service. The service is written in Go, taking advantage of that language’s native concurrency primitives to easily be able to scale operations as we onboard experiments. The service uses as its first credentials a set of kerberos keytabs, stored on the same secure machine that the Managed Tokens service runs on. These kerberos credentials allow the service to use htgettoken via condor_vault_storer to store vault tokens in the HTCondor credential managers (credds) that run on the batch system scheduler machines (HTCondor schedds); as well as downloading a local, shorter-lived copy of the vault token. The kerberos credentials are then also used to distribute copies of the locally-stored vault tokens to experiment submit points. When experimenters schedule jobs to be submitted, these distributed vault tokens are used to access a Hashicorp Vault instance (run separately from the Managed Tokens service), and previously-stored refresh tokens there are used to obtain the bearer token that is submitted with the job. We will discuss here the design of the Managed Tokens service, including elaborating on certain choices we made with regards to concurrent operations, configuration, monitoring, and deployment.

Bhat, Shreyas↗

Examination of coal combustion management sites for microbiological and chemical signatures of groundwater impacts

Coal combustion accounts for 40% of the world’s electricity and generates more than a billion tons of coal combustion products (CCP) annually, half of which end up in landfills and impoundments. CCP contain mixtures of chemicals that can be mobile in the environment and impact the quality of surface water and potable groundwater. In this investigation, water samples from 14 coal combustion management sites across 4 physiographic regions in the United States, paired with background and down-gradient groundwater samples, were analyzed for water chemistry and microbiology. The objective was to determine if microbiology data alone, or supported by chemistry data, could reliably differentiate source waters and identify sites where CCP is known or expected to be influencing groundwater. Two percent of the total amplicons showed genus level conservation across CCP management sites, regions, and sample types; corresponding to ubiquitous, facultatively aerobic proteobacterial taxa that are generally recognized for the potential to respire using different terminal electron acceptors. Ordination plots did not reveal significant differences ( p > 0.05) in 16S rRNA gene amplicon diversity by CCP management site, water sample types, or physiographic regions. Contrastingly, chemistry distinguished sample types by standard water quality metrics (total dissolved solids, Ca:SO 4 ratio), alkali earth metals (K, Na, Li), selenium, boron, and fluoride. A focused evaluation of 16S rRNA gene amplicons for a subset of CCP management sites revealed microbiological features and chemical drivers (F, Ca, temperature) that positively identified the single CCP management site confirmed to have groundwater impacted by CCP leachate. At this site, 9 genera (>0.5% relative abundance) were exclusive to CCP porewater and downgradient groundwater. Inferred metabolisms for these taxa indicates potential for N and S biogeochemical transformations and 1-C metabolism that are consistent with a reducing environment, as evidenced by low ORP and depleted SO 4 2− . This research contributes to a growing understanding of conditions where these data types, analyses, and interpretation methods could be applied for distinguishing influence from CCP on the surrounding environment, as well as practical limitations.

01 COAL, LIGNITE, AND PEAT↗

Aerospace management techniques: Commercial and governmental applications

A guidebook for managers and administrators is presented as a source of useful information on new management methods in business, industry, and government. The major topics discussed include: actual and potential applications of aerospace management techniques to commercial and governmental organizations; aerospace management techniques and their use within the aerospace sector; and the aerospace sector's application of innovative management techniques.

Milliken, J. G.↗

Management approach recommendations. Earth Observatory Satellite system definition study (EOS)

Management analyses and tradeoffs were performed to determine the most cost effective management approach for the Earth Observatory Satellite (EOS) Phase C/D. The basic objectives of the management approach are identified. Some of the subjects considered are as follows: (1) contract startup phase, (2) project management control system, (3) configuration management, (4) quality control and reliability engineering requirements, and (5) the parts procurement program.

Source record↗

Risk Management Technique for design and operation of facilities and equipment

The Risk Management System collects information from engineering, operating, and management personnel to identify potentially hazardous conditions. This information is used in risk analysis, problem resolution, and contingency planning. The resulting hazard accountability system enables management to monitor all identified hazards. Data from this system are examined in project reviews so that management can decide to eliminate or accept these risks. This technique is particularly effective in improving the management of risks in large, complex, high-energy facilities. These improvements are needed for increased cooperation among industry, regulatory agencies, and the public.

Fedor, O. H.↗

Planning and managing future space facility projects

To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.

Sieber, J. E.↗

A review of Spacelab mission management approach

The Spacelab development program is a joint undertaking of the NASA and ESA. The paper addresses the initial concept of Spacelab payload mission management, the lessons learned, and modifications made as a result of the actual implementation of Spacelab Mission 1. The discussion covers mission management responsibilities, program control, science management, payload definition and interfaces, integrated payload mission planning, integration requirements, payload specialist training, payload and launch site integration, payload flight/mission operations, and postmission activities. After 3.5 years the outlined overall mission manager approach has proven to be most successful. The approach does allow the mission manager to maintain the lowest overall mission cost.

Craft, H. G., Jr.↗

Engineering management and innovation

Although improved management methods can enhance the performance of some enterprises, they can lower that of research organizations. The prevalent use of cost-effectiveness criteria as a management tool overvalues identifiable short-term accomplishment at the expense of long-term research efforts, which often serve as the antecedents upon which a new, seemingly unrelated technology is later founded. Medical instruments used in the treatment of emphysema, for example, evolved from NASA-sponsored research devoted to the measurement of the composition of the atmospheres of the planets. The best manager is the manager who creates an environment that enables his research engineers to pursue ideas with a minimum of interference. Such an environment consists of broad research objectives, adequate facilities, and proper technical support. Within a framework of prudent spending, the manager's aim is to cultivate innovation.

Graham, R. W.↗

Flight management concepts development for fuel conservation

It is pointed out that increased airspace congestion will produce increased flight delay unless advanced flight management concepts are developed to compensate. It has been estimated that a 5 percent reduction in delay is approximately equivalent, in terms of direct operating costs, to a 5 percent reduction in drag. The present investigation regarding the development of the required flight management concepts is organized into three sections, related to background, current research, and future effort. In the background section, a summary is provided of past technical effort concerning flight management. The second section is concerned with on-going efforts to integrate flight management with ground-based flight planning, and with an advanced concepts simulator to test the new developments. In the third section, attention is given to research concerning airborne flight management integration with other flight functions.

Sorensen, J. A.↗

Flight management systems - What are they and why are they being developed?

This paper presents the motivation for developing and using flight management systems. The architecture and theoretical basis of these systems is presented and their typical operation during a flight is described. Two computer programs developed to support flight management research are used to obtain numerical results which illustrate significant potential reductions in fuel used and/or airline operating costs which can be achieved through use of flight management systems. The specific levels of savings depend on the nature of the air traffic control system in which the aircraft operates. Accordingly, results are presented both for operations in the existing air traffic control system and in an air traffic control environment with reduced restrictions on airplane operations. The capability of airplanes equipped with suitable flight management systems to operate in a time-based (4-D) environment is also discussed. Programs of the Federal Aviation Administration which may influence the operation of flight management system equipped aircraft in the evolving National Airspace System are also briefly reviewed.

Creedon, J. F.↗

Space station human productivity study. Volume 5: Management plans

The 67 Management Plans represent recommended study approaches for resolving 108 of the 305 Issues which were identified. Each study Management Plan is prepared in three formats: Management Plan Overview (lists the subsumed Issues, study background, and related overview information); Study Plan (details the study approach by tasks, lists special needs, and describes expected study products); Schedule-Task Flow (provides a time-lined schedule for the study tasks and resource requirements). The Management Relationships Matrix, included in this volume, shows the data input-output relationships among all recommended studies. A listing is also included which cross-references the unresolved requirements to Issues to management plans. A glossary of all abbreviations utilized is provided.

Source record↗

Notes on a storage manager for the Clouds kernel

The Clouds project is research directed towards producing a reliable distributed computing system. The initial goal is to produce a kernel which provides a reliable environment with which a distributed operating system can be built. The Clouds kernal consists of a set of replicated subkernels, each of which runs on a machine in the Clouds system. Each subkernel is responsible for the management of resources on its machine; the subkernal components communicate to provide the cooperation necessary to meld the various machines into one kernel. The implementation of a kernel-level storage manager that supports reliability is documented. The storage manager is a part of each subkernel and maintains the secondary storage residing at each machine in the distributed system. In addition to providing the usual data transfer services, the storage manager ensures that data being stored survives machine and system crashes, and that the secondary storage of a failed machine is recovered (made consistent) automatically when the machine is restarted. Since the storage manager is part of the Clouds kernel, efficiency of operation is also a concern.

Pitts, David V.↗

Intelligent Resource Management for Local Area Networks: Approach and Evolution

The Data Management System network is a complex and important part of manned space platforms. Its efficient operation is vital to crew, subsystems and experiments. AI is being considered to aid in the initial design of the network and to augment the management of its operation. The Intelligent Resource Management for Local Area Networks (IRMA-LAN) project is concerned with the application of AI techniques to network configuration and management. A network simulation was constructed employing real time process scheduling for realistic loads, and utilizing the IEEE 802.4 token passing scheme. This simulation is an integral part of the construction of the IRMA-LAN system. From it, a causal model is being constructed for use in prediction and deep reasoning about the system configuration. An AI network design advisor is being added to help in the design of an efficient network. The AI portion of the system is planned to evolve into a dynamic network management aid. The approach, the integrated simulation, project evolution, and some initial results are described.

Meike, Roger↗

An investigation of transitional management problems for the NSTS at NASA, executive summary

A summary is given of the work of the University of Houston research team for the third quarter of effort in a yearly grant for the National Space Transportation System (NSTS). As such it serves as a resting place for the ideas and concepts developed this quarter with the collaboration of the Management Integration Offices of NASA. Another objective is the hope that the report will help to stimulate the healthy problem solving process already present at NASA. The main goal of the contractual work is to help NASA to find ways and means of moving into a truly operational era with the shuttle program. This work is a continuation of early work and the reader is encouraged to read the final reports of earlier years. Chapter One of the report is an introduction. Chapter Two deals with industrial adaptation and is in two parts: theory and application. In the theory section, impressions of the management system immediately after reflight are discussed. A key issue, in the author's opinion is the seeming lack of purpose of the program. The application section has six appendices: 1988 Demographic Survey, Field Notes of Interview with HL/P South Texas Nuclear Project, a comparison of the Agendas of the current manager with that of a previous manager, a note on compartmentalization to assist in manifesting, a study on launch prediction for STS-26, and a discussion of a statistical decision-making course for upper level managers. Chapter Three deals with theoretical results returned on flow shop scheduling which will be of use downstream. Chapter Four deals with a statistical model developed to predict the flight rate in future years and indicates the program will have trouble making its schedule. Chapter Five covers the constructural effort and shows the work to be on schedule.

Hunsucker, John↗

Space data management at the NSSDC (National Space Sciences Data Center): Applications for data compression

The National Space Science Data Center (NSSDC), established in 1966, is the largest archive for processed data from NASA's space and Earth science missions. The NSSDC manages over 120,000 data tapes with over 4,000 data sets. The size of the digital archive is approximately 6,000 gigabytes with all of this data in its original uncompressed form. By 1995 the NSSDC digital archive is expected to more than quadruple in size reaching over 28,000 gigabytes. The NSSDC digital archive is expected to more than quadruple in size reaching over 28,000 gigabytes. The NSSDC is beginning several thrusts allowing it to better serve the scientific community and keep up with managing the ever increasing volumes of data. These thrusts involve managing larger and larger amounts of information and data online, employing mass storage techniques, and the use of low rate communications networks to move requested data to remote sites in the United States, Europe and Canada. The success of these thrusts, combined with the tremendous volume of data expected to be archived at the NSSDC, clearly indicates that innovative storage and data management solutions must be sought and implemented. Although not presently used, data compression techniques may be a very important tool for managing a large fraction or all of the NSSDC archive in the future. Some future applications would consist of compressing online data in order to have more data readily available, compress requested data that must be moved over low rate ground networks, and compress all the digital data in the NSSDC archive for a cost effective backup that would be used only in the event of a disaster.

Green, James L.↗

Tools for distributed application management

Distributed application management consists of monitoring and controlling an application as it executes in a distributed environment. It encompasses such activities as configuration, initialization, performance monitoring, resource scheduling, and failure response. The Meta system (a collection of tools for constructing distributed application management software) is described. Meta provides the mechanism, while the programmer specifies the policy for application management. The policy is manifested as a control program which is a soft real-time reactive program. The underlying application is instrumented with a variety of built-in and user-defined sensors and actuators. These define the interface between the control program and the application. The control program also has access to a database describing the structure of the application and the characteristics of its environment. Some of the more difficult problems for application management occur when preexisting, nondistributed programs are integrated into a distributed application for which they may not have been intended. Meta allows management functions to be retrofitted to such programs with a minimum of effort.

Marzullo, Keith↗