Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operating Experience”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Maximally Expressive Modeling

Planning and scheduling systems organize tasks into a timeline or schedule. Tasks are logically grouped into containers called models. Models are a collection of related tasks, along with their dependencies and requirements, that when met will produce the desired result. One challenging domain for a planning and scheduling system is the operation of on-board experiments for the International Space Station. In these experiments, the equipment used is among the most complex hardware ever developed; the information sought is at the cutting edge of scientific endeavor; and the procedures are intricate and exacting. Scheduling is made more difficult by a scarcity of station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling International Space Station experiment operations calls for a maximally expressive modeling schema.

Jaap, John↗

ISS - Enabling Exploration Through Docking Standards

NASA and the ISS partnership are jointly developing a key standard to enable future collaborative exploration. The IDSS is based on flight proven design while incorporating new low impact technology. Low impact technology accommodates a wide range of vehicle contact and capture conditions. This standard will get early demonstration on the ISS. Experience gained here will enable operational experience and the opportunity to refine the standard.

Hatfield, Caris A.↗

Next Generation Waste Tracking: Linking Legacy Systems with Modern Networking Technologies

This report describes results from a preliminary analysis to satisfy the Department of Energy (DOE) objective to ensure the safe, secure, efficient packaging and transportation of materials both hazardous and non hazardous [1, 2]. The DOE Office of Environmental Management (OEM) through Oak Ridge National Laboratory (ORNL) has embarked on a project to further this objective. OEM and ORNL have agreed to develop, demonstrate and make available modern day cost effective technologies for characterization, identification, tracking, monitoring and disposal of radioactive waste when transported by, or between, motor, air, rail, and water modes. During the past 8 years ORNL has investigated and deployed Web 2.0 compliant sensors into the transportation segment of the supply chain. ORNL has recently demonstrated operational experience with DOE Oak Ridge Operations Office (ORO) and others in national test beds and applications within this domain of the supply chain. Furthermore, in addition to DOE, these hazardous materials supply chain partners included Federal and State enforcement agencies, international ports, and commercial sector shipping operations in a hazardous/radioactive materials tracking and monitoring program called IntelligentFreight. IntelligentFreight is an ORNL initiative encompassing 5 years of research effort associated with the supply chain. The ongoing ORNL SmartFreight programs include RadSTraM [3], GRadSTraM , Trusted Corridors, SensorPedia [4], SensorNet, Southeastern Transportation Corridor Pilot (SETCP) and Trade Data Exchange [5]. The integration of multiple technologies aimed at safer more secure conveyance has been investigated with the core research question being focused on testing distinctly different distributed supply chain information sharing systems. ORNL with support from ORO have demonstrated capabilities when transporting Environmental Management (EM) waste materials for disposal over an onsite haul road. ORNL has unified the operations of existing legacy hazardous, radioactive and related informational databases and systems using emerging Web 2.0 technologies. These capabilities were used to interoperate ORNL s waste generating, packaging, transportation and disposal with other DOE ORO waste management contractors. Importantly, the DOE EM objectives were accomplished in a cost effective manner without altering existing information systems. A path forward is to demonstrate and share these technologies with DOE EM, contractors and stakeholders. This approach will not alter existing DOE assets, i.e. Automated Traffic Management Systems (ATMS), Transportation Tracking and Communications System (TRANSCOM), the Argonne National Laboratory (ANL) demonstrated package tracking system, etc

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of display design and command usage guidelines for Spacelab experiment computer applications

Individual Spacelab experiments are responsible for developing their CRT display formats and interactive command scenarios for payload crew monitoring and control of experiment operations via the Spacelab Data Display System (DDS). In order to enhance crew training and flight operations, it was important to establish some standardization of the crew/experiment interface among different experiments by providing standard methods and techniques for data presentation and experiment commanding via the DDS. In order to establish optimum usage guidelines for the Spacelab DDS, the capabilities and limitations of the hardware and Experiment Computer Operating System design had to be considered. Since the operating system software and hardware design had already been established, the Display and Command Usage Guidelines were constrained to the capabilities of the existing system design. Empirical evaluations were conducted on a DDS simulator to determine optimum operator/system interface utilization of the system capabilities. Display parameters such as information location, display density, data organization, status presentation and dynamic update effects were evaluated in terms of response times and error rates.

Dodson, D. W.↗

First Post-Flight Status Report for the Microgravity Science Glovebox

The Microgravity Science Glovebox (MSG) was launched to the International Space Station (ISS) this year on the second Utilization Flight (UF2). After successful on-orbit activation, the facility began supporting an active microgravity research program. The inaugural NASA experiments operated in the unit were the Solidification Using a Baffle in Sealed Ampoules (SUBSA, A. Ostrogorski, PI), and the Pore Formation and Mobility (PFMI, R. Grugel, PI) experiments. Both of these materials science investigations demonstrated the versatility of the facility through extensive use of telescience. The facility afforded the investigators with the capability of monitoring and operating the experiments in real-time and provided several instances in which the unique combination of scientists and flight crew were able to salvage situations which would have otherwise led to the loss of a science experiment in an unmanned, or automated, environment. The European Space Agency (ESA) also made use of the facility to perform a series of four experiments that were carried to the ISS via a Russian Soyuz and subsequently operated by a Belgium astronaut during a ten day Station visit. This imaginative approach demonstrated the ability of the MSG integration team to handle a rapid integration schedule (approximately seven months) and an intensive operations interval. Interestingly, and thanks to aggressive attention from the crew, the primary limitation to experiment thru-put in these early operational phases is proving to be the restrictions on the up-mass to the Station, rather than the availability of science operations.

Baugher, Charles R., III↗

Enhanced Component Performance Study: Motor Driven Pumps 1998–2022

This report presents an enhanced performance evaluation of motor-driven pumps (MDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trends were identified for MDPs for the most recent 10-year period: (1) Standby MDP frequency of start demands (demands per reactor year), (2) Standby MDP frequency of FTR=1H hours (hours per reactor year), (3) Standby MDP frequency of FTR>1H hours, and (4) Normally running MDP frequency of run hours. The following decreasing trends were identified for MDPs for the most recent 10-year period: (1) Standby MDP FTR=1H failure probability, (2) Normally running MDP FTR failure rate, (3) Standby MDP unavailability, (4) Standby MDP total unreliability (8-hour mission), and (5) Normally running MDP total unreliability (8-hour mission).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Component Performance Study: Motor Operated Valves 1998–2022

This report presents an enhanced performance evaluation of motor-operated valves (MOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MOV failure modes considered are fail to open or close (FTOC), fail to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trend was identified for MOVs for the most recent 10-year period: • Low-demand MOV frequency of FTOC demands (demands per reactor year). The following decreasing trends were identified for MOVs for the most recent 10-year period: • Low-demand MOV FTOC failure probability • Low-demand MOV frequency of FTOC events (failures per reactor year).

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Turbine Driven Pumps 1998–2022

This report presents an enhanced performance evaluation of turbine driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The TDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10 year period while yearly estimates for reliability are provided for the entire study period. No increasing trends were identified for TDPs for the most recent 10 year period: The following decreasing trends were identified for TDPs for the most recent 10 year period: • Standby TDP FTR>1H failure rate • Normally running TDP FTR failure rate • Standby TDP unavailability • Standby MDP total unreliability (8-hour mission) • Standby TDP frequency of start demands (demands per reactor year) • Standby TDP frequency of FTR=1H hours (hours per reactor year) • Standby TDP frequency of FTR>1H events (failures per reactor year) • Normally running TDP frequency of start demands • Normally running TDP frequency of run hours • Normally running TDP frequency of FTR events.

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Air Operated Valves 1998–2022

This report presents an enhanced performance evaluation of air operated valves (AOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The AOV failure modes considered are fail to open or close (FTOC), fail to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10 year period while yearly estimates for reliability are provided for the entire study period. The following increasing trends were identified for AOVs for the most recent 10 year period: • Low demand AOV frequency of FTOC demands (demands per reactor year) • High demand AOV frequency of FTOC demands. The following decreasing trends were identified for AOVs for the most recent 10 year period: • Low demand AOV FTOC failure probability • Low demand AOV FTOP failure rate • Low demand AOV frequency of FTOC events (failures per reactor year) • Low demand AOV frequency of FTOP events.

99 GENERAL AND MISCELLANEOUS↗

Making Spaceflight Practical and Affordable: Spacecraft Designs and Their Degree of Operability

As we push toward new and diverse space transportation capabilities, reduction in operations cost will become increasingly important. Achieving affordable and safe human spaceflight capabilities will be the mark of success for new programs and new providers. This paper reviews NASA s history in developing and operating human rated spacecraft, reviewing the key aspects of spacecraft design and their resultant impacts on operations phase complexity and cost. Specific examples from current and past programs are provided to tie together early program requirements, design implementation and resulting real-time operations experience into a complete "story" of design decisions and operational results. Based on these experiences, recommended techniques are outlined to enable earlier and more effective assessment of operations concerns during the design process.

Crocker, Alan R.↗

Enhanced Component Performance Study: Turbine-Driven Pumps 1998–2013

This report presents an enhanced performance evaluation of turbine-driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from fiscal year 1998 through 2013 for the component reliability as reported in the Institute of Nuclear Power Operations Consolidated Events Database. The TDP failure modes considered are failure to start, failure to run less than or equal to 1 hour, failure to run more than 1 hour, and (for normally running systems) failure to run. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. Statistically significant increasing trends were identified for TDP unavailability, for frequency of start demands for standby TDPs, and for run hours in the first hour after start. Statistically significant decreasing trends were identified for start demands for normally running TDPs, and for run hours per reactor critical year for normally running TDPs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Enhanced Component Performance Study: Motor-Driven Pumps 1998–2013

This report presents an enhanced performance evaluation of motor-driven pumps at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from fiscal year 1998 through 2013 for the component reliability as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The motor-driven pump failure modes considered for standby systems are failure to start, failure to run less than or equal to 1 hour, and failure to run more than 1 hour; for normally running systems, the failure modes considered are failure to start and failure to run. An 8 hr unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. One statistically significant increasing trend was identified in the standby pump run hours per reactor year. Statistically significant decreasing trends were identified for standby systems industry-wide frequency of start demands, run hours per reactor year for runs of less than or equal to 1 hour, and frequency of fail to start events per reactor year.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Enhanced Component Performance Study: Motor-Operated Valves 1998–2013

This report presents an enhanced performance evaluation of motor-operated valves (MOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from fiscal year 1998 through 2013 for the component reliability as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The MOV failure modes considered are failure to open/close, failure to operate or control, and spurious operation. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. Statistically significant increasing trends were identified in the MOV spurious operation failure rate estimate (a highly statistically significant trend), and in the MOV spurious operation failure events per reactor year (a highly statistically significant trend). Statistically significant decreasing trends were identified for failure to open/close demand rates.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Spacelab simulation using a Lear Jet aircraft: Mission no. 4 (ASSESS program)

The fourth ASSESS Spacelab simulation mission utilizing a Lear Jet aircraft featured trained experiment operators (EOs) in place of the participating scientists, to simulate the role and functions of payload specialists in Spacelab who may conduct experiments developed by other scientists. The experiment was a broadband infrared photometer coupled to a 30-cm, open port, IR telescope. No compromises in equipment design or target selection were made to simplify operator tasks; the science goals of the mission were selected to advance the mainline research program of the principle investigator (PI). Training of the EOs was the responsibility of the PI team and consisted of laboratory sessions, on-site training during experiment integration, and integrated mission training using the aircraft as a high-fidelity simulator. The EO permission experience in these several disciplines proved adequate for normal experiment operations, but marginal for the identification and remedy of equipment malfunctions. During the mission, the PI utilized a TV communication system to assist the EOs to overcome equipment difficulties; both science and operations were successfully implemented.

Reller, J. O., Jr.↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Pathfinder for Artemis Gateway

The Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission was developed by NASA in collaboration with Advanced Space, LLC of Westminster, Colorado. This technology demonstration mission serves as a pathfinder for near rectilinear halo orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) is the intended orbit for NASA’s Artemis Gateway, a small, human-tended space station planned for lunar orbit. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and stationkeeping requirements for Gateway’s Power and Propulsion Element. Therefore, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The CAPSTONE mission consists of a 12-unit (U)+ CubeSat developed, integrated, and tested by the Terran Orbital Corporation that carries a payload communications system capable of crosslink ranging with NASA’s Lunar Reconnaissance Orbiter (LRO). CAPSTONE contains a chip-scale atomic clock (CSAC) for a one-way ranging experiment with NASA’s Deep Space Network, a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA’s Launch Services Program, was provided by Rocket Lab on its Electron launch vehicle using their Photon upper stage to deploy the CAPSTONE spacecraft. The mission launched June 28, 2022. The CAPSTONE spacecraft deployed from the Photon stage and traversed an approximately 4-month, highly fuel-efficient transfer phase entering the NRHO November 13, 2022, for a six-month primary mission phase. The mission is currently in a twelve-month technology enhancement operations phase. The CAPSTONE technology demonstration mission is led by Advanced Space, LLC. Spacecraft development and mission operations are conducted by Terran Orbital Corporation of Irvine, California. Noted accomplishments for the CAPSTONE mission include demonstrating the accessibility of NHROs; validating key operational concepts in the NHRO environment; laying the foundation for commercial support of future lunar operations; and accelerating the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA’s Small Spacecraft Technology (SST) program, which is one of several programs within NASA’s Space Technology Mission Directorate. The program is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The CAPSTONE mission launch was provided by NASA’s Exploration Systems Development Missions Directorate’s Advanced Exploration Systems Division. Coordination and acquisition of the launch was managed by NASA’s Launch Services Program. The CAPSTONE mission and project status will be presented.

Elwood Agasid↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Pathfinder for Artemis Gateway

The Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission was developed by NASA in collaboration with Advanced Space, LLC of Westminster, Colorado. This technology demonstration mission serves as a pathfinder for near rectilinear halo orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) is the intended orbit for NASA’s Artemis Gateway, a small, human-tended space station planned for lunar orbit. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for Gateway’s Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The CAPSTONE mission consists of a 12-unit (U) CubeSat developed, integrated, and tested by the Terran Orbital Corporation that carries a payload communications system capable of cross-link ranging with NASA’s Lunar Reconnaissance Orbiter (LRO). CAPSTONE contains a chip scale atomic clock (CSAC) for a one-way ranging experiment with NASA’s Deep Space Network, a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA’s Launch Services Program, was provided by Rocket Lab on its Electron launch vehicle utilizing their Photon upper stage to deploy the CAPSTONE spacecraft into lunar orbit. The mission launched June 28, 2022. The CAPSTONE spacecraft deployed from Rocket Lab’s Photon stage and traversed an approximately 4 month highly efficient transfer phase entering the NRHO Novermber 13, 2022 for a six-month primary mission phase. The mission is currently in a twelve-month technology enhancement operations phase. The CAPSTONE technology demonstration mission is lead by Advanced Space, LLC. Spacecraft development and mission operations is conducted by Terran Orbital Corporation of Irvine, California. Noted accomplishments for the CAPSTONE mission include demonstration of the accessibility of NHROs, validation of key operational concepts in the NHRO environment, laying the foundation for commercial support of future lunar operations, and accelerating the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology (SST) program, which is one of several programs within NASA’s Space Technology Mission Directorate. The program is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The CAPSTONE mission launch was provided by NASA’s Exploration Systems Development Missions Directorate’s Advanced Exploration Systems Division. Coordination and acquisition of the launch was managed by NASA’s Launch Services Program. The CAPSTONE mission and project status will be presented.

Elwood Agasid↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE): Pathfinder for Artemis Gateway

The Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission was developed by NASA in collaboration with Advanced Space, LLC of Westminster, Colorado. This technology demonstration mission serves as a pathfinder for near rectilinear halo orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) is the intended orbit for NASA’s Artemis Gateway, a small, human-tended space station planned for lunar orbit. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and stationkeeping requirements for Gateway’s Power and Propulsion Element. Therefore, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. This presentation accompanies the paper of the same title.

Elwood F Agasid↗