Search NASA⌕ Search

SEARCH · Search NASA

Results for “Payload”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

A Human Factors Framework for Payload Display Design

During missions to space, one charge of the astronaut crew is to conduct research experiments. These experiments, referred to as payloads, typically are controlled by computers. Crewmembers interact with payload computers by using visual interfaces or displays. To enhance the safety, productivity, and efficiency of crewmember interaction with payload displays, particular attention must be paid to the usability of these displays. Enhancing display usability requires adoption of a design process that incorporates human factors engineering principles at each stage. This paper presents a proposed framework for incorporating human factors engineering principles into the payload display design process.

Dunn, Mariea C.↗

Payload Operations and Telescience on ISS

The objective of this paper is to provide future International Space Station (ISS) scientists and/or engineers with an overview of the ISS payload operations and integration process. This process begins with the payload being manifested on the ISS and continued through the integration and operations process. Emphasis is placed on the interfaces and tools that the payload will utilize when going through the process. For each of the Data Sets, the Payload Operations and Integration Center (POIC) provides a Data Set Manager to work with the PD's.

Cissom, Rickey D.↗

Exploring Mars: the Ares Payload Service (APS)

In last year's Mars Society convention we introduced the results of five years of studies of space launch capability for the second millennium. We concluded that Single Stage to Orbit (SSTO) vehicles such as the Delta Clipper X33, and X34 cannot make it to orbit from the Earth's surface. Whether taking off vertically or horizontally or landing vertically or horizontally, the rocket equations, the performance of available fuels, and the realities of the weight and strength of materials leave no margin for payload. The promised savings from SSTO systems are illusory. However, a configuration that is able to deliver useful payload to orbit is the Single step to Orbit, SsTO, a rocket plane that is released fully fueled, from 35,000 to 40,000 feet altitude. Three approaches have been proposed. The Hot'l and Molnya Corporation designs carry the fueled rocket plane to altitude on the back of a carrier aircraft. In this design the carrier aircraft is Russia's Antonov 225 the world's largest cargo plane. The rocket plane is a modified version of the Buran, Russia's own space shuttle. Another configuration is Kelly Aviation's concept in which the fully fueled rocket plane is towed to altitude by the cargo plane and then released. A third approach is based on the early "X" planes, which were dropped from the belly of the carrier plane. While the rocket equations indicate that these three concepts can deliver useful payloads, the Stanford review found significant advantages to the approach of Pioneer Rocket, in which the rocket plane flies up to the carrier plane with conventional jet engines, docks, and then loads on the oxidizer for the flight to orbit. This architecture has more reasonable abort modes in case of system failure in either aircraft and can deliver a larger final payload to orbit for a given sized carrier. The Stanford recommendation is that the carrier aircraft be the Antonov 225. A design based on this was presented in a report last year. Refinements to the design notably an improved re-entry cooling system and fueling stability analysis were done this year. More technical detail and a proposed international consortium to develop the SSTO is presented in another session of this year's Mars convention. We believe that there will be no human exploration of Mars based on the Shuttle or Expendable launch vehicles, and no resources available except for a cooperative international program. However, just as the world is learning to cooperate in peacekeeping, we hold out the hope that similar cooperation will develop for Mars exploration. With that in mind, this year we asked the question- "How will the human mission get to Mars if it has to use the SsTO for transportation?"

Bowen, Justin↗

HERO: High Energy Replicated Optics for a Hard-X-Ray Balloon Payload

We are developing high-energy grazing-incidence replicated optics for a balloon-borne hard-x-ray telescope. When completed, the instrument will have 170 cm2 of effective collecting area at 40 keV and 130 square cm at 60 keV with <= 30 arc seconds half power diameter. This payload will offer unprecedented sensitivity in the hard-x-ray region, with around 250 microCrab sensitivity on long-duration flights and 50-100 microCrab on ultra- long-duration balloon missions The payload consists of 16 mirror modules, each with 14 nested mirrors made from a high-strength nickel alloy, and a corresponding array of 16 focal plane detectors. An engineering demonstration flight is scheduled for the Spring of 2000, using just two mirror modules each with 3 shells, above a pair of gas-scintillation-proportional counters. This flight is intended to test a newly designed gondola pointing and aspect system and the stability of the optical bench design. The first scientific flight of the full payload is scheduled for the Fall of 2002. Full details of the payload and its capabilities will be presented together with data from various mirror-module tests. If available data from the first flight will also be presented.

Ramsey, B.↗

STS-39: Payloads in Cannister at VPF

Discovery spent about 15 weeks in the processing facility undergoing about 22 modifications and routine testing. Shown are STS-39 primary payloads installed in Discovery's payload bay in the Orbiter Processing Facility (OPF). Payloads installed in the OPF include the Critical Ionization Velocity payload and the Chemical Release Observatory.

Source record↗

Reflight of the Gamma-Ray Arcminute Telescope Imaging System (GRATIS) Payload

The Gamma-Ray Arcminute Telescope Imaging System (GRATIS) balloon payload was prepared for reflight. This involved repair of damage caused in the previous flight to structural members of the payload (the gondola support structure) as well as damage to some of the pointing system elements and electronics modules. This work was successfully completed. An extensive pre-calibration of the CsI(Na) imaging detectors was then done. The plan was to take several months to calibrate the 36 detectors and to compare the results with the post-calibration from the previous flight in Alice Springs Australia. During the course of the pre-calibrations it was noted that the light output of the crystals was severely degraded in more than half the detectors compared to the values recorded 1.5 years earlier. Subsequent investigation revealed that the light yield degradation was not unreasonable. The CsI crystals had in fact performed well past their rated life from hygroscopic contamination. The crystals had spent the majority of their life either in the desert or in the extremely low humidity conditions of Livermore California. where the GRATIS payload had been based prior to transfer to Columbia. The extreme summer humidity of New York simply exacerbated a degradation process that had been artificially delayed by dry conditions. Because such a large part of the detector array had been degraded we did not feel it was appropriate to refly the payload because the scientific performance would have been compromised.

Hailey, Charles J.↗

Structural Qualification Testing of the WindSat Payload Using Sine Bursts Near Structural Resonance

Sine burst tests are often used for structural qualification of space flight hardware. In most instances, the driving frequency of the shaker is specified far below the structure's first resonant mode, such that the entire test article sees uniform acceleration. For large structures, this limits qualification testing to lower parts of the structure, or else it over-tests the lower structure to achieve qualification of the upper structure. The WindSat payload, a 10.5 foot tall graphite/epoxy, titanium, and aluminum radiometer, experiences accelerations at the six foot diameter reflector nearly four times that at the spacecraft interface. Due to size of the payload, the number of bonded joints, and the lightweight reflector support structure design and construction, using static pull testing to qualify all of the bonded joints in the upper structure would result in large, expensive, and extensive test fixturing. Sine burst testing near the first two structural resonant modes was performed on the WindSat payload to achieve the correct load factor distribution up the stack for structural qualification. In this presentation, how finite element method (FEM) sine burst predictions were used in conjunction with low level random and sine burst tests to achieve correct qualification test load factor distribution on the WindSat payload is discussed. Also presented is the risk mitigation approach for using the uncorrelated FEM in this procedure.

Pontius, Jim↗

Transitioning to Intel-based Linux Servers in the Payload Operations Integration Center

The MSFC Payload Operations Integration Center (POIC) is the focal point for International Space Station (ISS) payload operations. The POIC contains the facilities, hardware, software and communication interface necessary to support payload operations. ISS ground system support for processing and display of real-time spacecraft and telemetry and command data has been operational for several years. The hardware components were reaching end of life and vendor costs were increasing while ISS budgets were becoming severely constrained. Therefore it has been necessary to migrate the Unix portions of our ground systems to commodity priced Intel-based Linux servers. hardware architecture including networks, data storage, and highly available resources. This paper will concentrate on the Linux migration implementation for the software portion of our ground system. The migration began with 3.5 million lines of code running on Unix platforms with separate servers for telemetry, command, Payload information management systems, web, system control, remote server interface and databases. The Intel-based system is scheduled to be available for initial operational use by August 2004 The overall migration to Intel-based Linux servers in the control center involves changes to the This paper will address the Linux migration study approach including the proof of concept, criticality of customer buy-in and importance of beginning with POSlX compliant code. It will focus on the development approach explaining the software lifecycle. Other aspects of development will be covered including phased implementation, interim milestones and metrics measurements and reporting mechanisms. This paper will also address the testing approach covering all levels of testing including development, development integration, IV&V, user beta testing and acceptance testing. Test results including performance numbers compared with Unix servers will be included. need for a smooth transition while maintaining real-time support. An important aspect of the paper will involve challenges and lessons learned. product compatibility, implications of phasing decisions and tracking of dependencies, particularly non- software dependencies. The paper will also discuss scheduling challenges providing real-time flight support during the migration and the requirement to incorporate in the migration changes being made simultaneously for flight support. This paper will also address the deployment approach including user involvement in testing and the , This includes COTS product compatibility, implications of phasing decisions and tracking of dependencies, particularly non- software dependencies. The paper will also discuss scheduling challenges providing real-time flight support during the migration and the requirement to incorporate in the migration changes being made simultaneously for flight support.

Guillebeau, P. L.↗

Silicone Contamination Camera for Developed for Shuttle Payloads

On many shuttle missions, silicone contamination from unknown sources from within or external to the shuttle payload bay has been a chronic problem plaguing experiment payloads. There is currently a wide range of silicone usage on the shuttle. Silicones are used to coat the shuttle tiles to enhance their ability to shed rain, and over 100 kg of RTV 560 silicone is used to seal white tiles to the shuttle surfaces. Silicones are also used in electronic components, potting compounds, and thermal control blankets. Efforts to date to identify and eliminate the sources of silicone contamination have not been highly successful and have created much controversy. To identify the sources of silicone contamination on the space shuttle, the NASA Lewis Research Center developed a contamination camera. This specially designed pinhole camera utilizes low-Earth-orbit atomic oxygen to develop a picture that identifies sources of silicone contamination on shuttle-launched payloads. The volatile silicone species travel through the aperture of the pinhole camera, and since volatile silicone species lose their hydrocarbon functionalities under atomic oxygen attack, the silicone adheres to the substrate as SiO_x. This glassy deposit should be spatially arranged in the image of the sources of silicone contamination. To view the contamination image, one can use ultrasensitive thickness measurement techniques, such as scanning variable-angle ellipsometry, to map the surface topography of the camera's substrate. The demonstration of a functional contamination camera would resolve the controversial debate concerning the amount and location of contamination sources, would allow corrective actions to be taken, and would demonstrate a useful tool for contamination documentation on future shuttle payloads, with near negligible effect on cost and weight.

Source record↗

Payload Operations Support Team Tools

Payload Operations Support Team Tools is a software system that assists in (1) development and testing of software for payloads to be flown aboard the space shuttles and (2) training of payload customers, flight controllers, and flight crews in payload operations

Askew, Bill↗

Launching Payloads Into Orbit at Relatively Low Cost

A report proposes the development of a system for launching payloads into orbit at about one-fifth the cost per unit payload weight of current systems. The PILOT system was a solid-fuel, aerodynamically spun and spin-stabilized, five-stage rocket with onboard controls including little more than an optoelectronic horizon sensor and a timer for triggering the second and fifth stages, respectively. The proposal calls for four improvements over the PILOT system to enable control of orbital parameters: (1) the aerodynamic tipover of the rocket at the top of the atmosphere could be modeled as a nonuniform gyroscopic precession and could be controlled by selection of the initial rocket configuration and launch conditions; (2) the attitude of the rocket at the top of the first-stage trajectory could be measured by use of radar tracking or differential Global Positioning System receivers to determine when to trigger the second stage; (3) the final-stage engines could be configured around the payload to enhance spin stabilization during a half-orbit coast up to apoapsis where the final stage would be triggered; and (4) the final payload stage could be equipped with a "beltline" of small thrusters for correcting small errors in the trajectory as measured by an off-board tracking subsystem.

Wilcox, Brian↗

Reinventing the International Space Station Payload Integration Processes and Capabilities

The fundamental ISS payload integration philosophy, processes and capabilities were established in the context of how NASA science programs were conducted and executed in the early 1990 s. Today, with the designation of the United States (US) portion of ISS as a National Lab, the ISS payload customer base is growing to include other government agencies, private and commercial research. The fields of research are becoming more diverse expanding from the NASA centric physical, materials and human research sciences to test beds for exploration and technology demonstration, biology and biotechnology, and as an Earth and Space science platform. This new customer base has a broader more diverse set of expectations and requirements for payload design, verification, integration, test, training, and operations. One size fits all processes are not responsive to this broader customer base. To maintain an organization s effectiveness it must listen to its customers, understand their needs, learn from its mistakes, and foster an environment of continual process improvement. The ISS Payloads office is evolving to meet these new customer expectations.

Jones, Rod↗

Payload Processing for Mice Drawer System

Experimental payloads flown to the International Space Station provide us with valuable research conducted in a microgravity environment not attainable on earth. The Mice Drawer System is an experiment designed by Thales Alenia Space Italia to study the effects of microgravity on mice. It is designed to fly to orbit on the Space Shuttle Utilization Logistics Flight 2 in October 2008, remain onboard the International Space Station for approximately 100 days and then return to earth on a following Shuttle flight. The experiment apparatus will be housed inside a Double Payload Carrier. An engineering model of the Double Payload Carrier was sent to Kennedy Space Center for a fit check inside both Shuttles, and the rack that it will be installed in aboard the International Space Station. The Double Payload Carrier showed a good fit quality inside each vehicle, and Thales Alenia Space Italia will now construct the actual flight model and continue to prepare the Mice Drawer System experiment for launch.

Brown, Judy↗

International Space Station Payload Operations Integration Center (POIC) Overview

Objectives and Goals: Maintain and operate the POIC and support integrated Space Station command and control functions. Provide software and hardware systems to support ISS payloads and Shuttle for the POIF cadre, Payload Developers and International Partners. Provide design, development, independent verification &validation, configuration, operational product/system deliveries and maintenance of those systems for telemetry, commanding, database and planning. Provide Backup Control Center for MCC-H in case of shutdown. Provide certified personnel and systems to support 24x7 facility operations per ISS Program. Payloads CoFR Implementation Plan (SSP 52054) and MSFC Payload Operations CoFR Implementation Plan (POIF-1006).

Ijames, Gayleen N.↗

Enhancing the NASA Expendable Launch Vehicle Payload Safety Review Process Through Program Activities

The safety review process for NASA spacecraft flown on Expendable Launch Vehicles (ELVs) has been guided by NASA-STD 8719.8, Expendable Launch Vehicle Payload Safety Review Process Standard. The standard focused primarily on the safety approval required to begin pre-launch processing at the launch site. Subsequent changes in the contractual, technical, and operational aspects of payload processing, combined with lessons-learned supported a need for the reassessment of the standard. This has resulted in the formation of a NASA ELV Payload Safety Program. This program has been working to address the programmatic issues that will enhance and supplement the existing process, while continuing to ensure the safety of ELV payload activities.

Palo, Thomas E.↗

NASA Expendable Launch Vehicle (ELV) Payload Safety Review Process

Issues addressed by this program: (1) Complicated roles and responsibilities associated with multi-partner projects (2) Working relationships and communications between all organizations involved in the payload safety process (3) Consistent interpretation and implementation of safety requirements from one project to the rest (4) Consistent implementation of the Tailoring Process (5) Clearly defined NASA decision-making-authority (6) Bring Agency-wide perspective to each ElV payload project. Current process requires a Payload Safety Working Group (PSWG) for eac payload with representatives from all involved organizations.

Starbus, Calvert S.↗

International Space Station-Based Electromagnetic Launcher for Space Science Payloads

A method was developed of lowering the cost of planetary exploration missions by using an electromagnetic propulsion/launcher, rather than a chemical-fueled rocket for propulsion. An electromagnetic launcher (EML) based at the International Space Station (ISS) would be used to launch small science payloads to the Moon and near Earth asteroids (NEAs) for the science and exploration missions. An ISS-based electromagnetic launcher could also inject science payloads into orbits around the Earth and perhaps to Mars. The EML would replace rocket technology for certain missions. The EML is a high-energy system that uses electricity rather than propellant to accelerate payloads to high velocities. The most common type of EML is the rail gun. Other types are possible, e.g., a coil gun, also known as a Gauss gun or mass driver. The EML could also "drop" science payloads into the Earth's upper

Jones, Ross M.↗

Exploration Missions to Host Small Payloads

The next-generation heavy launch vehicle, the Space Launch System (SLS), will provide the capability to deploy small satellites during the trans-lunar phase of the exploration mission trajectory. We will describe the payload mission concept of operations, the payload capacity for the SLS, and the payload requirements. Exploration Mission 1, currently planned for launch in December 2017, will be the first mission to carry such payloads on the SLS.

Cirtain, Jonathan↗