At least 379 records · Page 21

Uncertainty Quantification of Bifacial Performance Modeling

Analysis on uncertainty in the annual energy of PV systems that can be attributed to parameters of particular importance to bifacial PV modules is presented. Monte Carlo simulations are used to evaluate the effect of uncertain module bifaciality factors, module transmission fractions, albedo values, and ground clearance. The analyses cover a wide spectrum of potential PV array archetypes through variation of installation parameters. The results of the Monte Carlo analysis reveal that the uncertainty is largely dependent on albedo uncertainty, but more simulations are needed to identify trends across system archetypes. The simulations are aimed at attributing an annual energy uncertainty factor for bifacial considerations that can be applied in post-processing of project probability of exceedance analysis.

energy modeling↗

Performance Modeling of a Variable-Geometry Oscillating Surge Wave Energy Converter on a Raised Foundation

This paper analyzes the power capture potential, structural loadings, and costs associated with an oscillating surge wave energy converter (OSWEC) operating on a raised foundation. The raised OSWEC offers opportunities for reduced installation costs, improved energy production, and greater flexibility of deployment when compared with fixed-bottom models. In this investigation, we simulated several different foundation geometries using WEC-Sim to estimate power capture and structural loads. In an effort to maximize power capture, several cases in which flat plates of varying size were attached to the top of the foundation, under and parallel with the OSWEC, were also simulated. These plates were found to enhance power capture by preventing the wave-induced pressure from passing underneath the OSWEC, diverting this pressure toward the OSWEC instead. The OSWEC was simulated in the six Wave Energy Prize sea states, which were chosen as a representative sample of U.S. deployment sites. A first-order estimate of structural costs was calculated using the Wave Energy Prize ACE metric, with the foundation comprised predominantly of steel-reinforced concrete and the OSWEC comprised of A36 steel. Influence of foundation geometry on power capture, structural loadings, and ACE are topics of particular interest. This work has been inspired by advances in large-scale additive manufacturing techniques that have the potential to dramatically reduce the cost of subsea foundations. These advancements may enable cost-effective WEC systems to be deployed on raised foundations.

cost↗

Performance Models for Data Transfers: A Case Study with Molecular Chemistry Kernels

In distributed memory systems, it is paramount to develop strategies to overlap the data transfers between memory nodes with the computations in order to exploit the full potential of these systems. In this paper, we consider the problem of determining the order of data transfers between two memory nodes for a set of independent tasks with the objective of minimizing the makespan. We prove that, with limited memory capacity, the problem of obtaining the optimal order of data transfers is NP-complete. We propose several heuristics to determine this order and discuss the conditions that might be favorable to different heuristics. We analyze our heuristics on traces obtained by running 2 molecular chemistry kernels, namely, Hartree–Fock (HF) and Coupled Cluster Single Double (CCSD) on 10 nodes of an HPC system. Our results show that some of our heuristics achieve significant overlap for moderate memory capacities and resulting in makespans that are very close to the lower bound.

Kumar, Suraj↗

Smart Grid Cybersecurity: Job Performance Model Report

This is the project report to DOE OE-30 for the completion of Phase 1 of a 3 phase report. This report outlines the work done to develop a smart grid cybersecurity certification. This work is being done with the subcontractor NBISE.

24 POWER TRANSMISSION AND DISTRIBUTION↗