Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Markov Decision Processes for Intelligent, Risk-Informed Asset-Management Decision-Making

Advanced nuclear reactors are a promising option for aiding the world in achieving its net-zero carbon emission goals, however, there are significant challenges to attaining and maintaining economic competitiveness with other sources of electricity. To improve the economic competitiveness of advanced reactor designs, a project was initiated to explore the use of Markov Decision Processes (MDPs) to guide asset-management decision-making during advanced reactor operation. MDPs are a powerful tool for optimizing decision-making in complex environments and their application to advanced reactors can aid in planning maintenance and repair activities to minimize downtime and maximize generation. The described approach expands on previous work regarding the use of MDPs for operational decision-making through the direct incorporation of real-time plant information. The integral MDP analysis includes information from online component diagnostic tools and the plant’s real-time generation risk assessment (GRA) and probabilistic risk assessment (PRA), which evaluate plant risk from both an economic and safety perspective. The result is an asset-management optimization framework that is based on real-time data regarding plant component status and the current best-estimate of plant risk. The paper presents an overview of the theoretical framework to incorporate the different information pathways into an integral MDP analysis, along with example analyses.

Grabaskas, David↗

SAPHIRE 8 Volume 5 - Workspaces

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Version 8 is a software application developed for performing a complete probabilistic risk assessment using a personal computer running the Microsoft Windows™ operating system. SAPHIRE 8 is funded by the U.S. Nuclear Regulatory Commission (NRC). The role of the Idaho National Laboratory (INL) in this project is that of software developer and tester. In older versions of SAPHIRE, the model creation and analysis functions were intermingled. However, in SAPHIRE 8, the act of creating a model has been separated from the analysis of that model in order to improve the quality of both the model (e.g., by avoiding inadvertent changes) and the analysis. Consequently, in SAPHIRE 8, the analysis of models is performed by using what are called Workspaces. Currently, there are Workspaces for three types of analyses: (1) the NRC’s Accident Sequence Precursor program, where the workspace is called “Events and Condition Assessment (ECA);” (2) the NRC’s Significance Determination Process (SDP); and (3) the General Analysis (GA) workspace. Workspaces for each type are created and saved separately from the base model which keeps the original database intact. Workspaces are independent of each other and modifications or calculations made within one workspace will not affect another. In addition, each workspace has a user interface and reports tailored for their intended uses.

99 GENERAL AND MISCELLANEOUS↗

Incorporating FLEX Strategies in Multi-Unit Probabilistic Risk Assessment

The catastrophic Fukushima nuclear accident reminded nuclear community about the possibilities of extreme accident scenarios, including those involving multiple reactor units on the same site. As the responses to the Fukushima accident, the nuclear power industry developed and implemented a series of strategies, including the Diverse and Flexible Coping Strategies (FLEX), to enhance the coping capacities of nuclear power plants (NPPs) under extreme accidents. This study intends to examine the impact of FLEX strategies on the risk from all the reactor units on the same NPP site, including risks from accidents involving a single unit and from accidents involving multiple units. The fundamental, methodological element of this study is Multi-Unit Probabilistic Risk Assessment (MUPRA), which requires a shift in Probabilistic Risk Assessment (PRA) from a “one-reactor-at-a-time” mindset to a “considering all reactors sharing a site as a unity” one. An integrated modeling approach for multi-unit event sequence development will be leveraged to develop MUPRA model and address the intra-unit and inter-unit dependencies. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE), a PRA software developed and maintained by Idaho National Laboratory (INL) for the U.S. Nuclear Regulatory Commission (NRC), will serve as the platform for MUPRA modeling. This study selects Loss Of Offsite Power (LOOP) as a representative initiating event, which may occur on a generic two-unit NPP site and impacts both reactor units on the site. First, an MUPRA model, including multi-unit event trees, will be developed to obtain single-unit and multi-unit accident scenarios. Next, different FLEX strategies will be assumed, including FLEX equipment for a unit cannot be used for another unit, FLEX equipment for multiple units can be used in a cross-connected manner, etc. Lastly, the effectiveness of each postulated FLEX strategy will be evaluated by incorporating the corresponding FLEX equipment and deployment logic in the MUPRA model.

99 GENERAL AND MISCELLANEOUS↗

Status of the phenomena representation, 3D modeling, and cloud-based software architecture development

Early in 2013, researchers at the Idaho National Laboratory outlined a technical framework to support the implementation of state-of-the-art probabilistic risk assessment to predict the safety performance of advanced small modular reactors. From that vision of the advanced framework for risk analysis, specific tasks have been underway in order to implement the framework. This report discusses the current development of a several tasks related to the framework implementation, including a discussion of a 3D physics engine that represents the motion of objects (including collision and debris modeling), cloud-based analysis tools such as a Bayesian-inference engine, and scenario simulations. These tasks were performed during 2015 as part of the technical work associated with the Advanced Reactor Technologies Program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Addressing the Hard Factors for Command File Errors by Probabilistic Reasoning

Command File Errors (CFE) are managed using standard risk management approaches at the Jet Propulsion Laboratory. Over the last few years, more emphasis has been made on the collection, organization, and analysis of these errors for the purpose of reducing the CFE rates. More recently, probabilistic modeling techniques have been used for more in depth analysis of the perceived error rates of the DAWN mission and for managing the soft factors in the upcoming phases of the mission. We broadly classify the factors that can lead to CFE's as soft factors, which relate to the cognition of the operators and hard factors which relate to the Mission System which is composed of the hardware, software and procedures used for the generation, verification & validation and execution of commands. The focus of this paper is to use probabilistic models that represent multiple missions at JPL to determine the root cause and sensitivities of the various components of the mission system and develop recommendations and techniques for addressing them. The customization of these multi-mission models to a sample interplanetary spacecraft is done for this purpose.

Meshkat, Leila↗

Europa Planetary Protection for Juno Jupiter Orbiter

NASA's Juno mission launched in 2011 and will explore the Jupiter system starting in 2016. Juno's suite of instruments is designed to investigate the atmosphere, gravitational fields, magnetic fields, and auroral regions. Its low perijove polar orbit will allow it to explore portions of the Jovian environment never before visited. While the Juno mission is not orbiting or flying close to Europa or the other Galilean satellites, planetary protection requirements for avoiding the contamination of Europa have been taken into account in the Juno mission design.The science mission is designed to conclude with a deorbit burn that disposes of the spacecraft in Jupiter's atmosphere. Compliance with planetary protection requirements is verified through a set of analyses including analysis of initial bioburden, analysis of the effect of bioburden reduction due to the space and Jovian radiation environments, probabilistic risk assessment of successful deorbit, Monte-Carlo orbit propagation, and bioburden reduction in the event of impact with an icy body.

Juno↗

Safety Analysis for the Versatile Test Reactor Conceptual Design

Safety analysis simulations have been carried out using the SAS4A/SASSYS-1 safety analysis code system to update the baseline set of results for the Versatile Test Reactor conceptual design. Results from a previous revision of this work provided input for the Conceptual Safety Design Report summarizing the overall safety basis for the VTR. This work will also support future analyses that will be required for Chapter 13, “Accident Analysis,” of a preliminary safety analysis report. A number of transients have been evaluated based on categories of postulated accident sequences suggested for consideration in NUREG-1537. Ultimately, the full spectrum of event initiators and subsequent accident sequences will be defined through a probabilistic risk assessment of the plant design following the implementation of the Licensing Modernization Project guidelines as described in the VTR Safety Design Strategy. Since that process is ongoing, the present analysis addresses several transients that are expected to be bounding accident scenarios that represent the three key ways to perturb a reactor: through changes to the core inlet temperature, mass flow rate, or reactivity. These correspond to a loss of heat sink (LOHS), loss of flow (LOF) or station blackout (SBO), and transient overpower (TOP), respectively. Both Protected and Unprotected versions of these transients have been evaluated, along with additional transients that include transient overpower with one stuck rod, pump coast-down failures, seismic events, and overcooling events. At the current stage of design, transient simulation results for the Versatile Test Reactor indicate that large safety margins exist for many event initiators. However, several “enabling” assumptions have been made, in terms of both design features and design limits, in order to perform the analyses; and these assumptions will need to be revised as the design matures. In addition, a larger spectrum of events needs to be evaluated as part of the on-going probabilistic risk assessment process.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Methodology for the Integration of a Mechanistic Source Term Analysis in a Probabilistic Framework for Advanced Reactors

GE Hitachi Nuclear Energy (GEH) and Argonne National Laboratory are currently engaged in a joint effort to modernize and develop probabilistic risk assessment (PRA) techniques for advanced non-light water reactors. At a high level, the primary outcome of this project will be the development of next-generation PRA methodologies that will enable risk-informed prioritization of safety- and reliability-focused research and development, while also identifying gaps that may be resolved through additional research. A subset of this effort is the development of PRA methodologies to conduct a mechanistic source term (MST) analysis for event sequences that could result in the release of radionuclides. The MST analysis seeks to realistically model and assess the transport, retention, and release of radionuclides from the reactor to the environment. The MST methods developed during this project seek to satisfy the requirements of the Mechanistic Source Term element of the ASME/ANS Non-LWR PRA standard. The MST methodology consists of separate analysis approaches for risk-significant and non-risk significant event sequences that may result in the release of radionuclides from the reactor. For risk-significant event sequences, the methodology focuses on a detailed assessment, using mechanistic models, of radionuclide release from the fuel, transport through and release from the primary system, transport in the containment, and finally release to the environment. The analysis approach for non-risk significant event sequences examines the possibility of large radionuclide releases due to events such as re-criticality or the complete loss of radionuclide barriers. This paper provides details on the MST methodology, including the interface between the MST analysis and other elements of the PRA, and provides a simplified example MST calculation for a sodium fast reactor.

Grabaskas, Dave↗

NASA System Safety Handbook: System Safety Framework and Concepts for Implementation - Volume 1

System safety assessment is defined in NPR 8715.3C, NASA General Safety Program Requirements as a disciplined, systematic approach to the analysis of risks resulting from hazards that can affect humans, the environment, and mission assets. Achievement of the highest practicable degree of system safety is one of NASA's highest priorities. Traditionally, system safety assessment at NASA and elsewhere has focused on the application of a set of safety analysis tools to identify safety risks and formulate effective controls.1 Familiar tools used for this purpose include various forms of hazard analyses, failure modes and effects analyses, and probabilistic safety assessment (commonly also referred to as probabilistic risk assessment (PRA)). In the past, it has been assumed that to show that a system is safe, it is sufficient to provide assurance that the process for identifying the hazards has been as comprehensive as possible and that each identified hazard has one or more associated controls. The NASA Aerospace Safety Advisory Panel (ASAP) has made several statements in its annual reports supporting a more holistic approach. In 2006, it recommended that "... a comprehensive risk assessment, communication and acceptance process be implemented to ensure that overall launch risk is considered in an integrated and consistent manner." In 2009, it advocated for "... a process for using a risk-informed design approach to produce a design that is optimally and sufficiently safe." As a rationale for the latter advocacy, it stated that "... the ASAP applauds switching to a performance-based approach because it emphasizes early risk identification to guide designs, thus enabling creative design approaches that might be more efficient, safer, or both." For purposes of this preface, it is worth mentioning three areas where the handbook emphasizes a more holistic type of thinking. First, the handbook takes the position that it is important to not just focus on risk on an individual basis but to consider measures of aggregate safety risk and to ensure wherever possible that there be quantitative measures for evaluating how effective the controls are in reducing these aggregate risks. The term aggregate risk, when used in this handbook, refers to the accumulation of risks from individual scenarios that lead to a shortfall in safety performance at a high level: e.g., an excessively high probability of loss of crew, loss of mission, planetary contamination, etc. Without aggregated quantitative measures such as these, it is not reasonable to expect that safety has been optimized with respect to other technical and programmatic objectives. At the same time, it is fully recognized that not all sources of risk are amenable to precise quantitative analysis and that the use of qualitative approaches and bounding estimates may be appropriate for those risk sources. Second, the handbook stresses the necessity of developing confidence that the controls derived for the purpose of achieving system safety not only handle risks that have been identified and properly characterized but also provide a general, more holistic means for protecting against unidentified or uncharacterized risks. For example, while it is not possible to be assured that all credible causes of risk have been identified, there are defenses that can provide protection against broad categories of risks and thereby increase the chances that individual causes are contained. Third, the handbook strives at all times to treat uncertainties as an integral aspect of risk and as a part of making decisions. The term "uncertainty" here does not refer to an actuarial type of data analysis, but rather to a characterization of our state of knowledge regarding results from logical and physical models that approximate reality. Uncertainty analysis finds how the output parameters of the models are related to plausible variations in the input parameters and in the modeling assumptions. The evaluation of unrtainties represents a method of probabilistic thinking wherein the analyst and decision makers recognize possible outcomes other than the outcome perceived to be "most likely." Without this type of analysis, it is not possible to determine the worth of an analysis product as a basis for making decisions related to safety and mission success. In line with these considerations the handbook does not take a hazard-analysis-centric approach to system safety. Hazard analysis remains a useful tool to facilitate brainstorming but does not substitute for a more holistic approach geared to a comprehensive identification and understanding of individual risk issues and their contributions to aggregate safety risks. The handbook strives to emphasize the importance of identifying the most critical scenarios that contribute to the risk of not meeting the agreed-upon safety objectives and requirements using all appropriate tools (including but not limited to hazard analysis). Thereafter, emphasis shifts to identifying the risk drivers that cause these scenarios to be critical and ensuring that there are controls directed toward preventing or mitigating the risk drivers. To address these and other areas, the handbook advocates a proactive, analytic-deliberative, risk-informed approach to system safety, enabling the integration of system safety activities with systems engineering and risk management processes. It emphasizes how one can systematically provide the necessary evidence to substantiate the claim that a system is safe to within an acceptable risk tolerance, and that safety has been achieved in a cost-effective manner. The methodology discussed in this handbook is part of a systems engineering process and is intended to be integral to the system safety practices being conducted by the NASA safety and mission assurance and systems engineering organizations. The handbook posits that to conclude that a system is adequately safe, it is necessary to consider a set of safety claims that derive from the safety objectives of the organization. The safety claims are developed from a hierarchy of safety objectives and are therefore hierarchical themselves. Assurance that all the claims are true within acceptable risk tolerance limits implies that all of the safety objectives have been satisfied, and therefore that the system is safe. The acceptable risk tolerance limits are provided by the authority who must make the decision whether or not to proceed to the next step in the life cycle. These tolerances are therefore referred to as the decision maker's risk tolerances. In general, the safety claims address two fundamental facets of safety: 1) whether required safety thresholds or goals have been achieved, and 2) whether the safety risk is as low as possible within reasonable impacts on cost, schedule, and performance. The latter facet includes consideration of controls that are collective in nature (i.e., apply generically to broad categories of risks) and thereby provide protection against unidentified or uncharacterized risks.

Dezfuli, Homayoon↗

Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Tutorial

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) refers to a set of computer programs that were developed to create and analyze probabilistic risk assessment (PRAs). This volume is the tutorial manual for the SAPHIRE system. In this document, a series of lessons are provided that guide the user through basic steps common to most analyses preformed with SAPHIRE. The tutorial is divided into two major sections covering both basic and advanced features. The section covering basic topics contains lessons that lead the reader through development of a probabilistic hypothetical problem involving a vehicle accident, highlighting the program’s most fundamental features. The advanced features section contains additional lessons that expand on fundamental analysis features of SAPHIRE and provide insights into more complex analysis techniques. Together, these two elements provide an overview into the operation and capabilities of the SAPHIRE software.

99 GENERAL AND MISCELLANEOUS↗

Extending Performance and Evaluating Risks of PV Systems Failure Using a Fault Tree and Event Tree Approach: Analysis of the Possible Application

Performance and reliability of photovoltaic (PV) systems are important issues in the overall evaluation of a PV plant and its components. While performance is connected to the amount of energy produced by the PV installation in the working environmental conditions, reliability impacts the availability of the system to produce the expected amount of energy. In both cases, the evaluation should be done considering information and data coming from indoor as well as outdoor tests. In this paper a way of re-thinking performance, giving it a probabilistic connotation, and connecting the two concepts of performance and reliability is proposed. The paper follows a theoretical approach and discusses the way to obtaining such information, facing benefits and problems. The proposed probabilistic performance accounts for the probability of the system to function correctly, thus passing through the complementary evaluation of the probability of system malfunctions and consequences. Scenarios have to be identified where the system is not functioning properly or at all. They are expected to be combined in a probabilistic safety analysis (PSA) based approach, providing not only the required probability, but also being capable of giving a prioritization of the risks and the most dominant scenario associated to a specific situation. This approach can offer the possibility to highlight the most critical parts of a PV system, as well as providing support in design activities identifying weak connections.

14 SOLAR ENERGY↗

Long-Term Performance of Transuranic Waste Inadvertently Disposed in a Shallow Land Burial Trench at the Nevada Test Site

In 1986, 21 m3 of transuranic (TRU) waste was inadvertently disposed in a shallow land burial trench at the Area 5 Radioactive Waste Management Site on the Nevada Test Site. U.S. Department of Energy (DOE) TRU waste must be disposed in accordance with Title 40, Code of Federal Regulations (CFR), Part 191, Environmental Radiation Protection Standard for Management and Disposal of Spent Nuclear Fuel, High-Level, and Transuranic Radioactive Wastes. The Waste Isolation Pilot Plant is the only facility meeting these requirements. The National Research Council, however, has found that exhumation of buried TRU waste for disposal in a deep geologic repository may not be warranted when the effort, exposures, and expense of retrieval are not commensurate with the risk reduction achieved. The long-term risks of leaving the TRU waste in-place are evaluated in two probabilistic performance assessments. A composite analysis, assessing the dose from all disposed waste and interacting sources of residual contamination, estimates an annual total effective dose equivalent (TEDE) of 0.01 mSv, or 3 percent of the dose constraint. A 40 CFR 191 performance assessment also indicates there is reasonable assurance of meeting all requirements. The 40 CFR 191.15 annual mean TEDE for a member of the public is estimated to reach a maximum of 0.055 mSv at 10,000 years, or approximately 37 percent of the 0.15 mSv individual protection requirement. In both assessments greater than 99 percent of the dose is from co-disposed low-level waste. The simulated probability of the 40 CFR 191.13 cumulative release exceeding 1 and 10 times the release limit is estimated to be 0.0093 and less than 0.0001, respectively. Site characterization data and hydrologic process modeling support a conclusion of no groundwater pathway within 10,000 years. Monte Carlo uncertainty analysis indicates that there is reasonable assurance of meeting all regulatory requirements. Sensitivity analysis indicates that the results are insensitive to TRU waste-related parameters. Limited quantities of TRU waste in a shallow land burial trench can meet DOE performance objectives for disposal of TRU waste and contribute negligibly to disposal site risk. Leaving limited quantities of buried TRU waste in-place may be preferred over retrieval for disposal in a deep geologic repository.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Limitations of traditional tools for beyond design basis external hazard PRA

Probabilistic risk assessment (PRA) is being used increasingly by the nuclear industry for safety during normal operations as well as for the protection against external hazards. Computation of total risk in an external hazard PRA is dependent on hazard assessment, fragility assessment, and systems analysis. A systems analysis for propagation of component fragilities is conducted using event and fault trees. The event and fault trees for an actual power plant can be fairly large in size, which imposes computational challenges. Hence, certain assumptions are employed for computational efficiency. These assumptions typically represent the conditions imposed during the design basis (DB) scenario. The traditional PRA tools based on these assumptions are also widely applied to perform risk assessment in the context of beyond design basis (BDB) scenarios. However, some of these assumptions may not be valid for certain BDB scenarios. In addition, the probability of dependent failures also increases in BDB scenarios due to common cause failures (CCF) which usually results from design modifications, human errors, etc. In this manuscript, a simple and a relatively more complex illustrative examples are used to show the limitation of these assumptions in the numerical quantification of risk for the case of BDB conditions. Case studies with CCF events across multiple fault trees are also presented to illustrate the effect of these assumptions when traditional approach is used in BDB risk assessment. It is shown that the assumptions are valid for the case of DB conditions but may lead to excessively conservative risk estimates in the case of BDB conditions. Finally, a Bayesian network based top-down algorithm is proposed as an alternative tool for accurate numerical quantification of total risk in systems analysis.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Enabling Space Exploration Medical System Development Using a Tool Ecosystem

The NASA Human Research Program’s (HRP) Exploration Medical Capability (ExMC) Element is utilizing a Model Based Systems Engineering (MBSE) approach to enhance the development of systems engineering products that will be used to advance medical system designs for exploration missions beyond Low Earth Orbit. In support of future missions, the team is capturing content such as system behaviors, functional decompositions, architecture, system requirements and interfaces, and recommendations for clinical capabilities and resources in Systems Modeling Language (SysML) models. As these products mature, SysML models provide a way for ExMC to capture relationships among the various products, which includes supporting more integrated and multi-faceted views of future medical systems. In addition to using SysML models, HRP and ExMC are developing supplementary tools to support two key functions: 1) prioritizing current and future research activities for exploration missions in an objective manner; and 2) enabling risk-informed and evidence-based trade space analysis for future space vehicles, missions, and systems. This paper will discuss the long-term HRP and ExMC vision for the larger ecosystem of tools, which include dynamic Probabilistic Risk Assessment (PRA) capabilities, additional SysML models, a database of system component options, and data visualizations. It also includes a review of an initial Pilot Project focused on enabling medical system trade studies utilizing data that is coordinated across tools for consistent outputs (e.g., mission risk metrics that are associated with medical system mass values and medical conditions addressed). This first Pilot Project demonstrated successful operating procedures and integration across tools. Finally, the paper will also cover a second Pilot Project that utilizes tool enhancements such as medical system optimization capabilities, post-processing, and visualization of generated data for subject matter expert review, and increased integration amongst the tools themselves.

Amador, Jennifer R.↗

Enabling Space Exploration Medical System Development Using a Tool Ecosystem

The NASA Human Research Program's (HRP) Exploration Medical Capability (ExMC) Element is utilizing a Model Based Systems Engineering (MBSE) approach to enhance the development of systems engineering products that will be used to advance medical system designs for exploration missions beyond Low Earth Orbit. In support of future missions, the team is capturing content such as system behaviors, functional decompositions, architecture, system requirements and interfaces, and recommendations for clinical capabilities and resources in Systems Modeling Language (SysML) models. As these products mature, SysML models provide a way for ExMC to capture relationships among the various products, which includes supporting more integrated and multi-faceted views of future medical systems. In addition to using SysML models, HRP and ExMC are developing supplementary tools to support two key functions: 1) prioritizing current and future research activities for exploration missions in an objective manner; and 2) enabling risk-informed and evidence-based trade space analysis for future space vehicles, missions, and systems. This paper will discuss the long-term HRP and ExMC vision for the larger ecosystem of tools, which include dynamic Probabilistic Risk Assessment (PRA) capabilities, additional SysML models, a database of system component options, and data visualizations. It also includes a review of an initial Pilot Project focused on enabling medical system trade studies utilizing data that is coordinated across tools for consistent outputs (e.g., mission risk metrics that are associated with medical system mass values and medical conditions addressed). This first Pilot Project demonstrated successful operating procedures and integration across tools. Finally, the paper will also cover a second Pilot Project that utilizes tool enhancements such as medical system optimization capabilities, post-processing, and visualization of generated data for subject matter expert review, and increased integration amongst the tools themselves.

Amador, Jennifer R.↗

DYNAMIC AND CLASSICAL PRA: A BWR SBO CASE COMPARISON

As part of the Light-Water Sustainability Program (LWRS), the purpose of the Risk Informed Safety Margin Characterization (RISMC) Pathway research and development is to support plant decisions for risk-informed margin management with the aim to improve economics, reliability, and sustain the safety of current NPPs. In this paper, we describe the RISMC analysis process illustrating how mechanistic (i.e., dynamic system simulators) and probabilistic (stochastic sampling strategies) approaches are combined in a dynamic PRA fashion in order to estimate safety margins. We use the scenario of a “station blackout” (SBO) wherein offsite power and onsite power are lost, thereby causing a challenge to plant safety systems. We describe the RISMC approach, illustrate the station blackout modeling, and compare this with traditional risk analysis modeling for this type of accident scenario. In the RISMC approach the dataset obtained consists of set of simulation runs (performed by using codes such as RELAP5/3D) where timing and ordering of events is changed accordingly to the stochastic sampling strategy adopted. On the other side, classical PRA methods, which are based on event-tree (FT) and fault-tree (FT) structures, generate minimal cut sets and probability values associated to each ET branch. The comparison of the classical and RISMC approaches is performed not only in terms of overall core damage probability but also considering statistical differences in the actual sequence of events. The outcome of this comparison analysis shows similarities and dissimilarities between the approaches but also highlights the greater amount of information that can be generated by using the RISMC approach.

97 MATHEMATICS AND COMPUTING↗

GPS Spoofing Mitigation and Timing Risk Analysis in Networked Phasor Measurement Units via Stochastic Reachability

To address phasor measurement unit (PMU) vulnerability to spoofing, we propose the use of a set-valued state estimation technique known as stochastic reachability (SR)-based distributed Kalman filter (DKF) that computes secure global positioning system (GPS) timing across a network of receivers. Utilizing SR, we estimate not only GPS time but also its stochastic reachable set, which is parameterized by probabilistic zonotope (p-Zonotope). While requiring known measurement error bounds in only non-spoofed conditions, we designed a two-tiered approach. We first performed measurement-level spoofing mitigation via deviation of a measurement innovation from its expected p-Zonotope. We then performed state-level timing risk analysis via a determination of the intersection probability of the estimated p-Zonotope with an unsafe set that violates IEEE C37.118.1a-2014 standards. Finally, we validated our SR-DKF algorithm by subjecting it to a simulated receiver network to coordinate signal-level spoofing. We demonstrate improved timing accuracy and successful spoofing mitigation via the use of our SR-DKF algorithm. We also validated the robustness of the estimated timing risk as the number of receivers were varied.

47 OTHER INSTRUMENTATION↗

Light Water Reactor Sustainability Program: Analysis of Pressurized Water Reactor Station Blackout Caused by External Flooding Using the RISMC Toolkit

The existing fleet of nuclear power plants is in the process of extending its lifetime and increasing the power generated from these plants via power uprates. In order to evaluate the impact of these factors on the safety of the plant, the Risk Informed Safety Margin Characterization (RISMC) project aims to provide insight to decision makers through a series of simulations of the plant dynamics for different initial conditions (e.g., probabilistic analysis and uncertainty quantification). This report focuses, in particular, on the application of a RISMC detailed demonstration case study for an emergent issue using the RAVEN and RELAP-7 tools. This case study looks at the impact of a couple of challenges to a hypothetical pressurized water reactor, including: (1) a power uprate, (2) a potential loss of off-site power followed by the possible loss of all diesel generators (i.e., a station black-out event), (3) and earthquake induces station-blackout, and (4) a potential earthquake induced tsunami flood. The analysis is performed by using a set of codes: a thermal-hydraulic code (RELAP-7), a flooding simulation tool (NEUTRINO) and a stochastic analysis tool (RAVEN) – these are currently under development at the Idaho National Laboratory.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗