Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic risk assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Space Shuttle Rudder Speed Brake Actuator-A Case Study Probabilistic Fatigue Life and Reliability Analysis

The U.S. Space Shuttle fleet was originally intended to have a life of 100 flights for each vehicle, lasting over a 10-year period, with minimal scheduled maintenance or inspection. The first space shuttle flight was that of the Space Shuttle Columbia (OV-102), launched April 12, 1981. The disaster that destroyed Columbia occurred on its 28th flight, February 1, 2003, nearly 22 years after its first launch. In order to minimize risk of losing another Space Shuttle, a probabilistic life and reliability analysis was conducted for the Space Shuttle rudder/speed brake actuators to determine the number of flights the actuators could sustain. A life and reliability assessment of the actuator gears was performed in two stages: a contact stress fatigue model and a gear tooth bending fatigue model. For the contact stress analysis, the Lundberg-Palmgren bearing life theory was expanded to include gear-surface pitting for the actuator as a system. The mission spectrum of the Space Shuttle rudder/speed brake actuator was combined into equivalent effective hinge moment loads including an actuator input preload for the contact stress fatigue and tooth bending fatigue models. Gear system reliabilities are reported for both models and their combination. Reliability of the actuator bearings was analyzed separately, based on data provided by the actuator manufacturer. As a result of the analysis, the reliability of one half of a single actuator was calculated to be 98.6 percent for 12 flights. Accordingly, each actuator was subsequently limited to 12 flights before removal from service in the Space Shuttle.

Rudder↗

Life Qualification of Hall Thrusters By Analysis and Test

High power Hall thrusters under development for deep space robotic and human exploration missions have demanding lifetime and operational requirements that make thruster life qualification challenging. The required burn times make it infeasible to conduct multiple tests with durations exceeding the life requirement, and complex wearout phenomena and the need for power throttling during missions complicate analyses and testing. The traditional qualification approach, a single life test that typically demonstrates 50 to 100% margin on the required lifetime, does not provide enough information to demonstrate low failure risk. It is a weak source of statistical information about the location of the peak in the failure probability distribution and provides no information on the width of the distribution. Testing does provide information that can be used to validate physics-based models of failure processes, however, and the combination can be used to assess mission risk. Validated, conservative, deterministic analysis can be used to demonstrate that most failure processes have such large margins that more detailed analysis is unnecessary. For a subset of the failure modes a more detailed probabilistic analysis is required. Pole erosion in a 12.5 kW Hall thruster is used as a detailed example of this qualification process.

Brophy, John R.↗

Prediction of Calcium Oxalate Stone Risk with Interventions

Introduction Mitigations intended to reduce bone mineral loss in-flight also influence the level of renal stone risk to astronauts. Extending a recent study completed by our group [1], we investigate the likely influence of combined fluid intake and Ca excretion mitigation strategies. Methods A computational biochemistry model representing CaOx crystal precipitation, growth, and agglomeration [2] is combined with a probabilistic analysis to predict the in-flight CaOx renal stone incidence risk ratio (IRR) relative to pre-flight values using 1517 astronaut 24-hour urine chemistries. The output of this simulation is used to assess the combined impact of controlling fluid intake and Ca excretion on maintaining IRR < 1.2 for > 95% of the population, a threshold determined from initial analysis of the model output compared to referent populations [1]. Results and Conclusions Figure 1 illustrates the simulated in-flight astronaut population (n=40000) with CaOx IRR > 1.2. The red lines indicate the known clinical risk boundary of each factor, and the white box is considered the area of high combined clinical risk. The simulation and identified risk threshold conform well to the expected clinical risk boundaries. The results, assuming insensible water losses equal or exceed 0.7 L/day, imply mitigations achieve risks similar to pre-flight levels when either Ca < 150 mg/day or fluid volume intake > 3.2 L/day individually, or combined Ca < 200 and fluid volume intake > 2.5 L/day. We continue to investigate similar compounded effects and look to apprise engineering trades by informing relative risk changes during mission design. References [1] D. A. Goodenow-Messman, S. A. Gokoglu, M. Kassemi, and J. Myers, Jerry G., “Characterization of Astronaut CaOx Renal Stone Incidence Rates to Quantify In-flight and Post-flight Relative Risk,” npj Microgravity, in review, 2021. [2] M. Kassemi and D. Thompson, “Prediction of renal crystalline size distributions in space using a PBE analytic model. 1. Effect of microgravity-induced biochemical alterations,” Am. J. Physiol. Physiol., vol. 311, no. 3, pp. F520–F530, Sep. 2016, doi: 10.1152/ajprenal.00401.2015.

Debra A Goodenow↗

Integrated Medical Model (IMM) Project Verification, Validation, and Credibility (VVandC)

The Integrated Medical Model (IMM) Project supports end user requests by employing the Integrated Medical Evidence Database (iMED) and IMM tools as well as subject matter expertise within the Project. The iMED houses data used by the IMM. The IMM is designed to forecast relative changes for a specified set of crew health and mission success risk metrics by using a probabilistic model based on historical data, cohort data, and subject matter expert opinion. A stochastic approach is taken because deterministic results would not appropriately reflect the uncertainty in the IMM inputs. Once the IMM was conceptualized, a plan was needed to rigorously assess input information, framework and code, and output results of the IMM, and ensure that end user requests and requirements were considered during all stages of model development and implementation, as well as lay the foundation for external review and application. METHODS: In 2008, the Project team developed a comprehensive verification and validation (VV) plan, which specified internal and external review criteria encompassing 1) verification of data and IMM structure to ensure proper implementation of the IMM, 2) several validation techniques to confirm that the simulation capability of the IMM appropriately represents occurrences and consequences of medical conditions during space missions, and 3) credibility processes to develop user confidence in the information derived from the IMM. When the NASA-STD-7009 (7009) [1] was published, the Project team updated their verification, validation, and credibility (VVC) project plan to meet 7009 requirements and include 7009 tools in reporting VVC status of the IMM. Construction of these tools included meeting documentation and evidence requirements sufficient to meet external review success criteria. RESULTS: IMM Project VVC updates are compiled recurrently and include updates to the 7009 Compliance and Credibility matrices. Reporting tools have evolved over the lifetime of the IMM Project to better communicate VVC status. This has included refining original 7009 methodology with augmentation from the HRP NASA-STD-7009 Guidance Document working group and the NASA-HDBK-7009 [2]. End user requests and requirements are being satisfied as evidenced by ISS Program acceptance of IMM risk forecasts, transition to an operational model and simulation tool, and completion of service requests from a broad end user consortium including operations, science and technology planning, and exploration planning. IMM v4.0 is slated for operational release in the FY015 and current VVC assessments illustrate the expected VVC status prior to the completion of customer lead external review efforts. CONCLUSIONS: The VVC approach established by the IMM Project of incorporating Project-specific recommended practices and guidelines for implementing the 7009 requirements is comprehensive and includes the involvement of end users at every stage in IMM evolution. Methods and techniques used to quantify the VVC status of the IMM Project represented a critical communication tool in providing clear and concise suitability assessments to IMM customers. These processes have not only received approval from the local NASA community but have also garnered recognition by other federal agencies seeking to develop similar guidelines in the medical modeling community.

Walton, M.↗

Probabilistic structural analysis methodology and applications to advanced space propulsion system components

The goal of the reported work is to develop and apply new technology that will enable the designer to efficiently and accurately account for each of the design sources of uncertainty as it might affect structural reliability and risk assessment. The paper discusses the development of the Numerical Evaluation of Stochastic Structures Under Stress (NESSUS) finite element code and its supporting reliability algorithms. The NESSUS code and the elements of the solution strategy are outlined and applications are made to several propulsion system components.

Cruse, T. A.↗

Integrated Medical Model Verification, Validation, and Credibility

The Integrated Medical Model (IMM) was designed to forecast relative changes for a specified set of crew health and mission success risk metrics by using a probabilistic (stochastic process) model based on historical data, cohort data, and subject matter expert opinion. A probabilistic approach is taken since exact (deterministic) results would not appropriately reflect the uncertainty in the IMM inputs. Once the IMM was conceptualized, a plan was needed to rigorously assess input information, framework and code, and output results of the IMM, and ensure that end user requests and requirements were considered during all stages of model development and implementation. METHODS: In 2008, the IMM team developed a comprehensive verification and validation (VV) plan, which specified internal and external review criteria encompassing 1) verification of data and IMM structure to ensure proper implementation of the IMM, 2) several validation techniques to confirm that the simulation capability of the IMM appropriately represents occurrences and consequences of medical conditions during space missions, and 3) credibility processes to develop user confidence in the information derived from the IMM. When the NASA-STD-7009 (7009) was published, the IMM team updated their verification, validation, and credibility (VVC) project plan to meet 7009 requirements and include 7009 tools in reporting VVC status of the IMM. RESULTS: IMM VVC updates are compiled recurrently and include 7009 Compliance and Credibility matrices, IMM VV Plan status, and a synopsis of any changes or updates to the IMM during the reporting period. Reporting tools have evolved over the lifetime of the IMM project to better communicate VVC status. This has included refining original 7009 methodology with augmentation from the NASA-STD-7009 Guidance Document. End user requests and requirements are being satisfied as evidenced by ISS Program acceptance of IMM risk forecasts, transition to an operational model and simulation tool, and completion of service requests from a broad end user consortium including Operations, Science and Technology Planning, and Exploration Planning. CONCLUSIONS: The VVC approach established by the IMM project of combining the IMM VV Plan with 7009 requirements is comprehensive and includes the involvement of end users at every stage in IMM evolution. Methods and techniques used to quantify the VVC status of the IMM have not only received approval from the local NASA community but have also garnered recognition by other federal agencies seeking to develop similar guidelines in the medical modeling community.

Validation↗

Probabilistic evaluation of uncertainties and risks in aerospace components

This paper summarizes a methodology developed at NASA Lewis Research Center which computationally simulates the structural, material, and load uncertainties associated with Space Shuttle Main Engine (SSME) components. The methodology was applied to evaluate the scatter in static, buckling, dynamic, fatigue, and damage behavior of the SSME turbo pump blade. Also calculated are the probability densities of typical critical blade responses, such as effective stress, natural frequency, damage initiation, most probable damage path, etc. Risk assessments were performed for different failure modes, and the effect of material degradation on the fatigue and damage behaviors of a blade were calculated using a multi-factor interaction equation. Failure probabilities for different fatigue cycles were computed and the uncertainties associated with damage initiation and damage propagation due to different load cycle were quantified. Evaluations on the effects of mistuned blades on a rotor were made; uncertainties in the excitation frequency were found to significantly amplify the blade responses of a mistuned rotor. The effects of the number of blades on a rotor were studied. The autocorrelation function of displacements and the probability density function of the first passage time for deterministic and random barriers for structures subjected to random processes also were computed. A brief discussion was included on the future direction of probabilistic structural analysis.

Shah, A. R.↗

Preliminary Approach to Assess the Seismic Hazard on a Lunar Site

The passive seismic network deployed on the Moon during the Apollo missions operated for eight years and allowed the observation of seismic activity. More than 12500 seismic events were registered, where 28 were classified as shallow moonquakes with moment magnitudes up to 4.1. Seismic events of this nature pose a significant risk to future long-term lunar habitats; thus, these events must be carefully studied and considered in the seismic design of these structures. This paper proposes a preliminary seismic hazard assessment imposed by shallow moonquakes. The hazard assessment is performed using the Probabilistic Seismic Hazard Analysis (PSHA) methodology, considering previous studies and theories regarding the seismic environment of the Moon. The study zone covers ~860 km2 of the Taurus-Littrow Valley, containing the Apollo 17 landing site and the Lee-Lincoln lobate scarp as the considered seismic source. The seismic hazard is quantified in terms of peak ground acceleration (PGA) and spectral acceleration (5% damped pseudo-acceleration, PSA). Seismic hazard deaggregation scenarios, Uniform Hazard Spectra (UHS) for different hazard levels, and a Conditional Mean Spectrum (CMS) for a target period of 0.2 s are obtained to quantify the seismic hazard on a specific site on the Moon. The developed seismic hazard assessment provides a preliminary approach for realistic scenarios to conduct structural designs that ensure the seismic performance of fully operational long-term lunar structures.

Moonquake↗

Lunar Exploration Architecture Level Key Drivers and Sensitivities

Strategic level analysis of the integrated behavior of lunar transportation and lunar surface systems architecture options is performed to assess the benefit, viability, affordability, and robustness of system design choices. This analysis employs both deterministic and probabilistic modeling techniques so that the extent of potential future uncertainties associated with each option are properly characterized. The results of these analyses are summarized in a predefined set of high-level Figures of Merit (FOMs) so as to provide senior NASA Constellation Program (CxP) and Exploration Systems Mission Directorate (ESMD) management with pertinent information to better inform strategic level decision making. The strategic level exploration architecture model is designed to perform analysis at as high a level as possible but still capture those details that have major impacts on system performance. The strategic analysis methodology focuses on integrated performance, affordability, and risk analysis, and captures the linkages and feedbacks between these three areas. Each of these results leads into the determination of the high-level FOMs. This strategic level analysis methodology has been previously applied to Space Shuttle and International Space Station assessments and is now being applied to the development of the Constellation Program point-of-departure lunar architecture. This paper provides an overview of the strategic analysis methodology and the lunar exploration architecture analyses to date. In studying these analysis results, the strategic analysis team has identified and characterized key drivers affecting the integrated architecture behavior. These key drivers include inclusion of a cargo lander, mission rate, mission location, fixed-versus- variable costs/return on investment, and the requirement for probabilistic analysis. Results of sensitivity analysis performed on lunar exploration architecture scenarios are also presented.

Goodliff, Kandyce↗

Model Verification and Validation Concepts for a Probabilistic Fracture Assessment Model to Predict Cracking of Knife Edge Seals in the Space Shuttle Main Engine High Pressure Oxidizer

Physics-based models are routinely used to predict the performance of engineered systems to make decisions such as when to retire system components, how to extend the life of an aging system, or if a new design will be safe or available. Model verification and validation (V&V) is a process to establish credibility in model predictions. Ideally, carefully controlled validation experiments will be designed and performed to validate models or submodels. In reality, time and cost constraints limit experiments and even model development. This paper describes elements of model V&V during the development and application of a probabilistic fracture assessment model to predict cracking in space shuttle main engine high-pressure oxidizer turbopump knife-edge seals. The objective of this effort was to assess the probability of initiating and growing a crack to a specified failure length in specific flight units for different usage and inspection scenarios. The probabilistic fracture assessment model developed in this investigation combined a series of submodels describing the usage, temperature history, flutter tendencies, tooth stresses and numbers of cycles, fatigue cracking, nondestructive inspection, and finally the probability of failure. The analysis accounted for unit-to-unit variations in temperature, flutter limit state, flutter stress magnitude, and fatigue life properties. The investigation focused on the calculation of relative risk rather than absolute risk between the usage scenarios. Verification predictions were first performed for three units with known usage and cracking histories to establish credibility in the model predictions. Then, numerous predictions were performed for an assortment of operating units that had flown recently or that were projected for future flights. Calculations were performed using two NASA-developed software tools: NESSUS(Registered Trademark) for the probabilistic analysis, and NASGRO(Registered Trademark) for the fracture mechanics analysis. The goal of these predictions was to provide additional information to guide decisions on the potential of reusing existing and installed units prior to the new design certification.

Pai, Shantaram S.↗

Probabilistic Structural Health Monitoring of the Orbiter Wing Leading Edge

A structural health monitoring (SHM) system can contribute to the risk management of a structure operating under hazardous conditions. An example is the Wing Leading Edge Impact Detection System (WLEIDS) that monitors the debris hazards to the Space Shuttle Orbiter s Reinforced Carbon-Carbon (RCC) panels. Since Return-to-Flight (RTF) after the Columbia accident, WLEIDS was developed and subsequently deployed on board the Orbiter to detect ascent and on-orbit debris impacts, so as to support the assessment of wing leading edge structural integrity prior to Orbiter re-entry. As SHM is inherently an inverse problem, the analyses involved, including those performed for WLEIDS, tend to be associated with significant uncertainty. The use of probabilistic approaches to handle the uncertainty has resulted in the successful implementation of many development and application milestones.

Yap, Keng C.↗

Quantification of Uncertainty and Risk Sensitivity for Safety of Emerging Operations

The growing need to develop and deploy small unmanned aerial vehicles (sUAVs) for various applications in the airspace necessitates reliable tools to accurately predict the flight trajectories of the sUAVs. The knowledge of the predicted trajectories help decision makers anticipate potential conflict, assess the risk, and take appropriate risk mitigation actions. In addition, uncertainties in vehicle models, weather, and controller action further highlights the need for reliable prediction tools. In this project, the application of mixed sparse grid-based quadrature and generalized polynomial chaos(gPC) expansion method for uncertainty quantification and collision assessment in air traffic consisting of fixed-wing small unmanned aerial vehicles (sUAV) was studied. From the results obtained, it can be concluded that this provides a reliable framework to carry out quantitative conflict assessment in an unmanned air traffic, which when employed, can improve the functionalities of the unmanned traffic management system. It was observed that the results from the gPC expansion framework developed in the project can be utilized to conduct rapid probabilistic collision assessment for near real-time unmanned traffic management in the airspace. From the vehicle models, position updates, and wind-field data, a priori gPC based 3-σcon-fidence ellipses can provide estimates of potential conflict at some future instants. The computational costs scaled linearly when the uncertain inputs were fewer. Further, the largest allowable distribution of para-metric uncertainties that leads to the smallest risk of collision in traffic of small unmanned aerial vehicles could be calculated. The time of closest approach between two sUAVs can be established paving way for development of proactive mitigation strategies. The separation between the sUAVs was found to be most significantly affected by uncertainties in the maximum available thrusts, zero-lift drag coefficients, and wing planform areas of the sUAVs. The study of uncertain wind-fields indicated that a heterogeneous traffic mix resulted in an increased probability of conflict. Increased measurement update rate reduced the uncertain-ties in the trajectories of the vehicles, further reducing the probability of conflict but rapid updates of all vehicles in the airspace poses a stringent communication limitation. The gPC framework also provided the means to analyze vehicle impact (crash region) due to loss of control resulting from actuator failure in sUAS traffic, essentially to predict impact and crash zones for representative vehicles. The predicted regions when compared with non-participant density, provides a means to develop an early mitigation strategy, should the sUAV detect an imminent actuator failure.

Rajnish Bhusal↗

An Integrated Physics-Based Risk Model for Assessing the Asteroid Threat

Although most asteroids and other near-Earth objects (NEOs) do not pose a threat to Earth’s inhabitants, impacts from objects that are just tens of meters in diameter can cause significant damage if they occur over a populated area. This paper forms the foundation of an effort at NASA Ames Research Center to quantify these risks and identify the greatest risk-driving parameters and uncertainties. An integrated risk model that couples dynamic probabilistic simulations of strike occurrences with physics-based models of NEO impact damage factors has been developed to generate casualty estimates for a range of NEO impact properties. Currently, the model focuses on the risk due to blast overpressure damage from airbursts and impacts on land. The model is first used to reproduce results from established sources, and then is extended to perform sensitivity studies that yield greater insights into risk driving parameters. Results show that meteor strength and entry angle play a role for small to mid-size NEOs, and that accounting for the specific target location significantly affects casualty estimates and dominates the risk. Future work will continue to refine and expand the models to better characterize key impact risk factors, include additional types of threats such as tsunamis and climate effects, and ultimately support assessments of potential asteroid mitigation strategies.

Asteroid Threat↗

A Comprehensive Reliability Methodology for Assessing Risk of Reusing Failed Hardware Without Corrective Actions with and Without Redundancy

This paper deals with the development of a reliability methodology to assess the consequences of using hardware, without failure analysis or corrective action, that has previously demonstrated that it did not perform per specification. The subject of this paper arose from the need to provide a detailed probabilistic analysis to calculate the change in probability of failures with respect to the base or non-failed hardware. The methodology used for the analysis is primarily based on principles of Monte Carlo simulation. The random variables in the analysis are: Maximum Time of Operation (MTO) and operation Time of each Unit (OTU) The failure of a unit is considered to happen if (OTU) is less than MTO for the Normal Operational Period (NOP) in which this unit is used. NOP as a whole uses a total of 4 units. Two cases are considered. in the first specialized scenario, the failure of any operation or system failure is considered to happen if any of the units used during the NOP fail. in the second specialized scenario, the failure of any operation or system failure is considered to happen only if any two of the units used during the MOP fail together. The probability of failure of the units and the system as a whole is determined for 3 kinds of systems - Perfect System, Imperfect System 1 and Imperfect System 2. in a Perfect System, the operation time of the failed unit is the same as that of the MTO. In an Imperfect System 1, the operation time of the failed unit is assumed as 1 percent of the MTO. In an Imperfect System 2, the operation time of the failed unit is assumed as zero. in addition, simulated operation time of failed units is assumed as 10 percent of the corresponding units before zero value. Monte Carlo simulation analysis is used for this study. Necessary software has been developed as part of this study to perform the reliability calculations. The results of the analysis showed that the predicted change in failure probability (P(sub F)) for the previously failed units is as high as 49 percent above the baseline (perfect system) for the worst case. The predicted change in system P(sub F) for the previously failed units is as high as 36% for single unit failure without any redundancy. For redundant systems, with dual unit failure, the predicted change in P(sub F) for the previously failed units is as high as 16%. These results will help management to make decisions regarding the consequences of using previously failed units without adequate failure analysis or corrective action.

Putcha, Chandra S.↗

A Probabilistic Approach of Incorporating Safety and Reliability in System Designs for a Manned Mission to Mars

Conceptual stages in mission design often lack the input of quantitative safety and reliability assessments, simply because failure rates or other data are not yet available for systems that have not yet been designed. Absence of such data should not, however, prevent the development of a quantitative risk models with placeholders for missing data. Functions (that is, actions the systems must perform) in mission design will eventually require system probabilities of success, and there could be much learned from surrogate data, adequately bounded in uncertainty, used in a large event tree model of a complex mission.

Railsback, Jan W.↗

Methodolgy For Evaluation Of Technology Impacts In Space Electric Power Systems

The Analysis and Management branch of the Power and Propulsion Office at NASA Glenn Research Center is responsible for performing complex analyses of the space power and In-Space propulsion products developed by GRC. This work quantifies the benefits of the advanced technologies to support on-going advocacy efforts. The Power and Propulsion Office is committed to understanding how the advancement in space technologies could benefit future NASA missions. They support many diverse projects and missions throughout NASA as well as industry and academia. The area of work that we are concentrating on is space technology investment strategies. Our goal is to develop a Monte-Carlo based tool to investigate technology impacts in space electric power systems. The framework is being developed at this stage, which will be used to set up a computer simulation of a space electric power system (EPS). The outcome is expected to be a probabilistic assessment of critical technologies and potential development issues. We are developing methods for integrating existing spreadsheet-based tools into the simulation tool. Also, work is being done on defining interface protocols to enable rapid integration of future tools. Monte Carlo-based simulation programs for statistical modeling of the EPS Model. I decided to learn and evaluate Palisade's @Risk and Risk Optimizer software, and utilize it's capabilities for the Electric Power System (EPS) model. I also looked at similar software packages (JMP, SPSS, Crystal Ball, VenSim, Analytica) available from other suppliers and evaluated them. The second task was to develop the framework for the tool, in which we had to define technology characteristics using weighing factors and probability distributions. Also we had to define the simulation space and add hard and soft constraints to the model. The third task is to incorporate (preliminary) cost factors into the model. A final task is developing a cross-platform solution of this framework.

Holda, Julie↗

Integrated Medical Model (IMM) Optimization Version 4.0 Functional Improvements

The IMMs ability to assess mission outcome risk levels relative to available resources provides a unique capability to provide guidance on optimal operational medical kit and vehicle resources. Post-processing optimization allows IMM to optimize essential resources to improve a specific model outcome such as maximization of the Crew Health Index (CHI), or minimization of the probability of evacuation (EVAC) or the loss of crew life (LOCL). Mass and or volume constrain the optimized resource set. The IMMs probabilistic simulation uses input data on one hundred medical conditions to simulate medical events that may occur in spaceflight, the resources required to treat those events, and the resulting impact to the mission based on specific crew and mission characteristics. Because IMM version 4.0 provides for partial treatment for medical events, IMM Optimization 4.0 scores resources at the individual resource unit increment level as opposed to the full condition-specific treatment set level, as done in version 3.0. This allows the inclusion of as many resources as possible in the event that an entire set of resources called out for treatment cannot satisfy the constraints. IMM Optimization version 4.0 adds capabilities that increase efficiency by creating multiple resource sets based on differing constraints and priorities, CHI, EVAC, or LOCL. It also provides sets of resources that improve mission-related IMM v4.0 outputs with improved performance compared to the prior optimization. The new optimization represents much improved fidelity that will improve the utility of the IMM 4.0 for decision support.

risk assessment↗

NASA Applications and Lessons Learned in Reliability Engineering

Since the Shuttle Challenger accident in 1986, communities across NASA have been developing and extensively using quantitative reliability and risk assessment methods in their decision making process. This paper discusses several reliability engineering applications that NASA has used over the year to support the design, development, and operation of critical space flight hardware. Specifically, the paper discusses several reliability engineering applications used by NASA in areas such as risk management, inspection policies, components upgrades, reliability growth, integrated failure analysis, and physics based probabilistic engineering analysis. In each of these areas, the paper provides a brief discussion of a case study to demonstrate the value added and the criticality of reliability engineering in supporting NASA project and program decisions to fly safely. Examples of these case studies discussed are reliability based life limit extension of Shuttle Space Main Engine (SSME) hardware, Reliability based inspection policies for Auxiliary Power Unit (APU) turbine disc, probabilistic structural engineering analysis for reliability prediction of the SSME alternate turbo-pump development, impact of ET foam reliability on the Space Shuttle System risk, and reliability based Space Shuttle upgrade for safety. Special attention is given in this paper to the physics based probabilistic engineering analysis applications and their critical role in evaluating the reliability of NASA development hardware including their potential use in a research and technology development environment.

Safie, Fayssal M.↗