Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probability estimates”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Fire in the Brazilian Amazon: A Spatially Explicit Model for Policy Impact Analysis

This article implements a spatially explicit model to estimate the probability of forest and agricultural fires in the Brazilian Amazon. We innovate by using variables that reflect farmgate prices of beef and soy, and also provide a conceptual model of managed and unmanaged fires in order to simulate the impact of road paving, cattle exports, and conservation area designation on the occurrence of fire. Our analysis shows that fire is positively correlated with the price of beef and soy, and that the creation of new conservation units may offset the negative environmental impacts caused by the increasing number of fire events associated with early stages of frontier development.

Arima, Eugenio Y.↗

Investigation of MMOD Impact on STS-115 Shuttle Payload Bay Door Radiator

The Orbiter radiator system consists of eight individual 4.6 m x 3.2 m panels located with four on each payload bay door. Forward panels #1 and #2 are 2.3 cm thick while the aft panels #3 and #4 have a smaller overall thickness of 1.3 cm. The honeycomb radiator panels consist of 0.028 cm thick Aluminum 2024-T81 facesheets and Al5056-H39 cores. The face-sheets are topped with 0.005 in. (0.127 mm) silver-Teflon tape. The radiators are located on the inside of the shuttle payload bay doors, which are closed during ascent and reentry, limiting damage to the on-orbit portion of the mission. Post-flight inspections at the Kennedy Space Center (KSC) following the STS-115 mission revealed a large micrometeoroid/orbital debris (MMOD) impact near the hinge line on the #4 starboard payload bay door radiator panel. The features of this impact make it the largest ever recorded on an orbiter payload bay door radiator. The general location of the damage site and the adjacent radiator panels can be seen in Figure 2. Initial measurements of the defect indicated that the hole in the facesheet was 0.108 in. (2.74 mm) in diameter. Figure 3 shows an image of the front side damage. Subsequent observations revealed exit damage on the rear facesheet. Impact damage features on the rear facesheet included a 0.03 in. diameter hole (0.76 mm), a approx.0.05 in. tall bulge (approx.1.3 mm), and a larger approx.0.2 in. tall bulge (approx.5.1 mm) that exhibited a crack over 0.27 in. (6.8 mm) long. A large approx.1 in. (25 mm) diameter region of the honeycomb core was also damaged. Refer to Figure 4 for an image of the backside damage to the panel. No damage was found on thermal blankets or payload bay door structure under the radiator panel. Figure 5 shows the front facesheet with the thermal tape removed. Ultrasound examination indicated a maximum facesheet debond extent of approximately 1 in. (25 mm) from the entry hole. X-ray examinations revealed damage to an estimated 31 honeycomb cells with an extent of 0.85 in. x 1.1 in. (21.6 x 27.9 mm). Pieces of the radiator at and surrounding the impact site were recovered during the repair procedures at KSC. They included the thermal tape, front facesheet, honeycomb core, and rear facesheet. These articles were examined at JSC using a scanning electron microscope (SEM) with an energy dispersive x-ray spectrometer (EDS). Figure 6 shows SEM images of the entry hole in the facesheet. The asymmetric height of the lip may be attributed to projectile shape and impact angle. Numerous instances of a glass-fiber organic matrix composite were observed in the facesheet tape sample. The fibers were approximately 10 micrometers in diameter and variable lengths. EDS analysis indicated a composition of Mg, Ca, Al, Si, and O. Figures 7 and 8 present images of the fiber bundles, which were believed to be circuit board material based on similarity in fiber diameter, orientation, consistency, and composition. A test program was initiated in an attempt to simulate the observed damage to the radiator facesheet and honeycomb. Twelve test shots were performed using projectiles cut from a 1.6 mm thick fiberglass circuit board substrate panel. Results from test HITF07017, shown in figures 9 and 10, correlates with the observed impact features reasonably well. The test was performed at 4.14 km/sec with an impact angle of 45 degrees using a cylindrical projectile with a diameter and length of 1.25 mm. The fiberglass circuit board material had a density of 1.65 g/cu cm, giving a projectile mass of 2.53 mg. An analysis was performed using the Bumper code to estimate the probability of impact to the shuttle from a 1.25 mm diameter particle. Table 1 shows a 1.6% chance (impact odds = 1 in 62) of a 1.25 mm or larger MMOD impact on the radiators of the vehicle during a typical ISS mission. There is a 0.4% chance (impact odds = 1 in 260) that a 1.25 mm or larger MMOD particle would impact the RCC wing leading edge and nose cap during a typical miion. Figure 11 illustrates the vulnerable areas of the wing leading edge reinforced carbon-carbon (RCC), an area of the vehicle that is very sensitive to impact damage. The highlighted red, orange, yellow, and light green areas would be expected to experience critical damage if impacted by an OD particle such as the one that hit the RH4 radiator panel on STS-115.

Hyde, J.↗

Effect of Surge Current Testing on Reliability of Solid Tantalum Capacitors

Tantalum capacitors manufactured per military specifications are established reliability components and have less than 0.001% of failures per 1000 hours for grades D or S, thus positioning these parts among electronic components with the highest reliability characteristics. Still, failures of tantalum capacitors do happen and when it occurs it might have catastrophic consequences for the system. To reduce this risk, further development of a screening and qualification system with special attention to the possible deficiencies in the existing procedures is necessary. The purpose of this work is evaluation of the effect of surge current stress testing on reliability of the parts at both steady-state and multiple surge current stress conditions. In order to reveal possible degradation and precipitate more failures, various part types were tested and stressed in the range of voltage and temperature conditions exceeding the specified limits. A model to estimate the probability of post-surge current testing-screening failures and measures to improve the effectiveness of the screening process has been suggested.

Teverovsky, Alexander↗

Characterization of Cloud Water-Content Distribution

The development of realistic cloud parameterizations for climate models requires accurate characterizations of subgrid distributions of thermodynamic variables. To this end, a software tool was developed to characterize cloud water-content distributions in climate-model sub-grid scales. This software characterizes distributions of cloud water content with respect to cloud phase, cloud type, precipitation occurrence, and geo-location using CloudSat radar measurements. It uses a statistical method called maximum likelihood estimation to estimate the probability density function of the cloud water content.

Lee, Seungwon↗

Simple Sensitivity Analysis for Orion Guidance Navigation and Control

The performance of Orion flight software, especially its GNC software, is being analyzed by running Monte Carlo simulations of Orion spacecraft flights. The simulated performance is analyzed for conformance with flight requirements, expressed as performance constraints. Flight requirements include guidance (e.g. touchdown distance from target) and control (e.g., control saturation) as well as performance (e.g., heat load constraints). The Monte Carlo simulations disperse hundreds of simulation input variables, for everything from mass properties to date of launch. We describe in this paper a sensitivity analysis tool ("Critical Factors Tool" or CFT) developed to find the input variables or pairs of variables which by themselves significantly influence satisfaction of requirements or significantly affect key performance metrics (e.g., touchdown distance from target). Knowing these factors can inform robustness analysis, can inform where engineering resources are most needed, and could even affect operations. The contributions of this paper include the introduction of novel sensitivity measures, such as estimating success probability, and a technique for determining whether pairs of factors are interacting dependently or independently. The tool found that input variables such as moments, mass, thrust dispersions, and date of launch were found to be significant factors for success of various requirements. Examples are shown in this paper as well as a summary and physics discussion of EFT-1 driving factors that the tool found.

Pressburger, Tom↗

Constructing the "Best" Reliability Data for the Job

Modern business and technical decisions are based on the results of analyses. When considering assessments using "reliability data", the concern is how long a system will continue to operate as designed. Generally, the results are only as good as the data used. Ideally, a large set of pass/fail tests or observations to estimate the probability of failure of the item under test would produce the best data. However, this is a costly endeavor if used for every analysis and design. Developing specific data is costly and time consuming. Instead, analysts rely on available data to assess reliability. Finding data relevant to the specific use and environment for any project is difficult, if not impossible. Instead, we attempt to develop the "best" or composite analog data to support our assessments. One method used incorporates processes for reviewing existing data sources and identifying the available information based on similar equipment, then using that generic data to derive an analog composite. Dissimilarities in equipment descriptions, environment of intended use, quality and even failure modes impact the "best" data incorporated in an analog composite. Once developed, this composite analog data provides a "better" representation of the reliability of the equipment or component can be used to support early risk or reliability trade studies, or analytical models to establish the predicted reliability data points. Data that is more representative of reality and more project specific would provide more accurate analysis, and hopefully a better final decision.

DeMott, D. L.↗

Simple Sensitivity Analysis for Orion GNC

The performance of Orion flight software, especially its GNC software, is being analyzed by running Monte Carlo simulations of Orion spacecraft flights. The simulated performance is analyzed for conformance with flight requirements, expressed as performance constraints. Flight requirements include guidance (e.g. touchdown distance from target) and control (e.g., control saturation) as well as performance (e.g., heat load constraints). The Monte Carlo simulations disperse hundreds of simulation input variables, for everything from mass properties to date of launch.We describe in this paper a sensitivity analysis tool (Critical Factors Tool or CFT) developed to find the input variables or pairs of variables which by themselves significantly influence satisfaction of requirements or significantly affect key performance metrics (e.g., touchdown distance from target). Knowing these factors can inform robustness analysis, can inform where engineering resources are most needed, and could even affect operations. The contributions of this paper include the introduction of novel sensitivity measures, such as estimating success probability, and a technique for determining whether pairs of factors are interacting dependently or independently. The tool found that input variables such as moments, mass, thrust dispersions, and date of launch were found to be significant factors for success of various requirements. Examples are shown in this paper as well as a summary and physics discussion of EFT-1 driving factors that the tool found.

Monte Carlo Simulation↗

Constructing the Best Reliability Data for the Job

Modern business and technical decisions are based on the results of analyses. When considering assessments using "reliability data", the concern is how long a system will continue to operate as designed. Generally, the results are only as good as the data used. Ideally, a large set of pass/fail tests or observations to estimate the probability of failure of the item under test would produce the best data. However, this is a costly endeavor if used for every analysis and design. Developing specific data is costly and time consuming. Instead, analysts rely on available data to assess reliability. Finding data relevant to the specific use and environment for any project is difficult, if not impossible. Instead, we attempt to develop the "best" or composite analog data to support our assessments. One method used incorporates processes for reviewing existing data sources and identifying the available information based on similar equipment, then using that generic data to derive an analog composite. Dissimilarities in equipment descriptions, environment of intended use, quality and even failure modes impact the "best" data incorporated in an analog composite. Once developed, this composite analog data provides a "better" representation of the reliability of the equipment or component can be used to support early risk or reliability trade studies, or analytical models to establish the predicted reliability data points. Data that is more representative of reality and more project specific would provide more accurate analysis, and hopefully a better final decision.

Kleinhammer, R. K.↗

Planetary Protection Trajectory Analysis for the Juno Mission

Juno is an orbiter mission expected to launch in 2011 to Jupiter. Juno's science orbit is a highly eccentric orbit with a period of about 11 days and a nominal duration of one year. Initially, the equatorial crossing near apojove occurs outside Callisto's orbit, but as the mission evolves the apsidal rotation causes this distance to move much closer to Jupiter. This motion could lead to potential impacts with the Galilean satellites as the ascending node crosses the satellite orbits. In this paper, we describe the method to estimate impact probabilities with the satellites and investigate ways of reducing the probabilities for the Juno mission.

Lam, Try↗

Pitfalls and Precautions When Using Predicted Failure Data for Quantitative Analysis of Safety Risk for Human Rated Launch Vehicles

Launch vehicle reliability analysis is largely dependent upon using predicted failure rates from data sources such as MIL-HDBK-217F. Reliability prediction methodologies based on component data do not take into account system integration risks such as those attributable to manufacturing and assembly. These sources often dominate component level risk. While consequence of failure is often understood, using predicted values in a risk model to estimate the probability of occurrence may underestimate the actual risk. Managers and decision makers use the probability of occurrence to influence the determination whether to accept the risk or require a design modification. The actual risk threshold for acceptance may not be fully understood due to the absence of system level test data or operational data. This paper will establish a method and approach to identify the pitfalls and precautions of accepting risk based solely upon predicted failure data. This approach will provide a set of guidelines that may be useful to arrive at a more realistic quantification of risk prior to acceptance by a program.

Hatfield, Glen S.↗

Exploring X-Ray Binary Populations in Compact Group Galaxies With Chandra

We obtain total galaxy X-ray luminosities, LX, originating from individually detected point sources in a sample of 47 galaxies in 15 compact groups of galaxies (CGs). For the great majority of our galaxies, we find that the detected point sources most likely are local to their associated galaxy, and are thus extragalactic X-ray binaries (XRBs) or nuclear active galactic nuclei (AGNs). For spiral and irregular galaxies, we find that, after accounting for AGNs and nuclear sources, most CG galaxies are either within the +/-1σ scatter of the Mineo et al. LX-star formation rate (SFR) correlation or have higher LX than predicted by this correlation for their SFR. We discuss how these "excesses" may be due to low metallicities and high interaction levels. For elliptical and S0 galaxies, after accounting for AGNs and nuclear sources, most CG galaxies are consistent with the Boroson et al. LX-stellar mass correlation for low-mass XRBs, with larger scatter, likely due to residual effects such as AGN activity or hot gas. Assuming non-nuclear sources are low- or high-mass XRBs, we use appropriate XRB luminosity functions to estimate the probability that stochastic effects can lead to such extreme LX values. We find that, although stochastic effects do not in general appear to be important, for some galaxies there is a significant probability that high LX values can be observed due to strong XRB variability.

X-rays: binaries↗

Dynamic Positioning System (DPS) Risk Analysis Using Probabilistic Risk Assessment (PRA)

The National Aeronautics and Space Administration (NASA) Safety & Mission Assurance (S&MA) directorate at the Johnson Space Center (JSC) has applied its knowledge and experience with Probabilistic Risk Assessment (PRA) to projects in industries ranging from spacecraft to nuclear power plants. PRA is a comprehensive and structured process for analyzing risk in complex engineered systems and/or processes. The PRA process enables the user to identify potential risk contributors such as, hardware and software failure, human error, and external events. Recent developments in the oil and gas industry have presented opportunities for NASA to lend their PRA expertise to both ongoing and developmental projects within the industry. This paper provides an overview of the PRA process and demonstrates how this process was applied in estimating the probability that a Mobile Offshore Drilling Unit (MODU) operating in the Gulf of Mexico and equipped with a generically configured Dynamic Positioning System (DPS) loses location and needs to initiate an emergency disconnect. The PRA described in this paper is intended to be generic such that the vessel meets the general requirements of an International Maritime Organization (IMO) Maritime Safety Committee (MSC)/Circ. 645 Class 3 dynamically positioned vessel. The results of this analysis are not intended to be applied to any specific drilling vessel, although provisions were made to allow the analysis to be configured to a specific vessel if required.

Thigpen, Eric B.↗

Dynamic Positioning System (DPS) Risk Analysis Using Probabilistic Risk Assessment (PRA)

The National Aeronautics and Space Administration (NASA) Safety & Mission Assurance (S&MA) directorate at the Johnson Space Center (JSC) has applied its knowledge and experience with Probabilistic Risk Assessment (PRA) to projects in industries ranging from spacecraft to nuclear power plants. PRA is a comprehensive and structured process for analyzing risk in complex engineered systems and/or processes. The PRA process enables the user to identify potential risk contributors such as, hardware and software failure, human error, and external events. Recent developments in the oil and gas industry have presented opportunities for NASA to lend their PRA expertise to both ongoing and developmental projects within the industry. This paper provides an overview of the PRA process and demonstrates how this process was applied in estimating the probability that a Mobile Offshore Drilling Unit (MODU) operating in the Gulf of Mexico and equipped with a generically configured Dynamic Positioning System (DPS) loses location and needs to initiate an emergency disconnect. The PRA described in this paper is intended to be generic such that the vessel meets the general requirements of an International Maritime Organization (IMO) Maritime Safety Committee (MSC)/Circ. 645 Class 3 dynamically positioned vessel. The results of this analysis are not intended to be applied to any specific drilling vessel, although provisions were made to allow the analysis to be configured to a specific vessel if required.

Thigpen, Eric B.↗

Predicting Ground Delay Program at an Airport Based on Meteorological Conditions

In this paper, we present two supervised-learning models, logistic regression and decision tree, to predict occurrence of ground delay program at an airport based on meteorological conditions and scheduled traffic demand. Such predictive capabilities can help the Federal Aviation Administration traffic managers and airline dispatchers to prepare mitigation strategies to reduce the impact of adverse weather. The models are applied to predict ground delay program occurrence at two major U.S. airports: Newark Liberty Intl. and San Francisco Intl. airports. The logistic regression model estimates the probability that a ground delay program will occur during a given hour. Decision tree, on the other hand, classifies an hour as a ground delay program or not based on the input variables. Results indicate that both models perform significantly better than a purely random prediction of ground delay program occurrence at the two airports. The logistic regression model performs better than the decision tree model. The degree to which various input variables impact the probability of ground delay program vary between the two airports. While the enroute convective weather is a dominant factor causing ground delay programs at New York airports, poor visibility and low cloud ceiling caused by marine stratus are major drivers of ground delay programs at San Francisco Intl. airport.

traffic flow management↗

Dynamics and Control of Quadcopter in Uncertain Environment

We consider problem of dynamics, control, and uncertainty quantification for quadcopter. We use the 6DOF model of quadcopter dynamics, linear quadratic regulator and linear quadratic Gaussian control of quadcopter in the presence of dynamical disturbances, measurement noise, hidden dynamical variables, dashing GPS signal, and wind gusts to predict quadcopter trajectory. We identify key sources of uncertainties and report on progress in development of a system that estimates the probability of safety-critical events using a set of algorithms based on the trajectory predictions.

uncertainty quantification↗

Validation of the Nasa Integrated Medical Model: a Space Flight Medical Risk Prediction Tool

The Human Research Program funded the development of the Integrated Medical Model (IMM) to quantify the medical component of overall mission risk. The IMM uses Monte Carlo simulation methodology, incorporating space flight and ground medical data, to estimate the probability of mission medical outcomes and resource utilization. To determine the credibility of IMM output, the IMM project team completed two validation studies that compared IMM predicted output to observed medical events from a selection of Shuttle Transportation System (STS) and International Space Station (ISS) missions. The validation study results showed that the IMM underpredicted the occurrence of ~10% of the modeled medical conditions for the STS missions and overpredicted ~20% of the modeled medical conditions for the ISS missions. These findings imply that the strength of IMM predictions to inform decisions depends on simulated mission specifications including length. This discrepancy could result from medical recording differences between ISS and STS that possibly influence observed incidence rates, IMM combining all "mission type" data as constant occurrence rate or fixed proportion across both mission types, misspecification of symptoms to conditions, and gaps in the literature informing the model. Some of these issues will be alleviated by updating the IMM source data through incorporation of the observed validation data.

medical equipment↗

Probabilistic Risk Analysis (PRA) of a Mobile Offshore Drilling Unit (MODU) Dynamic Positioning System (DPS)

Probabilistic Risk Assessment (PRA) has been utilized by NASA in a variety of space oriented projects. It has served as one of the primary risk identification and ranking tools. Recent developments in the oil and gas industry have presented opportunities for NASA to lend their PRA expertise to both ongoing and developmental projects within the industry. As a result, NASA has entered into an agreement with Anadarko Petroleum Company (APC) to collaboratively develop PRAs for different aspects of the subsea drilling and completion process of well development. This paper documents how PRA was applied to estimate the probability that a Mobile Offshore Drilling Unit (MODU) equipped with a generically configured Dynamic Positioning System (DPS) loses location and needs to initiate an emergency disconnect. Since this project was in essence a pilot project, the PRA described in this paper is intended to be generic such that the vessel meets the general requirements of an International Maritime Organization (IMO) Maritime Safety Committee (MSC)/Circ. 645 Class 3 dynamically positioned vessel. The results of this analysis are not intended to be applied to any specific drilling vessel, although provisions were made to allow the analysis to be configured to a specific vessel if required.

Thigpen, Eric B.↗

Validation of the NASA Integrated Medical Model: a Space Flight Medical Risk Prediction Tool

The Human Research Program funded the development of the Integrated Medical Model (IMM) to quantify the medical component of overall mission risk. The IMM uses Monte Carlo simulation methodology, incorporating space flight and ground medical data, to estimate the probability of mission medical outcomes and resource utilization. To determine the credibility of IMM output, the IMM project team completed two validation studies that compared IMM predicted output to observed medical events from a selection of Shuttle Transportation System (STS) and International Space Station (ISS) missions. The validation study results showed that the IMM underpredicted the occurrence of ~10% of the modeled medical conditions for the STS missions and overpredicted ~20% of the modeled medical conditions for the ISS missions. These findings imply that the strength of IMM predictions to inform decisions depends on simulated mission specifications including length. This discrepancy could result from medical recording differences between ISS and STS that possibly influence observed incidence rates, IMM combining all "mission type" data as constant occurrence rate or fixed proportion across both mission types, misspecification of symptoms to conditions, and gaps in the literature informing the model. Some of these issues will be alleviated by updating the IMM source data through incorporation of the observed validation data.

risk assessment↗