Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Physics-Based Limiter Redesign and Bit Performance Analysis at The Geysers

As part of a U.S. DOE Geothermal Technologies Office funding opportunity, Geysers Power Company, LLC (GPC), an indirect subsidiary of Calpine Corporation, partnered with Sandia National Labs, EGI at the University of Utah, and Texas A&M University to demonstrate increased drilling performance at The Geysers Geothermal Field. The performance target in the drilling demonstrations is at least a 25% improvement in rates of penetration, with increased footage on bottom for each bit coupled with increased bit life and time drilling. The project leverages advances in oil and gas drilling technologies including PDC bits, along with the physics-based limiter redesign techniques championed in drilling demonstrations conducted at the Utah FORGE geothermal site. The planned drilling demonstrations are being conducted as part of an existing drilling campaign intended to enhance reservoir utilization. The wells are typically drilled to the top of the reservoir with mud and then air-drilled to total depth (TD) through fractured zones at temperatures ≥ 450°F. A major goal of the project is to assess the effectiveness of implementing mechanical specific energy (MSE) and drilling dysfunction diagnosis and remediation in these challenging environments, as well as alternate rock reduction technologies. The first demonstration well has been completed, with 15 PDC bit runs in the 17.5”, 12.25” and 8.5” sections. Initial analysis shows ROP gains in all three sections, especially in the 17.5” and 12.25” sections, compared with conventional roller cone bit runs in the demonstration well and offset wells. However, in the 8.5” hole, wear and damage to the PDC bits resulted in relatively short bit runs. Analysis is underway to take advantage of the positive results and remediate the challenges. This paper provides updates on drilling activities conducted since the Phase 1 demonstration well at GDC-36 which was drilled from November 2023-January 2024. Additional analysis of the bit performance has been conducted. Furthermore, in subsequent wells drilled by GPC, PDC bits have been used extensively, building on the gains realized at GDC-36. GPC has continued to work with bit vendors to identify designs that last longer in the harsh, air-drilled 8.5” portions of the wells. Planning for the Phase 2 demonstration at Prati-44 is ongoing.

15 GEOTHERMAL ENERGY↗

DSN energy data base preliminary design

The design and implementation of a computerized data base created to support the DSN Energy Conservation Project with data relating to energy use at Goldstone Deep Space Communications Complex are described. The results of development work to date, are presented along with work currently in progress or in the planning stage.

Cole, E. R.↗

Dawn Spacecraft Performance at Ceres: Results of Hybrid Control for Ceres Mapping

Dawn is a low-thrust interplanetary spacecraft currently orbiting the dwarf planet Ceres, to better understand the early creation of the solar system. Launched in September 2007, Dawn arrived at Vesta in July 2011. After a 16-month successful science campaign at Vesta, Dawn departed for Ceres, arriving in early 2015. The Dawn spacecraft uses both reaction wheel assemblies (RWA) and a reaction control system (RCS) to provide 3-axis attitude control for the spacecraft. Reaction wheels were designed to be the primary system for attitude control, however two wheels have shown high friction anomalies and have been removed from service. The project has implemented a hybrid control algorithm using two reaction wheels and RCS thrusters. This hybrid control capability enabled Dawn to achieve very high science return, while significantly conserving remaining hydrazine propellant. With only two remaining healthy RWA’s, hybrid control became part of the baseline plan for Ceres science operations. The Dawn team developed specific operational approaches in which sequences were developed with careful consideration of science versus resource trades. Commanding and sequence planning also incorporated contingency planning, in the event that another reaction wheel may fail. Despite the differences in operational approach between Vesta and Ceres, both campaigns achieved very rich scientific data return. This paper highlights Dawn’s recent flight experience with hybrid attitude control during Ceres orbit operations. The discussion includes the approaches utilized by the Dawn team to address unique operational challenges presented by the hybrid approach, and reviews spacecraft performance under hybrid control in low orbit at Ceres. Additionally, methods used to optimize hydrazine use and thereby extend the science campaign will be presented. Finally, a preliminary assessment of an orbit transfer with two reaction wheels, during extended mission operations, is discussed.

Smith, Brett A.↗

DUNE Phase II: scientific opportunities, detector concepts, technological solutions

The international collaboration designing and constructing the Deep Underground Neutrino Experiment (DUNE) at the Long-Baseline Neutrino Facility (LBNF) has developed a two-phase strategy toward the implementation of this leading-edge, large-scale science project. The 2023 report of the US Particle Physics Project Prioritization Panel (P5) reaffirmed this vision and strongly endorsed DUNE Phase I and Phase II, as did the European Strategy for Particle Physics. While the construction of the DUNE Phase I is well underway, this White Paper focuses on DUNE Phase II planning. DUNE Phase-II consists of a third and fourth far detector (FD) module, an upgraded near detector complex, and an enhanced 2.1 MW beam. The fourth FD module is conceived as a “Module of Opportunity”, aimed at expanding the physics opportunities, in addition to supporting the core DUNE science program, with more advanced technologies. This document highlights the increased science opportunities offered by the DUNE Phase II near and far detectors, including long-baseline neutrino oscillation physics, neutrino astrophysics, and physics beyond the standard model. It describes the DUNE Phase II near and far detector technologies and detector design concepts that are currently under consideration. A summary of key R&D goals and prototyping phases needed to realize the Phase II detector technical designs is also provided. DUNE's Phase II detectors, along with the increased beam power, will complete the full scope of DUNE, enabling a multi-decadal program of groundbreaking science with neutrinos.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Full Life-Cycle Defect Management Assessment: Initial Inspection Data Collection Results and Research Questions for Further Study

It is often the case in software projects that when schedule and budget resources are limited, the Verification and Validation (V&V) activities suffer. Fewer V&V activities can be afforded and moreover, short-term challenges can result in V&V activities being scaled back or dropped altogether. As a result, too often the default solution is to save activities for improving software quality until too late in the life-cycle, relying on late-term code inspections followed by thorough testing activities to reduce defect counts to acceptable levels. As many project managers realize, however, this is a resource-intensive way of achieving the required quality for software. The Full Life-cycle Defect Management Assessment Initiative, funded by NASA s Office of Safety and Mission Assurance under the Software Assurance Research Program, aims to address these problems by: Improving the effectiveness of early life-cycle V&V activities to make their benefits more attractive to team leads. Specifically, we focus on software inspection, a proven method that can be applied to any software work product, long before executable code has been developed; Better communicating this effectiveness to software development teams, along with suggestions for parameters to improve in the future to increase effectiveness; Analyzing the impact of early life-cycle V&V on the effectiveness and cost required for late life-cycle V&V activities, such as testing, in order to make the tradeoffs more apparent. This white paper reports on an initial milestone in this work, the development of a preliminary model of inspection effectiveness across multiple NASA Centers. This model contributes toward reaching our project goals by: Allowing an examination of inspection parameters, across different types of projects and different work products, for an analysis of factors that impact defect detection effectiveness. Allowing a comparison of this NASA-specific model to existing recommendations in the literature regarding how to plan effective inspections. Forming a baseline model which can be extended to incorporate factors describing: the numbers and types of defects that are missed by inspections; how such defects flow downstream through software development phases; how effectively they can be caught by testing activities in the late stages of development. The model has been implemented in a prototype web-enabled decision-support tool which allows developers to enter their inspection data and receive feedback based on a comparison against the model. The tool also allows users to access reusable materials (such as checklists) from projects included in the baseline. Both the tool itself and the model underlying it will continue to be extended throughout the remainder of this initiative. As results of analyzing inspection effectiveness for defect containment are determined, they can be shared via the tool and also via updates to existing training courses on metrics and software inspections. Moreover, the tool will help satisfy key CMMI requirements for the NASA Centers, as it will enable NASA to take a global view across peer review results for various types of projects to identify systemic problems. This analysis can result in continuous improvements to the approach to verification.

Shull, Forrest↗

High-Resolution ESM Projections for Energy Applications Over the CONUS

Assessing energy resources under future scenarios requires high-resolution meteorological information that is physically consistent and suitable for regional-scale analysis. While Earth system model (ESM) projections provide valuable large-scale information, their coarse resolution and systematic biases limit direct applicability for energy system modeling and planning. In this study, we develop a high-resolution dynamical downscaling framework based on the Weather Research and Forecasting (WRF) model to translate global-scale ESM data into energy-relevant regional projections over the contiguous United States (CONUS). The framework identifies an optimized WRF configuration through numerical experiments and evaluates raw and bias-corrected ESM initial and boundary conditions, with soil moisture (SM) and soil temperature (ST) bias correction implemented as an integral part of the bias-corrected ESM forcing to improve land-atmosphere coupling prior to WRF dynamical downscaling. Using an optimized WRF configuration at 4-km resolution, we show that raw ESM forcing introduces systematic dry and cold soil biases that propagate into pronounced warm biases in near-surface air temperature and positive biases in solar irradiance, particularly during summer. Applying bias-corrected atmospheric forcing together with bias-corrected SM and ST substantially reduces these downstream biases and improves the surface energy balance and near-surface atmospheric fields. These results demonstrate that bias-aware treatment of initial conditions is critical for producing high-resolution downscaled projections suitable for energy system modeling and planning applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Staying Current: A Community Readiness Framework for Marine Energy Applied to River Current Energy in Alaska

Marine energy-including wave, tidal, and river current energy-can provide a local energy source for rural and remote communities. Marine energy has the potential to bolster self-sufficiency and create economic opportunities while preserving ecological integrity. Communities may be interested in deploying, testing, and advancing these early-stage technologies to meet their needs. However, limited capacity, workforce constraints, and other barriers can challenge development. To better understand a community's interest in and preparedness for marine energy, we developed a suite of 150 'metrics of readiness.' Organized across seven categories-technical, social, environmental, strategic, governance, economic, financial-and 29 subcategories, the metrics provide a holistic perspective beyond the technical aspects of an energy device. We conducted a desktop application of the metrics of readiness for Igiugig, Alaska. The metrics were applied retrospectively for two points in time: before (2009) and after (2018) in-stream testing of a river current energy device. By documenting changes among categories and subcategories of the metrics, our results show the evolving nature of community readiness for river current energy. They also illustrate how our interdisciplinary framework captures the investment in environmental effects research and commitment to strategic planning that occurred in Igiugig. In future applications, we envision the framework could be used to foster public engagement in marine energy, collaborate with communities in project development, shape capacity building activities, prioritize investments, and inform research needs. While our study focuses on enabling river current energy in Alaska, the metrics of readiness have the potential to inform implementation of other renewable technologies with communities in new geographies.

13 HYDRO ENERGY↗

Implementation of the NASA Metacenter

This paper discusses the efforts to create, using two NASA SP2 supercomputers, a 'Metacenter' which includes the capability to transparently and dynamically distribute the SP2 workload across the geographically separated systems. Functional components of the Phase 1 Metacenter are identified, outstanding issues are discussed, and the plan for the second phase of the project is outlined.

Jones, James Patton↗

Solar Panel Installation at Goucher College

As part of our multi-phased sustainability initiative, Goucher College is implementing a series of necessary changes to become a model “green” campus. This comprehensive approach includes implementing systems designed to reduce energy consumption, water usage, and waste production by 2030. The first phase of this holistic endeavor is to develop two independent solar projects. One will be on the Facility Management Services building (FMS) and the other will be on the Central Utility Plan (CUP). The anticipated duration of this project is expected to be 24 months. When completed, the new photovoltaic panels (PVPs) and resulting solar array system will help offset campus energy consumption. The projects will also help the College achieve its goal of working towards operating primarily on renewable energy. During initial review of the project, it was revealed replacing the roofs prior to installing new PVPs would not only provide a sound structural foundation for the projects, but the new roofing systems will also aid de-carbonization. The project’s scope is divided between two buildings. Building A: FMS is the first building and Building B: CUP is the second building.

14 SOLAR ENERGY↗

Nascom System Development Plan: System Description, Capabilities and Plans

The NASA Communications (Nascom) System Development Plan (NSDP), reissued annually, describes the organization of Nascom, how it obtains communication services, its current systems, its relationship with other NASA centers and International Partner Agencies, some major spaceflight projects which generate significant operational communication support requirements, and major Nascom projects in various stages of development or implementation.

Source record↗

Cryo Testing of tbe James Webb Space Telescope's Integrated Science Instrument Module

The Integrated Science Instrument Module (ISIM) of the James Webb Space Telescope will be integrated and tested at the Environmental Test Facilities at Goddard Space Flight Center (GSFC). The cryogenic thermal vacuum testing of the ISIM will be the most difficult and problematic portion of the GSFC Integration and Test flow. The test is to validate the coupled interface of the science instruments and the ISIM structure and to sufficiently stress that interface while validating image quality of the science instruments. The instruments and the structure are not made from the same materials and have different CTE. Test objectives and verification rationale are currently being evaluated in Phase B of the project plan. The test program will encounter engineering challenges and limitations, which are derived by cost and technology many of which can be mitigated by facility upgrades, creative GSE, and thorough forethought. The cryogenic testing of the ISIM will involve a number of risks such as the implementation of unique metrology techniques, mechanical, electrical and optical simulators housed within the cryogenic vacuum environment. These potential risks are investigated and possible solutions are proposed.

VanCampen, Julie↗

Processing Spacecraft Data Without Confusion

Producing multiple versions of the same data product for the same time frame with the same remotely sensed inputs can be a recipe for disaster. Yet, amidst the commotion of satellite launch and early operations (LEO), such data processing is needed. After LEO, the situation gets worse. Processing newly arriving data ("forward processing") is augmented with reprocessing and algorithm development, comparison, evaluation, and testing -- often happening all at the same time. The problem can be analyzed in three main parts -- maintaining multiple versions of algorithms and data so that end-product users are not overwhelmed,allocating computer resources efficiently, and simplifying production operations so that va st amounts of data can be processed with minimal staff and fewer errors. OMIDAPS provides a framework for execution of algorithms that transform lower level data acquired by OMI on NASA's Aura satellite into higher level science data products. In contrast to traditional science data processing systems, we address all parts of the problem with an innovative approach allowing multiple data processing to run within a single physical system. The data products, imports, exports, and execution planning are all segregated into distinct "ArchiveSets." This paper describes reasons for multiple concurrent productions on a typical satellite data processing project using OMI as an example. It describes the virtual data processing system concept and its advantages over separate physical processing strings. It explores the specific implementation of the virtual systems within OMIDAPS and discusses some of the implications of our approach and describes how virtual processing is used to accomplish the overall mission of OMI data processing.

Tilmes, Curt↗

Mission Operations Planning and Scheduling System (MOPSS)

MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

Wood, Terri↗

Behavioral Health and Performance at NASA JSC: Recent Successes and Future Plan for BHP Research and Operations

The Behavioral Health and Performance discipline at NASA Johnson Space Center is organized into two distinct Divisions (Biomedical Research and Environmental Science Division and Space and Clinical Operations Division) but is integrated and interrelated in its day‐to‐day work. Ongoing operations supporting NASA's spaceflight goals benefit from the research portfolios that address risks to mission success. Similarly, these research portfolios are informed by operations to ensure investigations stay relevant given the dynamic environment of spaceflight. There are many success stories that can be presented where initial work begun as a BHP Research project, and funded through the Human Research Program, was fully implemented in operations or addressed an operational need. Examples include improving effectiveness of the debriefings used within Mission Control by the Mission Operations Directorate and countermeasures for fatigue management. There is also ongoing collaboration with research and operations for developing selection methods for future generation astronauts, and to enhance and inform the current family support function. The objective of this panel is to provide examples of recent success stories, describe areas where close collaboration is benefitting ongoing research and operations, and summarize how this will come together as NASA plans for the one year ISS mission - a unique opportunity for both BHP operations and research to learn more about preparing and supporting crewmembers for extended missions in space. The proposed panel will be comprised of six presentations, each describing a unique aspect of research or operations and the benefits to current and future spaceflight.

Leveton, L. B.↗

SOFIA Program SE and I Lessons Learned

Once a "Troubled Project" threatened with cancellation, the Stratospheric Observatory for Infrared Astronomy (SOFIA) Program has overcome many difficult challenges and recently achieved its first light images. To achieve success, SOFIA had to overcome significant deficiencies in fundamental Systems Engineering identified during a major Program restructuring. This presentation will summarize the lessons learn in Systems Engineering on the SOFIA Program. After the Program was reformulated, an initial assessment of Systems Engineering established the scope of the problem and helped to set a list of priorities that needed to be work. A revised Systems Engineering Management Plan (SEMP) was written to address the new Program structure and requirements established in the approved NPR7123.1A. An important result of the "Technical Planning" effort was the decision by the Program and Technical Leadership team to re-phasing the lifecycle into increments. The reformed SOFIA Program Office had to quickly develop and establish several new System Engineering core processes including; Requirements Management, Risk Management, Configuration Management and Data Management. Implementing these processes had to consider the physical and cultural diversity of the SOFIA Program team which includes two Projects spanning two NASA Centers, a major German partnership, and sub-contractors located across the United States and Europe. The SOFIA Program experience represents a creative approach to doing "System Engineering in the middle" while a Program is well established. Many challenges were identified and overcome. The SOFIA example demonstrates it is never too late to benefit from fixing deficiencies in the System Engineering processes.

Ray, Ronald J.↗

2018-2019 Mid-Term Credibility Plan Review

This presentation summarizes the Interagency Modeling and Analysis Group (IMAG) / Multiscale Modeling (MSM)'s Committee on Credible Practice in Modeling and Simulation in Healthcare's (CPMS) mid-term review of each MSM U01 project's progress toward fulfilling their Model Credibility plan. Generally, the model credibility reporting and update process utilized several pieces of information formatted to communicate to the uninformed reviewer/user an assessment of steps taken toward model credibility with respect to the intended use of each U01 model, as well as communicate where the more interested reviewer/user can go to find more information. The reviewers, consisting of the members of the CPMS Executive Committee, focused on the documentation and communication of each PI's credibility efforts and did not perform an assessment of the implemented credible practice given the evolving nature of the projects. In this inaugural activity, the CPMS members sought insight on how PIs may view the importance of communicating credibility, as well as how PIs interpret establishing evidence for credibility within the scope of CPMS Tens simple rules. To that end, reviewers provided feedback on documentation and communication adequacy, and, only in few rare cases, on the credible practice itself.

Myers, Jerry↗

Astrobee: Improving Capabilities for Free Flying Robotic Technology Demonstrations

The Astrobee Project has completed three years operating inside the ISS. Three Astrobee Free Flyers reached the ISS in April 2019 and are currently hosting a variety of users. During this time, Astrobee has advanced the state of the art in free-flying robots on ISS, operated over 100 sessions, logged over 750 hours of free-flyer operation, and made several capability improvements. Astrobee’s primary objective is to provide a highly flexible and capable free-flying robotic research platform to enable future guest scientist investigations. However, Astrobee is also demonstrating the feasibility of intra-vehicular robots (IVR) for performing key caretaking functions within exploration vehicles as part of NASA’s Moon-to-Mars exploration strategy. IVR capabilities will be especially vital during uncrewed mission phases. For example, current plans call for the lunar Gateway to be uncrewed >85% of the time. Astrobee’s baseline implementation supports free-flying camera and sensor survey use cases. Astrobee guest scientists can deploy software updates and hardware payloads to extend its capabilities. Astrobee is continuously improving its navigation robustness, general flight software maturity, and ISS interior maps, both through the baseline Astrobee operations and with the help of the ISAAC project. Astrobee began with mapping, localization, and operations in the Japanese Experiment Module (JEM), and has expanded to mapping in Node 2 and the US Lab. Astrobee has improved localization and operational robustness through improved mapping processes, algorithm updates (Soussan 2022) that reduce the occurrences of lost localization as well as developed recovery techniques to return to a good localization fix when loss of localization does occur. Future guest science experiments currently in development could demonstrate cargo transfer, fault isolation, free flyer and stationary robot collaboration, microgravity fluid transfer, and new docking mechanisms, among others. This presentation will focus on 1) Astrobee technical capabilities 2) What Astrobee can provide to a guest science experiment 3) Astrobee’s recent improvements 4) Possibilities for using Astrobee for future investigations. Soussan, R., Kumar, V., Coltin, B. and Smith, T. (2022) AstroLoc: An Efficient and Robust Localizer for a Free-flying Robot, Proc. Int. Conf. Rob. Autom. (ICRA) [to appear]

Astrobee↗