Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

A NEA review on innovative structural materials solutions, including advanced manufacturing processes for nuclear applications based on technology readiness assessment

The Nuclear Energy Agency (NEA) Expert Group on Innovative Structural Materials (EGISM) was established in 2008 under the guidance of the Nuclear Science Committee (NSC). Its objectives are to conduct joint and comparative studies to support the development, selection and characterisation of innovative structural materials that can be implemented in advanced nuclear fuel cycles, under long service lifetime and extreme conditions, such as high temperature, high dose/dose rate and corrosive chemical environments. In this context of growing interest and initiatives, the EGISM initiated at the beginning of 2018 an activity among its members to: Identify, in a non-exhaustive way, the currently existing programs on innovative materials and fabrication processes in NEA member countries and China; Establish a first cartography of the activities that are underway on these topics and identify common subjects and thematic; Propose a Technology Readiness Level scale to estimate the maturity of both innovative materials and fabrication processes; Carry out a reflection on what the enablers are to quickly climb this TRL scale, as well as the obstacles, in order to identify solutions to overcome them. This paper first gives definitions shared between the EGISM members on what are considered as advanced structural materials solutions. Next, some international initiatives for the accelerated development of high performance materials are presented both in non-nuclear and nuclear fields. Then, the methodology adopted for technology readiness assessment is explained. A non-exhaustive synthesis of the projects identified among the EGISM members on innovative structural materials and advanced manufacturing solutions such as additive manufacturing is presented. The TRL level of these projects is evaluated. A focus is also made on some of these projects to illustrate and explain the TRLs chosen as well as highlighting enablers or obstacles identified to climbing up the TRL scale.

36 MATERIALS SCIENCE↗

Design, Manufacture and Test of Cryotank Components

On the composite cryotank technology development (CCTD) project, the Boeing Company built two cryotanks as a means of advancing technology and manufacturing readiness levels (TRL and MRL) and lowering the risk of fabricating full-scale fuel containment vessels.1 CCTD focused on upper stage extended duration applications where long term storage of propellants is required. The project involved the design, analysis, fabrication, and test of manufacturing demonstration units (MDU), a 2.4 m (precursor) and a 5.5 m composite cryotank. Key design features included one-piece wall construction to minimize overall weight (eliminating the need for a bellyband joint), 3-dimensionally (3D) reinforced y-joint material to alleviate stress concentrations at the tank to skirt interface and a purge-able fluted core skirt to carry high axial launch loads. The tanks were made with OoA curing pre-impregnated (prepreg) carbon/epoxy (C/E) slit-tape tow (STT) that contained thin micro-crack resistant plies in the tank wall center to impede permeation. The tanks were fabricated at Boeing's Seattle-based Advanced Development Center (ADC) using RAFP and multipiece break-down tooling. The tooling was designed and built by Janicki Industries (JI) at Sedro Woolley, Washington. Tank assemblage consisted of co-bonded dome covers, one-piece fluted core skirts and mechanical fastened cover/sump. Ultrasonic inspection was performed after every cure or bond and a structural health monitoring system (SHMS) was installed to identify potential impact damage events (in-process and/or during transportation). The tanks were low temperature tested at NASA's George C. Marshall Space Flight Center (MSFC) in Huntsville, Alabama. The testing, which consisted of a sequence of fill/drain pressure and thermal cycles using LH2, was successfully concluded in 2012 on the 2.4 m tank and in 2014 on the 5.5 m tank. Structural, thermal, and permeation performance data was obtained. 2 Critical design features and manufacturing advancements, which helped to validate 25% weight and 30% cost reduction projections, were matured. These advancements will help to guide future composite tank integration activities on next generation long duration aircraft and space launch vehicles. Because CCTD addressed innovative design features, heavy lift size scale-up, multipiece captured tooling, new generation automated material placement (AMP) equipment and OoA materials, this chapter should be of interest to educators, students and manufacturers of composite hardware and flight vehicles.

McCarville, Douglas A.↗

Data Architecture for Security Monitoring (Project Summary)

The research has 2 thrusts: 1. new data architectures and tech-transfer-ready prototype tools that use write optimized data structures (WODS) to track real-world events, provide value to analysts, and support our cyber missions; and 2. algorithm research to address infinite streams of data, including expiration and sustainability.

97 MATHEMATICS AND COMPUTING↗

Low cost solar array project production process and equipment task. A Module Experimental Process System Development Unit (MEPSDU)

Technical readiness for the production of photovoltaic modules using single crystal silicon dendritic web sheet material is demonstrated by: (1) selection, design and implementation of solar cell and photovoltaic module process sequence in a Module Experimental Process System Development Unit; (2) demonstration runs; (3) passing of acceptance and qualification tests; and (4) achievement of a cost effective module.

Source record↗

MODIS Validation, Data Merger and Other Activities Accomplished by the SIMBIOS Project: 2002-2003

The purpose of this technical report is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, satellite data processing, and data product validation. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report focuses on the SIMBIOS Project s efforts in support of the Moderate-Resolution Imaging Spectroradiometer (MODIS) on the Earth Observing System (EOS) Terra platform (similar evaluations of MODIS/Aqua are underway). This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project.

Fargion, Giulietta S.↗

Synchrophasor Visual Integration and Event Evaluation for Utilities (SynchroVIEEU) with High Penetration of Renewables

The Hawaiian Electric Companies (Companies), operating independent grid systems on the islands of Oahu, Hawaii, Maui, Molokai and Lanai, have been contending with some of the highest levels of renewable generation from both utility-scale and distributed generation resources. Renewable penetration levels exceeding 50% of generation are some of the highest in the nation and are changing the system characteristics and requiring operational changes to grid management. The Companies have aggressively leveraged federal, multi-state and industry grant funding to demonstrate new technologies for monitoring, visualization, forecasting and analysis to inform transformation needs and to improve operational awareness, especially at the distribution level. As part of the American Recovery and Reinvestment Act (ARRA) supported efforts to facilitate integration of renewables, synchrophasor devices were deployed on the islands of Hawaii and Maui in 2010. The devices have potential to provide Hawaii Electric Light Company (HELCO) on Hawaii Island and Maui Electric Company (MECO) with additional information to support post-event analysis and to help quantify observed area-wide changes in voltage and frequency on the systems. Consistent with the U.S. Department of Energy’s (DOE) Office of Electricity Delivery and Energy Reliability (OE) FOA objectives, the goal of this project was to accelerate the integration of synchrophasor information into production grade data visualization and analysis platforms/models to inform timely, efficient and reliable operations of a modern grid in light of high penetrations of renewable resources. The project comprised a two-year development effort to investigate the integration and visualization of synchrophasor field data into production-ready transmission and distribution proactive modeling efforts and a common data analysis platform application currently being used by the Companies. Conceptually, the project was about getting the right data to the right people at the right time in an easily accessible and timely environment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design, Construction, and Commissioning of the RH LLW Disposal Facility at INL - 19445

The newly-commissioned Remote-Handled Low-Level Waste (RH LLW) Disposal Facility at Idaho National Laboratory (INL) provides permanent disposal capability critical for continuing INL nuclear research and Naval Reactors missions at the Idaho site. The facility mission need [critical decision (CD)- 0] was approved in 2009. Alternative selection (CD-1) was finalized in 2011. The project performance baseline (CD-2/3) was approved and design was initiated in 2014 and construction began in 2015. Construction was completed and transitioned to Materials and Fuels Complex (MFC) Operations in 2017. The facility successfully achieved readiness with authorization to begin operations (CD-4) in 2018. The $77 M line-item capital-acquisition project was completed six months ahead of the congressional commitment date and significantly under budget. This paper presents highlights of the RH LLW Disposal Facility project delivery and a summary of facility features and critical characteristics. Highlights include: - As a hazard category II nuclear facility, the project complied with United States Department of Energy (DOE) requirements for incorporation of nuclear safety into facility design and construction as identified in DOE-STD-1189 as well as 10 CFR 835 Subpart K requirements for incorporation of ALARA principles in facility design. - From an environmental compliance perspective, the facility was subject to National Environmental Policy Act requirements resulting in a Finding of No Significant Impact as determined by an Environmental Assessment. An operating disposal authorization statement from the Low-Level Waste Disposal Facility Federal Review Group (LFRG) authorizing waste disposal operations in accordance with DOE Order 435.1 was obtained. - The project was delivered using a design-build delivery method with a firm-fixed price with incentive fee contracting mechanism. The project was executed as a line-item capital-acquisition project, in full compliance with DOE Order 413.3B under INL's certified Earned Value Management System (EVMS) program. - The facility supports twenty years of waste disposal operations with five disposal vault configurations in four vault arrays supporting six different cask/canister system configurations. Three of the six cask/canister systems currently exist and three will be developed to support future operations. There are a total of 446 waste disposal vaults that will accommodate disposal of a total of 939 stainless steel radioactive waste canisters. The facility is designed to accommodate canisters with contact radiation dose rates as high as 600 Sievert/hour (60,000 Rem/hour). - The facility underwent a rigorous readiness review process in accordance with DOE Order 425.1D. Readiness activities included rigorous facility testing and shakedown activities, a management-self assessment, a contractor operational readiness review, and a DOE operational readiness review. Readiness was demonstrated for an existing cask/canister system (the MFC HFEF-5 cask). Separate readiness activities will be conducted for each cask/canister system as they are brought online for facility operations. INL's successful delivery of the project has provided waste disposal capability to ensure long-term viability of planned and current facilities and missions associated with both INL and the Naval Reactors Facility. Successful execution of the project has proven to be strategically important to future capital investments in capabilities necessary to advance INL's mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of NASA's Thermal Control System Development for Exploration Project

NASA s Constellation Program includes the Orion, Altair, and Lunar Surface Systems project offices. The first two elements, Orion and Altair, are manned space vehicles while the third element is broader and includes several subelements including Rovers and a Lunar Habitat. The upcoming planned missions involving these systems and vehicles include several risks and design challenges. Due to the unique thermal environment, many of these risks and challenges are associated with the vehicles thermal control system. NASA s Exploration Systems Mission Directorate (ESMD) includes the Exploration Technology Development Program (ETDP). ETDP consists of several technology development projects. The project chartered with mitigating the aforementioned risks and design challenges is the Thermal Control System Development for Exploration Project. The risks and design challenges are addressed through a rigorous technology development process that culminates with an integrated thermal control system test. The resulting hardware typically has a Technology Readiness Level (TRL) of six. This paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing assessments for thermal control system fluids. The current paper will provide an update to a similar overview paper published at last year s International Conference on Environmental Systems (ICES).

Stephan, Ryan A.↗

Overview of NASA's Thermal Control System Development for Exploration Project

NASA's Constellation Program includes the Orion, Altair, and Lunar Surface Systems project offices. The first two elements, Orion and Altair, are manned space vehicles while the third element is broader and includes several sub-elements including Rovers and a Lunar Habitat. The upcoming planned missions involving these systems and vehicles include several risks and design challenges. Due to the unique thermal environment, many of these risks and challenges are associated with the vehicles' thermal control system. NASA's Exploration Systems Mission Directorate (ESMD) includes the Exploration Technology Development Program (ETDP). ETDP consists of several technology development projects. The project chartered with mitigating the aforementioned risks and design challenges is the Thermal Control System Development for Exploration Project. The risks and design challenges are addressed through a rigorous technology development process that culminates with an integrated thermal control system test. The resulting hardware typically has a Technology Readiness Level (TRL) of six. This paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing assessments for thermal control system fluids.

Stephan, Ryan A.↗

Overview of ERA Integrated Technology Demonstration (ITD) 51A Ultra-High Bypass (UHB) Integration for Hybrid Wing Body (HWB)

The NASA Environmentally Responsible Aircraft Project (ERA) was a ve year project broken into two phases. In phase II, high N+2 Technical Readiness Level demonstrations were grouped into Integrated Technology Demonstrations (ITD). This paper describes the work done on ITD-51A: the Vehicle Systems Integration, Engine Airframe Integration Demonstration. Refinement of a Hybrid Wing Body (HWB) aircraft from the possible candidates developed in ERA Phase I was continued. Scaled powered, and unpowered wind- tunnel testing, with and without acoustics, in the NASA LARC 14- by 22-foot Subsonic Tunnel, the NASA ARC Unitary Plan Wind Tunnel, and the 40- by 80-foot test section of the National Full-Scale Aerodynamics Complex (NFAC) in conjunction with very closely coupled Computational Fluid Dynamics was used to demonstrate the fuel burn and acoustic milestone targets of the ERA Project.

Flamm, Jeffrey D.↗

NASA POWER: Providing Analysis-Ready, Cloud-Optimized Data for AI /ML Training and Applications in Earth Science

As global demand for sustainable development grows, the integration of Earth Observation (EO) data into decision making frameworks has become a primary objective for the scientific community. The NASA Prediction of Worldwide Energy Resources (POWER) project serves as a bridge between NASA EO data and the specialized needs of the renewable energy, sustainable infrastructure and agroclimatology communities. In this poster presentation we will present an overview of POWER data products and services along with its use in diverse research to decision-making workflows. By providing over 40 years of high-resolution historical, hourly and daily solar and meteorological data, POWER transforms satellite observations and global model reanalysis into actionable, Analysis-Ready Dataset (ARD). Currently, the project delivers over 250 industry-friendly parameters to the users from different NASA datasets like CERES SYN1Deg, MERRA-2, and IMERG alongside downscaled CMIP6 climate model data, fulfilling over 16 million requests from 50,000 unique users monthly. To ensure data quality and traceability, these parameters are rigorously validated against the ground-based observations from the Baseline Surface Radiation Network (BSRN) and the Global Surface Summary of the Day (GSOD) – these results will be discussed in the presentation. A newly introduced web-based PaRameter Uncertainty ViEwer (PRUVE) tool will be presented that provides an online validation platform to the users that benchmarks satellite-based and assimilation data products against these surface measurements. To reduce technical barriers to data adoption, POWER data is accessible through RESTful APIs, ESRI ArcGIS Image Services, a web-based Data Access Viewer tool, allowing users to visualize, validate and apply the dataset. For efficient data delivery POWER data is cloud-optimized into Zarr datastore accessible through NASA managed Amazon S3 ensures high-performance allowing users to integrate EO directly into operational pipelines. These customized services will be presented. Use cases from application will be presented from the energy sector - such as for design of generation systems, performance monitoring of solar power plants, in infrastructure sector- optimizing building energy efficiency and thermal comfort, in agriculture – such as driving crop simulation and yield forecasting models to enable climate resilient farming. Furthermore, the shift toward machine learning (ML) in EO research that has positioned POWER as a key provider for training datasets which will be discussed. Use-cases will be presented to showcase how NASA data is enabling the development of predictive tools for climate variability and resource management. The poster will present POWER’s future plans including technology development to enhance data traceability and reproducibility and improving I/O performance to support the rapid integration of new EO products, ensuring that POWER remains a robust scalable backend for the evolving landscape of AI-driven Earth Science. Additionally, POWER is developing an AI Agent and an MCP-Server to enable industry AI-Agentic workflows.

Neha Khadka↗

Heatshield for Extreme Entry Environment Technology (HEEET) Thermal Protection System (TPS)

Over the last 5 years, the Heatshield for Extreme Entry Environment Technology (HEEET) project has been working to mature a 3-D Woven Thermal Protection System (TPS) to Technical Readiness Level (TRL) 6 to support future NASA missions to destinations with extreme entry environments such as Venus, Saturn, Uranus, Neptune and high speed sample return missions to Earth. A key aspect of the project has been the building and testing of a 1-meter base diameter Engineering Test Unit (ETU) representative of what could be used for a Saturn probe. This paper provides a high level overview of the HEEET project including manufacturing and testing of the ETU which has been subjected to mission relevant thermal and mechanical loads, to verify structural models, establish system capability and verify manufacturing workmanship.

TPS↗

Overview of Heatshield for Extreme Entry Environment Technology (HEEET)

The objective of the Heatshield for Extreme Entry Environment Technology (HEEET) projects is to mature a 3-D Woven Thermal Protection System (TPS) to Technical Readiness Level (TRL) 6 to support future NASA missions to destinations such as Venus and Saturn. Destinations that have extreme entry environments with heat fluxes > 3500 W/cm2 and pressures up to 5 atmospheres, entry environments that NASA has not flown since Pioneer-Venus and Galileo. The scope of the project is broad and can be split into roughly four areas, Manufacturing/Integration, Structural Testing and Analysis, Thermal Testing and Analysis and Documentation. Manufacturing/Integration covers from raw materials, piece part fabrication to final integration on a 1-meter base diameter 45-degree sphere cone Engineering Test Unit (ETU). A key aspect of the project was to transfer as much of the manufacturing technology to industry in preparation to support future mission infusion. The forming, infusion and machining approaches were transferred to Fiber Materials Inc. and FMI then fabricated the piece parts from which the ETU was manufactured. The base 3D-woven material consists of a dual layer weave with a high-density outer layer to manage recession in the system and a lower density, lower thermal conductivity inner layer to manage the heat load. At the start of the project it was understood that due to weaving limitations the heat shield was going to be manufactured from a series of tiles. And it was recognized that the development of a seam solution that met the structural and thermal requirements of the system was going to be the most challenging aspect of the project. It was also recognized that the seam design would drive the final integration approach and therefore the integration of the ETU was kept in-house within NASA. A final seam concept has been successfully developed and implemented on the ETU. The structural testing and analysis covers from characterization of the different layers of the infused material as functions of weave direction and temperature to sub-component level testing such as 4pt bend testing at sub-ambient and elevated temperature and culminates in testing of the ETU results from which will validate the structural models developed using the element and sub-component level tests. Given the seam has to perform both structurally and aerothermally during entry a novel 4pt bend test fixture was developed allowing articles to be tested while the front surface is heated with a laser. These tests are being utilized to establish the systems structural capability during entry.A broad range of aerothermal tests (arcjet tests) were performed to develop material response models for predicting the required TPS thickness to meet a missions needs and to evaluate failure modes and establish the capability of the system. The final aspect of the project is to develop a comprehensive Design and Data Book such that a future mission will have the information necessary to adopt the technology. This presentation will provide an overview for each of these areas and argue that HEEET has successfully achieved TRL 6.

HEEET↗

Airframe Research and Technology for Hypersonic Airbreathing Vehicles

The Hypersonics Investment Area (HIA) within NASA's Advanced Space Transportation Program (ASTP) has the responsibility to develop hypersonic airbreathing vehicles for access to space. The Airframe Research and Technology (AR and T) Project, as one of six projects in the HIA, will push the state-of-the-art in airframe and vehicle systems for low-cost, reliable, and safe space transportation. The individual technologies within the project are focused on advanced, breakthrough technologies in airframe and vehicle systems and cross-cutting activities that are the basis for improvements in these disciplines. Both low and medium technology readiness level (TRL) activities are being pursued. The key technical areas that will be addressed by the project include analysis and design tools, integrated vehicle health management (IVHM), composite (polymer, metal, and ceramic matrix) materials development, thermal/structural wall concepts, thermal protection systems, seals, leading edges, aerothermodynamics, and airframe/propulsion flowpath technology. Each of the technical areas or sub-projects within the Airframe R and T Project is described in this paper.

Glass, David E.↗

Heatshield for Extreme Entry Environment Technology (HEEET) Thermal Protection System (TPS)

Starting in 2013 and completing in 2019, the Heatshield for Extreme Entry Environment Technology (HEEET) project has been working to mature a 3-D Woven Thermal Protection System (TPS) to Technical Readiness Level (TRL) 6 to support future NASA missions to destinations with extreme entry environments such as Venus, Saturn, Uranus, Neptune and high-speed sample return missions to Earth. A key aspect of the project has been the building and testing of a 1-meter base diameter Engineering Test Unit (ETU) representative of what could be used for a Saturn probe. This paper provides a high-level overview of the HEEET project including manufacturing and testing of the ETU for structural model verification, establish system capability and verify manufacturing workmanship.

Extreme Entry Environment↗

Securing Grid-interactive Efficient Buildings (GEB) through Cyber Defense and Resilient System (CYDRES)

The DOE CYDRES project is driven by the urgent need to address critical research gaps in the domain of cyber-physical security of smart buildings, including Grid-interactive Efficient Buildings (GEBs). CYDRES, a real-time advanced building resilient platform, aims to enhance the cyber-attack-immune capabilities of buildings through multi-layered prevention, detection, and adaptation mechanisms. CYDRES consists of five key modules: a multi-layer network analyzer, an Automatic Fault Detection, Diagnosis, and Prognosis (AFDDP) framework, an intelligent mode selector, a cyber-resilient control framework, and a situation awareness platform. The Network Analyzer employs a data-driven framework that includes a protocol state learning tool and a CRF (Conditional Random Field) command validator. In Hardware-In-the-Loop (HIL) testbeds, it achieved 100% detection accuracy with a false alarm rate of 3%, validating its efficacy in identifying selected cyber-attacks. The AFDDP framework leverages pattern matching, PCA (Principal Component Analysis)-based strategies, and a DBN (Dynamic Bayesian Network)-based fault diagnosis approach to pinpoint the causes of physical system abnormalities using Building Automation System (BAS) data. In HIL experiments, the AFDDP module attained a detection accuracy of over 95% with a false alarm rate below 7%. Additionally, the fault detector utilized machine learning (Random Forest) and deep learning (Multi-Layer Perceptron) methods with acoustic sensor data to achieve a 100% fault detection accuracy in Heating, Ventilation, and Air-Conditioning (HVAC) equipment. The Mode Selector offered real-time impact analysis, allowing immediate actions to protect BASs in the face of emerging threats. The cyber-resilient control framework included an adaptive Model Predictive Control (MPC) and a measurement compensator, reducing temperature violations by up to 94% and improving the total demand flexibility by up to 70% in HIL experiments. Such HIL experiments covered a cyber-attack case and a physical fault case, showcasing CYDRES’ efficiency in maintaining operational continuity during threats. The situation awareness platform in Grafana enhanced real-time threat detection and response visualization, augmenting the operational awareness for building operators. CYDRES demonstrated high technical effectiveness in various test scenarios, particularly in HIL environments. The project's phased development approach ensured efficient use of resources, highlighting its practical feasibility and readiness for commercialization. By enhancing the security and resilience of building operations, CYDRES represents a significant advance in mitigating risks associated with cyber-physical systems, thereby enhancing public confidence in the safety of modern building infrastructure. Future directions for the project include expanding testing protocols, refining AFDDP methodologies, exploring more comprehensive resilient control strategies, and testing in real commercial buildings.

42 ENGINEERING↗

Overview of Heatshield for Extreme Entry Environment Technology (HEEET)

The objective of the Heatshield for Extreme Entry Environment Technology (HEEET) projects is to mature a 3-D Woven Thermal Protection System (TPS) to Technical Readiness Level (TRL) 6 to support future NASA missions to destinations such as Venus and Saturn. Destinations that have extreme entry environments with heat fluxes > 3500 W/sq cm and pressures up to 5 atmospheres, entry environments that NASA has not flown since Pioneer-Venus and Galileo. The scope of the project is broad and can be split into roughly four areas, Manufacturing/Integration, Structural Testing and Analysis, Thermal Testing and Analysis and Documentation. Manufacturing/Integration covers from raw materials, piece part fabrication to final integration on a 1-meter base diameter 45-degree sphere cone Engineering Test Unit (ETU). A key aspect of the project was to transfer as much of the manufacturing technology to industry in preparation to support future mission infusion. The forming, infusion and machining approaches were transferred to Fiber Materials Inc. and FMI then fabricated the piece parts from which the ETU was manufactured.

Thermal Protection System↗

Design and Construction of a High Field Cable Test Facility at Fermilab

Fermi National Accelerator Laboratory, together with Lawrence Berkeley National Laboratory, is building a new High Field Vertical Magnet Test Facility (HFVMTF) to be situated in the Magnet Test Facility at Fermilab. The HFVMTF is jointly funded by the US DOE Offices of Science, High Energy Physics, and Fusion Energy Sciences, and will serve as a superconducting cable test facility for both communities. The background magnetic field for test samples is 15 T and will be produced by a magnet provided by LBNL operating at 1.9 K in superfluid helium. The samples will be placed in the background magnetic field, cooled to between 4.5 K and a user-specified upper limit, and will be powered with a super-conducting transformer at up to 100 kA. Additionally, this facility will be used to test high-field superconducting magnet models and demonstrators, including hybrid magnets, produced by the US Magnet Development Program. Presently, the various tasks of the project are at different stages of execution, from conceptual to ready-for-construction designs. Here, this paper describes the parameters and design status of the pit construction, cryostat, heat exchanger, lambda plate, power system, and quench protection and monitoring systems of the facility.

43 PARTICLE ACCELERATORS↗