Search NASA⌕ Search

SEARCH · Search NASA

Results for “ROCKET BOOSTER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Methods and Techniques for Risk Prediction of Space Shuttle Upgrades

Since the Space Shuttle Accident in 1986, NASA has been trying to incorporate probabilistic risk assessment (PRA) in decisions concerning the Space Shuttle and other NASA projects. One major study NASA is currently conducting is in the PRA area in establishing an overall risk model for the Space Shuttle System. The model is intended to provide a tool to predict the Shuttle risk and to perform sensitivity analyses and trade studies including evaluation of upgrades. Marshall Space Flight Center (MSFC) and its prime contractors including Pratt and Whitney (P&W) are part of the NASA team conducting the PRA study. MSFC responsibility involves modeling the External Tank (ET), the Solid Rocket Booster (SRB), the Reusable Solid Rocket Motor (RSRM), and the Space Shuttle Main Engine (SSME). A major challenge that faced the PRA team is modeling the shuttle upgrades. This mainly includes the P&W High Pressure Fuel Turbopump (HPFTP) and the High Pressure Oxidizer Turbopump (HPOTP). The purpose of this paper is to discuss the various methods and techniques used for predicting the risk of the P&W redesigned HPFTP and HPOTP.

Hoffman, Chad R.↗

An Overview of Quantitative Risk Assessment of Space Shuttle Propulsion Elements

Since the Space Shuttle Challenger accident in 1986, NASA has been working to incorporate quantitative risk assessment (QRA) in decisions concerning the Space Shuttle and other NASA projects. One current major NASA QRA study is the creation of a risk model for the overall Space Shuttle system. The model is intended to provide a tool to estimate Space Shuttle risk and to perform sensitivity analyses/trade studies, including the evaluation of upgrades. Marshall Space Flight Center (MSFC) is a part of the NASA team conducting the QRA study; MSFC responsibility involves modeling the propulsion elements of the Space Shuttle, namely: the External Tank (ET), the Solid Rocket Booster (SRB), the Reusable Solid Rocket Motor (RSRM), and the Space Shuttle Main Engine (SSME). This paper discusses the approach that MSFC has used to model its Space Shuttle elements, including insights obtained from this experience in modeling large scale, highly complex systems with a varying availability of success/failure data. Insights, which are applicable to any QRA study, pertain to organizing the modeling effort, obtaining customer buy-in, preparing documentation, and using varied modeling methods and data sources. Also provided is an overall evaluation of the study results, including the strengths and the limitations of the MSFC QRA approach and of qRA technology in general.

Safie, Fayssal M.↗

The aerodynamic challenges of SRB recovery

Recovery and reuse of the Space Shuttle solid rocket boosters was baselined to support the primary goal to develop a low cost space transportation system. The recovery system required for the 170,000-lb boosters was for the largest and heaviest object yet to be retrieved from exoatmospheric conditions. State-of-the-art design procedures were ground-ruled and development testing minimized to produce both a reliable and cost effective system. The ability to utilize the inherent drag of the boosters during the initial phase of reentry was a key factor in minimizing the parachute loads, size and weight. A wind tunnel test program was devised to enable the accurate prediction of booster aerodynamic characteristics. Concurrently, wind tunnel, rocket sled and air drop tests were performed to develop and verify the performance of the parachute decelerator subsystem. Aerodynamic problems encountered during the overall recovery system development and the respective solutions are emphasized.

Bacchus, D. L.↗

Probabilistic failure assessment with application to solid rocket motors

A quantitative methodology is being developed for assessment of risk of failure of solid rocket motors. This probabilistic methodology employs best available engineering models and available information in a stochastic framework. The framework accounts for incomplete knowledge of governing parameters, intrinsic variability, and failure model specification error. Earlier case studies have been conducted on several failure modes of the Space Shuttle Main Engine. Work in progress on application of this probabilistic approach to large solid rocket boosters such as the Advanced Solid Rocket Motor for the Space Shuttle is described. Failure due to debonding has been selected as the first case study for large solid rocket motors (SRMs) since it accounts for a significant number of historical SRM failures. Impact of incomplete knowledge of governing parameters and failure model specification errors is expected to be important.

Jan, Darrell L.↗

Scaled Rocket Testing in Hypersonic Flow

NASA's Space Launch System (SLS) uses four clustered liquid rocket engines along with two solid rocket boosters. The interaction between all six rocket exhaust plumes will produce a complex and severe thermal environment in the base of the vehicle. This work focuses on a recent 2% scale, hot-fire SLS base heating test. These base heating tests are short-duration tests executed with chamber pressures near the full-scale values with gaseous hydrogen/oxygen engines and RSRMV analogous solid propellant motors. The LENS II shock tunnel/Ludwieg tube tunnel was used at or near flight duplicated conditions up to Mach 5. Model development was strongly based on the Space Shuttle base heating tests with several improvements including doubling of the maximum chamber pressures and duplication of freestream conditions. Detailed base heating results are outside of the scope of the current work, rather test methodology and techniques are presented along with broader applicability toward scaled rocket testing in supersonic and hypersonic flow.

Dufrene, Aaron↗

Space Launch System Base Heating Test: Experimental Operations & Results

NASA's Space Launch System (SLS) uses four clustered liquid rocket engines along with two solid rocket boosters. The interaction between all six rocket exhaust plumes will produce a complex and severe thermal environment in the base of the vehicle. This work focuses on a recent 2% scale, hot-fire SLS base heating test. These base heating tests are short-duration tests executed with chamber pressures near the full-scale values with gaseous hydrogen/oxygen engines and RSRMV analogous solid propellant motors. The LENS II shock tunnel/Ludwieg tube tunnel was used at or near flight duplicated conditions up to Mach 5. Model development was based on the Space Shuttle base heating tests with several improvements including doubling of the maximum chamber pressures and duplication of freestream conditions. Test methodology and conditions are presented, and base heating results from 76 runs are reported in non-dimensional form. Regions of high heating are identified and comparisons of various configuration and conditions are highlighted. Base pressure and radiometer results are also reported.

Dufrene, Aaron↗

Historical perspectives on Apollo.

Apollo historical perspectives, background to U.S. man on moon decision in mid-1961, rocket booster development and space mobility

NASA PROGRAM↗

Solid Rocket Motor for the Space Shuttle Booster

The Solid Rocket Motor (SRM) for the Space Shuttle Solid Rocket Booster (SRB) is being developed by Thiokol Corporation, Wasatch Division under the cognizance of Marshall Space Flight Center (MSFC), Contract NAS8-30490. Solid Rocket Motor requirements are summarized, and the overall SRM configuration and performance characteristics are presented in this paper. Design details of the major SRM components are reviewed and the approach taken in each component area is identified and related to previous industry experience. The overall scope of the SRM Project is presented. Activities on the project since authorization to proceed in June 1974 are reviewed. A summary schedule is presented which relates key SRM Project activities to the overall Shuttle Program.

Thirkill, J.↗

Satellite Power Systems (SPS) Space Transportation Workshop Summary

Space transportation requirements are major elements in the technical and economic realization of the entire SPS concept. First, steps in enhancing the shuttle include the Titan based liquid boost module (LBM) and liquid propellant boosters (LPB) to replace the present solid rocket boosters (SRB). The next choice between new ballistic or winged boosters must still be made; as well as the choice between series (staged) and parallel operation. Entirely new vehicles of large size are required before the economic and environmental problems of the prototype, or even demonstration, SPS can be resolved. Social impacts such as noise, and atmospheric pollution, locally and in the ionosphere, must be fully addressed. Although rather advanced technology and well developed operational management is required to properly target the average cost of gross cargo payloads into LEO at 30 $ (1979)/kg for the construction of the initial SPS, the further goal for repetitive construction of 30 to 60 SPS at 15 $ (1979)/kg for all operational payloads require the use of very advanced, long lived vehicles with a sophisticated operational organization using off shore, equatorial launch sites.

Layton, J. P.↗

External Payload Carrier (XPC) A Suborbital Research Platform

This slide presentation details the concept of an External Payload Carrier (XPC), that can fly on ann unused Solid Rocket Booster (SRB) location on the Atlas V rocket to suborbital environment. The XPC can be used anytime there is sufficient excess lift capability available. The dimensions and possible uses of the XPC are reviewed. The completed Phase 1 study reviewed 57 variations, and arrived at three viable configurations, identified design baselines, subsystems and preliminary testing requirements. Phase II effort is planned to produce the preliminary design (i.e., PDR level), Systems Requirements Document (SRD), identify flight candidates, develop schedule and funding profiles, and identify the risk-reduction activities.

Schallhorn, Paul↗

Advances in high chamber pressure propulsion

NASA has been involved in the development of improved high thrust booster rocket engines to meet the propulsion requirements of launch vehicles such as the Space Shuttle. Solutions that NASA/Marshall Space Flight Center pursued to accomplish the high performance, long life goals set for SSME are discussed. In addition, currently projected requirements for liquid rocket engines have identified liquid oxygen/hydrocarbon-fueled engines for booster application in the near future. These advanced hydrocarbon-fueled engines will require improvements in performance and life to be suitable for their projected missions. Raising chamber pressure to increase performance and reduce engine envelope are the key objectives in hydrocarbon-fueled engine technology. This paper traces the history of advances in high pressure rocket engine systems and the challenges it presents.

Mccool, A. A.↗

Space vehicle

A space vehicle having an improved ascent configuration for use in traveling in space is presented. Components of the vehicle are: (1) a winged orbiter having an elongater fuselage and rearwardly directed main engines fixed to the fuselage; (2) an elongated tank assembly of an improved configuration disposed forwardly of the fuselage and connected with the main engines of the vehicle for supplying liquid propellants; and (3) a booster stage comprising a pair of integrated solid rocket boosters connected with the orbiter immediately beneath the fuselage and extended in substantial parallelism.

Vonpragenau, G. L.↗

STS-99 Crew Activities Report/Flight Day 1 Highlights

Live footage shows the crew, Commander Kevin R. Kregel, Pilot Dominic L. Pudwill Gorie, and Mission Specialists Janet L. Kavandi, Janice E. Voss, Mamoru Mohri and Gerhard P.J. Thiele, seated in the dining room with the traditional cake. The crew is seen performing various pre-launch activities including suit-up, walk out to the Astro-van, and strap-in into the vehicle. Also seen are the retractions of the orbiter access arm and the gaseous oxygen mint hood, main engine start, booster ignition, liftoff, and separation of the solid rocket boosters. The Red Team (first of the dual shift crew) includes Kregel, Kavandi, and Thiele, who are shown conducting jet thruster firings, activating radar instruments, and deploying the boom (mass).

Source record↗

Shuttle Upgrade Using 5-Segment Booster (FSB)

In support of NASA's continuing effort to improve the over-all safety and reliability of the Shuttle system- a 5-segment booster (FSB) has been identified as an approach to satisfy that overall objective. To assess the feasibility of a 5-segment booster approach, NASA issued a feasibility study contract to evaluate the potential of a 5-segment booster to improve the overall capability of the Shuttle system, especially evaluating the potential to increase the system reliability and safety. In order to effectively evaluate the feasibility of the 5-segment concept, a four-member contractor team was established under the direction of NASA Marshall Space Flight Center (MSFC). MSFC provided the overall program oversight and integration as well as program contractual management. The contractor team consisted of Thiokol, Boeing North American Huntington Beach (BNA), Lockheed Martin Michoud Space Systems (LMMSS) and United Space Alliance (USA) and their subcontractor bd Systems (Control Dynamics Division, Huntsville, AL). United Space Alliance included the former members of United Space Booster Incorporated (USBI) who managed the booster element portion of the current Shuttle solid rocket boosters. Thiokol was responsible for the overall integration and coordination of the contractor team across all of the booster elements. They were also responsible for all of the motor modification evaluations. Boeing North American (BNA) was responsible for all systems integration analyses, generation of loads and environments. and performance and abort mode capabilities. Lockheed Martin Michoud Space Systems (LMMSS) was responsible for evaluating the impacts of any changes to the booster on the external tank (ET), and evaluating any design changes on the external tank necessary to accommodate the FSB. USA. including the former USBI contingent. was responsible for evaluating any modifications to facilities at the launch site as well as any booster component design modifications.

Sauvageau, Donald R.↗

Space shuttle booster separation motor design

The separation characteristics of the space shuttle solid rocket boosters (SRBs) are introduced along with the system level requirements for the booster separation motors (BSMs). These system requirements are then translated into specific motor requirements that control the design of the BSM. Each motor component is discussed including its geometry, material selection, and fabrication process. Also discussed is the propellant selection, grain design, and performance capabilities of the motor. The upcoming test program to develop and qualify the motor is outlined.

Smith, G. W.↗

Update on Risk Reduction Activities for a Liquid Advanced Booster for NASA's Space Launch System

Goals of NASA's Advanced Booster Engineering Demonstration and/or Risk Reduction (ABEDRR) are to: (1) Reduce risks leading to an affordable Advanced Booster that meets the evolved capabilities of SLS. (2) Enable competition by mitigating targeted Advanced Booster risks to enhance SLS affordability. SLS Block 1 vehicle is being designed to carry 70 mT to LEO: (1) Uses two five-segment solid rocket boosters (SRBs) similar to the boosters that helped power the space shuttle to orbit. Evolved 130 mT payload class rocket requires an advanced booster with more thrust than any existing U.S. liquid-or solid-fueled boosters

Crocker, Andy↗