Search NASA⌕ Search

SEARCH · Search NASA

Results for “SRB”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

An investigation of drag reduction fairings on the space shuttle vehicle 5 configuration (model 74-OTS) in the MSFC 14 inch trisonic wind tunnel (FA14)

An experimental investigation was conducted in the MSFC 14-inch TWT (FA14, TWT 600) to determine the static stability and drag on a 0.004 scale model of the shuttle ascent configuration. The primary objective was to study the possibility of reducing the launch vehicle drag by using Orbiter/ET/SRB fairings, streamlined orbiter fore and aft attach structures, SRB and ET alternative nose configurations, and devices for modifying the flow between the orbiter and ET. The secondary objective was to determine the longitudinal and directional characteristics of the ascent configuration with the most promising of the drag reduction devices installed. Data were obtained for a Mach number range of 0.6 through 4.96 and angles of attack from -5 through 5 degrees at zero degrees side slip angle.

Ramsey, P. E.↗

Solid rocket booster thermal radiation model. Volume 2: User's manual

A user's manual was prepared for the computer program of a solid rocket booster (SRB) thermal radiation model. The following information was included: (1) structure of the program, (2) input information required, (3) examples of input cards and output printout, (4) program characteristics, and (5) program listing.

Lee, A. L.↗

Space Shuttle noise suppression concepts for the Eastern Test Range

The basic objectives of the Space Shuttle noise suppression program for the Eastern Test Range were the definition of the acoustic environment of the Shuttle and the adjacent ground plane for both on-pad and liftoff conditions and the definition of realistic noise suppression techniques and modification of the launch facility that could reduce engine noise associated with supersonic flow. Scaling considerations for acoustic model testing based on the principle of dynamic similarity are detailed. Suppression approaches are described with emphasis placed on barriers and shields: exhaust flow trench covers, solid dividers between the SSME and SRB exhaust flows and a crossed pipe water injection system over the SSME exhaust flow trench. Graphs are presented summarizing noise data gathered for various noise sources and using different suppression approaches.

Guest, S. H.↗

Solid rocket booster performance evaluation model. Volume 3: Sample case

The solid rocket booster performance evaluation model (SRB-11) is used to predict internal ballistics in a sample motor. This motor contains a five segmented grain. The first segment has a 14 pointed star configuration with a web which wraps partially around the forward dome. The other segments are circular in cross-section and are tapered along the interior burning surface. Two of the segments are inhibited on the forward face. The nozzle is not assumed to be submerged. The performance prediction is broken into two simulation parts: the delivered end item specific impulse and the propellant properties which are required as inputs for the internal ballistics module are determined; and the internal ballistics for the entire burn duration of the motor are simulated.

Source record↗

EDIN design study alternate space shuttle booster replacement concepts. Volume 1: Engineering analysis

The use of a recoverable liquid rocket booster (LRB) system to replace the existing solid rocket booster (SRB) system for the shuttle was studied. Historical weight estimating relationships were developed for the LRB using Saturn technology and modified as required. Mission performance was computed using February 1975 shuttle configuration groundrules to allow reasonable comparison of the existing shuttle with the study designs. The launch trajectory was constrained to pass through both the RTLS/AOA and main engine cut off points of the shuttle reference mission 1. Performance analysis is based on a point design trajectory model which optimizes initial tilt rate and exoatmospheric pitch profile. A gravity turn was employed during the boost phase in place of the shuttle angle of attack profile. Engine throttling add/or shutdown was used to constrain dynamic pressure and/or longitudinal acceleration where necessary. Four basic configurations were investigated: a parallel burn vehicle with an F-1 engine powered LRB; a parallel burn vehicle with a high pressure engine powered LRB; a series burn vehicle with a high pressure engine powered LRB. The relative sizes of the LRB and the ET are optimized to minimize GLOW in most cases.

Demakes, P. T.↗

Space Shuttle - Now and later

The Space Shuttle System consisting of four major elements, the orbiter, three main engines, an expendable external tank, and solid rocket boosters is examined. Dimensions, thrust and payload capacity are observed, noting cost reduction through recovery and subsequent reuse of some components. Return of the solid rocket boosters (SRB's) via parachute and recovery from the ocean for refurbishment is covered. Objectives for the first mission scheduled for November 1979 include achieving a 150 nautical mile orbit and carrying a payload consisting of development flight instrumentation (DFI), the induced environment contamination monitor (IECM), and the aerodynamic coefficients identification package (ACIP). A section devoted to performance enhancement, discusses weight reduction on the orbiter, external tanks and thrust augmentation through the use of strap on solid motors (SOSM).

Malkin, M. S.↗

Space Shuttle solid rocket booster

Details of the design, operation, testing and recovery procedures of the reusable solid rocket boosters (SRB) are given. Using a composite PBAN propellant, they will provide the primary thrust (six million pounds maximum at 20 s after ignition) within a 3 g acceleration constraint, as well as thrust vector control for the Space Shuttle. The drogues were tested to a load of 305,000 pounds, and the main parachutes to 205,000. Insulation in the solid rocket motor (SRM) will be provided by asbestos-silica dioxide filled acrylonitrile butadiene rubber ('asbestos filled NBR') except in high erosion areas (principally in the aft dome), where a carbon-filled ethylene propylene diene monomer-neopreme rubber will be utilized. Furthermore, twenty uses for the SRM nozzle will be allowed by its ablative materials, which are principally carbon cloth and silica cloth phenolics.

Hardy, G. B.↗

Evaluation of several corrosion protective coating systems on aluminum

A study of several protective coating systems for use on aluminum in seawater/seacoast environments was conducted to review the developments made on protective coatings since early in the Space Shuttle program and to perform comparative studies on these coatings to determine their effectiveness for providing corrosion protection during exposure to seawater/seacoast environments. Panels of 2219-T87 aluminum were coated with 21 different systems and exposed to a 5 percent salt spray for 4000 hr. Application properties, adhesion measurements, heat resistance and corrosion protection were evaluated. For comparative studies, the presently specified Bostik epoxy system used on the SRB structures was included. Results of these tests indicate four systems with outstanding performance and four additional systems with protection almost as good. These systems are based on a chromated pretreatment, a chromate epoxy primer, and a polyurethane topcoat. Consideration for one of these systems should be included for those applications where superior corrosion protection for aluminum surfaces is required.

Higgins, R. H.↗

Solid rocket booster thrust vector control V-2 off-nominal testing

The results of the V-2 off nominal test sequence performed on the space shuttle solid rocket booster thrust vector control (SRB TVC) system are reported. The TVC subsystem was subjected to 19 off nominal test conditions. The test sequence consisted of: 8 burp starts, 30 hot firings, 14 GN2 spin tests, and 3 servicing passive system tests. It is concluded that the TVC subsystem operated nominally in response to the given commands and test conditions. Test objectives, detail results, and data are included.

Pagan, B.↗

The Space Shuttle as an educational tool

The paper discusses the impact of the Space Transportation System (STS) and the Space Shuttle on the science educational community and gives an overview of past space education programs. Construction of four flight 'Orbiters' (Columbia, Challenger, Discovery, and Atlantis) is being planned, with each Orbiter containing an External Tank (ET) to power the Orbiter's main engines, and two solid rocket boosters (SRB). Each Orbiter can carry a crew of seven, has a cargo bay for 65,000 lb of satellites and scientific equipment, and has an average flight duration of up to 7 days. NASA educational programs reviewed are the Skylab Student Program, the 'Getaway Special' Program, and the Shuttle Student Involvement Project for Secondary Schools (SSIP-S), as well as ESA programs including the Educational Physics Experiments in Spacelab and the Access to Spacelab for Young Europeans Program. A 'Classroom in Space' and 'Space University' have been proposed for the future.

David, L. W.↗

Satellite Power Systems (SPS) Space Transportation Workshop Summary

Space transportation requirements are major elements in the technical and economic realization of the entire SPS concept. First, steps in enhancing the shuttle include the Titan based liquid boost module (LBM) and liquid propellant boosters (LPB) to replace the present solid rocket boosters (SRB). The next choice between new ballistic or winged boosters must still be made; as well as the choice between series (staged) and parallel operation. Entirely new vehicles of large size are required before the economic and environmental problems of the prototype, or even demonstration, SPS can be resolved. Social impacts such as noise, and atmospheric pollution, locally and in the ionosphere, must be fully addressed. Although rather advanced technology and well developed operational management is required to properly target the average cost of gross cargo payloads into LEO at 30 $ (1979)/kg for the construction of the initial SPS, the further goal for repetitive construction of 30 to 60 SPS at 15 $ (1979)/kg for all operational payloads require the use of very advanced, long lived vehicles with a sophisticated operational organization using off shore, equatorial launch sites.

Layton, J. P.↗

Integration and software for thermal test of heat rate sensors

A minicomputer controlled radiant test facility is described which was developed and calibrated in an effort to verify analytical thermal models of instrumentation islands installed aboard the space shuttle external tank to measure thermal flight parameters during ascent. Software was provided for the facility as well as for development tests on the SRB actuator tail stock. Additional testing was conducted with the test facility to determine the temperature and heat flux rate and loads required to effect a change of color in the ET tank external paint. This requirement resulted from the review of photographs taken of the ET at separation from the orbiter which showed that 75% of the external tank paint coating had not changed color from its original white color. The paint on the remaining 25% of the tank was either brown or black, indicating that it had degraded due to heating or that the spray on form insulation had receded in these areas. The operational capability of the facility as well as the various tests which were conducted and their results are discussed.

Wojciechowski, C. J.↗

Space Shuttle program orbital flight test program results and implications

The Space Shuttle System Orbital Flight Test (OFT) program results are described along with an overview of significant development issues and their resolution. In addition, an overall summary of the development status and the follow-on flight demonstrations of Shuttle improvements such as Lightweight External Tank, High Performance SRBs, Full Power Level (109%) Main Engine Operation, and the SRB Filament Wound Case (FWC) will be discussed.

Kohrs, R. H.↗

Atmospheric environment for Space Shuttle (STS-4) launch

Selected atmospheric conditions observed near space shuttle STS-4 launch time on June 27, 1982, at Kennedy Space Center, Florida are summarized. Values of ambient pressure, temperature, moisture, ground winds, visual observations (cloud), and winds aloft are included. The sequence of prelaunch Jimsphere measured vertical wind profiles is given as well as the wind and thermodynamic parameters measured at the surface and aloft in the SRB descent/impact ocean area. Final meteorological tapes, which consist of wind descent were constructed. The STS-4 ascent meteorological data tape was constructed by Marshall Space Flight Center in response to shuttle task agreement No. 989-13-22-368 with Johnson Space Center.

Johnson, D. L.↗

Shuttle derived vehicle analysis solid booster unmanned launch vehicle concept definition study, volume 2

The technical effort associated with the selection and definition of the recommended SRB-X concept is documented. Included are discussions concerning the trades leading to the selected concept, the analysis that established the concept's basic subsystem characteristics, selected configuration description and performance capabilities, launch site operations and facility needs, development schedule, cost characteristics, risk assessment, and a cursory comparison with other launch systems.

Source record↗

Range safety signal attenuation by the Space Shuttle main engine exhaust plumes

An analysis of attenuation of the range safety signal at 416.5 MHz observed after SRB separation and ending at hand over to Bermuda, during which transmission must pass through the LOX/H2 propelled main engine exhaust plumes, is summarized. Absorption by free electrons in the exhaust plume can account for the nearly constant magnitude of the observed attenuation during this period; it does not explain the short term transient increases that occur at one or more times during this portion of the flight. It is necessary to assume that a trace amount (about 0.5 ppm) of easily ionizable impurity must be present in the exhaust flow. Other mechanisms of attenuation, such as scattering by turbulent fluctuations of both free and bound electrons and absorption by water vapor, were examined but found to be inadequate to explain the observations.

Pearce, B. E.↗

Materials investigation of STS-3 parachute failure

Main parachute, No. 2 of SRB A-12 on STS-3, sustained damage during deployment or initial inflation that resulted in its collapse and failure to sustain load. During an investigation of the materials from this parachute, optical and scanning electron microscope analyses were conducted. This examination identified stains and abrasions on vent lines that appear to have been a result of friction contact with its flotation bag lanyard. Mechanical testing of the vent band indicated a reduction in strength of 37 percent obviously due to structural overload, heat, and ocean water exposure. It is concluded from this and other available data that entanglement of parachutes No. 1 and No. 2 during deployment caused adequate structural damage to main parachute No. 2 to render it unable to carry load.

Nichols, R. L.↗

Atmospheric environment for Space Shuttle (STS-7) launch

Selected atmospheric conditions observed near Space Shuttle STS-7 launch time on June 18, 1983, at Kennedy Space Center, Florida are summarized. Values of ambient pressure, temperature, moisture, ground winds, visual observations (cloud), and winds aloft are included. The sequence of prelaunch Jimsphere measured vertical wind profiles is given in this report. Also presented are wind and thermodynamic parameters representative of surface and aloft conditions in the SRB descent/impact ocean area. Final meteorological tapes, which consist of wind and thermodynamic parameters versus altitude, for STS-7 vehicle ascent and Acoustic/SRB descent have been constructed. The STS-7 ascent meteorological data tape has been constructed by Marshall Space Flight Center in response to Shuttle task agreement No. 936-53-22-368 with Johnson Space Center.

Johnson, D. L.↗