Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling and spacing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

NASA/USRA University Advanced Design Program Fifth Annual Summer Conference

The NASA/USRA University Advanced Design Program is a unique program that brings together NASA engineers, students, and faculty from United States engineering schools by integrating current and future NASA space/aeronautics engineering design projects into the university curriculum. The Program was conceived in the fall of 1984 as a pilot project to foster engineering design education in the universities and to supplement NASA's in-house efforts in advanced planning for space and aeronautics design. Nine universities and five NASA centers participated in the first year of the pilot project. Close cooperation between the NASA centers and the universities, the careful selection of design topics, and the enthusiasm of the students has resulted in a very successful program than now includes forty universities and eight NASA centers. The study topics cover a broad range of potential space and aeronautics projects which could be undertaken during a 20-30 year period beginning with the deployment of the Space Station Freedom scheduled for the mid1990s. Both manned and unmanned endeavors are embraced, and the systems approach to the design problem is emphasized. The student teams pursue the chosen problem during their senior year in a one or two semester capstone design course and submit a comprehensive written report at the conclusion of the project. Finally, student representatives from each of the universities summarize their work in oral presentations at the annual Summer Conference, held at one of the NASA centers and attended by the university faculty, NASA and USRA personnel, and aerospace industry representatives.

Source record↗

Planetary system evolution and the Vega stars: The potential for ESA's Infrared Space Observatory

ESA's Infrared Space Observatory (ISO), scheduled for launch within the next 2-3 years, will place a complement of powerful infrared imagers and spectrometers into high orbit, with an operational life anticipated to be about 18 months. During this time, numerous scientific investigations of every conceivable astrophysical target will be made. The purpose of this paper is to consider the instrumental complement in terms of specific observations of Vega-like systems with cold, infrared excesses, in order to investigate problems relating to the evolution of planetary systems, and to optimize the scientific results possible with ISO on such topics.

Stencel, Robert E.↗

The Infrared Telescope in Space (IRTS) Mission

The Infrared Telescope in Space is a cryogenically-cooled NASA/ISAS space survey instrument scheduled for a February, 1995 launch. The telescope optical system is optimized for studies of extended low surface-brightness objects. Four focal-plane instruments cover wavelengths ranging form 1 to 800 microns.

Roellig, Thomas L.↗

The feasibility study and evaluation of applying expert system techniques to the mission operations for the AXAF-I spacecraft

Advanced X-ray Astrophysics Facility - Imaging (AXAF-I) is a spacecraft for X-ray emitting sources observation and has been tentatively scheduled for a space shuttle launch in late 1998 at the Kennedy Space Center. Its main objectives are 'to determine the nature of astronomical objects ranging from normal stars to quasars, to understand the nature of the physical processes which take place in and between astronomical objects, and to add to our understanding of the history and evolution of the universe.' The AXAF-I will have an expected five year life time for the science mission phase. During the science mission phase, the monitoring and management operation of the flight and ground systems is personnel intensive, requiring system experts on duty around the clock. The purpose of the expert system presented in this report is intended to reduce the level of expertise, training, and personnel requirement for the mission operation. The telemetry data from the spacecraft can be divided into two categories: the science observation data and the engineering status data. The science data contains the outputs from the X-ray sensing devices and will be forwarded to the AXAF-I Science Center for interpretation; while the engineering status data will be monitored by the Operation Control Center (OCC) for the operation diagnosis of the spacecraft. The expert system is designed to assist the operation controllers at the OCC to perform the daily mission operations. Since there are hundreds of engineering telemetry data points and the interpretation of the telemetry depends on many factors, e.g., sun or eclipse, the monitoring of the AXAF-I is not a trivial task. In this phase of expert system development, the focus has been limited to the engineering data interpretation, i.e., warnings will be provided to the operation controllers to signal any anomaly. The system is hosted in a Silicon Graphics Indigo-2 workstation running the IRIX operating system. The expert system tool used is the G2 system from Gensym (Gensy).

Chang, Kai H.↗

STS-109 Flight Day 2 Highlights

Footage shows the cargo bay of the Columbia Orbiter, including the rigid array carrier, the solar arrays to be installed on the Hubble Space Telescope, and the robotic arm. Close-up shots show several components of the flight support system. STS-109 Commander Scott Altman, Payload Commander John Grunsfeld, and Mission Specialist Nancy Currie are seen on the flight deck, and they answer questions about the stabilization of the freon flow, details of the upcoming rendezvous and capture of the Hubble Space Telescope, the scheduled spacewalks, and the social dynamics of the flight crew.

Source record↗

Solar System Studies with the Space Infrared Telescope Facility (SIRTF)

SIRTF (Space Infrared Telescope Facility) is the final element in NASA's 'Great Observatories' program. It consists of an 85-cm cryogenically-cooled observatory for infrared astronomy from space. SIRTF is scheduled for launch in late 2001 or early 2002 on a Delta rocket into a heliocentric orbit trailing the Earth. Data from SIRTF will be processed and disseminated to the community through the SIRTF Science Center (SSC) located at the Infrared Processing and Analysis Center (IPAC) at Caltech. Some 80/% of the total observing time (estimated at a minimum of 7500 hours of integration time per year for the mission lifetime of about 4 years) will be available to the scientific community at large through a system of refereed proposals. Three basic instruments are located in the SIRTF focal plane. The Multiband Imaging Photometer (MIPS), the Infrared Array Camera (IRAC), and the Infrared Spectrometer (IRS), taken together, provide imaging and spectroscopy from 3.5 to 160 microns. Among the solar system studies suited to SIRTF are the following: 1) spectroscopy and radiometry of small bodies from the asteroid main belt, through the Trojan clouds, to the Kuiper Disk; 2) dust distribution in the zodiacal cloud and the Earth's heliocentric dust ring; 3) spectroscopy and radiometry of comets; and 4) spectroscopy and radiometry of planets and their satellites. Searches for, and studies of dust disks around other stars, brown dwarfs, and superplanets will also be conducted with SIRTF. The SORTIE web site (http://ssc.ipac.caltech.edu/sirtf) contains important details and documentation on the project, the spacecraft, the telescope, instruments, and observing procedures. A community-wide workshop for solar system studies with SIRTF is in the planning stages by the author and Martha S. Hanner for the summer of 1999.

Cruikshank, Dale P.↗

STS-114: Discovery L-2 Countdown Status Briefing

George Diller of NASA Public Affairs hosted this briefing. Pete Nickolenko, NASA Test Director; Scott Higgenbotham, STS-114 Payload-Mission Manager; Cathy Winters, Shuttle Weather Officer were present. Pete reports his team has completed the avionics system check ups, servicing of the cryogenic tanks will take about seven hours that day, and will perform engine system checks and pad close outs come evening. Pete also summarized other standard close out activities: check ups of the Orbiter and ground communications network, rotary service, structure retraction, and external tank load (ETL). Pete reported that the mission will be 12 days with two weather contingency days, and end of mission landing scheduled at Kennedy Space Center (KSC) at approximately 11:00 in the morning, Eastern time on July 25th. Scott briefly reported that all hardware is on board Discovery, closed out, and ready to fly. Cathy reported that hurricane Dennis moved to the North and looking forward to launch. She mentioned of a new hurricane looming and will be named Emily, spotted some crosswinds which will migrate to the west, there is 30% probability weather prohibiting launch. Cathy further gave current weather forecast supported with charts: the Launch Forecast, Tanking Forecast, SRB (Shuttle Solid Rocket Booster) Forecast, CONUS and TAL Launch Sites Forecast, and with 24 hours and 48 hours turn around plan. Launch constraints, weather, crosswinds, cloud cover, ground imagery system, launch countdown, launch crews, mission management simulations, launch team simulations were topics covered with the News Media.

Source record↗

Endosafe(R)-Portable Test System (PTS)

The Portable Test System (PTS) is a hand-held device for monitoring the presence of potentially hazardous bacteria in the environment. It uses an immunological method derived from the horseshoe crab (Limulus polyphemus) to detect bacterial cell membranes and other molecular components of a cell. Further modifications of the PTS will allow detection of individual hazardous species of bacteria. This study was a follow-up of previous PTS and other immunological tests performed on the KC-135 during 2002-2003 (Maule et al., 2003, J. Gravit. Physiol.) and in the underwater habitat Aquarius during NEEMO 5 (Maule et al., 2005, Appl. Environ. Microbiol in prep.). The experiments described here were part of a final testing phase prior to use of the PTS on the International Space Station (ISS), scheduled for launch on 12A.1 on February 9th 2006. The specific aspects of PTS operation studied were those involving a fluid component: pumping, mixing, incubations and pipetting into the instrument. The PTS uses a stepper motor to move fluid along small channels, which may be affected by reduced gravity.

Maule, Jake↗

Prospects for GLAST

The Gamma-ray Large Area Space Telescope (GLAST), scheduled for launch in late 007, is a satellite based observatory to study the high energy gamma-ray sky. There are two instruments on GLAST: the Large Area Telescope (LAT) which provides coverage from 20 MeV to over 300 GeV, and the GLAST Burst Monitor (GBM) which provides supportive observations of transients from 8 keV to 30 MeV. GLAST will provide well beyond those achieved by the highly successful EGRET instrument on the Compton Gamma-Ray Observatory, with dramatic improvements in sensitivity, angular resolution and energy range. The very large field of view will make it possible to observe approx. 20% of the sky at any instant, and the entire sky on timescale of a few hours. This talk includes a description of the instruments, the opportunities for guest investigators, and the mission status.

McEnery, Julie↗

NASA's Astronant Family Support Office

During the NASA‐Mir program of the 1990s and due to the challenges inherent in the International Space Station training schedule and operations tempo, it was clear that a special focus on supporting families was a key to overall mission success for the ISS crewmembers pre‐, in‐ and post‐flight. To that end, in January 2001 the first Family Services Coordinator was hired by the Behavioral Health and Performance group at NASA JSC and matrixed from Medical Operations into the Astronaut Office's organization. The initial roles and responsibilities were driven by critical needs, including facilitating family communication during training deployments, providing mission‐specific and other relevant trainings for spouses, serving as liaison for families with NASA organizations such as Medical Operations, NASA management and the Astronaut Office, and providing assistance to ensure success of an Astronaut Spouses Group. The role of the Family Support Office (FSO) has modified as the ISS Program matured and the needs of families changed. The FSO is currently an integral part of the Astronaut Office's ISS Operations Branch. It still serves the critical function of providing information to families, as well as being the primary contact for US and international partner families with resources at JSC. Since crews launch and return on Russian vehicles, the FSO has the added responsibility for coordinating with Flight Crew Operations, the families, and their guests for Soyuz launches, landings, and Direct Return to Houston post‐flight. This presentation will provide a summary of the family support services provided for astronauts, and how they have changed with the Program and families the FSO serves. Considerations for future FSO services will be discussed briefly as NASA proposes one year missions and beyond ISS missions. Learning Objective: 1) Obtain an understanding of the reasons a Family Support Office was important for NASA. 2) Become familiar with the services provided for astronauts and their families and how they changed with the Program and family needs.

Beven, Gary↗

Evaluation of the Terminal Sequencing and Spacing System for Performance Based Navigation Arrivals

NASA has developed the Terminal Sequencing and Spacing (TSS) system, a suite of advanced arrival management technologies combining timebased scheduling and controller precision spacing tools. TSS is a ground-based controller automation tool that facilitates sequencing and merging arrivals that have both current standard ATC routes and terminal Performance-Based Navigation (PBN) routes, especially during highly congested demand periods. In collaboration with the FAA and MITRE's Center for Advanced Aviation System Development (CAASD), TSS system performance was evaluated in human-in-the-loop (HITL) simulations with currently active controllers as participants. Traffic scenarios had mixed Area Navigation (RNAV) and Required Navigation Performance (RNP) equipage, where the more advanced RNP-equipped aircraft had preferential treatment with a shorter approach option. Simulation results indicate the TSS system achieved benefits by enabling PBN, while maintaining high throughput rates-10% above baseline demand levels. Flight path predictability improved, where path deviation was reduced by 2 NM on average and variance in the downwind leg length was 75% less. Arrivals flew more fuel-efficient descents for longer, spending an average of 39 seconds less in step-down level altitude segments. Self-reported controller workload was reduced, with statistically significant differences at the p less than 0.01 level. The RNP-equipped arrivals were also able to more frequently capitalize on the benefits of being "Best-Equipped, Best- Served" (BEBS), where less vectoring was needed and nearly all RNP approaches were conducted without interruption.

terminal sequencing↗

Delay-Throughput Performance of the Deep-Space Ka-band Link

In this paper, performance of a first-in, first-out (FIFO), selective retransmission scheme for the deep-space Ka-band link is presented and compared to the performance of a comparable X-band link. In this analysis, 16 months of water vapor radiometer (WVR) and advanced water vapor radiometer (AWVR) data from the three Deep Space Network (DSN) Communication Complexes (DSCC) were used to emulate weather effects on X-band and Ka-band links from Mars. Mars Reconnaissance Orbiter (MRO) X-band and Ka-band telecommunications parameters were used for spacecraft telecommunications capabilities. One pass per week per complex was selected from MRO's Deep Space Network (DSN) schedule from April 1, 2006 to August 31, 2007 for a total of 207 passes (69 passes per complex) for this analysis. For each pass both X-band and Ka-band links were designed using at most two data rates so that the expected pass capacity would be maximized subject to a minimum availability requirement (MAR). In conjunction with the WVR/AWVR data, elevation profiles of the selected passes and models for the performance of the antennas in the DSN were used to emulate the performance of both links. It was assumed that the retransmission of the data takes place not on the same pass as the original transmission but during subsequent passes. The data collected before a pass was assumed to be a fraction of the expected capacity of the pass as calculated through the link design process. Infinite spacecraft storage was assumed to obtain an upper bound on the spacecraft storage requirement. The independent parameters of this analysis were MAR and the ratio of data collected before a pass to the expected pass capacity. Since the selected passes did not occur at regular intervals, the delay in this analysis was measured in terms of number of passes. The throughput was measured in terms of number of bits received successfully on the ground. The results indicate that reasonable delay performance could be achieved with very high throughput for relatively low MAR values for data collection to expected pass capacity ratio of around 97% for Ka-band. The results indicate that, except for very low average delay requirements, the Ka-band link provides more than twice the throughput of the X-band link for the same amount of power consumed by the spacecraft. In addition, the results indicate that the required storage onboard the spacecraft is not prohibitive and good performance could be achieved by using a buffer size less than three times the maximum amount of data collected before a pass.

Shambayati, Shervin↗

Delay-Throughput Performance the Deep-Space Ka-Band Link

In this paper, performance of a first-in, first-out (FIFO), selective retransmission scheme for the deep-space Ka-band link is presented and compared to the performance of a comparable X-band link. In this analysis, 16 months of water vapor radiometer (WVR) and advanced water vapor radiometer (AWVR) data from the three Deep Space Network (DSN) Communication Complexes (DSCC) were used to emulate weather effects on X-band and Ka-band links from Mars. Mars Reconnaissance Orbiter (MRO) X-band and Ka-band telecommunications parameters were used for spacecraft telecommunications capabilities. One pass per week per complex was selected from MRO's Deep Space Network (DSN) schedule from April 1, 2006 to August 31, 2007 for a total of 207 passes (69 passes per complex) for this analysis. For each pass both X-band and Ka-band links were designed using at most two data rates so that the expected pass capacity would be maximized subject to a minimum availability requirement (MAR). In conjunction with the WVR/AWVR data, elevation profiles of the selected passes and models for the performance of the antennas in the DSN were used to emulate the performance of both links. It was assumed that the retransmission of the data takes place not on the same pass as the original transmission but during subsequent passes. The data collected before a pass was assumed to be a fraction of the expected capacity of the pass as calculated through the link design process. Infinite spacecraft storage was assumed to obtain an upper bound on the spacecraft storage requirement. The independent parameters of this analysis were MAR and the ratio of data collected before a pass to the expected pass capacity. Since the selected passes did not occur at regular intervals, the delay in this analysis was measured in terms of number of passes. The throughput was measured in terms of number of bits received successfully on the ground. The results indicate that reasonable delay performance could be achieved with very high throughput for relatively low MAR values for data collection to expected pass capacity ratio of around 97% for Ka-band. The results indicate that, except for very low average delay requirements, the Ka-band link provides more than twice the throughput of the X-band link for the same amount of power consumed by the spacecraft. In addition, the results indicate that the required storage onboard the spacecraft is not prohibitive and good performance could be achieved by using a buffer size less than three times the maximum amount of data collected before a pass.

Shambayati, Shervin↗

New Mie Scattering Diffuse Targets Development and Characterization

Earth science remote sensing observations require the detection and measurement of light originating from bright targets, such as clouds, and darker targets, such as an open ocean. This requirement drives the need to design, develop, and characterize improved calibration targets in support of current and future NASA instruments. New diffuse targets to be used as spectral albedo calibration standards were developed and characterized. The new targets based on fused silica or/and pressed and sintered Polytetrafluoroethylene (PTFE) were developed to be Earth scene specific. The various reflectance levels are achieved by modifying the material parameters, thickness, and surface finish. The new targets were characterized in laboratory and simulated space environments. We acquired high accuracy reflectance and transmittance data using a precision optical scatterometer and spectrophotometer located in the NASA Goddard Space Flight Center (GSFC) Diffuser Calibration Lab. The Total hemispherical reflectance (THR) and Bidirectional Reflectance Distribution Function (BRDF) were measured over the range of solar incident and scattered elevation and azimuthal angles typically realized on orbit by remote sensing instruments. We intend to space certify the new calibration targets after concluding on-orbit testing on the International Space Stations (ISS) scheduled for the second half of 2023.

Georgi Georgiev↗

STS-106 Crew Interviews: Richard A. Mastracchio

Live footage of a preflight interview with Mission Specialist Richard A. Mastracchio is seen. The interview addresses many different questions including why Mastracchio became interested in the space program, the events that led to his interest, his 14 year career path through the Johnson Space Center (JSC) as an engineer before finally getting selected into the astronaut program. Other interesting information that this one-on-one interview discusses is the main goal of the STS-106 mission, and its scheduled docking with the new International Space Station (ISS) since the arrival and connection of the Zvezda Service Module. Mastracchio also mentions his responsibility during the much-anticipated docking and scheduled space-walk.

Source record↗