Search NASA⌕ Search

SEARCH · Search NASA

Results for “Solar Array”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

The systems impact of a concentrated solar array on a Jupiter orbiter

Results of a study are presented suggesting that a Galileo Jupiter orbiting mission could be performed with a concentrated solar array power source. A baseline spacecraft design using concentrated arrays is given, and the overall spacecraft implications for attitude control, propulsion, power conditioning and the resultant spacecraft mass are examined. It is noted that while the concentrated array concept still requires extensive development effort, no insurmountable system level barriers preclude the use of a concentrated solar array on this difficult mission, with its stressing radiation environment, its lengthy periods of spacecraft shadowing as it passes behind Jupiter, and, finally, its large delta v burn required for orbital insertion.

Rockey, D. E.↗

Achieving Solar Pressure Equilibrium Attitude using Solar Array Feathering

Many competing requirements such as communication margin, thermal mitigation, and power generation may drive a specific flight attitude. However, a solar pressure equilibrium attitude (SPEA) is typically desired for a spacecraft in heliocentric space in order to minimize attitude maintenance. In this work, the benefits of solar array feathering in order to maintain specific and precise pointing requirements are quantified. A case study in which an asymmetrical spacecraft exploits a normally unstable flight attitude in concert with solar array feathering is explored in order to optimize power utilization while still minimizing attitude maintenance.

Benjamin Asher↗

High Current ESD Test of Advanced Triple Junction Solar Array Coupon

Testing was conducted on an Advanced Triple Junction (ATJ) coupon that was part of a risk reduction effort in the development of a high-powered solar array design by Space Systems/Loral, LLC (SSL). The ATJ coupon was a small, 4-cell, two-string configuration that has served as the basic test coupon design used in previous SSL environmental aging campaigns. The coupon has many attributes of the flight design; e.g., substrate structure with graphite face sheets, integrated by-pass diodes, cell interconnects, RTV grout, wire routing, etc. The objective of the present test was to evaluate the performance of the coupon after being subjected to induced electrostatic discharge (ESD) testing at two string voltages (100 V, 150 V) and four array currents (1.65 A, 2.0 A, 2.475 A, and 3.3 A). An ESD test circuit, unique to SSL solar array design, was built that simulates the effect of missing cells and strings in a full solar panel with special primary arc flashover circuitry. A total of 73 primary arcs were obtained that included 7 temporary sustained arcs (TSA) events. The durations of the TSAs ranged from 50 micro-seconds to 2.75 milli-seconds. All TSAs occurred at a string voltage of 150 V. Post-test Large Area Pulsed Solar Simulator (LAPSS), Dark I-V, and By-Pass Diode tests showed that no degradation occurred due to the TSA events. In addition, the post-test insulation resistance measured was > 50 G-ohms between cells and substrate. These test results indicate a robust design for application to a high-current, high-power mission.

Wright, Kenneth H., Jr.↗

High Current ESD Test of Advanced Triple Junction Solar Array Coupon

A test was conducted on an Advanced Triple Junction (ATJ) coupon that was part of a risk reduction effort in the development of a high-powered solar array design by SSL. The ATJ coupon was a small, 4-cell, two-string configuration that has served as the basic test coupon design used in previous SSL environmental aging campaigns. The coupon has many attributes of the flight design; e.g., substrate structure with graphite face sheets, integrated by-pass diodes, cell interconnects, RTV grout, wire routing, etc. The objective of the present test was to evaluate the performance of the coupon after being subjected to induced electrostatic discharge testing at two string voltages (100 V, 150 V) and four array current (1.65 A, 2.0 A, 2.475 A, and 3.3 A). An ESD test circuit, unique to SSL solar array design, was built that simulates the effect of missing cells and strings in a full solar panel with special primary arc flashover circuitry. A total of 73 primary arcs were obtained that included 7 temporary sustained arcs (TSA) events. The durations of the TSAs ranged from 50 μs to 2.9 ms. All TSAs occurred at a string voltage of 150 V. Post-test Large Area Pulsed Solar Simulator (LAPSS), Dark I-V, and By-Pass Diode tests showed that no degradation occurred due to the TSA events. In addition, the post-test insulation resistance measured was > 50 G-ohms between cells and substrate. These test results indicate a robust design for application to a high-current, high-power mission application.

Wright, K. H.↗

High Current ESD Test of Advanced Triple Junction Solar Array Coupon

A test was conducted on an Advanced Triple Junction (ATJ) coupon that was part of a risk reduction effort in the development of a high-powered solar array design by SSL. The ATJ coupon was a small, 4-cell, two-string configuration that has served as the basic test coupon design used in previous SSL environmental aging campaigns. The coupon has many attributes of the flight design; e.g., substrate structure with graphite face sheets, integrated by-pass diodes, cell interconnects, RTV grout, wire routing, etc. The objective of the present test was to evaluate the performance of the coupon after being subjected to induced electrostatic discharge testing at two string voltages (100 V, 150 V) and four array current (1.65 A, 2.0 A, 2.475 A, and 3.3 A). An ESD test circuit, unique to SSL solar array design, was built that simulates the effect of missing cells and strings in a full solar panel with special primary arc flashover circuitry. A total of 73 primary arcs were obtained that included 7 temporary sustained arcs (TSA) events. The durations of the TSAs ranged from 50 micros to 2.9 ms. All TSAs occurred at a string voltage of 150 V. Post-test Large Area Pulsed Solar Simulator (LAPSS), Dark I-V, and By-Pass Diode tests showed that no degradation occurred due to the TSA events. In addition, the post-test insulation resistance measured was > 50 G-ohms between cells and substrate. These test results indicate a robust design for application to a high-current, high-power mission application.

Wright, Kenneth H., Jr.↗

Solar array conceptual design for the Halley's Comet ion drive mission, phase 2

Conceptual design studies were performed directed toward a high power, ultralightweight solar array, compatible with the requirements for the Halley's Comet Ion Drive Mission. A planar, rollup array design concept capable of producing 120 kW at 1 AU and 6 kW at 4.5 AU, and a concentrator, rollup array design concept capable of producing 60 kW at 1 AU and 15.5 kW at 4.5 AU evolved. Both arrays make maximum use of thin film, lightweight technology. The Halley's Comet spacecraft and mission requirements developed from preliminary definition to a more finalized and mature design. As solar array requirements were updated, conceptual design iterations were necessary to keep pace with the rapidly changing program objectives and goals. The Halley's Comet Mission program status and design approaches were reviewed and more realistic power requirements at 4.5 AU for the ion engines were established at the 12 to 16 kW range. This higher power necessitated a change from the planar array design to a concentrator array design in order to remain within suitable cost and weight objectives.

Rayl, G. J.↗

Pioneer's solar-cell array.

Solar array as primary electrical power source of Pioneer deep space probes, comparing performance data with test and design data

Baron, W. R.↗

Solar Array System for the Skylab Orbital Workshop.

The Solar Array System for the Skylab Orbital Workshop is designed to supply average power to power-conditioning equipment of 10496 watts while oriented toward the sun during the sunlit portion of each orbit. This paper discusses the operating voltage of the arrays over the expected temperature range, temperature cycling effects on both cell interconnects and cells, and overall effects of hot spots induced by shadows cast on the arrays by elements of the spacecraft.

North, N. B.↗

Flat-plate solar array progress and plans

The Flat-Plate Solar Array Project (FSA), sponsored by the U.S. Department of Energy (DOE) and managed by the Jet Propulsion Laboratory (JPL), has achieved progress in a broad range of technical activities since that reported at the Fourth European Communities Conference. A particularly important analysis has been completed recently which confirms the adoption into practice by the U.S. Photovoltaic (PV Industry, of all the low-cost module technology elements proposed at the 16th Project Integration Meeting for a $2.80/Wp (1980 U.S. Dollars) design approach in the fall of 1980. This work presents along with a projection, using the same techniques, for what is believed to be a very credible ribbon-based module design for less that $0.55/Wp (1980 U.S. Dollars). Other areas to be reported upon include low-cost Si feedstock refinement; ribbon growth; process sequence development for cells; environmental isolation; engineering science investigations; and module testing progress.

Callaghan, W. T.↗

Dark Forward Electrical Testing of the Mir Cooperative Solar Array

During July 11 to 13, 1995, a team from the NASA Lewis Research Center performed dark forward electrical testing on the Mir Cooperative Solar Array (MCSA) flight unit in the Space Station Processing Facility at the NASA Kennedy Space Center. The MCSA was jointly designed and built by the United States and Russia to supply approximately 6 kW of electricity to the Russian Mir space station. The primary objective of testing was to assess the overall electrical performance of the flight array after handling and shipment from Russia to NASA Kennedy. This objective was achieved without the high cost and difficulties of deploying and illuminating the MCSA as is usually done with large-area solar arrays. The data obtained provided U.S. and Russian program managers with a high level of confidence in the MCSA electrical performance prior to the array's launch on shuttle mission STS-74 in November 1995 and its deployment on Mir in May 1996.

Kerslake, Thomas W.↗

GPM Solar Array Gravity Negated Deployment Testing

NASA Goddard Space Flight Center (GSFC) successfully developed a g-negation support system for use on the solar arrays of the Global Precipitation Measurement (GPM) Satellite. This system provides full deployment capability at the subsystem and observatory levels. In addition, the system provides capability for deployed configuration first mode frequency verification testing. The system consists of air pads, a support structure, an air supply, and support tables. The g-negation support system was used to support all deployment activities for flight solar array deployment testing.

Penn, Jonathan↗