Search NASA⌕ Search

SEARCH · Search NASA

Results for “Upgrade”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Near Earth Network (NEN) CubeSat Communications

The NASA Near Earth Network (NEN) consists of globally distributed tracking stations, including NASA, commercial, and partner ground stations, that are strategically located to maximize the coverage provided to a variety of orbital and suborbital missions, including those in LEO (Low Earth Orbit), GEO (Geosynchronous Earth Orbit), HEO (Highly Elliptical Orbit), lunar and L1-L2 orbits. The NEN's future mission set includes and will continue to include CubeSat missions. The first NEN-supported CubeSat mission will be the Cubesat Proximity Operations Demonstration (CPOD) launching into LEO in 2017. The majority of the CubeSat missions destined to fly on EM-1, launching in late 2018, many in a lunar orbit, will communicate with ground-based stations via X-band and will utilize the NASA Jet Propulsion Laboratory (JPL)-developed IRIS (Satellite Communication for Air Traffic Management) radio. The NEN recognizes the important role CubeSats are beginning to play in carrying out NASAs mission and is therefore investigating the modifications needed to provide IRIS radio compatibility. With modification, the NEN could potentially expand support to the EM-1 (Exploration Mission-1) lunar CubeSats. The NEN could begin providing significant coverage to lunar CubeSat missions utilizing three to four of the NEN's mid-latitude sites. This coverage would supplement coverage provided by the JPL Deep Space Network (DSN). The NEN, with smaller apertures than DSN, provides the benefit of a larger beamwidth that could be beneficial in the event of uncertain ephemeris data. In order to realize these benefits the NEN would need to upgrade stations targeted based on coverage ability and current configuration ease of upgrade, to ensure compatibility with the IRIS radio. In addition, the NEN is working with CubeSat radio developers to ensure NEN compatibility with alternative CubeSat radios for Lunar and L1-L2 CubeSats. The NEN has provided NEN compatibility requirements to several radio developers who are developing radios that offer lower cost and, in some cases, more capabilities with fewer constraints. The NEN is ready to begin supporting CubeSat missions. The NEN is considering network upgrades to broaden the types of CubeSat missions that can be supported and is supporting both the CubeSat community and radio developers to ensure future CubeSat missions have multiple options when choosing a network for their communications support.

CubeSat↗

NASA Near Earth Network (NEN) Support for Lunar and L1/L2 CubeSats

The NASA Near Earth Network (NEN) consists of globally distributed tracking stations, including NASA, commercial, and partner ground stations, that are strategically located to maximize the coverage provided to a variety of orbital and suborbital missions, including those in LEO, GEO, HEO, lunar and L1/L2 orbits. The NENs future mission set includes and will continue to include CubeSat missions. The first NEN supported CubeSat mission will be the Cubesat Proximity Operations Demonstration (CPOD) launching into low earth orbit (LEO) in early 2017. The majority of the CubeSat missions destined to fly on EM-1, launching in late 2018, many in a lunar orbit, will communicate with ground based stations via X-band and will utilize the NASA Jet Propulsion Laboratory (JPL) developed IRIS radio. The NEN recognizes the important role CubeSats are beginning to play in carrying out NASAs mission and is therefore investigating the modifications needed to provide IRIS radio compatibility. With modification, the NEN could potentially expand support to the EM-1 lunar CubeSats. The NEN could begin providing significant coverage to lunar CubeSat missions utilizing three to four of the NENs mid-latitude sites. This coverage would supplement coverage provided by the JPL Deep Space Network (DSN). The NEN, with smaller apertures than DSN, provides the benefit of a larger beamwidth that could be beneficial in the event of uncertain ephemeris data. In order to realize these benefits the NEN would need to upgrade stations targeted based on coverage ability and current configurationease of upgrade, to ensure compatibility with the IRIS radio.In addition, the NEN is working with CubeSat radio developers to ensure NEN compatibility with alternative CubeSat radios for Lunar and L1/L2 CubeSats. The NEN has provided NEN compatibility requirements to several radio developers who are developing radios that offer lower cost and, in some cases, more capabilities with fewer constraints. The NEN is ready to begin supporting CubeSat missions. The NEN is considering network upgrades to broaden the types of CubeSat missions that can be supported and is supporting both the CubeSat community and radio developers to ensure future CubeSat missions have multiple options when choosing a network for their communications support.

Global Tracking Network Ground Station↗

NASA Near Earth Network (NEN) Support for Lunar and L1/L2 CubeSats

The NASA Near Earth Network (NEN) consists of globally distributed tracking stations, including NASA, commercial, and partner ground stations, that are strategically located to maximize the coverage provided to a variety of orbital and suborbital missions, including those in LEO, GEO, HEO, lunar and L1/L2 orbits. The NENs future mission set includes and will continue to include CubeSat missions. The majority of the CubeSat missions destined to fly on EM-1, launching in late 2018, many in a lunar orbit, will communicate with ground based stations via X-band and will utilize the NASA Jet Propulsion Laboratory (JPL) developed IRIS radio. The NEN recognizes the important role CubeSats are beginning to play in carrying out NASAs mission and is therefore investigating the modifications needed to provide IRIS radio compatibility. With modification, the NEN could potentially expand support to the EM-1 lunar CubeSats.The NEN could begin providing significant coverage to lunar CubeSat missions utilizing three to four of the NENs mid-latitude sites. This coverage would supplement coverage provided by the JPL Deep Space Network (DSN). The NEN, with smaller apertures than DSN, provides the benefit of a larger beamwidth that could be beneficial in the event of uncertain ephemeris data. In order to realize these benefits the NEN would need to upgrade stations targeted based on coverage ability and current configuration/ease of upgrade, to ensure compatibility with the IRIS radio. In addition, the NEN is working with CubeSat radio developers to ensure NEN compatibility with alternative CubeSat radios for Lunar and L1/L2 CubeSats. The NEN has provided NEN compatibility requirements to several radio developers who are developing radios that offer lower cost and, in some cases, more capabilities with fewer constraints. The NEN is ready to begin supporting CubeSat missions. The NEN is considering network upgrades to broaden the types of CubeSat missions that can be supported and is supporting both the CubeSat community and radio developers to ensure future CubeSat missions have multiple options when choosing a network for their communications support.

Schaire, Scott↗

NASA'S Space Launch System: Progress Toward the Proving Ground

With significant and substantial progress being accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight – using an upgraded version of the vehicle – and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and together with the Orion spacecraft will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 metric tons. For that flight, the new configuration introduces two major new elements to the vehicle – an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a “payload bay” for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Beyond the second flight, additional upgrades will be made to the vehicle. The Block 1B vehicle will also be able to launch 8.4-meter-diameter payload fairings, larger than any previously flown, and the Spacecraft Payload Integration and Evolution (SPIE) Element will oversee development and production of those fairings. Ultimately, SLS will be evolved to a Block 2 configuration, which will replace the solid rocket boosters on the Block 1 and 1B vehicles with more powerful boosters, and will be capable of delivering at least 130 metric tons to LEO. The Block 2 vehicle will be capable of launching even larger 10-meter diameter fairings, which will enable human mission of Mars. With these fairings, the Block 1B and 2 configurations of SLS will also be enabling for a wide variety of other payloads. For robotic science probes to the outer solar system, for example, SLS can cut transit times to less than half that of currently available vehicles, producing earlier data return, enhancing iterative exploration, and reducing mission cost and risk. In the field of astrophysics, SLS’ high payload volume, in the form of payload fairings with a diameter of up to 10 meters, creates the opportunity for launch of large-aperture telescopes providing an unprecedented look at our universe, and offers the ability to conduct crewed servicing missions to observatories stationed at locations beyond low Earth orbit. This paper will provide a description of the SLS vehicle, and an overview of the vehicle’s capabilities and utilization potential.

Jackman, Angie↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress is on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance (ULA) in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the OSA and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center (MSFC) in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 t to LEO, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the EUS, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the proving ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations program is transforming Kennedy Space Center into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the Exploration Upper Stage, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the Proving Ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Oxygen Generation Assembly Design for Exploration Missions

Future Exploration missions will require an Oxygen Generation Assembly (OGA) to electrolyze water to supply oxygen for crew metabolic consumption. The system design will be based on the International Space Station (ISS) OGA but with added improvements based on lessons learned during ISS operations. These improvements will reduce system weight, crew maintenance time and resupply mass from Earth while increasing reliability. Currently, the design team is investigating the feasibility of the upgrades by performing ground tests and analyses. Upgrades being considered include: redesign of the electrolysis cell stack, deletion of the hydrogen dome, replacement of the hydrogen sensors, deletion of the wastewater interface, redesign of the recirculation loop deionizing bed and redesign of the cell stack Power Supply Module. The upgrades will be first demonstrated on the ISS OGA.

Takada, Kevin↗

Planned Improvements to the Venus Global Reference Atmospheric Model

The Venus Global Reference Atmospheric Model (Venus-GRAM) is an engineering-level atmospheric model applicable for engineering design analyses, mission planning, and operational decision making. Missions to Venus have generated a wealth of atmospheric data, however, Venus-GRAM has not been updated since its development and release in 2005. GRAM upgrades and maintenance have depended on inconsistent and waning project-specific support. The NASA Science Mission Directorate (SMD) has agreed to provide funding support in Fiscal Year 2018 and 2019 to upgrade the GRAMs. This presentation will provide an overview of Venus-GRAM and the objectives, tasks, and milestones related to the GRAM upgrades.

Justh, H. L.↗

The Role of Alerting System Failures in Loss of Control Accidents CAST SE-210 Output 2

This report is part of a series of reports that address flight deck design and evaluation, written as a response to loss of control accidents. In particular, this activity is directed at failures in airplane state awareness in which the pilot loses awareness of the airplane's energy state or attitude and enters an upset condition. In a report by the Commercial Aviation Safety Team, an analysis of accidents and incidents related to loss of airplane state awareness determined that hazard alerting was not effective in producing the appropriate pilot response to a hazard (CAST, 2014). In the current report, we take a detailed look at 28 airplane state awareness accidents and incidents to determine how well the hazard alerting worked. We describe a five-step integrated alerting-to-recovery sequence that prescribes how hazard alerting should lead to effective flight crew actions for managing the hazard. Then, for each hazard in each of the 28 events, we determine if that sequence failed and, if so, how it failed. The results show that there was an alerting failure in every one of the 28 safety events, and that the most frequent failure (20/28) was tied to the flight crew not orienting to (not being aware of) the hazard. The discussion section summarizes findings and identifies alerting issues that are being addressed and issues that are not currently being addressed. We identify a few recent upgrades that have addressed certain alerting failures. Two of these upgrades address alerting design, but one response to the safety events is to upgrade training for approach to stall and stall recovery. We also describe issues that are not being addressed adequately: better alert integration for flight path management types of hazards, airplanes in the fleet that do not meet the current alerting regulations, a lack of innovation for addressing cases of channelized attention, and existing vulnerabilities in managing data validity.

aviation safety↗

Advanced Oxygen Generation Assembly for Exploration Missions

Future Exploration missions will require an Oxygen Generation Assembly (OGA) to electrolyze water to supply oxygen for crew metabolic consumption. The system design will be based on the International Space Station (ISS) OGA but with added improvements based on lessons learned during ISS operations and technological advances since the original OGA was designed and built. These improvements will reduce system weight, crew maintenance time and spares mass while increasing reliability. Currently, the design team is investigating the feasibility of the upgrades by performing ground tests and analyses. Upgrades being considered include: redesign of the electrolysis cell stack, deletion of the hydrogen dome, replacement of the hydrogen sensors, deletion of the wastewater interface, redesign of the recirculation loop deionizing bed and redesign of the cell stack Power Supply Module. The upgrades will be first demonstrated on the ISS OGA.

Takada, Kevin↗

NASA Orbital Debris Engineering Model ORDEM 3.1 - Software User Guide

This National Aeronautics and Space Administration (NASA) Orbital Debris Engineering Model (ORDEM) 3.1 Software User Guide accompanies delivery of the latest upgraded version of the model, ORDEM 3.1. The user guide also provides a top-level program description and a list of capabilities. It includes descriptions of runtime error and information codes, input/output file formats, runtimes for different orbit configurations, and how to use uncertainty files. ORDEM 3.1 supersedes the previous NASA Orbital Debris Program Office (ODPO) models – ORDEM 3.0 (Stansbery, et al. 2014) and ORDEM2000 (Liou, et al. 2002). The availability of new sensor and in situ data, re-analysis of older data, and development of new analytical techniques has enabled the construction of this more comprehensive and sophisticated model. An upgraded graphical user interface (GUI) is integrated with the software. This upgraded GUI uses project-oriented organization and provides the user with graphical representations of numerous output data products. For example, these range from the conventional flux vs. average debris size (or altitude bin) for chosen analysis orbits (or views) to the more complex color-contoured, two-dimensional (2-D) directional flux diagrams in local spacecraft elevation and azimuth. The current model, ORDEM 3.1, supports spacecraft as well as telescope/radar project assessments. ORDEM 3.1 contains updated debris populations covering low Earth orbit (LEO, up to 2000 km altitude) to geosynchronous orbit (GEO, up to 40,000 km altitude) and can assess debris calculations up to year 2050, extending coverage past the previous limit of 2035 in ORDEM 3.0. Although populations differ from its predecessor, ORDEM 3.1 is functionally the same as ORDEM 3.0 and can support ORDEM 3.0 projects through backward compatibility.

Vavrin, Andrew B.↗

The NASA/GSFC 94 GHz Airborne Solid State Cloud Radar System (CRS)

The NASA/Goddard Space Flight Center’s (GSFC’s) W-band (94 GHz) Cloud Radar System (CRS) has been comprehensively updated to modern solid-state and digital technology. This W-band (94 GHz) radar flies in nadir-pointing mode on the NASA ER-2 high-altitude aircraft, providing polarimetric reflectivity and Doppler measurements of clouds and precipitation. This paper describes the design and signal processing of the upgraded CRS. It includes details on the hardware upgrades (SSPA transmitter, antenna, and digital receiver) including a new reflect array antenna and solid-state transmitter. It also includes algorithms, including internal loop-back calibration, external calibration using a direct relationship between volume reflectivity and the range-integrated backscatter of the ocean, and a modified staggered-PRF Doppler algorithm that is highly resistant to unfolding errors. Data samples obtained by upgraded CRS through recent NASA airborne science missions are provided.

Radar↗

Status of the Advanced Oxygen Generation Assembly Design

Future Exploration missions will require an Oxygen Generation Assembly (OGA) to electrolyze water to supply oxygen for crew metabolic consumption. The system design will be based on the International Space Station (ISS) OGA but with added improvements based on lessons learned during ISS operations and technological advances since the original OGA was designed and built. The goal of these improvements will be to reduce system weight, crew maintenance time and spares mass while increasing reliability. Over the past year, the team has performed additional design reviews, testing and analysis in an effort to optimize upgrade efforts and achieve the best value that meets Exploration mission requirements. Upgrades that will be incorporated include: redesign of the electrolysis cell stack, redesign of the hydrogen dome, replacement of the hydrogen sensors, redesign of the recirculation loop deionizing bed, and incorporation of recirculation loop nitrogen purging and water flushing. The ISS OGA will be upgraded to an Advanced OGA (AOGA) configuration and its operation demonstrated in a relevant flight environment.

Oxygen Generation Assembly↗

Characterization of Novel Spacecraft Materials aboard the Materials International Space Station Experiment-Flight Facility (Preliminary Results)

This work will encompass the preflight characterization of 15 novel and heritage materials currently under observation on the Materials International Space Station Experiment-Flight Facility (MISSE-FF). MISSE-FF has been upgraded to perform active reflectance measurements of the materials. Images taken in RGB/IR colors are compared to results from an extensive ground testing campaign to obtain quantitative on-orbit material evolution data. Identical materials samples are to be flown on the ram, wake, and zenith faces of MISSE-FF, enabling deconvolution of the energetic electron, proton, atomic oxygen, and ultraviolet damage pathways. Energy deposition from the space environment leads to chemical changes in the material that in turn alter the optical properties. The same chemical damage that manifests as changes in optical reflectance and absorptance also leads to changes in myriad physical properties such as mechanical strength, electrical conductivity, and chemical reactivity. Therefore, flight materials are able to be characterized based on their unique reflectance spectra by comparing on-orbit measurements of optical reflectance with extensive terrestrial experiments, which help to correlate changes in reflectance with respect to changes in other material properties. The MISSE program has been a part of the International Space Station National Laboratory for many years and has been instrumental in understanding space weather modification of material properties. However, MISSE-FF has been limited to passive experiments with only pre/post flight material studies possible. In advance of the MISSE-16 experiment, the flight facility has received a major upgrade to provide daily spectral observations by way of a RGB/IR camera and a tunable light source. The MISSE-16 mission launched in February 2022 and carries 15 material samples for 6 months of the low Earth orbital exposure. Identical materials samples are to be flown on the ram, wake, and zenith faces of MISSE-FF, enabling deconvolution of the energetic electron, proton, atomic oxygen, and ultraviolet damage pathways. This paper discusses the MISSE-16 experiment, highlights the first use of the facility upgrades, and presents results from the extensive preflight material characterization that includes directional hemispherical reflectance, bidirectional reflectance, AFM, SEM, and electrical conductivity. Additionally, data showing the modification of these properties by ground-based exposure to space-like electron and atomic oxygen flux will be discussed. Finally, updates on deployment and initial check-out of the experiment on MISSE-FF will be presented. It is the ultimate goal of this program to provide validation for the development of ground based space weather simulation facilities and techniques.

Ryan Hoffman↗

Electromagnetic Compatibility Test and Analysis Campaign of NASA's Mars 2020 Rover Final Submission

NASA's Mars 2020 Perseverance Rover—with a launch window opening July 2020, and landing expected February 2021—has mission objectives to look for evidence of habitability, seek biosignatures of past life, collect and cache samples for possible future return to Earth, and prepare for future human missions to Mars. The Rover platform is similar to the previous Mars Science Laboratory (MSL) “Curiosity” rover that landed in 2012 but contains a new suite of scientific instruments and upgrades to existing functionality: seven new and/or upgraded scientific payloads, an upgraded arm and sampling system, and a Helicopter demonstration. These changes—along with new efficiency goals to operate more Rover subsystems concurrently and thus collect more science—presented new electromagnetic compatibility (EMC) challenges. In this paper, we will describe the campaign to ensure Mars 2020 mission success from an electromagnetic environment perspective: 1) confirming existing MSL heritage subsystems and EMC requirements were compatible with the new Mars 2020 mission objectives, 2) engaging with engineers and scientists early in the project to identify and evaluate risks before hardware assembly and performing ambitious risk reduction tests, 3) undertaking a comprehensive subsystem qualification test program based on tailored MIL-STD-461F requirements, occasionally leading to redesign, 4) synthesizing the data collected to perform detailed analyses toward the goal of making risk-informed decisions at a system level. The spacecraft successfully completed all three planned system level tests, demonstrating self-compatibility with minimal impact to operations from electromagn

Gonzales, Edward C↗

Electromagnetic Compatibility Test and Analysis Campaign of NASA's Mars 2020 Rover

NASA's Mars 2020 Rover—with a launch window opening July 2020, and landing expected February 2021—has mission objectives to look for evidence of habitability, seek biosignatures of past life, collect and cache samples for possible future return to Earth, and prepare for future human missions. The Rover platform is similar to the previous Mars Science Laboratory (MSL) “Curiosity” rover that landed in 2012 but contains a new suite of scientific instruments and upgrades to existing functionality. The scientific payload includes a trio of chemical analysis tools (PIXL, SHERLOC, SuperCam), a ground penetrating radar (RIMFAX), an upgraded weather station (MEDA), upgraded high resolution camera (MastCam-Z), and an oxygen-producing experiment (MOXIE). These changes—along with new efficiency goals to operate more Rover subsystems concurrently and thus collect more science—presented new electromagnetic compatibility (EMC) challenges. In this paper, we will describe the campaign to ensure Mars 2020 mission success from an electromagnetic environment perspective: 1) confirming existing MSL heritage subsystems and EMC requirements were compatible with the new Mars 2020 mission objectives, 2) engaging with engineers and scientists early in the project to identify and evaluate risks before hardware assembly and performing ambitious risk reduction tests, 3) undertaking a comprehensive subsystem qualification test program based on tailored MIL-STD-461F requirements, occasionally leading to redesign, 4) synthesizing the data collected to perform detailed analyses toward the goal of making risk-informed decisions at a system level. The spacecraft has successfully completed all three planned system level tests, demonstrating self-compatibility with minimal impact to operations from electromagnetic interference in all mission phases.

Gonzales, Edward C↗

Status of the Advanced Oxygen Generation Assembly Design

Future Exploration missions will require an Oxygen Generation Assembly (OGA) to electrolyze water to supply oxygen for crew metabolic consumption. The system design will be based on the International Space Station (ISS) OGA but with added improvements based on lessons learned during ISS operations and technological advances since the original OGA was designed and built. The goal of these improvements will be to reduce system weight, crew maintenance time and spares mass while increasing reliability. Over the past year, the team has performed additional design reviews, testing and analysis in an effort to optimize upgrade efforts and achieve the best value that meets Exploration mission requirements. Upgrades that will be incorporated include: redesign of the electrolysis cell stack, redesign of the hydrogen dome, replacement of the hydrogen sensors, redesign of the recirculation loop deionizing bed, and incorporation of recirculation loop nitrogen purging and water flushing. The ISS OGA will be upgraded to an Advanced OGA (AOGA) configuration and its operation demonstrated in a relevant flight environment.

Oxygen Generation Assembly↗

Status of the Advanced Oxygen Generation Assembly

Future Exploration missions will require an Oxygen Generation Assembly (OGA) to electrolyze water to supply oxygen for crew metabolic consumption. The system design will be based on the International Space Station (ISS) OGA but with added improvements based on lessons learned during ISS operations and technological advances since the original OGA was designed and built. The goal of these improvements will be to reduce spares mass and crew maintenance time while increasing reliability. Over the past year, the team has performed additional design reviews, testing and analysis in an effort to optimize upgrade efforts and achieve the best value that meets Exploration mission requirements. Upgrades that will be incorporated include: redesign of the electrolysis cell stack, redesign of the hydrogen dome, replacement of the hydrogen sensors, redesign of the recirculation loop deionizing bed, and incorporation of recirculation loop nitrogen purging and water flushing. The ISS OGA will be upgraded to an Advanced OGA (AOGA) configuration and its operation demonstrated in a relevant flight environment.

ECLSS↗