Search NASA⌕ Search

SEARCH · Search NASA

Results for “Verification of data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

Ares I-X Range Safety Flight Envelope Analysis

Ares I-X was the first test flight of NASA's Constellation Program's Ares I Crew Launch Vehicle designed to provide manned access to low Earth orbit. As a one-time test flight, the Air Force's 45th Space Wing required a series of Range Safety analysis data products to be developed for the specified launch date and mission trajectory prior to granting flight approval on the Eastern Range. The range safety data package is required to ensure that the public, launch area, and launch complex personnel and resources are provided with an acceptable level of safety and that all aspects of prelaunch and launch operations adhere to applicable public laws. The analysis data products, defined in the Air Force Space Command Manual 91-710, Volume 2, consisted of a nominal trajectory, three sigma trajectory envelopes, stage impact footprints, acoustic intensity contours, trajectory turn angles resulting from potential vehicle malfunctions (including flight software failures), characterization of potential debris, and debris impact footprints. These data products were developed under the auspices of the Constellation's Program Launch Constellation Range Safety Panel and its Range Safety Trajectory Working Group with the intent of beginning the framework for the operational vehicle data products and providing programmatic review and oversight. A multi-center NASA team in conjunction with the 45th Space Wing, collaborated within the Trajectory Working Group forum to define the data product development processes, performed the analyses necessary to generate the data products, and performed independent verification and validation of the data products. This paper outlines the Range Safety data requirements and provides an overview of the processes established to develop both the data products and the individual analyses used to develop the data products, and it summarizes the results of the analyses required for the Ares I-X launch.

Starr, Brett R.↗

New Whole-House Solutions Case Study: Testing Ductless Heat Pumps in High-Performance Affordable Housing, the Woods at Golden Given - Tacoma, Washington

The Woods is a 30-home, high- performance, energy efficient sustainable community built by Habitat for Humanity (HFH). With Support from Tacoma Public Utilities, Washington State University (part of the Building America Partnership for Improved Residential Construction) is researching the energy performance of these homes and the ductless heat pumps (DHP) they employ. This project provides Building America with an opportunity to: field test HVAC equipment, ventilation system air flows, building envelope tightness, lighting, appliance, and other input data that are required for preliminary Building Energy Optimization (BEopt™) modeling and ENERGY STAR® field verification; analyze cost data from HFH and other sources related to building-efficiency measures that focus on the DHP/hybrid heating system and heat recovery ventilation system; evaluate the thermal performance and cost benefit of DHP/hybrid heating systems in these homes from the perspective of homeowners; compare the space heating energy consumption of a DHP/electric resistance (ER) hybrid heating system to that of a traditional zonal ER heating system; conduct weekly "flip-flop tests" to compare space heating, temperature, and relative humidity in ER zonal heating mode to DHP/ER mode.

Appliance↗

Validation and Verification of MCNP6 Against High-Energy Experimental Data and Calculations by Other Codes. III. The MPI Testing Primer

This primer presents a set of Validation and Verification (V&V) MCNP6 results calculated in parallel, with MPI, obtained mostly using its event generators at intermediate and high-energies, but also several examples of results using data libraries at energies below 150 MeV, against various recent experimental data. It is the third part of a set of MCNP6 Testing Primers, after its first, LA-UR-11-05129, and second, LA-UR-11-05627, publications. The MCNP6 test-problems discussed here are presented in the /VALIDATION CEM/, /VALIDATION LAQGSM/, and /DELAYED PARTICLES/ subdirectories in the MCNP6 /Testing/ directory. README files that contain short descriptions of every input file, the experiment, the quantity of interest that the experiment measures and its description in the MCNP6 output files, and the publication reference of that experiment are presented for every test-problem. Templates for plotting the corresponding results with xmgrace as well as pdf files with figures representing the final results of our V&V efforts are presented. Several technical “bugs” in MCNP6 while running it in parallel with MPI using its event generators were discovered during our current V&V of MCNP6 and were fixed mostly by Dr. Jeffrey S. Bull. Our results show that MCNP6 using its CEM03.03, LAQGSM03.03, Bertini, INCL+ABLA, and ISABEL event generators describes, as a rule, reasonably well different intermediate- and high-energy measured data and agrees very well with calculations by other codes. Just as expected, the MCNP6 results obtained with MPI are practically the same as the ones calculated with MCNP6 in a sequential mode. This primer isn’t meant to be read from cover to cover. Readers may skip some sections and go directly to a test-problem they are interested in.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Trustworthy Autonomy for Gateway Vehicle System Manager

The Vehicle System Manager (VSM) is the highest-level software control system in the Gateway hierarchical Autonomous System Management Architecture. The VSM provides four function categories: Mission Management and Timeline Execution, Resource Management, Fault Management, Vehicle Control and Operation. VSM provides various levels of automation ranging from fully autonomous operations with no flight crew and minimal ground monitoring to advisory automation when Gateway is crewed and has full ground monitoring. Trustworthiness is achieved via verified specification, comprehensive development verification, and real-time verification using assume-guarantee contracts. Development verification includes semantic verification of the data model via peer review and testing and assume-guarantee contracts implemented using the PlusCal/TLA+ environment. VSM also uses runtime assume-guarantee contracts, implemented in R2U2 via a runtime monitor that feeds the necessary telemetry data to R2U2 and which receives and responds to the R2U2 verdict stream. The full lifecycle verification approach and use of assume-guarantee contracts provides increased trustworthiness to VSM. Preliminary results provide encouragement that VSM can be both autonomous and trustworthy.

Assume-guarantee contracts↗

NASA InterCenter Collaboration Increases ROI

Funding for National Aeronautics and Space Administration (NASA) space mission operations is tighter than ever in the current environment of federal government deficit reductions. Conventional wisdom would expect this environment to drive increasing competition between NASA centers for the limited available funds. However, recent inter-center activities at the Huntsville Operations Support Center (HOSC) at NASA's Marshall Space Flight Center emphasize collaboration rather than competition and demonstrate the value of partnerships to increase the return on shrinking investments. These efforts cover a variety of activities and potential returns. To facilitate sharing data from test and verification through operations without levying requirements on data format or software tools, the HOSC is working with multiple centers on an evolutionary path toward a distributed data architecture and archive. The approach reduces the required investment by allowing the partners to reuse their existing formats and tools, while facilitating gone ]stop h user visibility into and controlled access to the full complement of data regardless of user or data location. The HOSC is also working on two activities to promote sharing operations implementations and leveraging the experts and expertise across multiple NASA sites. In one, the use of Consultative Committee for Space Data Systems (CCSDS) standards for the message abstraction layer provides an interoperability layer on top of existing ground data system communication architectures. This allows missions to select the most appropriate solutions for their requirements with a minimal investment in rehosting the components in a coherent operational environment. The other emphasizes shared tools and increased remote access to minimize travel for tests and critical activities and reduce the floor space required for a dedicated operations center. This paper summarizes these and other inter-center collaboration activities at the HOSC and the benefits that each can bring, not just to the participants, but to the broader operations community.

Lankford, Kimberly↗

Solutions Network Formulation Report. Integration of OMI and TES Aerosol Products into the EPA Regional Planning Organizations' FASTNET Aerosol Tracking and Analysis Tool

Every year, more than 280 million visitors tour our Nation s most treasured parks and wilderness areas. Unfortunately, many visitors are unable to see the spectacular vistas they expect because of white or brown haze in the air. Most of this haze is not natural; it is air pollution, carried by the wind often hundreds of miles from its origin. Some of the pollutants have been linked to serious health problems, such as asthma and other lung disorders, and even premature death. In addition, nitrates and sulfates contribute to acid rain formation, which contaminates rivers and lakes and erodes buildings and historical monuments. The U.S. Environmental Protection Agency RPOs (Regional Planning Organizations) have been tasked with monitoring and determining the nature and origin of haze in Class I scenic areas, and finding ways to reduce haze in order to improve visibility in these areas. The RPOs have developed an Internet-based air quality DST (Decision Support Tool) called FASTNET (Fast Aerosol Sensing Tools for Natural Event Tracking). While FASTNET incorporates a few satellite datasets, most of the data utilized by this DST comes from ground-based instrument networks. The problem is that in many areas the sensors are sparsely located, with long distances between them, causing difficulties in tracking haze over the United States, determining its source, and analyzing its content. Satellite data could help to fill in the data gaps and to supplement and verify ground-recorded air quality data. Although satellite data are now being used for air quality research applications, such data are not routinely used for environmental decision support, in part because of limited resources, difficulties with interdisciplinary data interpretation, and the need for advanced inter-agency partnerships. As a result, the validation and verification of satellite data for air quality operational system applications has been limited This candidate solution evaluates the usefulness of OMI (Ozone Monitoring Instrument) and TES (Tropospheric Emission Spectrometer) air quality data for the RPOs by comparing OMI and TES data with ground-based data that are acquired during identified episodes of air pollution. The air quality data from OMI and TES are of different spectral ranges than data from satellites currently included in FASTNET, giving them potential advantages over the existing satellites. If the OMI and TES data are shown to be useful to the RPOs, they would then be integrated into the FASTNET DST for use on an operational basis.

Knowlton, Kelly↗

Multi-year assessment of the impact of ship-borne radiosonde observations on polar WRF forecasts in the Arctic

Abstract To compensate for the lack of conventional observations over the Arctic Ocean, ship-borne radiosonde observations have been regularly carried out during summer Arctic expeditions and the observed data have been broadcast via the global telecommunication system since 2017. With these data obtained over the data-sparse Arctic Ocean, observing system experiments were carried out using a polar-optimized version of the Weather Research and Forecasting (WRF) model and the WRF Data Assimilation (WRFDA) system to investigate their effects on analyses and forecasts over the Arctic. The results of verification against reanalysis data reveal: (1) DA effects on analyses and forecasts; (2) the reason for the year-to-year variability of DA effects; and (3) the possible role of upper-level potential vorticity in delayed DA effects. The overall assimilation effects of the extra data on the analyses and forecasts over the Arctic are positive. Initially, the DA effects are the most apparent in the temperature variables in the middle/lower troposphere, which spread to the wind variables in the upper troposphere. The effects decrease with time but reappear after approximately 120 h, even in the 240-h forecasts. The effects on forecasts vary depending on the proximity of the radiosonde observation locations to the high synoptic variability. The upper-level potential vorticity is known to play an important role in the development of Arctic cyclones, and it is suggested as a possible explanation for the delayed DA effects after about 120 h.

Geology↗

Information Filters for Safeguards Applications: A Scoping Study

A core concern of the Department of Energy is protecting sensitive information in the face of verification agreements that may make use of increasingly sophisticated and intrusive sensors. The conflict between intrusiveness and information protection is evident in existing treaties, such as the Chemical Weapons Convention (CWC) and the Additional Protocol (AP), where Congress has seen a need to step in and enact implementing legislation to protect, for example, sensitive information such as certain unique chemical signatures, but in so doing has introduced complexities into U.S. treaty compliance policy. Information barriers or filters (IFs) – broadly defined as physical and/or encryption mechanisms that preclude acquisition of sensitive, quantitative information while allowing the acquisition of treaty-relevant qualitative information by an inspectorate – could play a useful role in avoiding this type of conflict. In order to stimulate new thinking on ways to meet existing and future safeguard challenges, this scoping study investigates how IFs – a technique borrowed from the realm of arms control verification - might contribute to international safeguards activities. Information filters (IFs) have long been recognized as an important tool for the protection of sensitive signals and other data in the verification of bilateral and multilateral arms control treaties. The implementation of NPT safeguards, while differing somewhat in context from arms control verification, involves similar sensitivity concerns. This report examines whether or not IFs can be useful in the world of international safeguards, and provides a survey of methods of barring or filtering information that could be applied. The study finds that while many safeguards activities involve non sensitive data, there are also a number of areas where IFs are already in use and others where IFs could make a useful contribution. Examples include verification of enrichment plants, complementary access inspections, and the Additional Protocol (AP) to Comprehensive Safeguards Agreements (CSAs) under the Nuclear Non-proliferation Treaty (NPT).

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

In-Flight Characterization of the Electromagnetic Environment Inside an Airliner

In 1995, the NASA Langley Research Center conducted a series of experimental measurements that characterized the electromagnetic environment (EME) inside a Boeing 757 airliner while in flight, Measurements were made of the electromagnetic energy coupled into a commercially configured aircraft as it was flown in close proximity to ground-based radio frequency (RF) transmitters operating at approximately 26, 173. and 430 MHz. The goal of this experiment was to collect data for the verification of analytical predictions of the internal aircraft response to an external stimulus. This paper describes the experiment, presents the data collected by it, and discusses techniques used to compute both the magnitude of the electric field illuminating the aircraft and its direction of propagation relative to a coordinate system fixed to the aircraft. The latter is determined from Global Positioning System (GPS) and aircraft Inertial Reference Unit (IRU) data. The paper concludes with an examination of the shielding effectiveness of the test aircraft. as determined by comparison of' the measured internal EME and computed external EME.

Moeller, Karl J.↗

Model verification of mixed dynamic systems

A parameter-estimation method is described for verifying the mathematical model of mixed (combined interactive components from various engineering fields) dynamic systems against pertinent experimental data. The model verification problem is divided into two separate parts: defining a proper model and evaluating the parameters of that model. The main idea is to use differences between measured and predicted behavior (response) to adjust automatically the key parameters of a model so as to minimize response differences. To achieve the goal of modeling flexibility, the method combines the convenience of automated matrix generation with the generality of direct matrix input. The equations of motion are treated in first-order form, allowing for nonsymmetric matrices, modeling of general networks, and complex-mode analysis. The effectiveness of the method is demonstrated for an example problem involving a complex hydraulic-mechanical system.

Chrostowski, J. D.↗

Vision-based obstacle detection for rotorcraft flight

An obstacle detection approach to rotorcraft flight is described which is based on feature tracking and recursive range estimation. Flight characteristics are taken into account. A range map derived on the basis of this approach provides an advisory display to the pilot and can serve as input to an automatic obstacle-avoidance guidance system. A NASA CH-47 Chinook helicopter was used to develop an image and rotorcraft flight data base for verification of obstacle detection concepts. The performance of the passive range estimation algorithms is demonstrated using both laboratory image and flight image data.

Sridhar, Banavar↗

The Potosi Reservoir Model 2013

As a part of a larger project co-funded by the United States Department of Energy (US DOE) to evaluate the potential of formations within the Cambro-Ordovician strata above the Mt. Simon as potential targets for carbon sequestration in the Illinois and Michigan Basins, the Illinois Clean Coal Institute (ICCI) requested Schlumberger to evaluate the potential injectivity and carbon dioxide (CO2) plume size of the Cambrian Potosi Formation. The evaluation of this formation was accomplished using wireline data, core data, pressure data, and seismic data from the US DOE-funded Illinois Basin–Decatur Project (IBDP) being conducted by the Midwest Geological Sequestration Consortium in Macon County, Illinois. In 2010, technical performance evaluations on the Cambrian Potosi Formation were performed through reservoir modeling. The data included formation tops from mud logs, well logs from the VW1 and the CCS1 wells, structural and stratigraphic formation from three dimensional (3D) seismic data, and field data from several waste water injection wells for Potosi Formation. Intention was for two million tons per annum (MTPA) of CO2 to be injected for 20 years. In the preceding, the 2010 Potosi heterogeneous model (referred to as the "Potosi Dynamic Model 2010" in this topical report) was re-run using a new injection scenario; 3.2 MTPA for 30 years. The extent of the Potosi Dynamic Model 2010, however, appeared too small for the new injection target. It was not sufficiently large enough to accommodate the evolution of the plume. The new model, Potosi Dynamic Model 2013a, was built by extending the Potosi Dynamic Model 2010 grid to 30 miles x 30 miles (48.3km x48.3km), while preserving all property modeling workflows and layering. This model was retained as the base case of Potosi Dynamic Model 2013a. The Potosi reservoir model was updated to take into account the new data from the verification well VW2 which was drilled in 2012. The new porosity and permeability modeling was performed to take into account the log data from the new well. Revisions of the 2010 modeling assumptions were also done on relative permeability, capillary pressures, formation water salinity, and the maximum allowable well bottomhole pressure. Dynamic simulations were run using the injection target of 3.2 MTPA for 30 years. This new dynamic model was named Potosi Dynamic Model 2013b. Due to the major uncertainties on the vugs permeability, two models were built; the Pessimistic and Optimistic Cases. The Optimistic Case assumes vugs permeability of 9,000 mD, which is analog to the vugs permeability identified in the pressure fall off test of a waste water injector in the Tuscola site, approx. 40 miles (64.4km) away from the IBDP area. The Pessimistic Case assumes that the vugs permeability is equal to the log data, which does not take into account the permeability from secondary porosity. The probability of such case is deemed low and could be treated as the worst case scenario, since the contribution of secondary porosity to the permeability is neglected and the loss circulation events might correspond to a much higher permeability. It is considered important, however, to identify the range of possible reservoir performance since there are no rigorous data available for the vugs permeability. The Optimistic Case gives an average CO2 injection rate of 0.8 MTPA and cumulative injection of 26 MT in 30 years, which corresponds to 27% of the injection target. The injection rate is approx. 3.2 MTPA in the first year as the well is injecting into the surrounding vugs, and declines rapidly to 0.8 MTPA in year 4 once the surrounding vugs are full and the CO2 start to reach the matrix. This implies that according to this preliminary model, a minimum of four (4) wells could be required to achieve the injection target. This result is lower than the injectivity estimated in the Potosi Dynamic Model 2013a (43 MT in 30 years), since the permeability model applied in the Potosi Dynamic Model 2013b is more conservative. This revision was deemed necessary to treat the uncertainty in a more appropriate manner. As the CO2 follows the paths where vugs interconnection exists, a reasonably large and irregular plume extent was created. For the Optimistic Case, the plume extends 17 miles (27.4km) in E-W and 14 miles (22.5km) in N-S directions after 30 years. After injection is completed, the plume continues to migrate laterally, mainly driven by the remaining pressure gradient. After 100 years post injection, the plume extends 20 miles (32.2km) in E-W and 15.5 miles (24.9km) in N-S directions. Should the targeted cumulative injection of 96 MT be achieved; a much larger plume extent could be expected. For the Optimistic Case, the increase of reservoir pressure at the end of injection is approximately 1200 psia (8,274 kPa) around the injector and gradually decreases away from the well. The reservoir pressure increase is less than 30 psia (206.8 kPa) beyond 14 miles (22.5km) away from injector. Should the targeted cumulative injection of 96 MT be achieved; a much larger areal pressure increase could be expected. The initial reservoir pressure is nearly restored after approximately 100 years post injection. The presence of matrix slows down the pressure dissipations. The Pessimistic Case gives an average CO2 injection rate of 0.2 MTPA and cumulative injection of 7 MT in 30 years, which corresponds to 7% of the injection target. This implies that in the worst case scenario, a minimum of sixteen (16) wells could be required to achieve the injection target. The present evaluation is mainly associated with uncertainty on the vugs permeability, distribution, and interconnectivity. The different results indicated by the Optimistic and Pessimistic Cases signify the importance of vugs permeability characterization. Therefore, injection test and pressure interference test among the wells could be considered to evaluate the local vugs permeability, extent, and interconnectivity. Porosity mapping derived from the seismic inversion could also be used in the succeeding task to characterize the lateral porosity distribution within the reservoir. With or without seismic inversion porosity mapping, it is worth exploring whether increased lateral heterogeneity plays a significant role in Potosi injectivity. Investigations on vugular, dolomitic outcrops suggest that there may be significantly greater lateral heterogeneity than what has been modeled here. Facies modeling within the Potosi has yet to be thoroughly addressed. The carbonates during the time of deposition are believed to be regionally extensive. However, it may be worth delineating the reservoir with other regional wells or modern day analogues to understand the extent of the Potosi. More specifically, the model could incorporate lateral changes or trends if deemed necessary to represent facies transition. Data acquisitions to characterize the fracture pressure gradient, the formation water properties, the relative permeability, and the capillary pressure could also be considered in order to allow a more rigorous evaluation of the Potosi storage performance. A simulation using several injectors could also be considered to determine the required number of wells to achieve the injection target while taking into account the pressure interference.

Adushita, Yasmin↗

Scientific Data Purchase Project Overview Presentation

The Scientific Data Purchase (SDP) project acquires science data from commercial sources. It is a demonstration project to test a new way of doing business, tap new sources of data, support Earth science research, and support the commercial remote sensing industry. Phase I of the project reviews simulated/prototypical data sets from 10 companies. Phase II of the project is a 3 year purchase/distribution of select data from 5 companies. The status of several SDP projects is reviewed in this viewgraph presentation, as is the SDP process of tasking, verification, validation, and data archiving. The presentation also lists SDP results for turnaround time, metrics, customers, data use, science research, applications research, and user feedback.

Holekamp, Kara↗

Ares I-X Post Flight Ignition Overpressure Review

Ignition Overpressure (IOP) is an unsteady fluid flow and acoustic phenomena caused by the rapid expansion of gas from the rocket nozzle within a ducted launching space resulting in an initially higher amplitude pressure wave. This wave is potentially dangerous to the structural integrity of the vehicle. An in-depth look at the IOP environments resulting from the Ares I-X Solid Rocket Booster configuration showed high correlation between the pre-flight predictions and post-flight analysis results. Correlation between the chamber pressure and IOP transients showed successful acoustic mitigation, containing the strongest IOP waves below the Mobile Launch Pad deck. The flight data allowed subsequent verification and validation of Ares I-X unsteady fluid ducted launcher predictions, computational fluid dynamic models, and strong correlation with historical Shuttle data.

Alvord, David A.↗

Varied farm-level carbon intensities of corn feedstock help reduce corn ethanol greenhouse gas emissions

Abstract A reduction in the overall carbon intensity (CI) of a crop-based biofuel can be achieved by cutting down the CI of the biofuel’s feedstock, which in turn correlates significantly to agricultural management practices. Proposals are being made to incentivize low-carbon biofuel feedstocks under U.S. fuel regulatory programs to promote sustainable farming practices by individual farms. For such an incentive scheme to function properly, robust data collection and verification are needed at the farm level. This study presents our collaboration with U.S. private sector companies to collect and verify the corn production data necessary for feedstock-specific CI calculation at the farm level, through a carefully designed questionnaire, to demonstrate the practicality and feasibility of data collection at scale. We surveyed 71 farms that produced 0.2 million metric tons of corn grain in 2018 in a Midwestern U.S. state to obtain information on key parameters affecting corn ethanol feedstock CI, such as grain yields, fertilizer/chemical application rates, and agronomic practices. Feedstock-specific CI was calculated in the unit of grams (g) CO 2 equivalent (CO 2 e) of greenhouse gases per kilogram (kg) of corn produced. Results showed large CI variations—from 119 to 407 g CO 2 e kg −1 of corn—due to the farm-level inventory, while the production-weighted average CI for all surveyed farms was 210 g CO 2 e kg −1 , comparable to the national average CI of 204 g CO 2 e kg −1 . The nitrogen fertilizer type applied and rate were identified as key factors contributing most to CI variations at the farm level. The estimated N 2 O emissions from fertilizer and biomass nitrogen inputs to soil accounted for 51% of the overall farm-level CI and therefore need to be better monitored at farm level with high resolution. We concluded that this feedstock-specific, farm-level CI evaluation has the potential to be used to incentivize low-carbon feedstock for biofuel production.

54 ENVIRONMENTAL SCIENCES↗

Model verification: synthetic single pattern simulations using seismic reflection data

During Phase 1 of the Weyburn Project (2000-2004), 4D reflection seismic data were used to map CO2 migration within the Midale reservoir, while an extensive fluid sampling program documented the geochemical evolution triggered by CO2-brine-oilmineral interactions. The aim of this task (3b.11) is to exploit these existing seismic and geochemical data sets, augmented by CO2/H2O injection and HC/H2O production data toward optimizing the reservoir model and thereby improving site characterization and dependent predictions of long-term CO2 storage in the Weyburn-Midale reservoir. Our current project activities have concentrated on completing and testing a stochastic inversion method that will identify reservoir models that optimize agreement between the observed and predicted seismic response. This report describes the results of a validation test that uses synthetic seismic data to identify optimal porosity/permeability distributions within the reservoir. The report partially fulfills deliverable D3: “Model verification: synthetic single pattern simulations” in the project’s statement of work. A future deliverable will describe verification activities related to the geochemical inversion algorithm.

58 GEOSCIENCES↗

Development and Validation of Algorithms That Analyze Communicating Thermostat Data to Identify Enclosure Retrofit Opportunities

This report, Development and Validation of Algorithms That Analyze Communicating Thermostat Data to Identify Enclosure Retrofit Opportunities , explores ways to automatically identify residential homes with enclosure retrofit opportunities; estimate prospective savings; and perform evaluation, measurement, and verification using interval data from communicating thermostats.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Authentication Protocol for ICS without Encryption

Industrial control systems (ICS) describes the different types of control systems and associated instrumentation, which includes the devices, systems, networks, and controls used to operate and/or automate industrial processes. Depending on the industry, each ICS functions differently and are built to electronically manage tasks efficiently. Historically, industrial plants have included networking, and changes have been made over time without consideration for security. Many ICS devices currently have inadequate security features. Adding encryption in ICS is undesirable because many of the new detection method involves deep packet inspection. Therefore, we propose to develop a method of providing authentication between devices without encrypting the data. This testbed design will allow rapid development and experimentation with Cyber Physical Systems. Modbus connects to a supervisory computer with a Remote Terminal Unit (RTU) in Supervisory Control and Data Acquisition (SCADA) systems. Our project seeks to enhance security in the ICS environment by adding device authentication to the lower levels of the plant floor. This approach was selected as it allows verification of the sender of data from level 1/level 0 devices up to supervisory systems. This addition is desirable as it adds enhanced verification to the integrity of system data without obscuring (via encryption) the data being transmitted across the network. This is important because many ICS systems are real time critical (decryption adds to latency) and many other good security options require deep packet inspection (which encryption completely defeats). To accomplish this, a proof of concept of adding an authentication scheme was designed and will be tested with a common ICS protocol. The setup includes a single serial cable connecting the serial ports on two devices, a Master and a Minion. Authentication will occur in the following methods: - Data layer involving Transport Layer Security/Secure Socket Layer (TLS/SSL); - TCP/IP route implementation; - Key exchange algorithm; - Raspberry Pi programming for authentication. A portion of the setup includes adding Raspberry Pi into the system as the device is handling the authentication for the network traffic. Modbus is the chosen ICS protocol. It is used to transmit signals from instrumentation and control devices back to a main controller or data gathering system. Typically, the device identity is assumed but not verified. For verifying device identity, we constructed a digital signature architecture with TLS. A novel adaptation of this is to use only the digital signature that is provided and not the encryption capability. This allows ICS traffic to flow unobscured while still providing verification for the integrity of the data. Verification of this process will involve adding additional I/O level network devices with spoofed IP addresses and detecting the authenticated versus unauthenticated traffic. Our TLS implementation will have encryption disabled but should still allow for digital signing of data. This will enable our system to distinguish between real end devices and spoofed end devices. This experiment is presently building the test setup. It is focusing on a small setting to identify authenticated and unauthenticated devices on the network. This should allow for scaling to a larger network size after the initial proof of concept. One concern with this scheme is a certificate deployment has a large scale key management. Network size will thus increase the key management task for security. In addition, we believe that further research should be done on exploring the use of this method to defeat man-in-the-middle attacks.

42 ENGINEERING↗