Search NASA⌕ Search

SEARCH · Search NASA

Results for “Waste Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 379 records · Page 21

PERFORMANCE ASSESSMENT TO SUPPORT CLOSURE OF SINGLE-SHELL TANK WASTE MANAGEMENT AREA C AT THE HANFORD SITE

Current proposed regulatory agreements (Consent Decree) at the Hanford Site call for closure of the Single-Shell Tank (SST) Waste Management Area (WMA) C in the year 2019. WMA C is part of the SST system in 200 East area ofthe Hanford Site and is one of the first tank farm areas built in mid-1940s. In order to close WMA C, both tank and facility closure activities and corrective actions associated with existing soil and groundwater contamination must be performed. Remedial activities for WMA C and corrective actions for soils and groundwater within that system will be supported by various types of risk assessments and interim performance assessments (PA). The U.S. Department of Energy, Office of River Protection (DOE-ORP) and the State ofWashington Department of Ecology (Ecology) are sponsoring a series of working sessions with regulators and stakeholders to solicit input and to obtain a common understanding concerning the scope, methods, and data to be used in the planned risk assessments and PAs to support closure of WMA C. In addition to DOE-ORP and Ecology staff and contractors, working session members include representatives from the U.S. Enviromnental Protection Agency, the U.S. Nuclear Regulatory Commission (NRC), interested tribal nations, other stakeholders groups, and members of the interested public. NRC staff involvement in the working sessions is as a technical resource to assess whether required waste determinations by DOE for waste incidental to reprocessing are based on sound technical assumptions, analyses, and conclusions relative to applicable incidental waste criteria.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Capacity building in rural Guatemala by implementing a solid waste management program

The development and implementation of a solid waste management program served to build local capacity in San Mateo Ixtatan between 2002 and 2003 as part of a public health action plan. The program was developed and implemented in two phases: (1) the identification and education of a working team from the community; and (2) the completion of a solid waste classification and quantification study. Social capital and the water cycle were two public health approaches utilized to build a sustainable program. The activities accomplished gained support from the community and municipal authorities. A description of the tasks completed and findings of the solid waste classification and quantification performed by a local working group are presented in this paper.

54 ENVIRONMENTAL SCIENCES↗

Maximizing Operational Efficiencies in Waste Management on the Hanford Plateau Remediation Contract in a Down-turned Market - 13484

Recent changes in DOE priorities and funding have pressed DOE and its contractors to look for innovative methods to sustain critical operations at sites across the Complex. At the Hanford Site, DOE Richland Operations and its prime contractor, CH2M Hill Plateau Remediation Company (CHPRC), have completed in-depth assessments of the Plateau Remediation Contract (PRC) operations that compared available funding to mission and operational objectives in an effort to maintain requisite safety and compliance margins while realizing cost savings that meet funding profiles. These assessments included confirmation of current baseline activities, identification of potential efficiencies, barriers to implementation, and potential increased risks associated with implementation. Six operating PRC waste management facilities were evaluated against three possible end-states: complete facility closure, maintaining base operations, and performing minimum safe surveillance and maintenance activities. The costs to completely close evaluated facilities were determined to be prohibitively high and this end-state was quickly dropped from consideration. A summary of the analysis of remaining options by facility, efficiencies identified, impact to risk profiles, and expected cost savings is provided in Table I. The expected cost savings are a result of: - right-sizing and cross-training work crews to address maintenance activities across facilities; - combining and sequencing 'like-moded' operational processes; - cross-cutting emergency planning and preparedness staffing; - resource redistribution and optimization; - reducing areas requiring routine surveillance and inspection. For the efficiencies identified, there are corresponding increases in risk, including a loss of breadth and depth of available resources; lengthened response time to emergent issues; inability to invest in opportunities for improvement (OFIs); potential single-point failures or non-compliancies due to resource scarcity; limited cross-training capability; and reduced capability to respond to changes in DOE priorities. Finally, there are many challenges to achieving these cost savings. With a workforce nearing retirement effective succession planning becomes critical to success and requires establishing a balance between the cost of hiring and training and cost-saving activities. With six active waste management facilities spread across nearly 15 square miles, scheduling and deploying cross-trained surveillance and maintenance teams is a logistical challenge, particularly as the loss of funding has not diminished emphasis by regulatory agencies placed on the safe and compliant performance of DOE and its contractors. As reflected in Table I, efficiencies are currently being implemented on the Hanford Plateau Remediation Contract (PRC) that deliver cost savings that align with the current site budget while maintaining critical capabilities. It is currently estimated that these efficiencies will result in a cost savings of approximately $9 million for FY13 in base and minimum safe operations on the PRC - a cost reduction of more than 13 percent over FY12 and nearly 30 percent over FY09 levels. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recent Developments in Radioactive Waste Management in the Federal Republic of Germany - 17450

In 2013 the Federal Parliament and the Federal Council passed the Act Concerning the Search and Selection of a Site for a Repository for Heat-Generating Radioactive Waste and the Amendment of Other Acts (Site Selection Act). It was a restart for the search for a repository for especially heat-generating waste in Germany. As a first step in May 2014 the Commission 'Storage of High-Level Radioactive Waste' started their work. Their aim was to debate and clarify the principle questions concerning the management of heat-generating radioactive waste. As well as to evaluate and determine the fundamentals for the Site Selection Process e.g. safety requirements, exclusion criteria, minimum requirements and consideration criteria for the site selection. They also evaluated the organizational and procedural arrangements in the scope of waste management. As a first act to implement the suggestions of this Commission the organizational structures in waste management were greatly altered. This reorganization not only had a significant influence on the waste management of high-active, but also on the management of low- and intermediate-active waste management in the Federal Republic of Germany. In 2015 a second Commission started its work focusing on the funding of waste management in Germany. The results of this Commission were presented in April 2016. At the moment the suggestions of this Commission are being implemented, changing the financial responsibilities for waste management in the Federal Republic of Germany. The presentation will focus on changes and the developments of radioactive waste management in Germany and talk about the ongoing process in implementing the suggestions of the two Commissions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Evaluation of Alternative Waste Management System Architectures - 16338

The Nuclear Fuels Storage and Transportation Planning Project (NFST), under the U.S. Department of Energy, Office of Nuclear Energy, Office of Fuel Cycle Technologies, is conducting analyses to inform future decisions regarding an integrated waste management system with a current focus on commercial spent nuclear fuel (SNF). This work builds on results from previous systems architecture studies within NFST. System-level analyses of the overall interface between at-reactor, consolidated storage, and ultimate disposition, along with the development of supporting logistic simulation tools, were initiated in 2012. This paper highlights recent results of the NFST systems architecture analysis efforts initiated in 2012. Waste management design choices are evaluated with respect to the impact on the entire system. This includes an analysis of alternative strategies for allocating receipt of SNF from reactor sites, storage options for SNF at an interim storage facility (ISF), and thermal limits restricting the transportation of canisters from an ISF to a mined geological repository (MGR). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The New TN{sup R} MW Cask System Focused on Facilities End-of-Life Waste Management - 16627

When preparing for the decommissioning of a nuclear facility, during its 'end of life' management and while performing the actual dismantling operations, one has to consider a large diversity of nuclear waste in term of types, volumes and activities. Customers are frequently faced with the obligation to undertake multiple and costly waste management operations including handling, reconditioning or re-transferring from one package to another, for example when moving from on-site storage to transportation. To address this issue, a new - highly flexible - cask system named TN{sup R} MW is being developed. This cask has a total weight of 10 T and is compliant with the 2012 IAEA regulations. It is developed on a flexible concept basis, adaptable to the various nuclear needs, including: from IP2 to B(U) / B(U)F; onsite/ international transportation; long term interim storage. Licensing and manufacturing of number of items of this TN{sup R} MW family is underway. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ecological risk assessment software for radioactive waste management facilities - 15464

Environmental Risk Assessment (ERA) is a systematic process which can be used to identify, quantify and characterize the risk posed by contaminants and physical stressors in the environment on biological receptors, including human and non-human biota. Human receptors can be addressed through a Human Health Risk Assessment and non-human biota can be addressed through an Ecological Risk Assessment (EcoRA). In 2012 the Canadian Standards Association (CSA) issued a CSA standard N288.6 Environmental Risk Assessment at Class I Nuclear Facilities and Uranium Mines and Mills. The standard applies to radioactive waste management facilities, as well as nuclear power plants. The ERA can also be used retrospectively, to estimate the effect that a contaminant or stressor has already had on the environment; and can be used to assist in determining possible remedial or risk management options to return the quality of the affected environment to a predetermined state. While industry-standard tools for estimating radiological doses to humans are readily available, there is a need for a tool to implement the CSA N288.6 standard for Ecological Risk Assessment. To address this need, AMEC developed a computer code called -Assessment of Impact of Contaminants on Ecological Receptors (AICER)-. The code was developed to be consistent with the CSA standard N288.6, by assessing the impact of radiological contamination on non-human biota for normal operations. The code can also be used to screen for the potential effects of conventional contamination on the environment. In addition, the code is also applicable for abnormal events and accidents with the appropriate modification of some parameters used in the code. The AICER code was qualified in accordance with the requirements of the Canadian quality standard CSA N286.7 -Quality Assurance of Analytical, Scientific, and Design Computer Programs for Nuclear Power Plants-. The functionality of the code is illustrated with screen shots in the paper, following the introduction of the theoretical model for the dose calculation. An inter-comparison with RESRAD-BIOTA and ERICA Assessment tool at the conceptual level was conducted. In addition, the practical application of the code for the assessment of the impacts related to an existing radioactive waste management facility is provided. In particular, analysis was conducted to evaluate radiological doses to non-human biota resulting from a fire accident scenario involving an existing waste storage and processing facility. Analysis included all feasible waterborne and airborne exposure pathways. Doses were evaluated for a range of species representing valued ecological components at various trophic levels and compared with benchmark values for indicator species. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Situ Measurements of Low Enrichment Uranium Holdup Process Gas Piping at K-25 - Paper for Waste Management Symposia 2010 East Tennessee Technology Park Oak Ridge, Tennessee

This document is the final version of a paper submitted to the Waste Management Symposia, Phoenix, 2010, abstract BJC/OR-3280. The primary document from which this paper was condensed is In-Situ Measurement of Low Enrichment Uranium Holdup in Process Gas Piping at K-25 Using NaI/HMS4 Gamma Detection Systems, BJC/OR-3355. This work explores the sufficiency and limitations of the Holdup Measurement System 4 (HJVIS4) software algorithms applied to measurements of low enriched uranium holdup in gaseous diffusion process gas piping. HMS4 has been used extensively during the decommissioning and demolition project of the K-25 building for U-235 holdup quantification. The HMS4 software is an integral part of one of the primary nondestructive assay (NDA) systems which was successfully tested and qualified for holdup deposit quantification in the process gas piping of the K-25 building. The initial qualification focused on the measurement of highly enriched UO{sub 2}F{sub 2} deposits. The purpose of this work was to determine if that qualification could be extended to include the quantification of holdup in UO{sub 2}F{sub 2} deposits of lower enrichment. Sample field data are presented to provide evidence in support of the theoretical foundation. The HMS4 algorithms were investigated in detail and found to sufficiently compensate for UO{sub 2}F{sub 2} source self-attenuation effects, over the range of expected enrichment (4-40%), in the North and East Wings of the K-25 building. The limitations of the HMS4 algorithms were explored for a described set of conditions with respect to area source measurements of low enriched UO{sub 2}F{sub 2} deposits when used in conjunction with a 1 inch by 1/2 inch sodium iodide (NaI) scintillation detector. The theoretical limitations of HMS4, based on the expected conditions in the process gas system of the K-25 building, are related back to the required data quality objectives (DQO) for the NBA measurement system established for the K-25 demolition project. The combined review of the HMS software algorithms and supporting field measurements lead to the conclusion that the majority of process gas pipe measurements are adequately corrected for source self-attenuation using HMS4. While there will be instances where the UO{sub 2}F{sub 2} holdup mass presents an infinitely thick deposit to the NaI-HMS4 system these situations are expected to be infrequent. This work confirms that the HMS4 system can quantify UO{sub 2}F{sub 2} holdup, in its current configuration (deposition, enrichment, and geometry), below the DQO levels for the K-25 building decommissioning and demolition project. For an area measurement of process gas pipe in the K-25 building, if an infinitely thick UO{sub 2}F{sub 2} deposit is identified in the range of enrichment of {approx}4-40%, the holdup quantity exceeds the corresponding DQO established for the K-25 building demolition project.

54 ENVIRONMENTAL SCIENCES↗

Panel Session 70: Nuclear Power Plant Waste Management, LLRW Processing Issues

This panel focused on senior utility managers discussing issues with commercial LLW processors. LLW processors had an opportunity to update utilities/NPPs on new or different services or technologies being offered to assist in their radioactive waste management goals, changes to their facility license, revisions to their acceptance guidelines, and emerging compliance issues. Panelists with presentations: UniTech - 'Expanding to Reduce Costs' LLW Processor Update (Gregg Johnstone); Veolia Nuclear Solutions Federal Services - Alaron Nuclear Services (Dave Garber); EnergySolutions Tennessee Processing Facilities (Fred Schulz); Complex Waste Management Issues Services and Treatment Facilities (George M. Taylor)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Material and energy recovery in integrated waste management system - An Italian case study on the quality of MSW data

This paper analyses the way numerical data on Municipal Solid Waste (MSW) quantities are recorded, processed and then reported for six of the most meaningful Italian Districts and shows the difficulties found during the comparison of these Districts, starting from the lack of homogeneity and the fragmentation of the data indispensable to make this critical analysis. These aspects are often ignored, but data certainty are the basis for serious MSW planning. In particular, the paper focuses on overall Source Separation Level (SSL) definition and on the influence that Special Waste (SW) assimilated to MSW has on it. An investigation was then necessary to identify new parameters in place of overall SSL. Moreover, these parameters are not only important for a waste management system performance measure, but are fundamental in order to design and check management plan and to identify possible actions to improve it.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2014 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

This report summarizes the results and conclusions of the annual review of the performance assessments (PAs) and composite analyses (CAs) of the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs). The Area 3 and Area 5 RWMSs were issued Disposal Authorization Statements (DASs) in accordance with U.S. Department of Energy Order DOE O 435.1 “Radioactive Waste Management” (U.S. Department of Energy [DOE] 2001). The Area 3 RWMS and Area 5 RWMS DASs (DOE 1999a, 2000) require preparation of an annual summary report and a determination of the continuing adequacy of the PAs and CAs. The requirement to prepare an annual summary report is implemented in the Maintenance Plan for the PAs and CAs (National Security Technologies, LLC [NSTec] 2007a). The annual summary report is submitted to the DOE Office of Environmental Management for review and approval.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Waste Management and Environmental Contamination Issues at the Chernobyl Site

The destruction of the Unit 4 reactor at the Chernobyl Nuclear Power Plant resulted in the generation of radioactive contamination and radioactive waste at the site and in the surrounding area (referred to as the Exclusion Zone). In the course of remediation activities, large volumes of radioactive waste were generated and placed in temporary near surface waste-storage and disposal facilities. Trench and landfill type facilities were created from 1986 to 1987 in the Chernobyl Exclusion Zone at distances 0.5 to 15 km from the NPP site. This large number of facilities was established without proper design documentation, engineered barriers, or hydrogeological investigations and they do not meet contemporary waste-safety requirements. Immediately following the accident, a Shelter was constructed over the destroyed reactor; in addition to uncertainties in stability at the time of its construction, structural elements of the Shelter have degraded as a result of corrosion. The main potential hazard of the Shelter is a possible collapse of its top structures and release of radioactive dust into the environment. A New Safe Confinement (NSC) with a 100-years service life is planned to be built as a cover over the existing Shelter as a longer-term solution. The construction of the NSC will enable the dismantlement of the current Shelter, removal of highly radioactive, fuel-containing materials from Unit 4, and eventual decommissioning of the damaged reactor. More radioactive waste will be generated during NSC construction, possible Shelter dismantling, removal of fuel containing materials, and decommissioning of Unit 4. The future development of the Exclusion Zone depends on the future strategy for converting Unit 4 into an ecologically safe system, i.e., the development of the NSC, the dismantlement of the current Shelter, removal of fuel containing material, and eventual decommissioning of the accident site. To date, a broadly accepted strategy for radioactive waste management at the reactor site and in the Exclusion Zone, and especially for high-level and long-lived waste, has not been developed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site 2012 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). The data have been collected since 1993 and include calendar year 2012 results. During 2012, groundwater samples were collected and static water levels were measured at the three pilot wells surrounding the Area 5 RWMS. Groundwater samples were collected at UE5PW-1, UE5PW-2, and UE5PW-3 on March 21, August 7, August 21, and September 11, 2012, and static water levels were measured at each of the three pilot wells on March 19, June 6, August 2, and October 15, 2012. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. Indicators of general water chemistry (cations and anions) were also measured. Final results from samples collected in 2012 were within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. These data indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS. There were no significant changes in measured groundwater parameters compared to previous years. The report contains an updated cumulative chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Baseline Risk Assessment Supporting Closure at Waste Management Area C at the Hanford Site Washington

The Office of River Protection under the U.S. Department of Energy is pursuing closure of the Single-Shell Tank (SST) Waste Management Area (WMA) C under the requirements of the Hanford Federal Facility Agreement and Consent Order (HFFACO). A baseline risk assessment (BRA) of current conditions is based on available characterization data and information collected at WMA C. The baseline risk assessment is being developed as a part of a Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Corrective Measures Study (CMS) at WMA C that is mandatory under Comprehensive Environmental Response, Compensation, and Liability Act and RCRA corrective action. The RFI/CMS is needed to identify and evaluate the hazardous chemical and radiological contamination in the vadose zone from past releases of waste from WMA C. WMA C will be under Federal ownership and control for the foreseeable future, and managed as an industrial area with restricted access and various institutional controls. The exposure scenarios evaluated under these conditions include Model Toxics Control Act (MTCA) Method C, industrial worker, maintenance and surveillance worker, construction worker, and trespasser scenarios. The BRA evaluates several unrestricted land use scenarios (residential all-pathway, MTCA Method B, and Tribal) to provide additional information for risk management. Analytical results from 13 shallow zone (0 to 15 ft. below ground surface) sampling locations were collected to evaluate human health impacts at WMA C. In addition, soil analytical data were screened against background concentrations and ecological soil screening levels to determine if soil concentrations have the potential to adversely affect ecological receptors. Analytical data from 12 groundwater monitoring wells were evaluated between 2004 and 2013. A screening of groundwater monitoring data against background concentrations and Federal maximum concentration levels was used to determine vadose zone contamination impacts on groundwater. Waste Management Area C is the first of the Hanford tank farms to begin the closure planning process. The current baseline risk assessment will provide valuable information for making corrective actions and closure decisions for WMA C, and will also support the planning for future tank farm soil investigation and baseline risk assessments.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The role of Aspo Hard Rock laboratory for the Swedish nuclear fuel and waste management's research, developing and demonstration programme for a final repository of spent nuclear fuel - 15378

The Aspo Hard Rock Laboratory (HRL), located in the Simpevarp area in the municipality of Oskarshamn in Sweden, Figure 1, constitutes an important part of the Swedish Nuclear Fuel and Waste Management (SKB) work with design and construction of a deep geological repository for final disposal of spent nuclear fuel. One of the fundamental reasons behind SKB's decision to construct an underground laboratory was to create an opportunity for research, development and demonstration in a realistic and undisturbed rock environment down to repository depth. Most of the research has concerned with processes of importance for the long-term safety of a future final repository and the capability to model the processes taking place at repository depth. Demonstration addresses the performance of the engineered barriers and practical means of constructing a repository and emplacing the canisters containing spent fuel. SKB will in the coming years more focus on using the Aspo HRL for demonstrating technology for and function of important parts of the repository system before constructing and operate the spent nuclear fuel repository in Forsmark. Aspo HRL includes both a research village with office space for 100 persons and different laboratories, e.g. Chemistry and Material Science Laboratory and Bentonite Laboratory, and an underground research laboratory to a depth of 460 m. The Aspo HRL is also open for other organisations to be used for their own projects and experiments not only related to nuclear waste management research. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Financial sustainability in municipal solid waste management – Costs and revenues in Bahir Dar, Ethiopia

Highlights: • Cost-revenue analysis over 2 years revealed insufficient cost-recovery. • Expenses for motorized secondary collection increased by 82% over two years. • Low fee collection rate and reliance on only one revenue stream are problematic. • Different options for cost reduction and enhanced revenue streams are recommended. • Good public–private alliance is crucial to plan and implement improvement measures. - Abstract: Providing good solid waste management (SWM) services while also ensuring financial sustainability of the system continues to be a major challenge in cities of developing countries. Bahir Dar in northwestern Ethiopia outsourced municipal waste services to a private waste company in 2008. While this institutional change has led to substantial improvement in the cleanliness of the city, its financial sustainability remains unclear. Is the private company able to generate sufficient revenues from their activities to offset the costs and generate some profit? This paper presents a cost-revenue analysis, based on data from July 2009 to June 2011. The analysis reveals that overall costs in Bahir Dar’s SWM system increased significantly during this period, mainly due to rising costs related to waste transportation. On the other hand, there is only one major revenue stream in place: the waste collection fee from households, commercial enterprises and institutions. As the efficiency of fee collection from households is only around 50%, the total amount of revenues are not sufficient to cover the running costs. This results in a substantial yearly deficit. The results of the research therefore show that a more detailed cost structure and cost-revenue analysis of this waste management service is important with appropriate measures, either by the privates sector itself or with the support of the local authorities, in order to enhance cost efficiency and balance the cost-revenues towards cost recovery. Delays in mitigating the evident financial deficit could else endanger the public-private partnership (PPP) and lead to failure of this setup in the medium to long term, thus also endangering the now existing improved and currently reliable service. We present four options on how financial sustainability of the SWM system in Bahir Dar might be enhanced: (i) improved fee collection efficiency by linking the fees of solid waste collection to water supply; (ii) increasing the value chain by sales of organic waste recycling products; (iii) diversifying revenue streams and financing mechanisms (polluter-pays-, cross-subsidy- and business-principles); and (iv) cost reduction and improved cost-effectiveness. We argue that in a PPP setup such as in Bahir Dar, a strong alliance between the municipality and private enterprise is important so that appropriate solutions for improved financial sustainability of a SWM system can be sought and implemented.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using Department of Energy (DOE) Order 435.1 To Find a Cost Effective Waste Management Option. - 12241

The Depleted Uranium Hexafluoride Project in Portsmouth Ohio was faced with an interesting dilemma. During hot functional testing in August 2010, an upset condition caused gaseous depleted uranium hexafluoride (UF{sub 6}) to come in contact with the hydrofluoric acid (HF) vapor stream. Although the resulting uranium contamination found in the condensed aqueous hydrofluoric acid was very low, it exceeded the Department of Energy (DOE) authorized release limit. After evaluating several commercial options for treatment and disposal using the guidelines found in DOE Order 435.1, Waste Control Specialists LLC was selected for the treatment of the waste, with EnergySolutions' Clive facility selected for disposal of the treated residues. The waste was safely transported from Piketon, Ohio to Andrews, Texas, where it was treated to meet the land Disposal Restrictions (LDR), and was disposed in EnergySolutions operational mixed waste cell. The entire effort was interesting for several reasons. The waste was generated during the last year of the first Depleted Uranium Hexafluoride contractor. The waste became additional scope for the new contractor, adding time delays and introducing new personnel into the project. The effort was also unique because it demonstrated the process mandated by DOE Order 435.1 to evaluate all options, including commercial options, could reveal solutions to waste management problems that are currently available and more cost effective, but not well know within the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗